POBLACION DE REFERENCIA:
FORMULA:
Poblacion Futura (Pf)
t= 20 t= 20
Datos Datos
Aos Pa(ha) t (Aos) P(Pf-Pa) Paxt r=P/Paxt rxt Aos Pa(ha)
1993 2759 1993 2759
1 20 2759 0.007249 0.007
2007 2779 2007 2779
1 30 2779 0.010795 0.011
2017 2809 2017 2809
2 0.018
Donde Donde
r= 0.0090 9.02 9.02 0/00 por cada 1000habitantes r= 0.0090
Familias 50 Familias 3
Hab. x familia 7 Hab. x f 7
Pm = 350 hab Pm = 21
Pf = 413 hab Pf = 25
CAUDALES DE DISEO
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12
Q L D v hf Hf 9,0-8,0
CAP-R 0.68 0.62 88.10 1.00 1.23 76.64 6.75 3884.06 3877.31 3884.06 3836.06
CAP-R 0.68 0.68 100.69 1.00 1.34 90.47 9.11 3836.06 3826.95 3836.06 3788.06
CAP-R 0.68 0.68 103.67 1.00 1.34 90.47 9.38 3788.06 3778.68 3788.06 3740.05
CAP-R 0.68 0.68 107.50 1.00 1.34 90.47 9.73 3740.05 3730.32 3740.05 3692.05
CAP-R 0.68 0.68 113.63 1.00 1.34 90.47 10.28 3692.05 3681.77 3692.05 3644.05
CAP-R 0.68 0.68 251.91 1.00 1.34 90.47 22.79 3644.05 3621.26 3644.05 3596.05
CAP-R 0.68 0.68 109.54 1.00 1.34 90.47 9.91 3596.05 3586.14 3596.05 3548.05
CAP-R 0.68 0.68 112.20 1.00 1.34 90.47 10.15 3548.05 3537.90 3548.05 3528.43
VOLUMEN DE RESERVORIIO
Qm=Pfxdotacion 35000
V = 0.25x Qmd
V= 8750.00 lts
V= 8.75 m3
RED DE DISTRIBUCION
CONSUMO UNITARIO
Formula
Qunit= Qmh / Poblacin futura
Formula
Qtramo= Qunitx nro de habitantes por tramo
CALCULOS
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12
Q L D v hf Hf 9,0-8,0
TOTAL 0.96
1-2 0.02 0.94 123.09 1.00 1.85 164.00 20.19 3520.17 3499.98 3520.17 3475.43
2-3 0.17 76.59 1.00 0.00 0.00 0.00 3475.43 3475.43 3475.43 3445.12
2-4 0.00 0.77 137.70 1.00 1.52 113.28 15.60 3445.12 3429.52 3445.12 3400.26
4-5 0.13 98.98 0.50 0.00 0.00 0.00 3400.26 3400.26 3400.26 3350.66
4-6 0.04 106.29 0.50 0.00 0.00 0.00 3362.74 3362.74 3520.17 3313.08
4-7 0.00 0.60 105.16 0.35 9.64 ### 1242.12 3323.73 2081.61 3313.08 3271.16
7-9 0.09 104.04 0.20 0.00 0.00 0.00 3284.73 3284.73 3271.16 3229.24
7-8 0.19 102.92 0.05 0.00 0.00 0.00 3245.72 3245.72 3229.24 3187.32
7-10 0.08 0.24 101.80 -0.10 47.78 #VALUE! #VALUE! 3206.72 #VALUE! 3520.17 3145.41
10-11 0.06 0.18 100.68 -0.25 5.75 #VALUE! #VALUE! 3167.72 #VALUE! 3145.41 3103.49
10-12 0.18 99.55 -0.40 0.00 #VALUE! #VALUE! 3128.71 #VALUE! 3520.17 3061.57
0.95
OLOGNESI
x ( txtasa de crecimiento/1000+1)
2 0.0180443
on actual (Pm)
hab
hab
PRESION
INICIAL FINAL
13 14
9,0-11,0 10,0-12,0
0.00 41.25 3836.06 48.00
0.00 38.89 3788.06 48.00
0.00 38.63 3740.06 48.00
0.00 38.27 3692.05 48.00
0.00 37.72 3644.05 48.00
0.00 25.21 3596.05 48.00
0.00 38.09 3548.05 48.00
0.00 9.47 3500.05 48.00
PRESION
INICIAL FINAL
13 14
9,0-11,0 10,0-12,0
0.00 24.55
0.00 30.31
0.00 29.26
0.00 49.60
-157.44 49.66
10.66 -1189.55
13.57 55.49
16.48 58.40
-313.45 #VALUE!
22.31 #VALUE!
-391.46 #VALUE!
DISEO DE AGUA POTABLE CENTRO POBLADO DE MIOPAMPA
POBLACION DE REFERENCIA:
FORMULA:
Poblacion Futura (Pf)
Pf = Pm x ( txtasa de crecimiento/1000+1)
t= 20
Datos
Aos Pa(ha) t (Aos) P(Pf-Pa) Paxt r=P/Paxt rxt
1993 2759
1 20 2759 0.007249 0.007249
2007 2779
1 30 2779 0.0107953 0.0107953
2017 2809
2 0.0180443
Donde
r= 0.0090 9.02 9.02 0/00 por cada 1000habitantes
Familias 9
Hab. x fam 7
Pm = 63 hab
Pf = 74 hab
CAUDALES DE DISEO
0.09 lps
Caudal mximo diario (Q md)
El caudal Q mad, servir para el diseo de la captacin y lnea de conduccin y reservorio.
Donde : Qmd = K1 x Qm , K1 = 1.3
Qmd= 0.11 lps
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Q L D v hf Hf 9,0-8,0 9,0-11,0 10,0-12,0
CAP-R 0.11 0.11 7.00 0.75 0.39 12.61 0.09 3384.89 3384.80 3384.89 3382.60 0.00 2.20
VOLUMEN DE RESERVORIIO
Qm=Pfxdota 6300
V = 0.25x Qmd
0.0215185
V= 1575.00 lts
V= 1.575 m3
RED DE DISTRIBUCION
Qm 0.17 lps
CALCULOS
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
POBLACION DE REFERENCIA:
Calculo
Pf = 700 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.41 lps
Calculo
Qmd= 0.53 lps
Qmh= 0.61 lps
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C1-CRP1 0.00 0.53 197.6 1.00 1.05 57.06 11.27 3555.40 3544.13 3555.00 3493.04 0.40 51.09
CRP1-CRP2 0.00 0.53 283.5 1.00 1.05 57.06 16.18 3493.44 3477.26 3493.04 3425.26 0.40 52.00
CRP2-CR 0.00 0.53 356.6 1.00 1.05 57.06 20.35 3425.66 3405.31 3425.26 3371.30 0.40 34.01
837.7
11.27
SEGUNDA CAPTACION
FORMULA: Pf = Pm x ( txtasa de crecimiento/1000+1)
FAMIL. 143
HABxFAM 5
Calculo
Pf = 1001 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
CONSUMO PROMEDIO DIARIO ANUAL (Qm)
calculo
Qm= 0.58 lps
Calculo
Qmd= 0.75 lps
Qmh= 0.87 lps
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C2-CR 0.00 0.75 236.4 2.00 0.37 3.72 0.88 3387.06 3386.18 3386.66 3371.30 0.40 14.88
RESUMEN
Pf = 1701.00
Qmd= 1.28
Qmh= 1.48
Qm= 0.98
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
R-VR lps 1.28 5 2.00 0.63 10.00 0.05 3372.07 3372.02 3371.67 3366.67 0.40 5.35
VOLUMEN DE RESERVORIIO
V= 16.58 m3
LINEA DE DISTRIBUCION
CONSUMO MAXIMO HORARIO
CONSUMO UNITARIO
Formula
Qunit= Qmh / Poblacin futura
POBLACION TRAMO
CALCULOS
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1.48 3964
TUBERIA -PARIA WULCAHUAIN
POBLACION DE REFERENCIA:
Calculo
Pf = 973 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.56 lps
Calculo
Qmd= 0.73 lps
Qmh= 0.84 lps
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
R-VR 0.00 0.73 219 1.00 1.44 103.17 22.59 3555.40 3532.81 3555.00 3485.00 0.40 47.81
VR-A 0.00 0.73 232 1.00 1.44 103.17 23.93 3485.40 3461.47 3485.00 3441.67 0.40 19.80
A-B 0.00 0.73 404 1.00 1.44 103.17 41.68 3442.07 3400.39 3441.67 3371.67 0.40 28.72
A-C 0.00 0.73 404 1.00 1.44 103.17 41.68 3422.07 3380.39 3421.67 3371.67 0.40 8.72
C-D 0.00 0.00 511.8 1.50 0.00 0.00 0.00 3380.39 3380.39 3371.67 2831.57 8.72 548.82
SEGUNDA CAPTACION
FORMULA: Pf = Pm x ( txtasa de crecimiento/1000+1)
FAMIL. 54
HABxFAM 5
Calculo
Pf = 378 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.22 lps
Calculo
Qmd= 0.28 lps
Qmh= 0.33 lps
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
R-VR 0.00 0.28 239 1.00 0.55 17.52 4.19 3385.69 3381.50 3385.65 3371.67 0.04 9.83
RESUMEN
Pf = 1351.00
Qmd= 1.02
Qmh= 1.17
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
R-VR lps 1.02 5 2.00 0.50 6.57 0.03 3371.71 3371.68 3371.67 3366.67 0.04 5.01
VOLUMEN DE RESERVORIIO
V= 13.17 m3
LINEA DE DISTRIBUCION
CONSUMO MAXIMO HORARIO
CONSUMO UNITARIO
Formula
Qunit= Qmh / Poblacin futura
Formula
Qtramo= Qunitx nro de habitantes por tramo
POBLACION TRAMO
CALCULOS
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1.17 3956
AGUA POTABLE : PARIA WILCAHUAIN
POBLACION DE REFERENCIA:
Calculo
Pf = 700 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.41 lps
Calculo
Qmd= 0.53 lps
Qmh= 0.61 lps
LINEA DE CONDUCION JATUN JIHKA
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C1-CRP1 0.00 0.53 197.6 1.00 1.05 57.06 11.27 3555.40 3544.13 3555.00 3493.04 0.40 51.09
CRP1-CRP2 0.00 0.53 283.5 1.00 1.05 57.06 16.18 3493.44 3477.26 3493.04 3425.26 0.40 52.00
CRP2-CR 0.00 0.53 356.6 1.00 1.05 57.06 20.35 3425.66 3405.31 3425.26 3371.30 0.40 34.01
SEGUNDA CAPTACION
FORMULA: Pf = Pm x ( txtasa de crecimiento/1000+1)
FAMIL. 143
HABxFAM 5
Calculo
Pf = 1001 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.58 lps
Calculo
Qmd= 0.75 lps
Qmh= 0.87 lps
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
C2-CR 0.00 0.75 236.4 2.00 0.37 3.72 0.88 3387.06 3386.18 3386.66 3371.30 0.40 14.88
RESUMEN
Pf = 1701.00
Qmd= 1.28
Qmh= 1.48
Qm= 0.98
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
R-VR lps 1.28 5 2.00 0.63 10.00 0.05 3372.07 3372.02 3371.67 3366.67 0.40 5.35
VOLUMEN DE RESERVORIIO
Formula V = 0.15x Qmd x 86400/1000
V= 16.58 m3
LINEA DE DISTRIBUCION
CONSUMO MAXIMO HORARIO
CONSUMO UNITARIO
Formula
Qunit= Qmh / Poblacin futura
Formula
Qtramo= Qunitx nro de habitantes por tramo
CALCULOS
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1.48 3964
miento/1000+1)
diseo 01
AGUA POTABLE : PARIA WILCAHUAIN
POBLACION DE REFERENCIA:
Calculo
Pf = 973 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.56 lps
Calculo
Qmd= 0.73 lps
Qmh= 0.84 lps
SEGUNDA CAPTACION
FORMULA: Pf = Pm x ( txtasa de crecimiento/1000+1)
FAMIL. 54
HABxFAM 5
Calculo
Pf = 378 hab
DEMANDA DE AGUA
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.22 lps
Calculo
Qmd= 0.28 lps
Qmh= 0.33 lps
Q L D v hf Hf
R-VR 0.00 0.28 239 1.00 0.55 17.52 4.19
RESUMEN
Pf = 1351.00
Qmd= 1.02
Qmh= 1.17
Q L D v hf Hf
VOLUMEN DE RESERVORIIO
V= 13.17 m3
LINEA DE DISTRIBUCION
CONSUMO MAXIMO HORARIO
CONSUMO UNITARIO
Formula
Qunit= Qmh / Poblacin futura
Formula
Qtramo= Qunitx nro de habitantes por tramo 2
POBLACION TRAMO
CALCULOS
Q L D v hf Hf
total 1.17
01 02 0.03 1.17 466 2.00 0.58 8.51 3.96
02 03 0.03 0.11 236 1.50 0.10 0.45 0.11
03 04 0.09 0.09 461 1.50 0.08 0.28 0.13
02 05 0.12 1.03 300 2.00 0.51 6.66 2.00
05 06 0.18 0.91 344 2.00 0.45 5.35 1.84
06 09 0.14 0.24 592 1.00 0.47 12.78 7.57
09 10 0.07 0.07 145 0.75 0.26 6.16 0.89
09 11 0.03 0.03 158 0.75 0.09 0.88 0.14
06 07 0.21 0.50 282 1.00 0.98 50.90 14.35
07 12 0.16 0.16 387 1.00 0.32 6.20 2.40
07 08 0.12 0.12 338 0.75 0.44 15.77 5.33
1.17 3709
COTA PEZOMETRICA COTA DE TERRENO PRESION
INICIAL FINAL INICIAL FINAL INICIAL FINAL
9 10 11 12 13 14
9,0-8,0 9,0-11,0 10,0-12,0
MANANTIAL DE FONDO
Donde :
A= 20 cm
B= 10 cm
C= 5.08 cm
E= 30 cm
H= ?
Qm = 0.37 l/s 0.00037
Donde
A= 3,14 D^2/4
D= 0.0508 m 2"
A= 0.0020258 m2
H= 0.27 cm
H= 30.00 cm Mnimo
Luego
Ht= 95,08cm
LONGITUD DE CANASTILLA
DIAMETRO = 2 X Dc = 10.16 cm
Luego ( 3Dc<L<6Dc)
3Dc= 15.24
6Dc= 30.48
Lasumido= 25cm
Ancho ranura=5mm
Largo ranura = 7mm
diamero de rebose
1.32 2"
LINEA DE CONDUCCION VILCABAMBA
POBLACION DE REFERENCIA:
Sierra = 50 Lts/hab/dia
calculo
Qm= 0.24 lps
Calculo
Qmd= 0.31 lps
Qmh= 0.36 lps
Longitud = 127.000 m
Caudal = 0.31
Carga = 3.00
FORMULA: Q = 0.0004264 x C x D^2.64 x hf^0.54
D= 0.71x Q^0.38 / (hf^0.21)
hf= H/L
Calculo
hf= 0.024
Velocidad
V= Q/A { 0.60 , 3.00}
A= 0.0005 m2 0.0011 m2
V= 0.61 m/s 0.27 m/s
VOLUMEN DE RESERVORIIO
V= 6.72 m3
RED DE DISTRIBUCION
CONSUMO UNITARIO
Formula
Qunit= Qmh / Poblacin futura
CALCULOS
TRAMO GASTO LONGITUD DIAMETRO VELOCIDAD PERDIDA DE CARGA COTA PEZOMETRICA COTA DE TERRENO PRESION
TRAMO DISEO (m) (plg) (m/s) UNT TRAMO INICIAL FINAL INICIAL FINAL INICIAL FINAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A-B 0.31 0.31 278.00 1.50 0.27 2.96 0.82 2820.40 2819.58 2820.00 2780.00 0.40 39.58
C-D 0.31 0.31 70.00 1.50 0.27 2.96 0.21 2780.40 2780.19 2780.00 2749.63 0.40 30.56
FORMULA
H = 1.56 V^2 / 2g g=9.81M/S2
H= 0.01 m
LINEA DE CONDUCCION VILCABAMBA
TOPOGRAFIA
COTA RELA
CAPTACION 0.61 100
2 3.54 104.15
3 1.85 102.46
4 0.79 101.4
5 1.98 98.63 1.37
6 7.72 92.89 7.11
7 1.51 99.1 0.9
8 0.14 100.75
B 0.27 100.34
9 18.98 81.36
10 17.31 83.03
C 1.32 99.1
11 0.6 97.78
D 0.58 97.78
12 4.88 92.9
E 4.79 92.9
13 4.21 88.69
F 4.1 88.69
14 23.75 64.94
G 24.26 64.94
15 8.3 56.64
16 0.25 65.19
H 56.64
17 19.46 37.18
18 6.39 50.25
I 19.17 37.18
19 10.55 26.63 RESEV
20 9.96 47.14
21 13.73 50.91