You are on page 1of 1

1 2 3 4 5 6 7 8 9 10

SW Review :- D
1. As per submitted RFQ, kindly show Pre filter, fine filter and activated
carbon filter after air dryer.
2. Kindly consider and supply pressure reducing valve along with
compressor and also show in PID.
3. Kindly show PRV set pressure value in PID.
4. Kindly show receiver with isolation valve and confirmed the outlet
size is 3/4" E
5. Kindly show nozzle types and thread standard for site installation.
6. Kindly confirm the type of drain valve. ie auto drain / manual type.
7. Confirm the power supply agreed as per submitted RFQ.
8. Kindly specify efficiency of the supply filter.

All materials supplied are in compliance with the


requirements of the List of Prohibited Substances F
copied, used for manufacturing or communicated to any other person or company.
This document is our property and shall not without our permission be altered,

Tolerances,if not indicated,according to:

ATLAS COPCO STANDARD/Klasse/Class

Name FLOW DIAGRAM CPA Secrecy Class

See Drawing
CONFIDENTIAL:

Material 1102 K/ 2

Treatment See Drawing ACD


Scale NTS Family A3 Compare - Drawing owner

Drawn by SAM Blank nr. Replaces CNK G


-
Version Drwg Designation Sheet ( ) 01 01
01.00 Kg Kg
STATUS 01.00 Blank wt. Fini wt.

Note
Posi-
tion
Modified from Date Intr./Appd. Parent 3D Model Ed.Version 3D PRELIMINARY
Des checked. Prod checked. Approved. Date
25-02-2005 9096 8001 15

You might also like