You are on page 1of 15

SUBJECT : CONCRETE POURING & TESTING RESULT MONITORING

Project : MAHOGANY TOWER

VOLUME (cu.m) POURING CONCRETE TEST RESULTS (COMPRESSIVE STRENGTH)


SUPPLIER DESIGN SPECS STRUCTURE DR # REMARKS
COMP. DELIVERED DATE 7D Doc No. Result 1 Result 2 Result 3 Result 4 Result 5 Result 6 % 14D Doc No. Result 1 Result 2 Result 3 Result 4 Result 5 Result 6 % 28D Doc No. Result 1 Result 2 Result 3 Result 4 Result 5 Result 6 %

OMNICO 4000 28D 3/4PCD 56.029 60 PILE CAP & FTB @ GL.9-10/A-D 0114683, 0114697, 0114716, 0114727, 0114733, 0114740, 12/4/2015 11-Dec MM-15-2668 3550 3180 84.13% 18-Dec 1215JCMTC-4684 4029 4384 105.16% 1-Jan 0116JCMTC-5639 5497 5193 133.63%
0114744, 0114745,

SUPERMIX 4000 28D 3/4PCD 43.89 44 PILE CAP & FTB @ GL. 8/A-D & 7/A 10301, 10302, 10305, 10306, 10309, 10310, 10311 12/9/2015 16-Dec 960332 3670 3520 89.88% 23-Dec HOLIDAYS HOLIDAYS HOLIDAYS HOLIDAYS 6-Jan 960587 5170 5060 127.88%

PEDESTAL @ GL. 9/A, 9/D, & 10/A-D, RC WALL @ GL. 9-10/A,


SUPERMIX 5000 28D 3/4 PCD 4.29 5 9-10/D & 10/A-D 10307 12/9/2015 16-Dec 960332 3820 3580 74.00% 23-Dec HOLIDAYS HOLIDAYS HOLIDAYS HOLIDAYS 6-Jan 960587 6110 6310 124.20%

SUPERMIX 4000 28D 3/4 PCD 22.915 24 PILE CAP & FTB @ GL. 7/C-D 10873, 10874, 10867, 10868 12/19/2015 26-Dec HOLIDAYS HOLIDAYS HOLIDAYS HOLIDAYS 2-Jan 960587 4150 4360 106.38% 16-Jan 968876 5060 5150 127.63%

PEDESTAL @ GL. 7/A, 8/A-D, RCW @


SUPERMIX 5000 28D 3/4 PCD 4.663 5 7-9/A & 8-9/D 10866 12/19/2015 26-Dec HOLIDAYS HOLIDAYS HOLIDAYS HOLIDAYS 2-Jan 960587 5490 4360 98.50% 16-Jan 968876 6140 6050 121.90%

SUPERMIX 4000 28D 3/4 PCD 32.061 33 PILE CAP & FTB GL. 6/A-D 11208, 11209, 11210, 11211, 11225 1/6/2016 13-Jan 0116JCMTC-5579 3641 3327 87.10% 20-Jan 968981 4220 4270 106.13% 3-Feb 977760 5070 5170 128.00%

EXCESS VOLUME POURED


OMNICO 4000 28D 3/4 PCD 44.653 47 PILE CAP & FTB GL. 4/A & 5/A-D 0117824, 0117826, 0117828, 0117845, 0117861, 0117871 1/13/2016 20-Jan MM-16-0079 4100 3690 97.38% 27-Jan MM-16-0141 4130 5010 114.25% 10-Feb MM-16-0226 5070 6020 138.63% ON CONCRETE PEDESTAL
OF SAFETY CANOPY

EXCESS VOLUME POURED


COL. @ GL. 9-10/A-D, PEDESTAL @ GL. 6/A & 7/C, RCW @ 6-
SUPERMIX 5000 28D 3/4 PCD 16.548 18 7/A & 6-8/D 11965, 11966, 11979 1/19/2016 26-Jan 969090 4210 4130 83.40% 2-Feb 977760 5040 5100 101.40% 16-Feb 978087 6270 6150 124.20% ON CONCRETE PEDESTAL
OF SAFETY CANOPY

SUPERMIX 5000 28D 3/4 PCD 9.46 13 COL. @ GL.7-8/A-D, PEDESTAL @ GL. 5/A-C, PASS ELEV PIT 12618, 12638 1/28/2016 4-Feb 977851 4130 4200 83.30% 11-Feb 977971 5070 5020 100.90% 25-Feb 980889 6370 6220 125.90%

SUPERMIX 4000 28D 3/4 PCD 49.7 47 PILE CAP/FTB @ GL.4/C-D, 1-3/A 12619, 12620, 12621, 12635, 12636 1/28/2016 4-Feb 977851 3320 3440 84.50% 11-Feb 977971 4060 4170 102.88% 25-Feb 980889 5310 5170 131.00%

OMNICO 5000 28D 3/4 PCD 79.386 80 2F SLAB/BEAM AREA 1 @ GL. 6-10/A-D, GF 122244, 122245, 122247, 122260, 122261, 122262, 122271, 2/5/2016 12-Feb MM-16-0226 4470 5130 5060 4970 98.15% 19-Feb 0216JCTMC-7314 5741 5597 5828 5550 113.58% 4-Mar 0316JCMTC-7507-a 6265 6114 6401 6004 123.92%
COL.@ GL. 6/A & 5/A 122272, 122273, 122281

GF COL @ GL. 2-4/A, 4/C-D, PED @ 1/A, 2F COL. @ GL. 7-


SUPPERMIX 5000 28D 3/4 PCD 37.062 45 10/A, 9/B, 7-9/C, 9-10/D, PASS. ELEV. WALL 13534, 13535, 13539, 13541, 13549, 13562 2/10/2016 17-Feb 978202 4040 4100 81.40% 24-Feb 980889 5330 5290 106.20% 9-Mar 0316JCMTC-8258-a 6528 6369 128.97%

SUPPERMIX 4000 28D 3/4 PCD 19.552 14 PILE CAP/FTB @ GL. 3/C-D, SERV. ELEV SLAB 13550, 13551 2/10/2016 17-Feb 978202 3500 3420 86.50% 24-Feb 980889 4280 4400 108.50% 9-Mar 0316JCMTC-8258-b 5224 5534 134.48%

3F SLAB/BEAM AREA 1 @ GL. 7-10/A-D, STAIR2, 13692, 13693, 13698, 13699, 13700, 13701, 13702, 13703,
SUPPERMIX 5000 28D 3/4 PCD 76.827 72 GF COL. @ GL. 5/C- 13705, 2/13/2016 20-Feb 978202 4130 4060 4200 4090 82.40% 27-Feb 980889 5060 5170 5100 5010 101.70% 12-Mar 0316JCMTC-8258-b 6178 6321 6560 6369 127.14%
D, SERV. ELEV WALL

OMNICO 5000 28D 3/4 PCD 3.625 5 GF COL @ GL. 1/A, 3/C, 3/D 124035 2/19/2016 26-Feb 0216JCTMC-7314 4405 4103 85.08% 4-Mar 0316JCMTC-7507-a 5470 5224 106.94% 18-Mar MM-16-0461 7060 7130 141.90%

OMNICO 4000 28D 3/4 PCD 27.635 26 PILE CAP/FTB @ GL. 2/B-D 0124041, 124045, 124047 2/19/2016 26-Feb 0216JCTMC-7314 3061 3308 79.61% 4-Mar 0316JCMTC-7507-b 5275 5335 132.63% 18-Mar MM-16-0461 5470 5660 139.13%

2F SLAB /BEAM AREA 2 @ GL. 3-6/A-D, 124396, 124397, 124398, 124408, 124415, 124416, 124418,
OMNICO 5000 28D 3/4 PCD 98.73 96 GF COL/PED @ GL. 2/B-D 124426, 124427, 124430, 124434, 124435, 2/21/2016 28-Feb 0316JCMTC-7507-a 4938 5303 4775 4883 99.50% 6-Mar MM-16-0381 5660 5610 5620 5710 113.00% 20-Mar 0316JCMTC-8690 6202 6464 6090 6313 125.35%

2-3F COL. @ GL. 3-6/A-D, 7/D, ELEV WALL,


SUPERMIX 5000 28D 3/4 PCD 41.693 42 3-4F COL. @ GL. 8-10/A-D, STAIR 1 14257, 14258, 14259, 14265, 14266, 14271, 2/24/2016 2-Mar 981006 4140 4010 81.50% 9-Mar 0316JCMTC-8258-a 5478 5232 107.10% 23-Mar 995454 6180 6200 123.80%

14508, 14509, 14510, 14513, 14517, 14518, 14519, 14520,


SUPERMIX 5000 28D 3/4 PCD 96.218 83 3F SLAB/BEAM @ GL. 3-7/A-D 14521, 14522, 14523 3/1/2016 8-Mar 981075 4050 4120 4170 4220 82.80% 15-Mar 0316JCMTC-8428-a 5383 5526 4922 4985 104.08% 29-Mar 995454 6040 6030 6030 6070 120.85%

OMNICO 4000 28D 3/4 PCD 17.451 21 PILE CAP/FTB @ GL. 1/B-D 125906, 125908, 125912, 125933 3/2/2016 9-Mar MM-16-0381 3780 3520 91.25% 16-Mar MM-16-0461 4320 4480 110.00% 30-Mar MM-16-0557 5140 5090 127.88%

GRND FLR COL @ GL. 1/B-D, 3-4F COL. @ 4-7/A-D, ELEV WALL
OMNICO 5000 28D 3/4 PCD 29.596 30 1&2 126275, 126287, 126293, 126294, 126307 3/4/2016 11-Mar MM-16-0382 4330 4270 86.00% 18-Mar MM-16-0461 5290 5350 106.40% 1-Apr MM-16-0557 6200 6360 126%

14752, 14752, 14758, 14759, 14763, 14764, 14765, 14766,


SUPERMIX 5000 28D 3/4 PCD 128.178 128 4F BEAM/SLAB AREA 1 @ G.L. 4-10/A-D 14767, 14769, 14770, 14771, 14772, 14773, 14774, 3/6/2016 13-Mar 0316JCMTC-8258-a 4349 4150 4087 4262 4286 4135 84.23% 20-Mar 995374 5010 5040 5000 5060 5180 5120 101.37% 3-Apr 995593 6300 6140 6240 6280 6230 6210 125%

SUPERMIX 4000 28D 3/4 PCD 10.185 11 CISTERN/FIRE TANK BOTTOM SLAB @ GL. 1-2/C-D 14867, 14868 3/8/2016 15-Mar 0316JCMTC-8428-a 3427 3331 84.48% 22-Mar 995374 4050 4120 102.13% 5-Apr 995671 5120 5170 129%

SUPERMIX 5000 28D 3/4 PCD 21.002 26 4-5F COL. @ GL.7-10/A-D, 5/A-C, 4/D, STAIR 1 14895, 14896, 14898, 14907, 3/10/2016 17-Mar 0316JCMTC-8428-a 4135 4079 82.14% 24-Mar 995454 5340 5280 106.20% 7-Apr 0416JCMTC-9450 5687 6068 118%

SUPERMIX 4000 28D 3/4 PCD 4.2 5 S.O.G. @ GL. 4-5/C-D (TOWER CRANE BED) 14902 3/10/2016 17-Mar 0316JCMTC-8428-a 3085 3228 78.91% 24-Mar 995454 4320 4250 107.13% 7-Apr 0416JCMTC-9451 4920 5248 127%

SUPERMIX 4000 28D 3/4 PCD 11 11 CISTERN/FIRE TANK WALL @ GL. 1-2/C-D 14927, 14928 3/10/2016 17-Mar 0316JCMTC-8428-a 3013 3355 79.60% 24-Mar 995454 4410 4470 111.00% 7-Apr 0416JCMTC-9452 4961 5171 127%

OMNICO 4000 28D 3/4 PCD 8.949 10 CISTERN/FIRE TANK TOP SLAB @ GL. 1-2/C-D 12735, 12736 3/11/2016 18-Mar MM-16-0461 3540 3270 85.13% 25-Mar MM-16-0557 4800 4800 120.00% 8-Apr 0416JCMTC-9431 5184 5303 131%

2F BEAM/SLAB @ GL. 1-2/A-D,


4-5F COL. @ GL. 4/A-C, 5/D, 6/C-D, 127730, 127731, 127737, 127744, 127745, 0127746, 127752,
OMNICO 5000 28D 3/4 PCD 130 120 ELEV. WALL P.E. & S.E., 127761, 127762, 127763, 127770, 127771, 127785, 127786, 3/16/2016 23-Mar HOLIDAYS 4341 4071 4023 4238 4150 3960 82.61% 30-Mar MM-16-0557 4700 4540 4480 4680 4580 4550 91.77% 13-Apr 0416JCMTC-9557 6238 6467 6393 5865 5962 6362 124%
5F BEAM/SLAB @ GL. 7- 127791
10/A-D

GIANT 5000 28D 3/4 PCD 58 58 2-3F COL. @ G.L. 1-2/A-D, 501203, 501204, 501205, 501206, 501207, 501208, 3/18/2016 25-Mar HOLIDAYS 1-Apr 995570 5130 5130 102.60% 15-Apr 1009963 6180 6350 6210 125%
3F BEAM/SLAB @ G.L. 1-3/A-D

3-4F COL @ GL 1-3/A-D,


SUPERMIX 5000 28D 3/4 PCD 72 70 4F BEAM/SLAB @GL 1-3/A-D 15574, 15575,15577, 15578, 15581, 15594, 15580 3/22/2016 29-Mar 995593 4920 4710 4780 4760 95.85% 5-Apr 995671 5090 5150 5180 5060 102% 19-Apr 1010050 6050 6080 6180 6120 122.15%

5F BEAM/SLAB @ GL. 1-6/A-D, 4-5F


COL. @ GL. 1-3/A-D, 4-5F STAIR2 15858, 15859, 15868, 15869, 15870, 15871, 15872, 15873,
SUPERMIX 5000 28D 3/4 PCD 141 140 @ GL.1/B-C, 5-6F COL. @ GL.7- 15878, 15879, 15880, 15881, 15884, 15885, 15888, 15889, 3/31/2016 7-Apr 0416JCMTC-9450 4121 3835 4017 3977 4153 80.41% 14-Apr 1009905 5270 5370 5400 5170 5350 5290 106.17% 28-Apr 101018 6030 6050 6080 6070 6180 6090 122%
9/A-D, 10/A&D PRE-CAST @ GL. 8-10/A 15890

6F BEAM/SLAB @ GL. 6-10/A-D 2F 129926, 129930, 129931, 129945, 129946, 129955, 129962,
OMNICO 5000 28D 3/4 PCD 75 77 PRECAST @ GL. 6-8/A 129967, 129972, 129980, 4/5/2016 12-Apr 0416JCMTC-9557 3956 4146 4065 4294 82.31% 19-Apr 0416JCMTC-10090 5671 5105 5294 5345 107% 3-May 0516JCMTC-10560 5758 6237 5813 5884 120%

SUPPERMIX 5000 28D 3/4 PCD 26 20 5F-6F COL. @ GL. 1/A&D, 2-4/A-D, 5/A-C,6/A 16188, 16189, 16190 4/7/2016 14-Apr 1009905 4300 4210 85.10% 21-Apr 1010050 5010 5150 101.60% 5-May 1026834 6070 6260 123%

501631, 501632, 501634, 501635, 501636, 501637, 501638,


GIANT 5000 28D 3/4 PCD 126 116 6F BEAM/SLAB @ GL. 1-6/A-D 501639, 501639, 501640, 501641, 501642, 4/9/2016 16-Apr 1009963 4200 4050 4190 82.93% 23-Apr 1010089 5050 5010 5140 101% 7-May 1027017 6180 6140 6010 6040 121.85%

7F SLAB AND BEAM @ GL. A-D/1-3


STAIR-1 (6-7th. Flr)
SUPERMIX 5000 28D 3/4 PCD 80 70 PRE-CAST
16483, 16484, 16485, 16486, 16494,16495,16496,16503 4/14/2016 21-Apr 1010050 4050 4090 4050 4100 81.45% 28-Apr 101018 5020 5000 5030 5060 101% 12-May 1026982 6270 6410 6490 6330 127.50% EXCESS VOLUME POURED
ON PRECAST WALL

COLUMN 6-7TH. FLOOR @ GL.A-D/4-10


OMNICO 5000 28D 3/4 PCD 45 40 ELEVATOR(6-7TH. FLOOR) GL. C-D/5-6 0131856, 0131860,0131864,0131868,0131869 4/16/2016 23-Apr 0416JCMTC-10090 4402 4402 88.04% 30-Apr 0516JCMTC-10560 5427 5043 105% 14-May 0156JCMTC-11262 6513 6173 126.86%

7F SLAB AND BEAM @ GL. A-D/3-10 16790,16789,16792,16791, 16800, 16793,


SUPERMIX 5000 28D 3/4 PCD 139 123 STAIR-2 (6-7th. Flr) 16808,16801,16809,16814,16821,16815,16823,16822,16833 4/20/2016 27-Apr 101018 4130 4050 4060 4090 4050 4110 81.63% 4-May 1026834 5130 5250 5070 5160 5010 5040 102.20% 18-May 1027067 6170 6320 6230 6380 6480 6350 126%

0132657,0132658,
5000 58 65 8F SLAB AND BEAM@ GL A-D/1-4 STAIR-1 (7-8FL) 0132659,0132662,0132667,0132665,0132669, 4/24/2016 1-May 0516JCMTC-10560 4540 4082 4150 4046 84.09% 8-May 0516JCMTC-11262 5837 5602 5663 5544 113% 22-May 0516JCMTC-11642 6564 6085 6397 6370 127.08%
OMNICO 28D 3/4 PCD 0132670,0132673

3000 6 5 PRE-CAST WALL @ 2ND AND 3RD. FLR. 132676 4/24/2016 1-May 0516JCMTC-10560 2560 2465 83.75% 8-May 0516JCMTC-11262 3430 3634 118% 22-May 0516JCMTC-11642 4151 4307 140.97%

5000 62 64 8F SLAB AND BEAM@ GL A-D/7-10 STAIR-2(7-8FL) 17214, 17215, 17216,17217,17230,17231,17241 4/29/2016 6-May 1026982 5230 5370 5270 5450 105.80% 13-May 1026982 5230 5370 5270 5450 107% 27-May 1027244 6000 6070 6030 6100 121.00%
SUPERMIX 28D 3/4 PCD

3000 11 10 PRE-CAST WALL @ 2ND ,3RD. FLR. AND 4TH. FLR. 17244, 17245 4/29/2016 6-May 1026982 1026982 3430 3290 112.00% 13-May 1026982 3430 3290 112% 27-May 1027244 4190 4290 141.33%

5000 57 58 9F SLAB AND BEAM@ GL A-D/1-4 STAIR-1(8-9FL) 502341 , 502342 ,502343,502344,502345,502346 5/4/2016 11-May 1026951 4130 4350 84.80% 18-May 1027083 5220 5310 105% 1-Jun 1041802 6370 6150 6030 6260 124.05%
GIANT 28D 3/4 PCD

3000 16 12 PRE-CAST WALL @ 4TH. FLR. 502347, 502348 5/4/2016 11-May 1026951 2660 2570 87.17% 18-May 1027083 3260 3190 108% 1-Jun 1041802 4130 3940 4220 4030 136.00%

SUPERMIX 5000 28D 3/4 PCD 65 60 9F SLAB AND BEAM@ GL A-D/8-10 STAIR-2 (8-9FL) 17652,17653,17654,17655, 17656,17662,17663,17666, 5/7/2016 14-May 1026982 4360 4190 4280 4400 86.15% 21-May 1027164 5130 5440 5210 5170 105% 4-Jun 1041843 6210 6100 6050 6320 123.40%

8F SLAB AND BEAM@ GL A-D/4-7 , ELEVATOR/COLUMN (7- 17968,17975,17985,17986, 17987,17988,17996,17997,


5000 87 92 8FLR) 17998,18008,18009,18013,18018 5/14/2016 21-May 1027164 4520 4290 4590 4380 88.90% 28-May 1027244 5050 4910 5020 5150 101% 11-Jun 0616JCMTC-12430 6213 6528 6395 6094 126.15%
SUPERMIX 28D 3/4 PCD

3000 16 14 PRE-CAST WALL @ 4TH. FLR. (16 pcs.) 17958 , 17962 5/14/2016 21-May 1027164 2800 2680 91.33% 28-May 1027244 3310 3150 108% 11-Jun 0616JCMTC-12430 3907 4422 138.82%

9F SLAB AND BEAM (A-D/4-7) , ELEVETOR-R.C WALL,COLUMN 18286 , 18285, 18283, 18282, 18277,
SUPERMIX 5000 28D 3/4 PCD 102 106 (8-9TH. FLOOR) 18276,18273,18268,18262,18296,18263,18272,18292 5/19/2016 26-May 1027244 4170 4260 4410 4460 4360 4440 87.00% 2-Jun 1041843 5180 5010 5070 5130 5010 5120 101.73% 16-Jun 1042121 6310 6480 6250 6540 6290 6490 128%

0136498, 0136499,0136500,0136508,0136509,
OMNICO 5000 28D 3/4 PCD 80 83 10F SLAB AND BEAM (A-D/7-10), COLUMN (9TH-10TH. FLOOR) 0136517,0136518,0136519,0136520, 0136536 5/26/2016 2-Jun 0616JCMTC-12116 4072 4320 4059 4172 83.12% 9-Jun 0516JCMTC-11262 5423 5600 4866 5268 106% 23-Jun 0616JCMTC-13014 6085 6538 6396 6461 127.40%

GIANT 4000 28D 3/4 PCD 10 12 CISTERN BOTTOM SLAB 502779, 502780 5/25/2016 1-Jun 1041802 4130 3940 4220 4110 102.50% 8-Jun 1041945 5050 5440 131% 22-Jun 1042303 6180 6320 156.25%

OMNICO 4000 28D 3/4 PCD 28 30 CISTERN TOP SLAB AND CISTERN WALL 0136729 , 0136728 ,0136753 ,0136737 5/27/2016 3-Jun 0616JCMTC-12116 3358 3168 81.58% 10-Jun 0516JCMTC-11262 4500 4010 106% 24-Jun 0616JCMTC-13014 5038 5144 127.28%

0137625 , 0137627 ,0137628 ,0137634 ,0137640 ,0137644 ,


10F SLAB AND BEAM (A-D/1-7), COLUMN
OMNICO 5000 28D 3/4 PCD 130.952 136 (9TH-10TH. FLOOR),ELEVATOR-R.C WALL
0137646 ,0137650, 0137653, 0137656 ,0137667, 0137673, 6/3/2016 10-Jun 0516JCMTC-11262 4238 4007 3944 4150 3892 4392 82.08% 17-Jun 0616JCMTC-12750 5395 5121 5280 5064 5000 5177 103.46% 1-Jul 0616JCMTC-13305 6234 6459 6395 6162 6121 6292 126%
0137679,0137688, 0137689,0137698,0137720

SUPERMIX 5000 28D 3/4 PCD 80.325 85 11F SLAB AND BEAM (A-D/7-10), COLUMN 19762, 19763 , 19764, 19765 ,19770,19771, 19772, 19773, 6/8/2016 15-Jun 1042121 4400 4200 4350 4250 86.00% 22-Jun 1044966 5290 5200 5230 5270 105% 6-Jul 1042547 6330 6550 6400 6650 129.65%
(10-11TH FLR.) 19774, 19775,19779

OMNICO 3000 28D 3/4 PCD 30 28 PRE-CAST PANEL (6TH.-7TH. FLOOR) 0138340 , 0138347 ,0138354 ,0138371 6/9/2016 16-Jun 0616JCMTC-12750 3215 3038 104.22% 23-Jun 0616JCMTC-13014 3351 3271 110% 7-Jul 0716JCMTC-1371-a 4325 4121 140.77%

SUPERMIX 5000 28D 3/4 PCD 136 132 11F SLAB AND BEAM (A-D/1-7), COLUMN 20109 , 20110, 20111 , 20112, 20113, 20114, 20115, 20116, 6/15/2016 22-Jun 1044966 4120 4050 4180 4030 4170 4130 82.27% 29-Jun 1042418 5080 5170 5250 5150 5370 5100 103.73% 13-Jul 1042591 6400 6310 6450 6180 6430 6250 127% EXCESS VOLUME POURED
(10-11TH FLR.),ELEVATOR-R.C WALL 20117, 20118, 20123, 20124,20125,20129,20140 ON PRECAST WALL

12F SLAB AND BEAM (A-D/7-10), COLUMN 0140290 ,0140277,0140276,0140274,0140271,


OMNICO 4000 28D 3/4 PCD 90.1 89 (11-12TH FLR.), and Wall Footing 0140267,0140261,0140252,0140241, 0140236,0140233 6/22/2016 29-Jun 0616JCMTC-13350 3589 3405 3490 3515 87.49% 6-Jul 0716JCMTC-13671-a 4756 4580 4877 4682 118% 20-Jul 0716JCMTC-13875-b 5212 5085 5468 5103 130.43%

12F SLAB AND BEAM (A-D/1-7), COLUMN 0141607,0141608,0141618,0141627,0141634,0141638,01416


OMNICO 4000 28D 3/4 PCD 131.357 133 (11-12TH FLR.),ELEVATOR-R.C WALL 40,041641,0141642,0141648,0141653,0141654, 7/1/2016 8-Jul 0716JCMTC-13671-a 3907 3795 3717 3820 3755 3656 94.38% 15-Jul 0716JCMTC-13875-a 4505 4337 4533 4364 4529 4615 112.01% 29-Jul 0716JCMTC-14215-b 4882 5348 5409 4863 5149 4951 128%
0141657,0141663,0141661,0141668

OMNICO 3000 28D 3/4 PCD 8 6 Pre-cast wall (Remaining wall at 6th annd 7th. Floor 141678 7/1/2016 8-Jul 0716JCMTC-13671-a 2844 2951 96.58% 15-Jul 0716JCMTC-13875-a 3622 3684 122% 29-Jul 0716JCMTC-14215-a 3936 4195 135.52%

PRIMEPRO 5000 28D 3/4 PCD 17 22 Top slab of cistern Rm (Gen. Set) At Ground Floor 22650, 22651,22652,22656 7/6/2016 13-Jul 1042617 4200 4290 84.90% 20-Jul 1060283 5450 5130 106% 3-Aug 1060535 6290 6170 6440 126.00%

PRIMEPRO 3000 28D 3/4 PCD 44 36 SLAB ON GRADE 22653, 22654,22657,22658,22662,22663 7/6/2016 13-Jul 1042617 2450 2540 83.17% 20-Jul 1060283 3490 3340 114% 3-Aug 1060535 3910 4290 4020 135.78%

OMNICO 3000 28D 3/4 PCD 32 25 PRE- CAST WALL (8th.9th. Floor) 0142583, 0142608, 0142634 , 0142695 , 0142676 7/12/2016 19-Jul 0716JCMTC-13875-a 2564 2718 88.03% 26-Jul 0716JCMTC-14215-a 3065 3312 106% 9-Aug 0816JCMTC-14651 4468 4082 142.50%

13F SLAB AND BEAM (A-D/7-10), COLUMN 0142860 , 0142866 , 0142873 , 0142880 ,0142889 ,0142896 ,
OMNICO 4000 28D 3/4 PCD 62 61 (12-13TH FLR.), and stair-2 0142897 , 0142907 , 0142914 7/13/2016 20-Jul 0716JCMTC-13875-b 3184 3098 3025 3001 78.53% 27-Jul 0716JCMTC-14215-a 4468 4065 4010 4243 107% 10-Aug 0816JCMTC-14651 4899 5367 4839 5080 126.16%

OMNICO 3000 28D 3/4 PCD 9 9 Remaining PRE- CAST WALL (6th,7th. And 8th Floor) 0143736 , 0143751 7/19/2016 26-Jul 0716JCMTC-14215-a 3184 2792 99.60% 2-Aug 0716JCMTC-14215-a 3160 3040 103% 16-Aug 0616JCMTC-13014 4548 4343 148.18%

OMNICO 4000 28D 3/4 PCD 6 6 R.C WALL @ GROUND FLOOR 144210 7/22/2016 29-Jul 0716JCMTC-14215-b 2918 3120 75.48% 5-Aug 0716JCMTC-14215-a 3500 3690 90% 19-Aug 0616JCMTC-13014 5288 5427 133.94%

OMNICO 3000 28D 3/4 PCD 17 17 FOUNDATION OF ALIMAK,REMAINING P.WALL @ 9TH. FLR. 0144183 , 0144193 , 0144194 7/22/2016 29-Jul 0716JCMTC-14215-b 2497 2565 84.37% 5-Aug 0716JCMTC-14215-a 2790 2590 90% 19-Aug 0616JCMTC-13014 4065 4468 142.22%

OMNICO 3000 28D 3/4 PCD 17 10 PRE- CAST WALL ( 10th. Floor) 0144657 , 0144669 7/26/2016 2-Aug 0716JCMTC-14215-b 2500 2660 86.00% 9-Aug 0816JCMTC-14651 3162 3309 108% 23-Aug 0616JCMTC-13014 4193 4330 142.05%

SUPERMIX 4000 28D 3/4 PCD 28 28 COLUMN (12-13TH. FLOOR LEVEL),GL-A-D/1-7 22801 , 22807 , 22809 , 22808 7/30/2016 6-Aug 1060605 3190 3140 3250 3090 3200 3015 78.69% 13-Aug 1060705 4120 4130 4130 4150 4160 4120 103% 27-Aug 1091089 5060 5090 5180 5110 5140 5130 127.96%

13F SLAB AND BEAM (A-D/1-7), (12-13TH FLR.), and stair-1 22811 , 22810 , 22813 , 22812 , 22817 , 22816 , 22821 ,
SUPERMIX 4000 28D 3/4 PCD 120 124 AND ELEVATOR WALL 22820 , 22824 , 22825 , 22827 , 22826 , 22829 , 22828 , 22830 7/30/2016 6-Aug 1060605 3190 3140 3250 3090 3200 3015 78.69% 13-Aug 1060705 4140 4130 4130 4150 4160 4120 103% 27-Aug 1091089 5060 5090 5180 5110 5140 5130 127.96%

14TH SLAB AND BEAM (6-10) , COLUMN (13TH - 14TH/ STAIR 22909, 22910, 22911, 22913, 22914, 22915, 22916, 22917,
SUPERMIX 4000 28D 3/4 PCD 80 80 -2. 22919, 22920 8/2/2016 9-Aug 1060658 3220 3170 3170 3300 80.38% 16-Aug 1090902 4420 4170 4090 4050 105% 30-Aug 1091174 4960 5040 5170 5070 126.50%

OMNICO 3000 28D 3/4 PCD 6 6 PRE-CAST WALL (9TH - 10TH FLOOR) 145951 8/3/2016 10-Aug 0816JCMTC-14651 2576 2533 85.15% 17-Aug 0816JCMTC-15031 3328 3473 113% 31-Aug 0816JCMTC-15352 4039 4316 139.25%

14TH SLAB AND BEAM (A-D /1-7), COLUMN 13TH -14TH / 23182, 23183, 23184, 23188, 23185, 23194, 23189, 23195,
SUPERMIX 4000 28D 3/4 PCD 135 135 STAIR -1 23196, 23197, 23198, 23199, 23202, 23203, 23204, 23211, 8/11/2016 18-Aug 1090902 3370 3330 3260 3190 4170 4260 89.92% 25-Aug 1091089 4530 4480 4570 4510 4600 4310 113% 8-Sep 1071093 5110 5130 5080 5100 5140 127.63%
23212

15TH SLAB AND BEAM (A-D/6-10), COLUMN (14TH - 15TH 503941, 503942, 503943, 503944, 503945, 503946, 503947,
GIANT 4000 28D 3/4 PCD 83 83 FLOOR), STAIR -2 503948, 503949 8/19/2016 26-Aug 1070958 3590 3740 3670 91.67% 2-Sep 1071039 4340 4150 4280 4130 106% 16-Sep 1071196 5020 5060 5250 5280 128.81%

OMNICO 3000 28D 3/4 PCD 82 82 SOG (A-D/6-10) 0148483, 0148484, 0148486, 0148501, 0148506, 0148514, 8/24/2016 31-Aug 0816JCMTC-15352 2843 2882 2578 2710 91.78% 7-Sep 1072024 3120 3360 3150 3010 108% 21-Sep 1119281 3870 4210 3760 4040 132.33%
0148515, 0148520, 0148521, 0148535, 0148537

0149041, 0149045, 0149051, 0149053, 0149054, 0149067,


15TH SLAB AND BEAM (A-D /1-6), COLUMN 14TH -15TH /
OMNICO 4000 28D 3/4 PCD 126 120 STAIR -1
0149070, 0149068, 0149073, 0149078, 0149092, 0149096, 8/27/2016 3-Sep 0816JCMTC-15352 2942 3371 3121 3026 3276 3234 79.04% 10-Sep 1072024 3880 4160 3900 4050 4270 4110 102% 24-Sep 1119281 4700 5050 4910 5000 4710 5110 122.83%
0149103, 0149107, 0149118

SUPERMIX 3000 28D 3/4 PCD 11 11 PRE-CAST WALL AT GROUND FLOOR 24077, 24081 9/1/2016 8-Sep 1071093 2430 2450 81.33% 15-Sep 1071232 3270 3390 111% 29-Sep 1102478 4210 4180 139.83%

16TH SLAB AND BEAM (A-D /7-10), COLUMN 15TH -16TH / 24147, 24148, 24232, 24149, 24209, 24213, 24221, 24216,
SUPERMIX 4000 28D 3/4 PCD 64 71 STAIR -2 AND TVR 24223, 9/3/2016 10-Sep 1071093 3100 3100 3060 3080 77.13% 17-Sep 1071232 4300 4490 4340 4280 109% 1-Oct 1102478 5210 5170 5220 5200 130.00%

16TH SLAB AND BEAM (A-D /1-7), COLUMN 15TH -16TH / 0150779, 0150778, 0150772, 0150763, 0150758, 0150754,
OMNICO 4000 28D 3/4 PCD 131 137 STAIR -1 /PRE-CAST WALL 0150752, 0150749, 0150745, 0150743, 0150740, 0150729, 9/9/2016 16-Sep 0916JCMTC-15901 3579 3619 3686 3572 3510 3495 89.42% 23-Sep 1119281 3840 4230 4020 4150 4010 4180 102% 7-Oct 1016JCMTC-16707-a 5212 5103 5531 5336 5408 5027 131.74%
0150725, 0150704, 0150701, 0150700, 0150688, 0150757

OMNICO 3000 28D 3/4 PCD 6 6 PRE-CAST WALL (GF,9TH AND 10TH. FLOOR REMAINING) 150757 9/9/2016 16-Sep 0916JCMTC-15901 2509 2712 87.02% 23-Sep 1119281 3010 3350 106% 7-Oct 1016JCMTC-16707-b 4417 4148 142.75%

17TH SLAB AND BEAM (A-D /7-10), COLUMN 16TH -17TH / 151639, 151645, 151646, 151647, 151655, 151656, 151660,
OMNICO 4000 28D 3/4 PCD 72 76 STAIR -2 151661, 151669, 151676 9/15/2016 22-Sep 1119281 3850 3540 3140 3360 86.81% 29-Sep 1016JCMTC-16443 4464 4422 4149 4298 108% 13-Oct 1016JCMTC-16927 5408 4946 5114 5310 129.86%

17TH SLAB AND BEAM (A-D /1-7), COLUMN 16TH -17TH / 24878, 24879, 24880, 24882, 24881, 24882,24892, 24893,
SUPERMIX 4000 28D 3/4 PCD 128 128 STAIR -1 /ELEVATOR WALL 24901, 24902, 24908, 24909, 24916, 24917, 24918, 24931 9/21/2016 28-Sep 1102389 3220 3240 3180 3200 3230 3260 80.54% 5-Oct 1102478 3630 3710 3650 3670 3750 3680 92% 19-Oct 1133833 5050 5010 5080 5100 5130 5160 127.21%

SUPERMIX 4000 28D 3/4 PCD 72 74 18TH SLAB AND BEAM (A-D /7-10), COLUMN 17TH -18TH / 25103, 25104, 25105, 25106, 25107, 25108, 25109, 25110, 9/24/2016 1-Oct 1102478 3380 3440 3520 3500 86.50% 8-Oct 1102604 4240 4090 4310 4150 105% 22-Oct 1133833 4980 4960 5000 4990 124.56%
STAIR -2 25111, 25119

GIANT 3000 28D 3/4 PCD 13 13 PRE-CAST WALL at 11th. Floor 504375, 504376 9/26/2016 3-Oct 1102503 2350 2380 78.83% 10-Oct 1102503 3200 3140 3260 106.7% 24-Oct 1133892 4100 4060 136.00%

18TH SLAB AND BEAM (A-D /1-7), COLUMN 17TH -18TH / 0153670, 0153673, 0153694, 0153698, 0153707, 0153713,
OMNICO 4000 28D 3/4 PCD 128 134 STAIR -1 /ELEVATOR WALL 0153741, 0153733, 0153720, 0153732, 0153736, 0153743, 9/29/2016 6-Oct 1016JCMTC-16707-a 3708 3510 3613 3575 3772 3660 90.99% 13-Oct 1016JCMTC-16927 5408 4946 5114 5310 129.9% 27-Oct 1016JCMTC-17530 5186 5101 5474 5566 5531 5392 134.38%
0153748, 0153749,0153750, 0153752

GIANT 3000 28D 3/4 PCD 13 13 PRE-CAST WALL at 12th. Floor 504351, 504352 10/1/2016 8-Oct 1102627 2340 2510 2450 81.11% 15-Oct 1102684 2950 3290 2910 101.7% 29-Oct 1134069 4130 4140 137.83%

GIANT 3000 28D 3/4 PCD 13 13 PRE-CAST WALL (remaining 9,10,11 and 12 th. Floor) 504461, 504463 10/5/2016 12-Oct 1102684 2710 2620 2590 2660 88.17% 19-Oct 1133817 3070 3080 102.5% 2-Nov 1134069 4100 4060 136.00%

25918, 25908, 25917, 25919, 25920, 25923, 25924, 25925,


SUPERMIX 4000 28D 3/4 PCD 110 118 WATER TANK LEVEL GL(A-D/1-10) 25926, 25929,25933, 25941, 25941, 25942, 25943, 25957, 10/12/2016 19-Oct 1133833 3270 3320 3340 3380 3350 3360 83.42% 26-Oct 1133969 4300 4340 4290 4320 4280 4330 107.8% 9-Nov 1134132 5050 5160 5180 5110 5210 5240 129.0%
25964

GIANT 3000 28D 3/4 PCD 12 12 PRE-CAST WALL at 13th. Floor 504512, 504514 10/13/2016 20-Oct 1133817 2440 2500 82.33% 27-Oct 1133892 2870 2930 96.7% 10-Nov 1134223 4070 4120 136.5%

GIANT 5000 28D 3/4 PCD 4 4 REMAINING SLAB (6TH AND 7TH FLOOR) , FOOTING 504612 10/14/2016 21-Oct 1133817 4420 4510 89.30% 28-Oct 1133892 4810 4850 96.6% 11-Nov 1134223 6120 6170 122.9%

GIANT 3000 28D 3/4 PCD 20 20 PRE-CAST WALL at 14th. Floor, S.O.G (C-D/2-3) 504677, 504679, 504680 10/18/2016 25-Oct 1133892 2660 2620 2580 87.33% 1-Nov 1134069 3540 3490 117.2% 15-Nov 1151319 4830 4750 159.7%

OMNICO 4000 28D 3/4 PCD 12 11 COLUMN @ WATER TANK LEVEL AND R.C WALL @ ELEC.RM 0157527, 0157608,0157545, 015737 10/24/2016 31-Oct 1116JCMTC-17579 3357 3219 82.20% 7-Nov 1116JCMTC-17776 4340 4142 106.0% 21-Nov 1116JCMTC-18703 5315 5598 136.4%

PRE-CAST WALL 15F (A/4-10) AND 2ND. FLOOR AND 3RD.


GIANT 3000 28D 3/4 PCD 13 13 FLOOR 504821, 504822 , 504823 10/26/2016 2-Nov 1134069 2510 2710 87.00% 9-Nov 1134223 4570 4440 150.2% 23-Nov 1151450 4200 4280 141.3%

GIANT 3000 28D 3/4 PCD 12 12 ROOF BEAM (A-D/8-10) AND WALL FOOTING 504842, 504844 10/28/2016 4-Nov 1134069 3130 3290 107.00% 11-Nov 1134223 5050 5010 167.7% 25-Nov 1151450 4940 5390 172.2%

PRE-CAST WALL 15TH. FLOOR AND REMAINING WALL, S.O.G


GIANT 3000 28D 3/4 PCD 22 24 (A-B/1-2) 506896, 506897, 506898, 506899 11/7/2016 14-Nov 1151319 2430 2620 84.17% 21-Nov 1151450 3260 3410 111.2% 5-Dec 1151715 4920 4380 155.0%

PRIMEPRO 4000 28D 3/4 PCD 7 7 R.C WALL OF TVR, PRE-CAST WALL STAIR-1 (4-5TH. FLOOR) 27339 11/9/2016 16-Nov 1151366 3640 3690 91.63% 23-Nov 1151429 4270 4100 104.6% 7-Dec 1151651 5080 5020 126.3%

PRIMEPRO 4000 28D 3/4 PCD 35 35 ROOF BEAM (A-D/1-4) , PRE-CAST WALL (17TH. FLOOR) 28108, 28109, 28110, 28111, 28112, 28107 11/25/2016 2-Dec 1151651 3620 3580 90.00% 9-Dec 1151742 4140 4100 103.0% 23-Dec 1172216 5370 5290 133.3%

PRIMEPRO 4000 28D 3/4 PCD 5 5 REMAINING WALL ON TVR 28234 11/29/2016 6-Dec 1151651 3140 3210 79.38% 13-Dec 1171771 4070 4050 101.5% 27-Dec 1172216 5110 5070 127.3%

PRIMEPRO 3000 28D 3/4 PCD 5 5 PRE-CAST WALL (6TH,10TH,11TH,12TH AND 14TH) 28233 11/29/2016 6-Dec 1151651 2670 2540 86.83% 13-Dec 1171771 3140 3110 104.2% 27-Dec 1172216 4100 4040 135.7%

PRIMEPRO 4000 28D 3/4 PCD 6 6 TVR,GL (A-B/2) 28403 12/2/2016 9-Dec 1171855 3110 3090 77.50% 16-Dec 1171857 4060 4070 101.6% 30-Dec 1172063 5460 5180 133.0%

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRE-CAST WALL 28387 12/2/2016 9-Dec 1171927 2570 2450 83.67% 16-Dec 1171856 3030 3050 101.3% 30-Dec 1172063 4080 4200 138.0%

PRIMEPRO 4000 28D 3/4 PCD 6 6 TVR,GL (A/2-3) 28543 12/6/2016 13-Dec 1171858 3520 3560 88.50% 20-Dec 1171930 4360 4420 109.8% 3-Jan 1172063 5120 5410 131.6%

PRIMEPRO 3000 28D 3/4 PCD 30 30 PRE-CAST WALL (6F-18TH. FLOOR) 28976, 28977, 28928, 28983, 28980 12/14/2016 21-Dec 1171930 3580 3670 120.83% 28-Dec 1172217 3390 3500 114.8% 11-Jan 1178775 4130 4170 138.3%

PRIMEPRO 4000 28D 3/4 PCD 30 30 CONCRETE GUTTER GL (A-D/5-10) , ELEVATOR TOP SLAB 29032, 29034, 29030, 29031, 29035 12/17/2016 24-Dec 1178777 4100 4180 103.50% 31-Dec 1178776 4690 4600 116.1% 14-Jan 1178775 5020 5060 126.0%

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRE-CAST WALL 15F GL (C-D/1, C-D/10) & 16F GL (A-B/10, B- 29631 1/16/2017 23-Jan 1178966 2510 2470 83.00% 30-Jan 1179081 3020 3050 101.2% 13-Feb 1206405 4200 4200 140.0%
C/10)

PRIMEPRO 4000 28D 3/4 PCD 6 6 R.C WALL OF PUMP ROOM AND GENSET RC WALL 29720 1/18/2017 25-Jan 1178966 3020 3040 75.75% 1-Feb 1179161 4450 4370 110.3% 15-Feb 1206405 5100 5600 133.8%

PRE-CAST WALL 18F GL(A/9-10), 17F GL(B-C/10, B-C/1) & 16F


PRIMEPRO 3000 28D 3/4 PCD 6 6 GL(B-C/1, A-B/3) 29836 1/20/2017 27-Jan 1179081 2540 2580 85.33% 3-Feb 1179161 3090 3150 104.0% 17-Feb 1206570 4200 4240 1.41

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRE-CAST WALL 18F GL(C-D/10, A/2-3, A/3/4, A/9-10) 29945 1/25/2017 1-Feb 1179161 2510 2620 85.50% 8-Feb 1206268 3110 3130 104.0% 22-Feb 1206570 4140 4270 1.40

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRE-CAST WALL AND PERIMETER FENCE FOOTING 29945 1/31/2017 7-Feb 1206268 2090 2160 70.83% 14-Feb 1206405 3080 3080 102.7% 28-Feb 1221262 4500 4420 1.49

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRE-CAST WALL (17F GL B-C/1, GF-2F GL B-C/10,) AND 30326 2/6/2017 13-Feb 1206405 2570 2540 85.17% 20-Feb 1206570 3200 3160 1.06 6-Mar 1221334 4160 4270 1.41
PERIMETER FENCE COLUMN (GL 1-5)

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRE-CAST WALLS (18F GL A-D/10) 30785 2/16/2017 23-Feb 1206651 2750 2630 89.67% 2-Mar 1221262 3270 3120 1.065 16-Mar 1221651 4210 4180 1.40

PRIMEPRO 4000 28D 3/4 PCD 14 14 CONCRETE GUTTER GL (C-D/1, D/1-6) 30858, 30848, 30860 2/17/2017 24-Feb 1206651 3610 3720 91.63% 3-Mar 1221262 4350 4250 1.075 17-Mar 1221651 5100 5110 1.28

SUPERMIX 4000 28D 3/4 PCD 14 14 CONCRETE GUTTER GL (A-B/1, A/1-6) 32587, 32590 2/20/2017 27-Feb 1192720 3260 3160 80.25% 6-Mar 1213505 4040 4110 1.01875 20-Mar 1221682 5170 5320 1.31

8F-10F SLAB @ TOWER CRANE AREA GL(C-D/4-5) & PRECAST


PRIMEPRO 5000 28D 3/4 PCD 6 6 WALL 8F-10F GL (D/4-5) & 17F GL (A-B/1) 31049 2/22/2017 1-Mar 1221262 4280 4380 86.60% 8-Mar 122140 5130 5170 1.03 22-Mar 1240753 6190 6300 1.25

13F-WTL SLAB @ TOWER CRANE AREA GL(C-D/4-5) &


PRIMEPRO 4000 28D 3/4 PCD 6 6 CONCRETE SADDLE GL(A-D/4-5) 31120 2/24/2017 3-Mar 1221262 3140 3110 78.13% 10-Mar 1221420 4110 4170 1.035 24-Mar 1240753 5180 5140 1.29

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRECAST WALL 10F-13F GL(B-C/1) & 11F GL(D/4-5) 31221 2/27/2017 6-Mar 1221334 2170 2230 73.33% 13-Mar 1221532 3060 3100 1.0266666667 27-Mar 1240854 4380 4210 1.43

PRECAST WALL 18F GL(D/4-5, A/4-5) & REMAINING SLAB @


PRIMEPRO 4000 28D 3/4 PCD 6 6 11F-12F TOWER CRANE AREA GL(C-D/4-5) 31359 3/1/2017 8-Mar 1221420 3260 3130 79.88% 15-Mar 1221532 4060 3930 0.99875 29-Mar 1240854 5230 5270 1.31

PRECAST WALL 9F-13F SIDINGS @ STAIR LANDING GL(B-C/1),


PRIMEPRO 3000 28D 3/4 PCD 6 6 14F GL(B-C/1), 15F GL(B-C/1), 18F GL(C-D/1) 31678 3/8/2017 15-Mar 1221532 2160 2220 73.00% 22-Mar 1240753 3130 3170 1.05 5-Apr 1241016 4140 4240 1.40

SOG @ STAIR LANDING GL(B-C/10),15F & 18F PCW SIDINGS


PRIMEPRO 3000 28D 3/4 PCD 6 6 @ STAIR LANDING GL (B-C/1), PCW @ 18F GL(C-D/1), 15F 31910 3/14/2017 21-Mar 1240753 2510 2420 82.17% 28-Mar 1240854 3260 3150 1.0683333333 11-Apr 1241215 4340 4450 1.47
GL(B-C/1)

PRIMEPRO 4000 28D 3/4 PCD 10 10 ROOF BEAM GL(C/4-8, A-D/5-7), CONCRETE SADDLE @ GL(C- 32209, 32215 3/21/2017 28-Mar 1240854 3110 3300 80.13% 4-Apr 1241016 4220 4180 1.05 18-Apr 1241215 5140 5120 1.28
D/6-7),WTL COLUMN @ GL(C/6&7)

18F PRECAST WALL GL(B-C/1), (A/1-2), (D/6-7) AND SOG @


PRIMEPRO 3000 28D 3/4 PCD 10 10 GROUND FLOOR MAIN LOBBY GL(5-6) 32423, 32433 3/28/2017 4-Apr 1241016 2190 2300 74.83% 11-Apr 1241215 3630 3600 1.205 25-Apr 1274954 4240 4300 1.42

PRIMEPRO 3000 28D 3/4 PCD 5 5 PRECAST WALL @ GROUND FLOOR GL(D/3-5) & GL(B-C/1) 33820 5/18/2017 25-May 1280920 2290 2380 77.83% 1-Jun 1281057 3360 3230 1.0983333333 15-Jun 1308830 4220 4170 1.40

PRIMEPRO 3000 28D 3/4 PCD 6 6 PRECAST WALL @ GROUND FLOOR GL(A/2-5) & RAMP @ TVR 36103 6/22/2017 29-Jun 1309176 2500 2360 81.00% 6-Jul 1302770 3090 3120 1.035 20-Jul 1301962 3900 3810 1.29

SUM TOTAL 5079 4925


AGA & SONS
CONST. AND DEV'T. CORP.

PROJECT : PGMH - MAHOGANY TOWER


LOCATION : Peafrancia, Paco, Manila
SUBJECT : TRIAL MIX
AS OF :

SUPPLIER DESIGN SPECIFICATION SLUMP POURING


(psi) (in) DATE 7D Doc No.
OMNICO 3000 G1 ORD@28 DAYS 3-5 11/4/2015 11-Nov 930782
OMNICO 3000 3/4 ORD@28 DAYS 4-6 11/4/2015 11-Nov 930782
OMNICO 3000 3/4 PCD @ 28 DAYS 6-8 11/4/2015 11-Nov 930782
OMNICO 4000 3/4 ORD@28 DAYS 4-6 11/4/2015 11-Nov 930782
OMNICO 4000 3/4 PCD @ 28 DAYS 6-8 11/4/2015 11-Nov 930782
OMNICO 5000 3/4 ORD@28 DAYS 4-6 11/4/2015 11-Nov 930782
OMNICO 5000 3/4 PCD @ 28 DAYS 6-8 11/4/2015 11-Nov 930782
GIANT 3000 3/4 ORD@28 DAYS 3-4 11/10/2015 17-Nov 931032
GIANT 3000 3/4 PCD @ 28 DAYS 5-6 11/10/2015 17-Nov 931032
GIANT 4000 3/4 ORD@28 DAYS 3-4 11/10/2015 17-Nov 931032
GIANT 4000 3/4 PCD @ 28 DAYS 5-6 11/10/2015 17-Nov 931032
GIANT 5000 3/4 ORD@28 DAYS 3-4 11/10/2015 17-Nov 931032
GIANT 5000 3/4 PCD @ 28 DAYS 5-6 11/10/2015 17-Nov 931032
GIANT 6000 3/4 ORD@28 DAYS 3-4 11/10/2015 17-Nov 931032
GIANT 6000 3/4 PCD @ 28 DAYS 5-6 11/10/2015 17-Nov 931032
10K 4000 G1 ORD@28 DAYS 3-5 11/10/2015 17-Nov 931123
10K 4000 PCD@28 DAYS 6-8 11/10/2015 17-Nov 931123
10K 5000 PCD@28 DAYS 6-8 11/10/2015 17-Nov 931123
10K 6000 PCD@28 DAYS 6-7 11/10/2015 17-Nov 931123
SUPPERMIX 3000 3/4 ORD@28 DAYS 4-6 11/11/2015 18-Nov 931130
SUPPERMIX 4000 3/4 ORD@28 DAYS 4-6 11/11/2015 18-Nov 931130
SUPPERMIX 5000 3/4 ORD@28 DAYS 4-6 11/11/2015 18-Nov 931130
SUPPERMIX 3000 3/4 PCD @ 28 DAYS 6-8 11/11/2015 18-Nov 931130
SUPPERMIX 4000 3/4 PCD @ 28 DAYS 6-8 11/11/2015 18-Nov 931130
SUPPERMIX 5000 3/4 PCD @ 28 DAYS 6-8 11/11/2015 18-Nov 931130
PRIME PRO 5000 3/4 PCD @ 28 DAYS 6-8 1/15/2015 22-Jan 969039
PRIME PRO 4000 3/4 PCD @ 28 DAYS 6-8 1/15/2015 22-Jan 969039
PRIME PRO 4000 G1 ORD@28 DAYS 4-6 1/15/2015 22-Jan 969039

NOTE: Results printed in red are tested by MATEST LAB. INC. and result printed in black are tested by TERMS CONC. TESTING.
CONCRETE TEST RESULTS (COMPRESSIVE STRENGTH)
Result 1 Result 2 % 14D Doc No. Result 1 Result 2 % 28D Doc No.
2850 2770 93.67% 18-Nov 931131 3270 3350 110.33% 2-Dec MM-15-2628
2590 3910 108.33% 18-Nov 931131 3450 3580 117.17% 2-Dec MM-15-2629
2970 2900 97.83% 18-Nov 931131 3710 3520 120.50% 2-Dec MM-15-2630
3660 3780 93.00% 18-Nov 931131 4240 4390 107.88% 2-Dec MM-15-2631
2920 3760 83.50% 18-Nov 931131 4640 4810 118.13% 2-Dec MM-15-2632
4350 4660 90.10% 18-Nov 931131 5370 5490 108.60% 2-Dec MM-15-2633
5000 4750 97.50% 18-Nov 931131 5820 5690 115.10% 2-Dec MM-15-2634
2550 2390 82.33% 24-Nov 931217 3700 3820 125.33% 8-Dec 931697
2750 2630 89.67% 24-Nov 931217 3640 3700 122.33% 8-Dec 931697
3350 3570 86.50% 24-Nov 931217 4610 4710 116.50% 8-Dec 931697
3700 3860 94.50% 24-Nov 931217 4540 4590 114.13% 8-Dec 931697
4410 4230 86.40% 24-Nov 931217 6080 6030 121.10% 8-Dec 931697
4880 4750 96.30% 24-Nov 931217 5480 5510 109.90% 8-Dec 931697
5330 5470 90.00% 24-Nov 931217 7170 7080 118.75% 8-Dec 931697
5740 5810 96.25% 24-Nov 931217 7120 7100 118.50% 8-Dec 931697
3730 3930 95.75% 24-Nov 931336 5240 5230 130.88% 8-Dec 931680
3720 3870 94.88% 24-Nov 931336 4510 4750 115.75% 8-Dec 931680
4750 4880 96.30% 24-Nov 931336 5480 5430 109.10% 8-Dec 931680
5790 5690 95.67% 24-Nov 931336 7640 7920 129.67% 8-Dec 931680
2280 2840 85.33% 25-Nov 931311 3800 3890 128.17% 9-Dec 931695
3350 3210 82.00% 25-Nov 931311 4860 4990 123.13% 9-Dec 931695
4310 4440 87.50% 25-Nov 931311 5950 6070 120.20% 9-Dec 931695
2550 2720 87.83% 25-Nov 931311 4120 4200 138.67% 9-Dec 931695
3710 3880 94.88% 25-Nov 931311 5600 5410 137.63% 9-Dec 931695
4830 4720 95.50% 25-Nov 931311 6200 6390 125.90% 9-Dec 931695
5170 5080 102.50% 29-Jan 96913 6040 6070 121.10% 12-Feb 978037
4230 4320 106.88% 29-Jan 96913 5020 5080 126.25% 12-Feb 978037
4050 4110 102.00% 29-Jan 96913 5180 5050 127.88% 12-Feb 978037
Result 1 Result 2 %
8230 8130 272.67%
8670 8780 290.83%
7840 8330 269.50%
8990 9140 226.63%
9780 8990 234.63%
9910 10160 200.70%
10580 10360 209.40%
4710 4860 159.50%
4340 4580 148.67%
5200 5380 132.25%
5730 5930 145.75%
5380 5470 108.50%
6800 7060 138.60%
7230 7350 121.50%
7780 7890 130.58%
5470 5480 136.88%
5590 5730 141.50%
6280 6500 127.80%
8070 8100 134.75%
4570 4460 150.50%
5290 5490 134.75%
6290 6480 127.70%
4700 4940 160.67%
5730 5920 145.63%
6720 7080 138.00%
6360 6520 128.80%
5160 5180 129.25%
5070 5110 127.25%
AGA & SONS
CONST. AND DEV'T. CORP.

PROJECT : PGMH - MAHOGANY TOWER


LOCATION : Peafrancia, Paco, Manila
SUBJECT : SUMMARY OF ACCOMPLISHMENT
As Of : 18-Jan-16

READY MIX CONCRETE


PREVIOUS
DESIGN MIX LAST DELIVERY TOTAL DELIVERY
DELIVERY
5000 PSI 28 13 41
4000 PSI 208 47 255
SUM TOTAL 296

CEMENT
GMQ DELIVERED ON SITE BALANCE
QUANTITY UNITS QUANTITY UNITS QUANTITY UNITS
53931 bulks 1944 bulks 51987 bulks
24980 bags 600 bags 24380 bags

CONCRETING
PREVIOUS TO DATE TOTAL
DESCRIPTION TOTAL NO. %
(CONCRETED) (CONCRETED) (CONCRETED)
PILE CAP 34 21 5 26 76.47%
FTB 43 29 8 37 86.05%
COLUMNS 34 8 6 14 41.18%
PEDESTAL 34 14 6 20 58.82%
RCW(PERIMETER) 24 10 1 11 45.83%

FORMWORKS
PREVIOUS TO DATE TOTAL
DESCRIPTION TOTAL NO. %
(INSTALLED) (INSTALLED) (INSTALLED)
PILE CAP 34 26 7 33 97.06%
FTB 43 29 7 36 83.72%
COLUMNS 34 8 6 14 41.18%
2ND FLOOR SLAB 9 0 1 1 11.11%
2ND FLOOR BEAM 24 0 9 9 37.50%

EXCAVATION
PREVIOUS TO DATE TOTAL
DESCRIPTION TOTAL NO. %
(EXCAVATED) (EXCAVATED) (EXCAVATED)
PILE CAP 34 26 2 28 82%
FTB 43 31 7 38 88%
CISTERN TANK 1 0 0 0 0%

BACKFILLING
PREVIOUS TO DATE TOTAL
TOTAL AREA TO BE
DESCRIPTION (BACKFILLED (BACKFILLED BACKFILLED %
BACKFILLED (sq.m) AREA) AREA) AREA (sq.m)

GROUND FLOOR 715 237.9 79.3 317.2 44.36%


%

3.60
2.40
PROJECT : PGMH - MAHOGANY TOWER
LOCATION : Peafrancia, Paco, Manila
SUBJECT : CONCRETED AREA (FOUNDATION)
As Of : 6-Jan-16

PREVIOUS TO DATE
DESCRIPTION DESIGN SPECS. TOTAL NUMBER (CONCRETED) (CONCRETED)
PILE CAP 34 17 4
4000 PSI
FTB 43 17 5
COLUMN (PEDESTAL) 34 8 3
PERIMETER RCW 5000 PSI 24 6 2
COLUMN 1st LIFT 34 0 8
TOTAL PERCENTAGE
(CONCRETED)
21 62%
22 51%
11 32%
8 33%
8 24%
AGA & SONS
CONST. AND DEV'T. CORP.

PROJECT : PGMH - MAGNOLIA TOWER


LOCATION : Peafrancia, Paco, Manila
SUBJECT : CONCRETE POURING MONITORING as of NOVEMBER 15, 2013

VOLUME POURING CONCRETE TEST RESULTS


SUPPLIER DESIGN SPECS STRUCTURE DR #
COMP. DELIVERED DATE 7D Doc No. Result 14D Doc No. Result
F4 @ 1D, F3 @ 2D, F3 @ 3D, FTB3 205310, 205319, 175534 3910
PRIME 4000 G1 ORD. 10 13 9/12/2013 19-Sep 3840 3660 26-Sep 176543
@ D 1-2/2-3, L/4 @ 1D, 2D, 3D 205000 175537 2270
F3 @ 1C, 1B, 4D & F2 @ 2C, 2B;
FTB @ 1-2/B-C; L/4 @ FTB-3 GL 1- 205431, 205432, 4210
4000 G1 ORD. 20 23 3030 3000
2/A-B; FTB-2 @ D-C/1-2; L/4 @ 205437, 205438 4270
PRIME FTB-2 4D 9/16/2013 23-Sep 176167 30-Sep 176936
4120
4000 3/4 ORD. 3 6 COLS. 1D, 2D, 3D 205433, 205439 3110 3120 4170
3800 4170
G1 ORD. 10 10 F3@4/D, WF@1/C-B 11053
3950 4270
SUMMIT 4000 9/19/2013 26-Sep 564477 3-Oct 564550
3780 4340
3/4 ORD. 3 4 C3@4/D, C2@ 2/C & 2/B 11069
3710 4210
F4@1/A, F2@2/B&C, FTB3 3-1/A,
G1 ORD. 13 13 FTB1@3/B-A
11259, 11265 3620 3660
4380 4320
SUMMIT 4000 9/26/2013 3-Oct 564550 10-Oct 564731
4280
3/4 ORD. 7 7 C3, Stair and Ret. Wall @ 2-1/C-B 11250 3430 3530 4220

SUMMIT 4000 G1 ORD. 9 11 PILE CAP 3/C AND INC. FTB 11307, 11308 9/27/2013 4-Oct 564550 3350 3320 11-Oct 564731 4250
4120
SUMMIT 4000 3/4 ORD. 5 5 C1@ 3/C & 4/C, C2@ 2/A & 3/A, C4@ 1/A 11350 9/28/2013 5-Oct 564550 3160 3240 12-Oct 564731 4050
4100
SUMMIT 4000 G1 ORD. 6 6 F2 & FTB 3&1 GL 4-3/C-A 11474 10/3/2013 10-Oct 564731 3510 3450 17-Oct 4320 4240
185067
SUMMIT 4000 3/4 ORD. 7 7 COL., STAIR, RET. WALL GL 2-1/C-B & 4/A 11495 10/4/2013 11-Oct 564731 3380 3350 18-Oct 4180
185067 4130
SUPERMIX 4000 G1 ORD. 12 14 F-1@5/C, F-2A@5/D and FTB 216267, 216265 10/9/2013 16-Oct 184150 3560 3430 23-Oct 4230
186292 4110
SUPERMIX 3000 G1 ORD. 11 13 S.O.G. @ 3-1/D-B 216270, 216269 10/9/2013 16-Oct 184150 2480 2380 23-Oct 3100
186292 3200
SUMMIT 3000 G1 ORD. 7 7 S.O.G @ GL. 3-4/D-B 177664 10/12/2013 19-Oct 26-Oct

SUMMIT 3000 G1 ORD. 9 9 S.O.G (PARKING) 11689 10/15/2013 22-Oct 590063 3820 3920 29-Oct 590154 3,190

Elev Foundation and PC @ GL 11685 11687 4360


SUMMIT 4000 G1 ORD. 21 21 C/6,D/6 11690 10/15/2013 22-Oct 590063 3740 3690 29-Oct 590154
4260
SUMMIT 4000 G1 ORD. 7 7 FTB's GL 7-4/D-C 11720 10/17/2013 24-Oct 590063 3590 3550 31-Oct 590154 4130
4180
C4@1/D, C3@3/D, C2@2/C, 11709 11713 4130
SUMMIT 4000 3/4 ORD. 13 13 C2@2/B, C1@3/C, C1@4/C, RC 11721 10/17/2013 24-Oct 590063 3510 3470 31-Oct 590154
wall (elev) GL 6-1/D-B 4210
C4 @ 1/A, C2 @ 2/A, C2@3/A,
SUMMIT 4000 3/4 ORD. 10 11 C2@4/A, C1@5/C, C3@2/D, 11792, 11783 10/18/2013 25-Oct 590063 3350 3300 1-Nov 590225 4280
C3@4/D (2ND LIFT) 4340
PILE CAP 7/D, 8/D, 9/D, 7/C AND 11797, 11805, 4580
SUMMIT 4000 G1 ORD. 20 20 INC. FTB 11810 10/18/2013 25-Oct 590063 3330 3280 1-Nov 590225
4530
11917 , 11918 , 4120
11919 , 11920 , 3740 3800 4180
SLAB @ 2ND FLR. FROM GL. D-A
SUMMIT 4000 3/4 PCD. 80 82 TO GL. 1-4 11921 , 11923 , 10/21/2013 28-Oct 590154 4-Nov 590225
11924 , 11925 , 4100
3710 3580
11927 , 11928 4170

SUPERMIX 3000 G1 ORD. 11 11 CISTERN TANK (bottom slab) 216885 , 216886 10/23/2013 30-Oct 590151 2530 2500 6-Nov 590242 3100
3160
SUMMIT 4000 G1 ORD. 6 6 12007 10/23/2013 30-Oct 6-Nov 590416 5150
5180
SUMMIT 4000 3/4 ORD. 10 10 12019 , 12020 10/24/2013 31-Oct 590154 3340 3390 7-Nov 590416 5160
5210
PILE CAP @ GL. 8/C, 8/A, 9/B, 217224, 217226, 4200
217229, 217230,
590242 3510 3470
9/A, 10/B, 10/A,ELEV. RC WALL, 3420 4240
SUPERMIX 4000 3/4 PCD 60 59 217234, 217242, 10/30/2013 6-Nov 13-Nov 590389
COL @ GL. 6/D, 6/C, 2ND FLR COL 217243, 217250, 4130
@ GL. 3/D, 4/D, 3/C, 4/C, 4/A 217252, 217256 4180

PRIME 4000 3/4 ORD. 20 20 0522, 0523, 0526 10/31/2013 7-Nov 192882 3120 3160 14-Nov 590425 4210
4130
PILE CAP @ GL. 9/C, COL @ GL. 4130
SUMMIT 4000 3/4 ORD. 12 12 12253, 12254 11/4/2013 11-Nov 590416 4090 4040 18-Nov 590541
8/C, 9/B, 8/A, 9/A 4220
CISTERN TANK TOP SLAB & PILE 4050
219551, 219555,
SUPERMIX 4000 3/4 PCD 21 21 CAP @ GL. 10/D,10/C & 1ST LIFT
219557 11/6/2013 13-Nov 590389 3330 3360 20-Nov 590538 4060
COL. @ GL. 10/B,10/A
1ST LIFT COLUMN @ GL.
SUPERMIX 4000 3/4 ORD. 5 5 9/D,10/D,9/C,9/B 219742 11/9/2013 16-Nov 590538 3650 3580 23-Nov
219759, 219761,
219763, 219766,
SUPERMIX 3000 G1 ORD. 70 68 219769, 219771, 11/10/2013 17-Nov 590538 2480 2540 24-Nov
219775, 219780,
219782, 219786

219857, 219859,
3RD FLR SLAB, ELEV. RC 219861, 219863,
WALL(GF), 2ND LIFT COL@ GL.
SUPERMIX 4000 3/4 PCD. 70 63 7/D,8/D,7/C,8/C,7/A,8/A,9/A,10/ 219864, 219865, 11/12/2013 19-Nov 590538 3260 3280 26-Nov
219867, 219868,
A 219870

1121, 1122, 1123,


1124, 1125, 1129, 3650 3440
590634 3380 3420
2ND FLOOR SLAB @ AREA-2 GL. 1130, 1133, 1136, 3480
SUMMIT 4000 3/4 PCD. 120 119 11/16/2013 23-Nov 30-Nov
5-10/A-D 1139, 1140, 1142, 3640
1146, 1147, 1150, 3510 3540
1402
2/B, COL. @ 2ND FLR GL. 7/D,
280173 280184
LILAI 4000 3/4 ORD. 21 21 9/D, 10/D, 5/C, 7/C, 8/C, 9/C,
280186 11/20/2013 27-Nov 4-Dec
10/C, 10/B, 9/B, 5/A, 6/A, 7/A,

VOLUMEDELIVERED (m3) VOLUMECOMPUTED (m3)


D-MIX G-1 ORD. 3/4 ORD D-MIX G-1 ORD 3/4 ORD 3/4 PCD
SUMMARY
4000 PSI 144 121 4000 PSI 134 396 -
3000 PSI 108 - 3000 PSI 38 - -
TOTAL REMARKS
28D Doc No. Result DELIVERED
5060
10-Oct 183765 13
5120

4900 4970 23
14-Oct 183765
4970 4880 6

5410 10
5330
17-Oct
5290
5200 4
5680 13
5630
24-Oct 590063
5490 7
5450

25-Oct 590063 5380 11


5320 PILE CAP FROM 2 X 3 TO 2.3 X 3M X 1.2 DEPTH

26-Oct 590063 4440 5


4480
31-Oct 590154 5430 6
5330
1-Nov 590154 5250 7
5320
6-Nov 590242 5300 14
5210
6-Nov 590242 4170 13
4260
9-Nov 590359 4220 7
4350
12-Nov 590359 4120 9

12-Nov 590359 5270 21

14-Nov 590416 5340 7


5430
5500
14-Nov 590416 13
5450
5520
15-Nov 590416 11
5570

15-Nov 590416 5330 20


5250

5370
18-Nov 590541 82
5480

20-Nov 590538 4090 11


4150
20-Nov 590634 5480 6
5580
21-Nov 590634 5390 10
5300

27-Nov 59

28-Nov 20

2-Dec 12

4-Dec 21

7-Dec 5
8-Dec 68

10-Dec 63

14-Dec 119

18-Dec 21

TOTALVOLUME 717