BeMobile Hardware Installation Checklist

(Huawei Site Quality Standard v1.5)

Site Name/ID: Date:


Code Description Category Score Checklist
General hardware quality standard for installation of racks
Waterproof and anticorrosive measures including plugs and door seals
1.1.001 are fixed according to the installation manual. All input and output cable MAJ 4 □ Pass □ Fail □ N/A
holes are sealed.
All racks and cabinets are installed securely for anti-shock; connecting
1.1.002 bolts, flat washers and spring washers for the racks and antennas are MAJ 2 □ Pass □ Fail □ N/A
installed in accordance with the installation manual.
All racks and cabinets are installed according to the engineering design
1.1.008
manual.
MED 0.5 □ Pass □ Fail □ N/A
The antistatic wrist strap is inserted into the designated hole within the
1.1.011
racks and cabinets.
MIN 0.2 □ Pass □ Fail □ N/A
Equipment Grounding Cable - Common:
General hardware quality standard for power and grounding
Power and grounding cables are connected securely in accordance with
3.2.004
the site installation pack.
MAJ 3 □ Pass □ Fail □ N/A
All copper lugs for power and grounding cable are crimped using a
3.2.005
crimping tool and wrapped with heat shrink.
MAJ 3 □ Pass □ Fail □ N/A
3.2.018 Grounding and power cable are cut to the correct length (not coiled). MED 1 □ Pass □ Fail □ N/A
3.2.019 Signal cable is tied off separately from the power cable. MED 1 □ Pass □ Fail □ N/A
The back to back installation method is adopted when two or more
cables are connected to an earthing bus bar termination point.
3.2.031
Overlapping lugs are installed at an angle of 45 degrees, the bigger lug
MED 0.5 □ Pass □ Fail □ N/A
on the bottom.

General hardware quality standard installation for signal cables


Signal cables are undamaged and there are no connection points
4.1.001
between the cables.
MAJ 2 □ Pass □ Fail □ N/A
Protective measures in place where signalling cables are fixed to sharp
4.1.011
edges and/or corners.
MED 0.5 □ Pass □ Fail □ N/A
Cables are neatly tied with uniform spacing, appropriate tightness and
4.1.014
excess cut flush with no sharp edges.
MED 0.5 □ Pass □ Fail □ N/A
The bending radius of the coaxial cable is smooth, not less than 4cm
4.1.022
and has no evidence of kinks.
MIN 0.2 □ Pass □ Fail □ N/A
Labels
Huawei Colour Ring Code Labelling used for all feeders, jumpers, signal,
7.1.001
CPRI and DC power cables as per Huawei standard below.
MAJ 1 □ Pass □ Fail □ N/A
7.1.003 All cable labeling is accordance with customer's requirement. MAJ 1 □ Pass □ Fail □ N/A
7.1.005 Signal cable label is clearly visible and attached 2cm from the connector. MED 0.5 □ Pass □ Fail □ N/A
Huawei Standard: Ensure that the color rings are in the correct direction and positions (both ends of all feeder, jumper,
power, CRPI cables). Wrap the jumpers with 3 layers of tape to make the color rings. The distance between neighbouring
color rings is 10 mm to 15 mm. Stick the same color rings as the original ones at the position 200 mm away from the all
connectors.

Sector Main (Tx/Rx) +450 Diversity (Rx) - 450


1 Red, two rings Red, one ring

2 Yellow, two rings Yellow, one ring

3 Blue, two rings Blue, one ring

Revision: Ver 4.0 19/09/2009 1 of 3


BeMobile Hardware Installation Checklist
(Huawei Site Quality Standard v1.5)
Antenna and feeder installation
9.1.002 Antennas are mounted within the lightening rod 45-degree envelope. MAJ 4 □ Pass □ Fail □ N/A
IF, jumper and feeder cables are installed with a smooth bend radius, no
9.1.003
twisting and no exposed copper.
MAJ 4 □ Pass □ Fail □ N/A
All connectors and grounding kits are sealed according to Huawei
9.1.006
Waterproofing Standard detailed below.
MAJ 4 □ Pass □ Fail □ N/A
The antenna mount is securely attached to the support pole as per the
9.1.007
installation manual.
MAJ 3 □ Pass □ Fail □ N/A
The RF cable connectors tightened to correct torque (DIN connectors by
9.1.008
the torque wrench S=32mm, 25-35N.m).
MAJ 2 □ Pass □ Fail □ N/A
All feeder cable VSWR results satisfy customer's requirement. (If not
9.1.010
specified, Huawei's reqiurement is VSWR <1.3).
MAJ 1 □ Pass □ Fail □ N/A
The azimuth error of the directional antenna is within ± 5 degrees and
9.1.012 the tilt angle error is within ± 0.5 degrees as per the site installation MED 1 □ Pass □ Fail □ N/A
pack.
Cable clamps are installed firmly, in the same direction and evenly; 1/2"
9.1.023
every 300mm, 1 5/8 every 1m, CPRI and DC power cable every 1m.
MED 0.5 □ Pass □ Fail □ N/A
The minimum space between existing and new antennas is
9.1.029
horizontal - 1m, vertical - 0.5m.
MED 0.5 □ Pass □ Fail □ N/A
Feeder cable minimum bend radius; 1/2" SuperFlex is 30mm, 1/2" Heliax
is 200mm, 7/8" feeder is 250 mm, 5/4" feeder is 380 mm and 1 5/8" is
9.1.035
510mm, all other cables; not less than 20 times the diameter of the
MED 0.5 □ Pass □ Fail □ N/A
cable.
All grounding cable is running in a downwards direction from the feeder
9.1.040 clips with a maximum angle of 15 degrees between the grounding cable MED 0.5 □ Pass □ Fail □ N/A
and the feeder cable.

Huawei waterproofing standards: When wrapping the tape, ensure that the upper layer covers more than 50% of the lower
layer. Before wrapping the waterproof tape, stretch the tape till the width of the tape becomes 1/2 of the original. Stretch each
layer of the waterproof tape and wrap each layer around the jumpers tightly.

Antenna
connector

Grounding
kit/
connector

Microwave installation
Antenna(s) Polarization and position is according to the network topology
14.1.001
and site installation pack documentation.
MAJ 2 □ Pass □ Fail □ N/A
ODU(s) and pole mounting position is according to the site installation
14.1.002
pack documentation.
MAJ 2 □ Pass □ Fail □ N/A
The antenna is securely fixed in accordance with the installation manual
14.1.003
and local wind loading requirements.
MAJ 2 □ Pass □ Fail □ N/A
IDU and ODU Cable(s) grounding termination is installed according to
14.1.004
site installation pack documentation.
MAJ 1 □ Pass □ Fail □ N/A
ODU RF Coupler grounding termination is installed according to the site
14.1.005
installation pack documentation.
MAJ 1 □ Pass □ Fail □ N/A
The ODU and antenna support structure is installed and orientated as
14.1.009
per the installation manual and site installation pack.
MED 1 □ Pass □ Fail □ N/A
Feeder and antenna, ODU and IF cable connectors are installed and
14.1.010 waterproofed as per the installation manual and in accordance with the MED 1 □ Pass □ Fail □ N/A
Huawei standard.

Revision: Ver 4.0 19/09/2009 2 of 3


BeMobile Hardware Installation Checklist
(Huawei Site Quality Standard v1.5)
Site clean
19.1.003 A protection cap is installed on any unused connectors. MED 0.2 □ Pass □ Fail □ N/A
The site is neat and tidy, waste materials have been removed and spare
19.1.005
material or parts neatly and securely stored.
MIN 0.2 □ Pass □ Fail □ N/A
Final inspection
Prior to equipment power on the self-inspection checklist is completed
20.1.001
and submitted to Huawei within 24hrs or as soon as practically possible.
MAJ 4 □ Pass □ Fail □ N/A
Photographs (with date stamp) of the site and installation as per the site
20.1.005 folder requirements have been taken. The racks and cabinets are locked MED 1 □ Pass □ Fail □ N/A
and prior to leaving site the relevant personnel are informed.
Quality management
The subcontractor site supervisor has completed the updated HSQS
v1.5 BMobile Hardware Installation Checklist and submitted a signed
23.1.001
scanned copy to Huawei PIC within 24hrs or as soon as practically
MAJ 2 □ Pass □ Fail □ N/A
possible.
The subcontractor QM/QC has completed the Huawei Site Quality
23.1.003 Report v1.5 (HSQR v1.5) and submitted a softcopy to Huawei PIC MAJ 2 □ Pass □ Fail □ N/A
within 24hrs or as soon as practically possible.
After completion of any Snag List items a softcopy of the HSQR v1.5
23.1.004
and photographs is submitted to Huawei PIC.
MAJ 2 □ Pass □ Fail □ N/A
Environment, health & safety
24.1.014 Have all staff/visitors been given safety induction? MED 0.5 □ Pass □ Fail □ N/A
24.1.061 All incidents have been reported to Huawei immediately. MAJ 4 □ Pass □ Fail □ N/A
SWMS or Safe Work Methods Specific for Works noted on site or
24.1.062
avaliable for audit.
MAJ 2 □ Pass □ Fail □ N/A
24.1.063 There is a first aid facility established or available. MAJ 2 □ Pass □ Fail □ N/A
Remote Location Emergency Management Plan or similar referred to in
24.1.064
SWMS is avaliable.
MAJ 2 □ Pass □ Fail □ N/A
Fatigue Management Plan for Driving or similar referred to in SWMS is
24.1.065
avaliable.
MAJ 2 □ Pass □ Fail □ N/A
Site supervisor (Project manager/ leading engineer) has conducted a
24.1.066
daily pre-start and comments/information match the Safe Work Methods.
MED 1 □ Pass □ Fail □ N/A

REMARK:

Subcontractor Site Engineer/Installer

Name:
Signature:
Contact number: Date:

Subcontractor Project Manager/Quality Manager

Name:
Signature:
Contact number: Date:

Revision: Ver 4.0 19/09/2009 3 of 3