C FLAT ROOF TO ENGR'S DTL WITH


1 LAYER OF WATER PROOF MEMBRANE
TO ARCH'S SPEC. ROOF LEV. 2
100MM UPVC SOIL & VENT PIPE METAL ROOFING SHEET FALL AT 10 PITCH ON
SERVICE/VENTILATOR SHAFT C/W DOUBLE SIDED SISSALLATION AND
MIN. 50MM FIBRE GLASS WOOL INSULATION
METAL ROOFING SHEET FALL AT 10 PITCH ON M.S PURLINS ON TRUSSES TO ENGR'S DTL. LIFT MOTOR
C/W DOUBLE SIDED SISSALLATION AND ROOM LEV.
MIN. 50MM FIBRE GLASS WOOL INSULATION
M.S PURLINS ON TRUSSES TO ENGR'S DTL. WATER TANK
100MM UPVC SOIL & VENT PIPE
AREA SERVICE/VENTILATOR SHAFT ROOF LEV. 1

R.C STAIRCASE TO ENGR'S DTL.


R : 166.67 ; T : 255 + 25MM NOSING STUDENTS REST/ 900MM HIGH 113MM THK. BRICK WALL WITH
19MM THK. CEMENT PLASTERING ON BOTH
WITH 1000MM HIGH M.S RAILING TO DTL. COMMON ROOM RM B B RM RM CORRIDOR CORRIDOR SIDES C/W M.S RAILING ABOVE TO DTL. 5TH. FLR. LEV.

ALUMN. FRAMED CASEMENT WITH FIXED STUDENTS REST/ 2 HOUR FIRE DOOR TO MANUF'S DTL.
GLASS AND CORNER WINDOW TO MANUF'S DTL. ( TO ALL HOSTEL ROOMS )
COMMON ROOM RM B B RM RM CORRIDOR CORRIDOR 4TH. FLR. LEV.

113MM THK. BRICK WALL WITH 19MM THK.


113MM THK. BRICK WALL WITH 19MM THK.
CEMENT PLASTERING ON BOTH SIDES STUDENTS REST/ CEMENT PLASTERING ON BOTH SIDES
( UP TO SOFFIT OF SLAB )
( UP TO SOFFIT OF SLAB ) COMMON ROOM RM B B RM RM CORRIDOR CORRIDOR 3RD. FLR. LEV.
BOX UP CEILING ABOVE
2100MM HIGH GLAZED WALL TILES ALL FOR FAN COIL UNIT
ROUND INTERNALLY TO ARCH'S SPEC. STUDENTS REST/ M.S/G.I FRAMED PLYWOOD FLUSH
( FOR TOILET ONLY ) COMMON ROOM RM B B RM RM CORRIDOR CORRIDOR DOOR TO DTL. 2ND. FLR. LEV.
1 HOUR FIRE DOOR TO
MANUF'S DTL. R.C SLAB & BEAM TO ENGR'S DTL.
R.C SLAB & BEAM TO ENGR'S DTL.
STUDENTS REST/ ( TO ALL HOSTEL ROOMS ) 1 HOUR FIRE DOOR TO MANUF'S DTL.
COMMON ROOM RM B B RM RM CORRIDOR CORRIDOR ( TO ALL HOSTEL ROOMS ) 1ST. FLR. LEV.

ALUMN. FRAMED FIXED GLASS WITH M.S GRILLES & DOOR TO DTL.
SIDE HUNG CASEMENT WINDOW STUDENTS REST/ M.S/G.I FRAMED DOUBLE LEAVES PLYWOOD
TO MANUF'S DTL. COMMON ROOM RM B B RM RM CORRIDOR CORRIDOR DOOR TO DTL. GRD. FLR. LEV.

R.C FOOTING TO ENGR'S DTL. GRD. LEV.


P.C DRAIN LAID TO FALL
100MM THK. CONC. FLOOR ON 150MM THK.
HARDCORE TO BE WELL COMPECTED AND
ONE LAYER OF DPM BELOW SLAB.

R.C FLAT ROOF TO ENGR'S DTL WITH


1 LAYER OF WATER PROOF MEMBRANE
TO ARCH'S SPEC. BOX UP CEILING ABOVE ROOF LEV. 2
FOR FAN COIL UNIT METAL ROOFING SHEET FALL AT 10 PITCH ON
113MM THK. BRICK WALL WITH 19MM THK.
CEMENT PLASTERING ON BOTH SIDES M.S/G.I FRAMED PLYWOOD FLUSH DOOR TO DTL. C/W DOUBLE SIDED SISSALLATION AND
( UP TO SOFFIT OF SLAB ) MIN. 50MM FIBRE GLASS WOOL INSULATION
M.S PURLINS ON TRUSSES TO ENGR'S DTL. LIFT MOTOR
DIMESTIC STORAGE TANK [ 4X3X2MM (H) ] MOTOR RM ROOM LEV.
ON 610 (H) R.C PLINTH TO ENGR'S DTL.

ROOF LEV. 1
M.S STAIRCASE TO ENGR'S DTL.
R : 175.45 ; T : 250 + 25MM NOSING
WITH 1000MM HIGH M.S RAILING TO DTL. LIFT
LOBBY 1 ROOM ROOM ROOM ROOM ROOM ROOM B CORR ROOM ROOM CORR B ROOM 5TH. FLR. LEV.
R.C STAIRCASE TO ENGR'S DTL.
R : 166.67 ; T : 255 + 25MM NOSING
WITH 1000MM HIGH M.S RAILING TO DTL. LIFT
LOBBY 1 ROOM ROOM ROOM ROOM ROOM ROOM B CORR B ROOM ROOM B CORR B ROOM 4TH. FLR. LEV.

113MM THK. BRICK WALL WITH 19MM THK.


LIFT SHAFT

LIFT CEMENT PLASTERING ON BOTH SIDES


( UP TO SOFFIT OF SLAB )
LOBBY 1 ROOM ROOM ROOM ROOM ROOM ROOM B CORR ROOM ROOM CORR B ROOM 3RD. FLR. LEV.

2100MM HIGH GLAZED WALL TILES ALL


LIFT ROUND INTERNALLY TO ARCH'S SPEC.
LOBBY 1 ROOM ROOM ROOM ROOM ROOM ROOM B CORR ROOM ROOM CORR B ROOM ( FOR TOILET ONLY ) 2ND. FLR. LEV.

R.C SLAB & BEAM TO ENGR'S DTL.


LIFT PVC DOOR TO MANUF'S DTL.
LOBBY 1 ROOM ROOM ROOM ROOM ROOM ROOM B CORR ROOM ROOM CORR B ROOM ( TO ALL TOILETS ) 1ST. FLR. LEV.
ALUMN. FRAMED FIXED GLASS WITH
SIDE HUNG CASEMENT WINDOW
LIFT TO MANUF'S DTL.
LOBBY 1 ROOM ROOM ROOM ROOM ROOM ROOM B CORR ROOM ROOM CORR B ROOM P.C DRAIN LAID TO FALL GRD. FLR. LEV.
GRD. LEV.
R.C FOOTING TO ENGR'S DTL.
100MM THK. CONC. FLOOR ON 150MM THK.
HARDCORE TO BE WELL COMPECTED AND
ONE LAYER OF DPM BELOW SLAB.

113MM THK. BRICK WALL WITH 19MM THK.


CEMENT PLASTERING ON BOTH SIDES
( UP TO SOFFIT OF SLAB )

ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM BOX UP CEILING ABOVE
FOR FAN COIL UNIT
STUDENTS TILES TILES TILES TILES TILES TILES TILES TILES TILES TILES STUDENTS
REST/ 75mm 75mm 75mm 75mm 75mm 75mm 75mm 75mm 75mm 75mm REST/ 100MM UPVC SOIL & VENT PIPE
dp dp dp dp dp dp dp dp dp dp
COMMON 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm COMMON 100MM UPVC RWDP
ROOM 1 dp dp dp dp dp
100mm dp
dp dp dp dp dp ROOM 2 SERVICE/VENTILATOR SHAFT
TILES M.S/G.I FRAMED PLYWOOD FLUSH DOOR TO DTL.
TILES EL CORRIDOR TILES EL K HR/DRY EL 2FD K EL TILES CORRIDOR EL
DP DP RISER DP DP ALUMN. FRAMED CASEMENT WITH FIXED
100mm dp 100mm dp
ELECT METER

100mm 100mm 100mm 100mm ELV/MATV K 100mm 100mm 100mm 100mm GLASS AND CORNER WINDOW TO MANUF'S DTL.
K 1FD HR DP FA/BG
dp dp dp dp
RISER
dp dp dp dp HR 1FD K
75mm 75mm 75mm 75mm DIST. 75mm 75mm 75mm 75mm FA/BG DP M.S/G.I FRAMED PLYWOOD FLUSH DOOR TO DTL.
K
ROOM

dp dp dp dp dp dp dp dp
STEM LIFT EL
UP EL UP
K LIFT BOARD K R.C STAIRCASE TO ENGR'S DTL.
TOR SY ROOM UP
DETEC
LOBBY 1 ROOM ROOM LOBBY 2 R : 166.67 ; T : 255 + 25MM NOSING
EL STR 1 ROOM ROOM EL STR 2 EL ELECT ROOM 1 ROOM ROOM ROOM STR 3 EL WITH 1000MM HIGH M.S RAILING TO DTL.
TILES TILES TILES TILES TILES CEMENT TILES TILES TILES TILES TILES
RISER
100mm dp K 100mm dp 100mm dp 100mm dp 100mm dp K 100mm dp
115MM THK. CLAY BRICK PARTY WALL WITH
75mm dp 75mm dp 75mm dp 75mm dp 75mm dp 75mm dp
ROOM ROOM ROOM ROOM ROOM ROOM 19MM THK. CEMENT PLASTERING ON BOTH SIDES
R.C STAIRCASE TO ENGR'S DTL. ( UP TO SOFIT OF SLAB )
R : 166.67 ; T : 255 + 25MM NOSING
WITH 1000MM HIGH M.S RAILING TO DTL. ALUMN. FRAMED FIXED GLASS WITH 2100MM HIGH GLAZED WALL TILES ALL
TILES TILES SIDE HUNG CASEMENT WINDOW TILES ROUND INTERNALLY TO ARCH'S SPEC.
ROOM ROOM ROOM ROOM TO MANUF'S DTL. ROOM ROOM ( FOR TOILET ONLY )
TILES TILES TILES TILES BOX UP CEILING ABOVE TILES TILES PVC DOOR TO MANUF'S DTL.
FOR FAN COIL UNIT ( TO ALL TOILETS )
100mm dp EL 100mm dp 100mm dp EL 100mm dp 100mm dp EL 100mm dp 1 HOUR FIRE DOOR TO MANUF'S DTL.
75mm dp 75mm dp 75mm dp 75mm dp 75mm dp 75mm dp
CORRIDOR

CORRIDOR
CORRIDOR

DP DP DP ( TO ALL HOSTEL ROOMS )


ROOM ROOM GREEN ROOM ROOM GREEN ROOM ROOM 100MM UPVC WASTE PIPE
113MM THK. BRICKWALL WITH 19MM THK. 100MM UPVC SOIL & VENT PIPE
CEMENT PLASTERING EXTERNALY
( UP TO SOFFIT OF SLAB ) SERVICE/VENTILATOR SHAFT
LAUNDRY75mm dp WARDEN OFFICE 75mm dp LAUNDRY
4 K ROOM K 100mm dp 1 HOUR FIRE DOOR TO MANUF'S DTL.
ROOM K 2 M.S/G.I FRAMED DOUBLE LEAVES PLYWOOD
TILES 100mm TILES TILES 100mm TILES ( TO ALL HOSTEL ROOMS ) TILES 100mm TILES DOOR TO DTL.
dp dp dp

FULL HEIGHT ADJ. GLASS LOUVRES


100MM UPVC RWDP AT 300MM ABOVE FLOOR FINISH
WAITING M.S/G.I FRAMED PLYWOOD FLUSH DOOR TO DTL.
COUNTER BY OTHERS
EM
SYST

PASSAGE EL PASSAGE
CTOR

113MM THK. BRICKWALL WITH 19MM THK.


CEMENT PLASTERING TO BOTH SIDES
SECURITY WAITING
DETE

( UP TO SOFFIT OF SLAB )

100mm dp 100mm
dp 100mm dp
K K K
LAUNDRY ROOM ROOM LAUNDRY
4 75mm dp ROOM ROOM 75mm dp 3
CORRIDOR

CORRIDOR

CORRIDOR

TILES TILES TILES TILES TILES


TILES

ALUMN. FRAMED FIXED GLASS WITH


GREEN GREEN SIDE HUNG CASEMENT WINDOW
ROOM75mm dp DP 75mm dp ROOM ROOM75mm dp DP 75mm dp ROOM ROOM75mm dp DP 75mm dp ROOM TO MANUF'S DTL.
100mm dp 100mm dp 100mm dp 100mm dp 100mm dp 100mm dp
EL EL EL

P.C DRAIN LAID TO FALL


R.C STAIRCASE TO ENGR'S DTL.
ROOM ROOM R : 166.67 ; T : 255 + 25MM NOSING ROOM ROOM ROOM ROOM
TILES TILES TILES TILES TILES TILES TILES TILES TILES
WITH 1000MM HIGH M.S RAILING TO DTL.

115MM THK. CLAY BRICK PARTY WALL WITH


19MM THK. CEMENT PLASTERING ON BOTH SIDES
ROOM75mm dp 75mm dp ROOM ROOM75mm dp 75mm dp ROOM ROOM75mm dp 75mm dp ROOM ( UP TO SOFIT OF SLAB )
100mm dp
K 100mm dp 100mm dp 100mm dp 100mm dp
K 100mm dp

ELECT
LIFT EL RISER LIFT
STR 6 ROOM ROOM ROOM ROOM STR 5 DIST. ROOM ROOM STEM ROOM ROOM STR 4 R.C STAIRCASE TO ENGR'S DTL.
LOBBY 4 TOR SY LOBBY 3
EL EL EL
ELECT METER

K K
BOARD DETEC
TILES TILES TILES TILES TILES TILES TILES TILES R : 166.67 ; T : 255 + 25MM NOSING
ROOM

UP
UP EL TILES K TILES EL UP WITH 1000MM HIGH M.S RAILING TO DTL.
K DP FA/BG
75mm
dp
75mm
dp
75mm
dp
75mm
dp
ROOM 1 75mm
dp
75mm
dp
75mm
dp
75mm
dp FA/BG DP K
1FD ELV/MATV K 1FD
HR 100mm 100mm 100mm 100mm CEMENT 100mm 100mm 100mm 100mm HR
100mm dp RISER dp dp dp dp 100mm dp
DP K HR/DRY EL 2FD K DP
STUDENTS EL CORRIDOR TILES EL RISER
100mm dp
EL TILES CORRIDOR EL STUDENTS SERVICE/VENTILATOR SHAFT
REST/ 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm 100mm REST/ 100MM UPVC SOIL & VENT PIPE
dp dp dp dp dp dp dp dp dp dp
COMMON 75mm 75mm 75mm 75mm 75mm 75mm 75mm 75mm 75mm 75mm COMMON
ROOM 4 dp dp dp dp dp dp dp dp dp dp ROOM 3
TILES ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM ROOM TILES
TILES TILES TILES TILES TILES TILES TILES TILES TILES TILES

M.S GRILLES & DOOR TO DTL.

M.S/G.I FRAMED DOUBLE LEAVES PLYWOOD


DOOR TO DTL.