You are on page 1of 2

PENCAPAIAN KESLING PUSKESMAS AMAHUSU BULAN Agustus 2017

PENCAPAIAN BULAN Agustus 2017


NO VARIABEL TARGET AMAHUSU ERIE SEILALE
ABS % ABS % ABS %
1 SARANA
KK : 1982
JIWA : 6537
RUMAH : 1401
AKSES AIR BERSIH 100% 3885 100% 1544 100% 1108 100%
SARANA AIR BERSIH 75%
IS 582 80.94% 144 35.12% 105 38.60%
SGL 16 3.48% 17 15.45% 3 3.95%
SR (PDAM) 250 54.35% 0 0 0 0
PAH 0 0 0 0 69 90.78%
PMA 194 42.17% 79 71.82% 3 3.94%
PP 0 0 0 0 0 0
2 SPAL 75%
MEMENUHI SYARAT 709 98.60% 401 97.80% 251 92.27%
TIDAK MEMENUHI SYARAT 10 1.39% 14 3.41% 21 7.70%
3 JAMBAN KELUARGA 100%
LEHER ANGSA 719 100% 410 100% 272 100%
CEMPLUNG 0 0 0 0 0 0
PLENGSENGAN 0 0 0 0 0 0
LAIN-LAIN 0 0 0 0 0 0
4 RUMAH 75%
RUMAH SEHAT 709 98.60% 410 97.80% 251 92.27%
RUMAH TIDAK SEHAT 10 1.39% 14 3.41% 21 7.70%
5 TTU / PENGAWASAN 100%
TTU MEMENUHI SYARAT 5 50% 3 60% 2 20%
TTU TMS 0 0 0 0 0 0
6 TPM / PENGAWASAN 100%
TPM MEMENUHI SYARAT 3 60% 1 20% 0 0
TPM TMS 2 40% 0 0 0 0

You might also like