PRECIPITACIONES EN LAS ESTACIONES

Estacin: VILLA MONTES Lat. S.: 21 15' 17''


Provincia: GRAN CHACO Long. W.: 63 24' 27''
Departamento: TARIJA Altura: 403 m.s.n.m.

AO ENE. FEB. MAR. ABR. MAY. JUN.


1975 83 63.2 10 48.2 6.7 12.5
1976 10.5 87.3 71 0 16 0
1977 242.2 13.2 97.3 30 27 16.5
1978 67.7 70 108.7 42.5 0 0
1979 251.8 181.5 229.7 32.3 13.5 5
1980 101.5 123.5 210.2 9.2 49.1 15.1
1981 412.5 174.3 153.2 148.2 60.9 8.1
1982 282.2 106.9 354.3 184.6 13.8 19.1
1983 138.1 162.9 84.2 92 48.2 13.3
1984 190.3 187.2 270.2 78.6 21.6 29.8
1985 60.4 519.7 49.2 168.4 0 0
1986 280.7 298.2 315.8 52.8 38 16.6
1987 367 72 72.5 235.1 6.9 0
1988 204.4 175.5 148.3 166.2 37 1.6
1989 101.4 49.6 218.6 67.4 15.3 5.4
1990 94.8 349.2 88.2 84.6 12.4 7.8
1991 140.8 137.6 158.2 55.2 36.6 3.2
1992 274.6 526.6 21.4 11.6 43.0 13.4
1993 79.8 93.8 126.2 13.8 4.2 0.0
1994 78.8 198.0 40.0 46.8 69.0 1.2
1995 207.4 122.6 172.0 7.8 28.2 13.0
1996 186.2 152.2 93.4 74.2 134.0 17.8
1997 182.4 210.6 213.1 62.6 6.6 10.9
1998 153.1 76.6 138.7 99.6 0.5 6.3
1999 31.7 134.7 257.0 62.9 30.8 18.1
2000 132.4 18.8 183.5 40.8 25.6 4.7
2001 71.1 125.3 192.9 59.6 8.9 9.6
2002 38.2 119.7 177.8 63.0 25.1 2.4
2003 139.3 52.3 207.6 12.3 4.6 11.1
2004 81.5 127.3 177.0 217.3 6.0 4.8
2005 191.1 308.7 108.0 62.2 6.0 6.0

MEDIA 157.32 162.55 153.17 75.15 25.66 8.82


DESV 98.28 124.37 83.82 62.41 27.27 7.31
MAX 412.50 526.60 354.30 235.10 134.00 29.80
Prec. Media 80% 125.86 130.04 122.53 60.12 20.53 7.05
Prec. Efect. 157.32 162.55 153.17 75.15 25.66 0.00
rea de la cuenca:
Coeficiente de escorrenta:

PRECIPITACIONES AO HIDROLOGICO

AO OCT NOV DIC ENE FEB MAR


75-76 0 28 94.9 10.5 87.3 71
76-77 15.5 49 133.5 242.2 13.2 97.3
77-78 9.2 90.8 211.5 67.7 70 108.7
78-79 23.1 34.1 182.7 251.8 181.5 229.7
79-80 29.5 197.5 178.5 101.5 123.5 210.2
80-81 20.4 123.1 49.6 412.5 174.3 153.2
81-82 45.8 48 141 282.2 106.9 354.3
82-83 13.8 42.3 89.2 138.1 162.9 84.2
83-84 27.6 77.2 145.8 190.3 187.2 270.2
84-85 28.5 190.1 174.9 60.4 519.7 49.2
85-86 26.6 76.5 165.7 280.7 298.2 315.8
86-87 37 24.4 172.5 367 72 72.5
87-88 21.6 61.3 150 204.4 175.5 148.3
88-89 8.5 35.1 298.5 101.4 49.6 218.6
89-90 53 157.5 257.6 94.8 349.2 88.2
90-91 84.2 77.2 186.6 140.8 137.6 158.2
91-92 16.6 90.4 62.8 274.6 526.6 21.4
92-93 9.6 104.4 138.2 79.8 93.8 126.2
93-94 78.8 198.0 40.0 78.8 198.0 40.0
94-95 106.6 77.0 183.2 207.4 122.6 172.0
95-96 27.6 78.2 107.2 186.2 152.2 93.4
96-97 24.6 108.6 269.2 182.4 210.6 213.1
97-98 42.4 74.6 220.0 153.1 76.6 138.7
98-99 58.3 98.7 71.3 31.7 134.7 257.0
99-00 14.7 23.8 70.1 132.4 18.8 183.5
00-01 32.7 143.1 165.2 71.1 125.3 192.9
01--02 36.7 41.9 44.2 38.2 119.7 177.8
02--03 130.3 43.8 36.5 139.3 52.3 207.6
03--04 27.9 41.5 184.1 81.5 127.3 177.0
04--05 67.0 121.1 135.2 191.1 308.7 108.0
MEDIA 37.27 85.24 145.32 159.80 165.86 157.94
DESV 30.08 51.09 69.15 98.97 125.09 80.85
MAX 130.30 198.00 298.50 412.50 526.60 354.30

PORCENTAJE DE DISTRIBUCION

AO OCT NOV DIC ENE FEB MAR


90-91 9.0 8.2 19.9 15.0 14.7 16.9
91-92 1.5 8.4 5.8 25.4 48.8 2.0
92-93 1.6 17.8 23.6 13.6 16.0 21.6
93-94 10.4 26.1 5.3 10.4 26.1 5.3
94-95 11.5 8.3 19.7 22.3 13.2 18.5
95-96 3.1 8.9 12.2 21.1 17.3 10.6
96-97 2.2 9.7 24.1 16.4 18.9 19.1
97-98 5.1 9.0 26.6 18.5 9.3 16.8
98-99 7.5 12.6 9.1 4.1 17.2 32.9
99-00 2.8 4.6 13.5 25.5 3.6 35.3
00-01 3.9 17.2 19.8 8.5 15.0 23.2
01--02 6.6 7.6 8.0 6.9 21.6 32.1
02--03 20.4 6.9 5.7 21.8 8.2 32.5
03--04 3.2 4.7 21.0 9.3 14.6 20.2
04--05 6.6 12.0 13.4 18.9 30.5 10.7

DETERMINACION DEL CAUDAL MEDIO MENSUAL


Pm 882.95 Precipitacin media anual de la cuenca (mm)
C 0.35 Coeficiente de escorrenta adimencional
A 27.5 rea de la cuenca

Qm 8498.425833
JUL. AGO. SEP. OCT. NOV. DIC. TOTAL
2 0.5 28.8 0 28 94.9 377.8
16 0 20.2 15.5 49 133.5 419
6 2.7 6.8 9.2 90.8 211.5 753.2
0 0 20 23.1 34.1 182.7 548.8
32 9 1 29.5 197.5 178.5 1161.3
0.2 11.6 0.8 20.4 123.1 49.6 714.3
1.2 48.1 0.2 45.8 48 141 1241.5
16 8.8 6.2 13.8 42.3 89.2 1137.2
24.9 3.9 2.8 27.6 77.2 145.8 820.9
2.5 45 11.5 28.5 190.1 174.9 1230.2
0 4 15 26.6 76.5 165.7 1085.5
6 0.5 19 37 24.4 172.5 1261.5
0 0 10 21.6 61.3 150 996.4
3.9 0 0 8.5 35.1 298.5 1079
14.5 0 18.2 53 157.5 257.6 958.5
0.0 0.0 0.0 84.2 77.2 186.6 985
1.0 0.0 56.6 16.6 90.4 62.8 759
2.6 4.6 11.4 9.6 104.4 138.2 1161.4
11.0 0.0 4.4 84.2 117.4 230.3 765.1
0.0 0.0 6.6 106.6 77.0 183.2 807.2
5.6 2.8 3.0 27.6 78.2 107.2 775.4
0.0 5.2 5.8 24.6 108.6 269.2 1071.2
3.0 0.1 23.8 42.4 74.6 220.0 1050.1
1.4 12.3 0.2 58.3 98.7 71.3 717
14.9 0.0 2.6 14.7 23.8 70.1 661.3
0.3 0.2 4.2 32.7 143.1 165.2 751.5
0.0 0.0 24.8 36.7 41.9 44.2 615
4.2 0.0 0.0 130.3 43.8 36.5 641
0.1 0.0 0.0 27.9 41.5 184.1 680.8
0.0 0.3 7.2 67.0 121.1 135.2 944.7
0.0 0.0 5.8 36.9 91.3 256.6 1072.6

5.46 5.15 10.22 37.43 82.84 155.05 878.82


8.07 11.63 12.07 29.84 46.14 69.35 242.63
32.00 48.10 56.60 130.30 197.50 298.50 1261.50
4.37 4.12 8.18 29.95 66.27 124.04 703.06
0.00 0.00 10.22 37.43 82.84 155.05 878.82
rea de la cuenca: A = 27.5 km2
oeficiente de escorrenta: C = 0.2

ABR MAY JUN JUL AGO SEP TOTAL


0 16 0 16 0 20.2 343.9
30 27 16.5 6 2.7 6.8 639.7
42.5 0 0 0 0 20 620.4
32.3 13.5 5 32 9 1 995.7
9.2 49.1 15.1 0.2 11.6 0.8 926.7
148.2 60.9 8.1 1.2 48.1 0.2 1199.8
184.6 13.8 19.1 16 8.8 6.2 1226.7
92 48.2 13.3 24.9 3.9 2.8 715.6
78.6 21.6 29.8 2.5 45 11.5 1087.3
168.4 0 0 0 4 15 1210.2
52.8 38 16.6 6 0.5 19 1296.4
235.1 6.9 0 0 0 10 997.4
166.2 37 1.6 3.9 0 0 969.8
67.4 15.3 5.4 14.5 0 18.2 832.5
84.6 12.4 7.8 0.0 0.0 0.0 1105.1
55.2 36.6 3.2 1.0 0.0 56.6 937.2
11.6 43.0 13.4 2.6 4.6 11.4 1079.0
13.8 4.2 0.0 11.0 0.0 4.4 585.4
46.8 69.0 1.2 0.0 0.0 6.6 757.2
7.8 28.2 13.0 5.6 2.8 3.0 929.2
74.2 134.0 17.8 0.0 5.2 5.8 881.8
62.6 6.6 10.9 3.0 0.1 23.8 1115.5
99.6 0.5 6.3 1.4 12.3 0.2 825.7
62.9 30.8 18.1 14.9 0.0 2.6 781.0
40.8 25.6 4.7 0.3 0.2 4.2 519.1
59.6 8.9 9.6 0.0 0.0 24.8 833.2
63.0 25.1 2.4 4.2 0.0 0.0 553.2
12.3 4.6 11.1 0.1 0.0 0.0 637.9
217.3 6.0 4.8 0.0 0.3 7.2 874.9
62.2 6.0 6.0 0.0 0.0 5.8 1011.1
76.05 26.29 8.69 5.58 5.30 9.60 882.95
63.27 27.51 7.40 8.18 11.79 11.77 235.47
235.10 134.00 29.80 32.00 48.10 56.60 1296.40

ABR MAY JUN JUL AGO SEP TOTAL


5.9 3.9 0.3 0.1 0.0 6.0 937.2
1.1 4.0 1.2 0.2 0.4 1.1 1079.0
2.4 0.7 0.0 1.9 0.0 0.8 100.0
6.2 9.1 0.2 0.0 0.0 0.9 757.2
0.8 3.0 1.4 0.6 0.3 0.3 929.2
8.4 15.2 2.0 0.0 0.6 0.7 881.8
5.6 0.6 1.0 0.3 0.0 2.1 1115.5
12.1 0.1 0.8 0.2 1.5 0.0 825.7
8.1 3.9 2.3 1.9 0.0 0.3 781.0
7.9 4.9 0.9 0.1 0.0 0.8 519.1
7.2 1.1 1.2 0.0 0.0 3.0 833.2
11.4 4.5 0.4 0.8 0.0 0.0 553.2
1.9 0.7 1.7 0.0 0.0 0.0 637.9
24.8 0.7 0.5 0.0 0.0 0.8 874.9
6.2 0.6 0.6 0.0 0.0 0.6 1011.1
377.8
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
PRECIPITACIONES EN LAS ESTACIONES

Estacin: VILLA MONTES Lat. S.: 21 15' 17''


Provincia: GRAN CHACO Long. W.: 63 24' 27''
Departamento: TARIJA Altura: 403 m.s.n.m.

AO ENE. FEB. MAR. ABR. MAY.


1990 94.8 349.2 88.2 84.6 12.4
1991 140.8 137.6 158.2 55.2 36.6
1992 274.6 526.6 21.4 11.6 43.0
1993 79.8 93.8 126.2 13.8 4.2
1994 78.8 198.0 40.0 46.8 69.0
1995 207.4 122.6 172.0 7.8 28.2
1996 186.2 152.2 93.4 74.2 134.0
1997 182.4 210.6 213.1 62.6 6.6
1998 153.1 76.6 138.7 99.6 0.5
1999 31.7 134.7 257.0 62.9 30.8
2000 132.4 18.8 183.5 40.8 25.6
2001 71.1 125.3 192.9 59.6 8.9
2002 38.2 119.7 177.8 63.0 25.1
2003 139.3 52.3 207.6 12.3 4.6
2004 81.5 127.3 177.0 217.3 6.0
2005 191.1 308.7 108.0 62.2 6.0

MEDIA 157.32 162.55 153.17 75.15 25.66


DESV 98.28 124.37 83.82 62.41 27.27
MAX 412.50 526.60 354.30 235.10 134.00
Prec. Media 80% 125.86 130.04 122.53 60.12 20.53
Prec. Efect. 157.32 162.55 153.17 75.15 25.66

Coeficiente d

PRECIPITACIONES AO HIDROLOGICO

AO OCT NOV DIC ENE FEB


90-91 84.2 77.2 186.6 140.8 137.6
91-92 16.6 90.4 62.8 274.6 526.6
92-93 9.6 104.4 138.2 79.8 93.8
93-94 78.8 198.0 40.0 78.8 198.0
94-95 106.6 77.0 183.2 207.4 122.6
95-96 27.6 78.2 107.2 186.2 152.2
96-97 24.6 108.6 269.2 182.4 210.6
97-98 42.4 74.6 220.0 153.1 76.6
98-99 58.3 98.7 71.3 31.7 134.7
99-00 14.7 23.8 70.1 132.4 18.8
00-01 32.7 143.1 165.2 71.1 125.3
01--02 36.7 41.9 44.2 38.2 119.7
02--03 130.3 43.8 36.5 139.3 52.3
03--04 27.9 41.5 184.1 81.5 127.3
04--05 67.0 121.1 135.2 191.1 308.7
MEDIA 37.27 85.24 145.32 159.80 165.86
DESV 30.08 51.09 69.15 98.97 125.09
MAX 130.30 198.00 298.50 412.50 526.60

PORCENTAJE DE DISTRIBUCION

AO OCT NOV DIC ENE FEB


90-91 9.0 8.2 19.9 15.0 14.7
91-92 1.5 8.4 5.8 25.4 48.8
92-93 1.6 17.8 23.6 13.6 16.0
93-94 10.4 26.1 5.3 10.4 26.1
94-95 11.5 8.3 19.7 22.3 13.2
95-96 3.1 8.9 12.2 21.1 17.3
96-97 2.2 9.7 24.1 16.4 18.9
97-98 5.1 9.0 26.6 18.5 9.3
98-99 7.5 12.6 9.1 4.1 17.2
99-00 2.8 4.6 13.5 25.5 3.6
00-01 3.9 17.2 19.8 8.5 15.0
01--02 6.6 7.6 8.0 6.9 21.6
02--03 20.4 6.9 5.7 21.8 8.2
03--04 3.2 4.7 21.0 9.3 14.6
04--05 6.6 12.0 13.4 18.9 30.5

DETERMINACION DEL CAUDAL MEDIO MENSUAL


Pm 882.95 Precipitacin media anual de la cuenca (mm)
C 0.35 Coeficiente de escorrenta adimencional
A 27.5 rea de la cuenca

Qm 8498.4258333333

PRECIPITACION *0,8
AO OCT NOV DIC ENE FEB
90-91 67.36 61.76 149.28 112.64 110.08
91-92 13.28 72.32 50.24 219.68 421.28
92-93 7.68 83.52 110.56 63.84 75.04
93-94 63.04 158.4 32 63.04 158.4
94-95 85.28 61.6 146.56 165.92 98.08
95-96 22.08 62.56 85.76 148.96 121.76
96-97 19.68 86.88 215.36 145.92 168.48
97-98 33.92 59.68 176 122.48 61.28
98-99 46.64 78.96 57.04 25.36 107.76
99-00 11.76 19.04 56.08 105.92 15.04
00-01 26.16 114.48 132.16 56.88 100.24
01--02 29.36 33.52 35.36 30.56 95.76
02--03 104.24 35.04 29.2 111.44 41.84
03--04 22.32 33.2 147.28 65.2 101.84
04--05 53.6 96.88 108.16 152.88 246.96

PRECIPITACION EFECTIVA
AO OCT NOV DIC ENE FEB
90-91 67.36 61.76 149.28 112.64 110.08
91-92 13.28 72.32 50.24 219.68 421.28
92-93 0 83.52 110.56 63.84 75.04
93-94 63.04 158.4 32 63.04 158.4
94-95 85.28 61.6 146.56 165.92 98.08
95-96 22.08 62.56 85.76 148.96 121.76
96-97 19.68 86.88 215.36 145.92 168.48
97-98 33.92 59.68 176 122.48 61.28
98-99 46.64 78.96 57.04 25.36 107.76
99-00 11.76 19.04 56.08 105.92 15.04
00-01 26.16 114.48 132.16 56.88 100.24
01--02 29.36 33.52 35.36 30.56 95.76
02--03 104.24 35.04 29.2 111.44 41.84
03--04 22.32 33.2 147.28 65.2 101.84
04--05 53.6 96.88 108.16 152.88 246.96

CAUDAL MEDIO

AO OCT NOV DIC ENE FEB


Dias Mes 31 28 31 30 31
90-91 0.2421 0.2457 0.5364 0.4183 0.3956
91-92 0.0477 0.2877 0.1805 0.8157 1.5139
92-93 0.0276 0.3323 0.3973 0.2371 0.2697
93-94 0.2265 0.6302 0.1150 0.2341 0.5692
94-95 0.3065 0.2451 0.5267 0.6161 0.3525
95-96 0.0793 0.2489 0.3082 0.5531 0.4376
96-97 0.0707 0.3457 0.7739 0.5419 0.6054
97-98 0.1219 0.2374 0.6325 0.4548 0.2202
98-99 0.1676 0.3141 0.2050 0.0942 0.3872
99-00 0.0423 0.0758 0.2015 0.3933 0.0540
00-01 0.0940 0.4555 0.4749 0.2112 0.3602
01--02 0.1055 0.1334 0.1271 0.1135 0.3441
02--03 0.3746 0.1394 0.1049 0.4138 0.1504
03--04 0.0802 0.1321 0.5293 0.2421 0.3660
04--05 0.1926 0.3854 0.3887 0.5677 0.8875
media 0.1453 0.2806 0.3668 0.3938 0.4609
90-91
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.1052 0.0872
Junio 31 0.0095 0.0140020582
Julio 61 0.0029 0.0023850124
Agosto 92 0.0003829711
Septiembre 123 6.14952299426998E-05

Caudal (m3/seg)
0.1200

0.1000

0.0800 f(x) = 0.0


R = 0.96

0.0600

0.0400

Caudal (m3/seg)
91-92
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO 0.0200
0.14
Mayo 0 0.1236185783 0.0928
Junio 31 0.0398070988 0.0401831052 0.12
0.0000
Julio 61 0.0074746117 0.0178757785 0.1 0 2
Agosto 92 0.0132 0.0077403479 f(x) = 0.09
0.08
Septiembre 123 0.0004749194 R = 0.755
0.06

0.04

0.02

0
0 10
Caudal (m3/seg)

92-93
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO 0.014
Mayo 0 0.0120743728 0.0011
0.012
Junio 31 0.000001 2.74966851879307E-05
Julio 61 7.74192644844654E-07 0.01
Agosto 92 1.93524831182772E-08
0.008
Septiembre 123 0.000000001 4.83753759916375E-10
0.006

0.004

0.002

0 f(x) = 0.0010
0.01

0.008

0.006

0.004

0.002

0 f(x) = 0.0010
R = 0.87135
0 20

93-94
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO

Caudal (m3/seg)
Mayo 0 0.1984 0.1359 0.2500
Junio 31 0.0035648148 0.0046316785
Julio 61 0.0001 0.0001760335
0.2000
Agosto 92 0.0000 5.99949080707475E-06
Septiembre 123 2.04471761243956E-07
0.1500
f(x) = 0.1359
R = 0.985896
0.1000

0.0500

0.0000
0 10 20

94-95

Caudal (m3/seg)
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.0810707885 0.081
Junio 31 0.0386188272 0.0373170063 0.09
Julio 61 0.0160991637 0.0176273056 0.08
f(x) = 0.0815
Agosto 92 0.0080495818 0.0081209663 0.07 R = 0.99760
Septiembre 123 0.0037413599 0.06
0.05
0.04
0.03
0.02
0.01
0
0 10 2

95-96
audal (m3/seg)

0.45
0.4
Caudal (m3/seg)
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.3852299881 0.2633
Junio 31 0.0528780864 0.0946602406 0.45
Julio 61 0.035173539 0.4
Agosto 92 0.0149492234 0.012645407 0.35
Septiembre 123 0.0045462107 0.3
0.25 f(x) = 0.263
0.2 R = 0.9047
0.15
0.1
0.05
0
0 20

96-97

Caudal (m3/seg)
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.0190 0.0292
Junio 31 0.0081920872
Julio 61 0.008624552 0.0023944863 0.0200
0.0180 f(x) =
Agosto 92 0.0002874851 0.0006717754 0.0160 R = 0
Septiembre 123 0.0001884672 0.0140
0.0120
0.0100
0.0080
0.0060
0.0040
0.0020
0.0000
0 20

Caudal (m3/seg)

97-98
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.0494
Junio 31 0.0187152778 0.0156888524 0.02
0.018
Julio 61 0.0040247909 0.0051704019
0.016
Agosto 92 0.0016420581 0.014
Septiembre 123 0.0005941358 0.0005214981 0.012
0.01
0.008
0.006
0.004
0.002
0
0 20
0.002
0
0 20

98-99

Caudal (m3/seg)
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.0885454002 0.103
Junio 31 0.0537692901 0.0554082771
Julio 61 0.0428352748 0.0304087072 0.1
0.09 f(x) = 0.1022
Agosto 92 0.0163581949 R = 0.95330
0.08
Septiembre 123 0.0077237654 0.0087997999 0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
0 20

99-00

Caudal (m3/seg)
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.0735961768 0.0637
Junio 31 0.0139621914 0.0112254617 0.08
Julio 61 0.0008624552 0.0020921339 0.07
Agosto 92 0.0005749701 0.000368684 0.06 f(x) = 0.0641
Septiembre 123 6.49709236634736E-05 0.05 R = 0.93467
0.04
0.03
0.02
0.01
0
0 20
Caudal (m3/seg)

00-01
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO 0.0300
Mayo 0 4.6517
Junio 31 0.0285 0.0801570651 0.0250
Julio 61 0.0121 0.0015745791
0.0200
Agosto 92 0.00001 2.7132799295133E-05
Septiembre 123 4.67546393450013E-07 0.0150

0.0100

0.0050

0.0000
0 10
0.0150

0.0100

0.0050

0.0000
0 10

Caudal (m3/seg)
01--02
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
0.08
Mayo 0 0.0721587515 0.144 f(x) = 0.1
Junio 31 0.0071 0.0100122896 0.07 R = 0.75
Julio 61 0.0121 0.0007586713 0.06
Agosto 92 0.00001 5.27502535277628E-05 0.05
Septiembre 123 3.66771399578411E-06 0.04
0.03
0.02
0.01
0
0 10 2

Caudal (m3/seg)
02--03
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO 0.035
f(x) = 0.0
Mayo 0 0.013224313 0.0548 0.03 R = 0.82
Junio 31 0.0330 0.0038102324
0.025
Julio 61 0.0002874851 0.0002887166
Agosto 92 0.0000 2.00744020369542E-05 0.02
Septiembre 123 1.39576893728451E-06
0.015

0.01

0.005

0
0 10 2
Caudal (m3/seg)

03--04
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
0.02
Mayo 0 0.0172491039 0.0244 f(x) = 0.
0.018
Junio 31 0.0142592593 0.0085043954 0.016
R = 0.9
Julio 61 0.0030666419 0.014
Agosto 92 0.0008624552 0.0010688498 0.012
Septiembre 123 0.0003725378 0.01
0.008
0.006
0.004
0.002
0
0 10
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
0 10

Caudal (m3/seg)
04--05
MES DIAS ACUMULADOS CAUDAL CAUDAL CALIBRADO
Mayo 0 0.0172491039 0.0604 0.02
0.018 f(x) = 0
Junio 31 0.0178 0.0014190521 R = 0.7
0.016
Julio 61 0.0000 3.76278468473228E-05 0.014
Agosto 92 0.000000884 0.012
Septiembre 123 2.07697928206369E-08 0.01
0.008
0.006
0.004
0.002
0
0 20

Precipitacion annual para un riesgo de 25 % y una vida util de 50 anos

Mes ENE. FEB. MAR. ABR. MAY.


% 17.5565350252 18.476576185 17.4184187985 8.54669814 2.95271583
Pmedias 154.3822580645 162.47258065 153.1677419355 75.1548387 25.9645161
Pminimas 71.9817936034 75.753962358 71.4155170738 35.0414624 12.1061349

Mes ENE. FEB. MAR. ABR. MAY.


Das 31 28 31 30 31
Qmed [m^3/s 0.2586711333 0.3013938028 0.2566361827 0.13012117 0.04350416
692824.7634324 729131.8877 687374.351835038 337274.075 116521.548
710741.935483871 724041.29032 670188.75 351477.5 126307.188
JUN. JUL. AGO. SEP. OCT. NOV. DIC.
7.8 0.0 0.0 0.0 84.2 77.2 186.6
3.2 1.0 0.0 56.6 16.6 90.4 62.8
13.4 2.6 4.6 11.4 9.6 104.4 138.2
0.0 11.0 0.0 4.4 84.2 117.4 230.3
1.2 0.0 0.0 6.6 106.6 77.0 183.2
13.0 5.6 2.8 3.0 27.6 78.2 107.2
17.8 0.0 5.2 5.8 24.6 108.6 269.2
10.9 3.0 0.1 23.8 42.4 74.6 220.0
6.3 1.4 12.3 0.2 58.3 98.7 71.3
18.1 14.9 0.0 2.6 14.7 23.8 70.1
4.7 0.3 0.2 4.2 32.7 143.1 165.2
9.6 0.0 0.0 24.8 36.7 41.9 44.2
2.4 4.2 0.0 0.0 130.3 43.8 36.5
11.1 0.1 0.0 0.0 27.9 41.5 184.1
4.8 0.0 0.3 7.2 67.0 121.1 135.2
6.0 0.0 0.0 5.8 36.9 91.3 256.6

8.82 5.46 5.15 10.22 37.43 82.84 155.05


7.31 8.07 11.63 12.07 29.84 46.14 69.35
29.80 32.00 48.10 56.60 130.30 197.50 298.50
7.05 4.37 4.12 8.18 29.95 66.27 124.04
0.00 0.00 0.00 10.22 37.43 82.84 155.05

rea de la cuenca: A = 27.5 km2


Coeficiente de escorrenta: C = 0.2

MAR ABR MAY JUN JUL AGO SEP


158.2 55.2 36.6 3.2 1.0 0.0 56.6
21.4 11.6 43.0 13.4 2.6 4.6 11.4
126.2 13.8 4.2 0.0 11.0 0.0 4.4
40.0 46.8 69.0 1.2 0.0 0.0 6.6
172.0 7.8 28.2 13.0 5.6 2.8 3.0
93.4 74.2 134.0 17.8 0.0 5.2 5.8
213.1 62.6 6.6 10.9 3.0 0.1 23.8
138.7 99.6 0.5 6.3 1.4 12.3 0.2
257.0 62.9 30.8 18.1 14.9 0.0 2.6
183.5 40.8 25.6 4.7 0.3 0.2 4.2
192.9 59.6 8.9 9.6 0.0 0.0 24.8
177.8 63.0 25.1 2.4 4.2 0.0 0.0
207.6 12.3 4.6 11.1 0.1 0.0 0.0
177.0 217.3 6.0 4.8 0.0 0.3 7.2
108.0 62.2 6.0 6.0 0.0 0.0 5.8
157.94 76.05 26.29 8.69 5.58 5.30 9.60
80.85 63.27 27.51 7.40 8.18 11.79 11.77
354.30 235.10 134.00 29.80 32.00 48.10 56.60

MAR ABR MAY JUN JUL AGO SEP


16.9 5.9 3.9 0.3 0.1 0.0 6.0
2.0 1.1 4.0 1.2 0.2 0.4 1.1
21.6 2.4 0.7 0.0 1.9 0.0 0.8
5.3 6.2 9.1 0.2 0.0 0.0 0.9
18.5 0.8 3.0 1.4 0.6 0.3 0.3
10.6 8.4 15.2 2.0 0.0 0.6 0.7
19.1 5.6 0.6 1.0 0.3 0.0 2.1
16.8 12.1 0.1 0.8 0.2 1.5 0.0
32.9 8.1 3.9 2.3 1.9 0.0 0.3
35.3 7.9 4.9 0.9 0.1 0.0 0.8
23.2 7.2 1.1 1.2 0.0 0.0 3.0
32.1 11.4 4.5 0.4 0.8 0.0 0.0
32.5 1.9 0.7 1.7 0.0 0.0 0.0
20.2 24.8 0.7 0.5 0.0 0.0 0.8
10.7 6.2 0.6 0.6 0.0 0.0 0.6

MAR ABR MAY JUN JUL AGO SEP


126.56 44.16 29.28 2.56 0.8 0 45.28
17.12 9.28 34.4 10.72 2.08 3.68 9.12
100.96 11.04 3.36 0 8.8 0 3.52
32 37.44 55.2 0.96 0 0 5.28
137.6 6.24 22.56 10.4 4.48 2.24 2.4
74.72 59.36 107.2 14.24 0 4.16 4.64
170.48 50.08 5.28 8.72 2.4 0.08 19.04
110.96 79.68 0.4 5.04 1.12 9.84 0.16
205.6 50.32 24.64 14.48 11.92 0 2.08
146.8 32.64 20.48 3.76 0.24 0.16 3.36
154.32 47.68 7.12 7.68 0 0 19.84
142.24 50.4 20.08 1.92 3.36 0 0
166.08 9.84 3.68 8.88 0.08 0 0
141.6 173.84 4.8 3.84 0 0.24 5.76
86.4 49.76 4.8 4.8 0 0 4.64

MAR ABR MAY JUN JUL AGO SEP


126.56 44.16 29.28 0 0 0 45.28
17.12 0 34.4 10.72 0 0 0
100.96 11.04 0 0 0 0 0
32 37.44 55.2 0 0 0 0
137.6 0 22.56 10.4 0 0 0
74.72 59.36 107.2 14.24 0 0 0
170.48 50.08 0 0 0 0 19.04
110.96 79.68 0 0 0 0 0
205.6 50.32 24.64 14.48 11.92 0 0
146.8 32.64 20.48 0 0 0 0
154.32 47.68 0 0 0 0 19.84
142.24 50.4 20.08 0 0 0 0
166.08 0 0 0 0 0 0
141.6 173.84 0 0 0 0 0
86.4 49.76 0 0 0 0 0

MAR ABR MAY JUN JUL AGO SEP


30 31 31 30 31 31 30
0.4700 0.1587 0.1052 0.0095 0.0029 0.0000 0.1681
0.0636 0.0333 0.1236 0.0398 0.0075 0.0132 0.0339
0.3749 0.0397 0.0121 0.0000 0.0316 0.0000 0.0131
0.1188 0.1345 0.1984 0.0036 0.0000 0.0000 0.0196
0.5110 0.0224 0.0811 0.0386 0.0161 0.0080 0.0089
0.2775 0.2133 0.3852 0.0529 0.0000 0.0149 0.0172
0.6331 0.1800 0.0190 0.0324 0.0086 0.0003 0.0707
0.4120 0.2863 0.0014 0.0187 0.0040 0.0354 0.0006
0.7635 0.1808 0.0885 0.0538 0.0428 0.0000 0.0077
0.5451 0.1173 0.0736 0.0140 0.0009 0.0006 0.0125
0.5730 0.1713 0.0256 0.0285 0.0000 0.0000 0.0737
0.5282 0.1811 0.0722 0.0071 0.0121 0.0000 0.0000
0.6167 0.0354 0.0132 0.0330 0.0003 0.0000 0.0000
0.5258 0.6247 0.0172 0.0143 0.0000 0.0009 0.0214
0.3208 0.1788 0.0172 0.0178 0.0000 0.0000 0.0172
0.4489 0.1705 0.0822 0.0243 0.0085 0.0049 0.0310
Caudal (m3/seg)

0.1200

0.1000

0.0800 f(x) = 0.0871543453 exp( - 0.0591201178 x )


R = 0.9672681276

0.0600

0.0400
Caudal (m3/seg)

0.0200
0.14

0.12
0.0000
0.1 0 20 40 60 80 100 120 140
Dias Acumulados
f(x) = 0.0927909282 exp( - 0.0273183707 x )
0.08
R = 0.7559377696
0.06

0.04

0.02

0
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
Caudal (m3/seg)

0.014

0.012

0.01

0.008

0.006

0.004

0.002

0 f(x) = 0.0010550257 exp( - 0.1194342603 x )


0.01

0.008

0.006

0.004

0.002

0 f(x) = 0.0010550257 exp( - 0.1194342603 x )


R = 0.8713585168 Dias
0 20 40 60Acumulados
80 100 120 140

93-94
Caudal (m3/seg)

0.2500

0.2000

0.1500
f(x) = 0.1359299438 exp( - 0.1086689917 x )
R = 0.9858965684
0.1000

0.0500

0.0000
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
Caudal (m3/seg)

Chart Title
0.09
0.08
f(x) = 0.0815458228 exp( - 0.0254957084 x )
0.07 R = 0.9976097087
0.06
0.05
0.04
0.03
0.02
0.01
0
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
audal (m3/seg)

95-96
0.45
0.4
Caudal (m3/seg)

95-96
0.45
0.4
0.35
0.3
0.25 f(x) = 0.2633454024 exp( - 0.0332838258 x )
0.2 R = 0.9047340351
0.15
0.1
0.05
0
0 20 40 Dias
60Acumulados
80 100 120 140
Caudal (m3/seg)

Chart Title
0.0200
0.0180 f(x) = 0.0292149704 exp( - 0.040999639 x )
0.0160 R = 0.7429655826
0.0140
0.0120
0.0100
0.0080
0.0060
0.0040
0.0020
0.0000
0 20 40 Dias
60Acumulados
80 100 120 140
Caudal (m3/seg)

Chart Title
0.02
0.018 f(x) = 0.0485712342 exp( - 0.0365019936 x )
0.016 R = 0.9818055832
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
0 20 40 Dias60Acumulados
80 100 120 140
0.002
0
0 20 40 Dias60Acumulados
80 100 120 140
Caudal (m3/seg)

Chart Title
0.1
0.09 f(x) = 0.1022822471 exp( - 0.0197258727 x )
0.08 R = 0.9533094047
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
0 20 40 Dias
60Acumulados
80 100 120 140
Caudal (m3/seg)

Chart Title
0.08
0.07
0.06 f(x) = 0.0641717081 exp( - 0.0565908307 x )
0.05 R = 0.9346726674
0.04
0.03
0.02
0.01
0
0 20 40 Dias
60Acumulados
80 100 120 140
Caudal (m3/seg)

0.0300
f(x) = 4.6512971885 exp( - 0.1309686715 x )
R = 0.8370283191
0.0250

0.0200

0.0150

0.0100

0.0050

0.0000
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
0.0150

0.0100

0.0050

0.0000
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
Caudal (m3/seg)

0.08
f(x) = 0.1439844684 exp( - 0.085596624 x )
0.07 R = 0.7569637724
0.06
0.05
0.04
0.03
0.02
0.01
0
0 10 20 30 40 50 60 70 80 90 100
Dias Acumulados
Caudal (m3/seg)

0.035
f(x) = 0.0547961817 exp( - 0.0858067604 x )
0.03 R = 0.8279529358

0.025

0.02

0.015

0.01

0.005

0
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
Caudal (m3/seg)

Chart Title
0.02
0.018 f(x) = 0.0244693864 exp( - 0.0344314944 x )
R = 0.9232354533
0.016
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
0 10 20 30 Dias
40 Acumulados
50 60 70 80 90 100
Caudal (m3/seg)

Chart Title
0.02
0.018 f(x) = 0.060353564 exp( - 0.1214947823 x )
0.016 R = 0.7384244474
0.014
0.012
0.01
0.008
0.006
0.004
0.002
0
0 20 40 Dias60Acumulados
80 100 120 140

410

JUN. JUL. AGO. SEP. OCT. NOV. DIC.


1.00001284 0.63922317 0.57172414 1.16160699 4.28362066 9.41721555 17.9756527
8.79354839 5.62096774 5.02741935 10.2145161 37.6677419 82.8096774 158.067742
4.10005264 2.62081501 2.34406898 4.76258866 17.5628447 38.6105838 73.7001759

JUN. JUL. AGO. SEP. OCT. NOV. DIC.


30 31 31 30 31 30 31
0.01522493 0.00941806 0.00842356 0.01768515 0.06311319 0.14337456 0.26484625
39463.0067 25225.3445 22561.6639 45839.9159 169042.38 371626.869 709364.193
121222.429 126307.188 126307.188 121222.429 168747.586 368704.828 681377.931
TOTAL
985
759
1161.4
765.1
807.2
775.4
1071.2
1050.1
717 717
661.3 661.3
751.5 751.5
615 615
641 641
680.8 680.8
944.7
1072.6

878.82
242.63
1261.50
703.06
878.82

TOTAL
937.2
1079.0
585.4
757.2
929.2
881.8
1115.5
825.7
781.0
519.1
833.2
553.2
637.9
874.9
1011.1
882.95
235.47
1296.40

TOTAL
937.2 100.0
1079.0 100.0
100.0 100.0
757.2 100.0
929.2 100.0
881.8 100.0
1115.5 100.0
825.7 100.0
781.0 100.0
519.1 100.0
833.2 100.0
553.2 100.0
637.9 100.0
874.9 100.0
1011.1 100.0

TOTAL media desviacion media+desviacio media-desvi


749.76 657.141333 147.9731016998 805.1144350332 509.1682
863.2
468.32
605.76
743.36
705.44
892.4
660.56
624.8
415.28
666.56
442.56
510.32
699.92
808.88
415.28

TOTAL
746.4
839.04
444.96
599.52
728
696.64
875.92
644
622.72
407.76
651.76
437.28
487.84
685.28
794.64

TOTAL

2.7525
3.1606
1.7353
2.2500
2.7329
2.5882
3.2816
2.4253
2.3053
1.5308
2.4680
1.6242
1.8817
2.5539
2.9739
2.4176

AO MODELO PRECIPITACION Qo prom


90-91 Q = 0,0872e-0,059t 749.76 0.0872 -0.059 -0.0656
91-92 y = 0,0928e-0,027x 863.2 0.0928 -0.027
92-93 y = 0,0011e-0,119x 468.32 -0.119
93-94 y = 0,1359e-0,109x 605.76 -0.109
94-95 Q = 0,081e-0,025t 743.36 0.081 -0.025
95-96 y = 0,2633e-0,033x 705.44 -0.033
96-97 y = 0,0292e-0,041x 892.4 -0.041
97-98 Q = 0,0494e-0,037t 660.56 0.0494 -0.037
98-99 Q = 0,103e-0,02t 624.8 -0.02
99-00 Q = 0,0637e-0,056t 415.28 0.0637 -0.056
00-01 y = 4,6513e-0,131x 666.56 -0.131
01--02 y = 0,144e-0,086x 442.56 -0.086
02--03 y = 0,0548e-0,086x 510.32 0.0548 -0.086
03--04 Q = 0,0244e-0,034t 699.92 -0.034
04--05 y = 0,0604e-0,121x 808.88 -0.121 -0.048333333

CAUDALES CALIBRADOS(m3/s)
AO MAYO JUNIO JULIO AGOSTO SEPTIEMBRE
90-91 0.0872 0.0140 0.0024 0.0004 0.0001
91-92 0.0928 0.0402 0.0179 0.0077 0.0005
92-93 0.0011 0.0000 0.0000 0.0000 0.0000
93-94 0.1359 0.0046 0.0002 0.0000 0.0000
94-95 0.0810 0.0373 0.0176 0.0081 0.0037
95-96 0.2633 0.0947 0.0352 0.0126 0.0045
96-97 0.0292 0.0082 0.0024 0.0007 0.0002
97-98 0.0494 0.0157 0.0052 0.0016 0.0005
98-99 0.1030 0.0554 0.0304 0.0164 0.0088
99-00 0.0637 0.0112 0.0021 0.0004 0.0001

01--02 0.1440 0.0100 0.0008 0.0001 0.0000


02--03 0.0548 0.0038 0.0003 0.0000 0.0000
03--04 0.0244 0.0085 0.0031 0.0011 0.0004
04--05 0.0604 0.0014 0.0000 0.0000 0.0000
50 MEDIA 0.0850 0.0218 0.0084 0.0035 0.0013
DESVESTA 0.0652 0.0267 0.0120 0.0054 0.0026
84.13 ME+DESVE 0.1503 0.0484 0.0203 0.0090 0.0039
15.87 ME-DESVE 0.0198 -0.0049 -0.0036 -0.0019 -0.0013
97-98 0.0494 0.0156888524 0.00517 0.00164 0.0005214981
98-99 0.103 0.0554082771 0.030409 0.01636 0.0087997999
99-00 0.0637 0.0112254617 0.002092 0.00037 6.497092E-05
00-01 0.0359 0.0288969859 0.023423 0.01885 0.0151763348
01--02 0.0746 0.0638885722 0.054989 0.04709 0.0403318108
02--03 0.0225 0.0032920659 0.000512 7.5E-05 1.097117E-05
MEDIA 0.0581833333 0.0297333692 0.019433 0.01407 0.0108175643
DESVESTA 0.0288286952 0.0247605005 0.021273 0.0182 0.0157007688
ME+DESVE 0.0870120285 0.0544938698 0.040706 0.03227 0.0265183331
ME-DESVE 0.0293546381 0.0049728687 -0.001841 -0.00414 -0.004883204
879.343548
410
0.1
0.09
f(x) = 7.88605663784997E-05x + 0.0196656324
0.08 R = 0.5322980919
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
300 400 500 600 700 800 900 1000

Q=(0,00004P-0,129)*e^(-0,0323*t)
y = 10,659x + 1,7667

0 31 61 92 122
CAUDALES CALIBRADOS(m3/s)
AO
90-91 0.0402 0.00899408 0.00211186 0.00047249 0.00011094
91-92
92-93
93-94
94-95
95-96
96-97
97-98
98-99
99-00 :)

01--02
02--03
03--04
04--05
MEDIA
DESVESTA
ME+DESVE
ME-DESVE
Q=(0,00005P+0,0197)*e^(-0,0483*t)

enero febrero marzo


dias 31 28 31
Q(m3/s) 0.3937932099 0.4608960573 0.4489290123
Vol 1054735.73333333 1114999.74193548 1202411.46666667
abril MAYO JUNIO JULIO AGOSTO SEPTIEMBRE octubre
30 31 30 31 31 30 31
0.170516975 0.0402 0.008994084 0.002111856 0.000472493 0.0001109436 0.145275787
441980 107671.68 23312.66498 5656.394058 1265.524419 287.5659004988 389106.6667
noviembre diciembre
30 31 365
0.280580633 0.366792613 2.3186736623 73121692.6136524
727265 982417.3333 6051109.7712895
CLCULO DE CAUDALES MXIMOS
Precipitacion
Mxima (mm)
Ao Diaria
VILLAMONTES
1975 50.0 N
1976 49.0 1.0
1977 131.0 2.0
1978 44.0 3.0
1979 95.0 4.0
1980 57.0 5.0
1981 94.0 6.0
1982 126.0 7.0
1983 50.1 8.0
1985 126.7 9.0
1986 159.0 10.0
1988 113.8 11.0
1990 91.0 12.0
1991 53.2 13.0
1992 146.4 14.0
1993 85.6 15.0
1994 75.6 16.0
1995 99.8 17.0
1996 101.4 18.0
1997 94.2 19.0
1998 42.4 20.0
1999 57.4 21.0
2000 72.3 22.00
2001 61.7 23.00
2002 137.3 1844.91
2003 60.2
2004 77.2
2005 121.2

MEDIA
X= 88.304
DESV. ESTANDAR
Sd = 34.103

MODA PONDERADA

Edp= 72.957

CARACTERISTICA PONDERADA

Kdp= 0.8392

1.- CALCULO DE LLUVIA MAXIMA

MEDIA X= 88.304 mm
DESV. ESTANDAR Sd = 34.103 mm
MODA PONDERADA Ed = 72.96 mm
CARACTERISTICA PONDERADA Kd = 0.84

2.- CLCULO DEL TIEMPO DE CONCENTRACIN DE LA CUENCA (Tc)

Datos Simbolo Magnitud Unidad


Longitud del ro: L= 12.500 Km
Desnivel: H= 830 m
rea de la cuenca: A= 27.50 Km^2
Pendiente media del ro: J= 0.066 m/m
Calculo por la formula de Giandotti
Donde:
tc: tiempo de concentracin [h]
L: longitud del ro [Km]
J: pendiente media del ro [m/m]
TIEMPO DE CONCENTRACION Tc = 1.892 h

3.- CLCULO DE ALTURAS DE LLUVIA MXIMAS HORARIA

Datos Simbolo Magnitud Unidad


Moda Ponderada EdP = 72.957 mm
Tiempo de Concentracion Tc = 1.892 h
Caracteristica Ponderada KdP = 0.839
Equivalente de lluvia diaria a= 12 m/m
Coeficiente Angular b= 0.2
Periodo de Retorno T= 1000 aos
Calculo por la expresion

ALTURA DE LLUVIA MAXIMA HOR htcT = 177.361 mm

4.- CALCULO DE LA INTENSIDAD Y CAUDAL MAXIMO

Calculo de la intensidad de la lluvia


Datos Simbolo Magnitud Unidad
Altura de lluvia maxima horaria h max 177.361 mm
Tiempo de Concentracion Tc 1.892 h
Calculo por la expresion

Imax = hmax / Tc
INTENSIDAD DE LLUVIA I max= 93.752 mm/h

Calculo del Caudal Maximo por el metodo racional


Datos Simbolo Magnitud Unidad
Coeficiente de Escorrentia C 0.300
Area de la Cuenca A 27.500 Km^2
Calculo por la expresion

CAUDAL PICO O MAXIMO Q max= 214.848 m^3/s

5.- CALCULO DEL TIEMPO PICO

Calculo del Tiempo Pico


Datos Simbolo Magnitud Unidad
Caudal Pico o Maximo Qp = 214.848 m^3/s
Area de la Cuenca A 27.500 Km^2
Lluvia neta igual a 1 pulgada h= 2.54 cm
Tp=D/2+0,6tc
Calculo por la Expresion
Calculo por la Expresion

TIEMPO PICO Tp = 1.640 h

6.- CALCULO DEL TIEMPO BASE


Calculo del Tiempo Base
Datos Simbolo Magnitud Unidad
Tiempo Pico Tp = 1.640 h

Calculo por la Expresion Tb = 5 * Tp


TIEMPO BASE Tb = 8.200 h

7.- CALCULO DEL TIEMPO DE RETARDO

Calculo del Tiempo Base


Datos Simbolo Magnitud Unidad
Tiempo Pico Tp = 1.640 h
Tiempo Base Tb = 8.200 h

Calculo por la Expresion Tr = Tb - Tp


TIEMPO DE RETARDO Tr = 6.560 h

CLCULO DE CAUDALES MXIMOS CRECIDAS

T htcT imx Qmx


2 63.16 33.39 76.508
5 80.00 42.29 96.905
10 92.73 49.02 112.335
20 105.47 55.75 127.764
50 122.31 64.65 148.162
100 135.05 71.39 163.592
500 164.62 87.02 199.419
1000 177.36 93.75 214.848
CLCULO DE CURVAS IDF

Duracion (hrs)
T
0.5 1 2 3
50 93.730 107.668 123.678 134.125
100 103.492 118.881 136.558 148.094
500 126.157 144.916 166.465 180.526
1000 135.918 156.129 179.345 194.495

Duracion (hrs)
T
5 10 12
50 148.553 170.642 176.980
100 164.023 188.413 195.411
500 199.945 229.677 238.206
1000 215.416 247.448 256.637
INTENSIDAD (mm/hr)

CURVAS IDF
300
Duracin (hr) 0.5 1 2 3
250
Para T(aos) Intensidad (mm/hr)Intensidad (mm/hr)
Intensidad (mm/hr)
Intensidad (mm/hr)
200
50 187.461 107.668 61.839 44.708
100 206.984 118.881 68.279 49.365
150 500 252.314 144.916 83.232 60.175
1000 271.836 156.129 89.673 64.832
100

50

0
0 2 4 6 8 10 12 14
PARA T=50 AOS PARA T=100 AOS DURACIN (hr)
PARA T=500 AOS PARA T=1000 AOS
HIDROGRAMA DE CRECIDAS

t (h) Q (m3/s)
0.000 0.000
0.164 3.223
0.328 16.114
0.492 34.376
0.656 60.158
0.820 92.385
0.984 128.909
1.148 165.433
1.230 178.324
1.312 191.215
1.476 208.403
1.640 214.848
1.804 210.551
1.968 197.661
2.050 189.067
2.132 180.473
2.296 161.136
2.460 141.800
2.624 120.315
2.952 90.236
3.280 68.752
3.608 51.564
3.936 38.673
4.264 27.930
4.510 22.559
4.592 21.055
4.920 16.114
5.740 7.735
6.560 3.867
7.380 1.934
7.790 1.289
8.200 0.859

Chart Title
500
CAUDAL (m3/s)

450

400

350

300

250

200

150

100

50

0
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8
TIEMPO
HIDROGRAMA (hr)
DE CRECIDAS
100

50

0
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8
TIEMPO
HIDROGRAMA (hr)
DE CRECIDAS
AOMAXIMA DIARIA (mm)
1980.0 78.5
1981.0 157.0
1982.0 158.8
1983.0 80.6
1984.0 131.0
1985.0 178.8
1986.0 159.5
1987.0 160.0
1988.0 93.1
1989.0 128.0
1990.0 80.0
1991.0 97.0
1992.0 101.5
1993.0 111.0
1994.0 105.0
1995.0 89.0
1996.0 170.0
1997.0 120.0
1998.0 109.4
1999.0 72.0
2000.0 87.3
2001.00 100.00
2002.00 157.00

2724.50

879.59
Cota aguas arriba: 1380
Cotas aguas abajo: 550
0
214.848
0.000
5 10 12
Intensidad (mm/hr)
Intensidad (mm/hr)
Intensidad (mm/hr)
29.711 17.064 14.748
32.805 18.841 16.284
39.989 22.968 19.851
43.083 24.745 21.386
t/tp Q/Qp
0 0
0.1 0.015
0.2 0.075
0.3 0.16
0.4 0.28
0.5 0.43
0.6 0.6
0.7 0.77
0.75 0.83
0.8 0.89
0.9 0.97
1 1
1.1 0.98
1.2 0.92
1.25 0.88
1.3 0.84
1.4 0.75
1.5 0.66
1.6 0.56
1.8 0.42
2 0.32
2.2 0.24
2.4 0.18
2.6 0.13
2.75 0.105
2.8 0.098
3 0.075
3.5 0.036
4 0.018
4.5 0.009
4.75 0.006
5 0.004
5.1
m
m
Segn Metodo Tradicional

Para realizar este metodo adoptamos un caudal solido (en Tarija este varia entre 1200-800 tn/(km/ao)),
con valor de 800 tn/(km/ao)
Qsolido= 800 (Tn/(km/ao))

Donde: W= Peso del sedimento


N= Vida util (Adoptamos 50 aos)
Qsolido= Caudal solido

Acuenca= Area de la cuenca 27.5 (Km)

Wsedimento= 1100000 (Tn)

sedimento= 1.8 (Tn/m)

Adoptamos coeficiente de atrape (valores recomendados desde 0,33 hasta 0,6) de 0,6 tomando en
cuenta la seguridad de la obra.

Wsedimento corregido= 660000 (Tn)

Vsedimento= 366666.667 (m)

Altura de sedimento
y = 0,1989x0,3345

h 14.4505234

Constructivamente asumimos 14,5m


TOPOGRAFA DEL VASO
Elevacin Area Volumen Vol acum
(msnm) (m2) (m3) (m3) area acum
551 2646.24 z 2646.24
552 4619.52 3632.88 3632.88 1 7265.76
553 6150.77 5385.15 9018.03 2 13416.53
554 7772.33 6961.55 15979.58 3.00 21188.86
555 9389.03 8580.68 24560.26 4 30577.89
556 11042.57 10215.80 34776.06 5 41620.46
557 12784.83 11913.70 46689.76 6.00 54405.29
558 14532.63 13658.73 60348.49 7 68937.92
559 16182.86 15357.75 75706.23 8 85120.78
560 18146.03 17164.45 92870.68 9.00 103266.81
561 21282.63 19714.33 112585.01 10 124549.44
562 26342.73 23812.68 136397.69 11 150892.17
563 31134.95 28738.84 165136.53 12.00 182027.12
564 37281.73 34208.34 199344.87 13 219308.85
565 42921.83 40101.78 239446.65 14 262230.68
566 48992.90 45957.37 285404.01 15.00 311223.58
567 55529.85 52261.38 337665.39 16 366753.43
568 62158.28 58844.07 396509.45 17 428911.71
569 70634.23 66396.26 462905.71 18.00 499545.94
570 78827.48 74730.86 537636.56 19 578373.42
571 87556.37 83191.93 620828.49 20 665929.79
572 104328.06 95942.22 716770.70 21.00 770257.85
573 118057.11 111192.59 827963.29 22 888314.96
574 129646.26 123851.69 951814.97 23 1017961.22
575 141114.08 135380.17 1087195.14 24.00 1159075.30
576 152995.72 147054.90 1234250.04 25 1312071.02
577 165437.50 159216.61 1393466.65 26 1477508.52
578 181301.30 173369.40 1566836.05 27.00 1658809.82
579 198403.81 189852.56 1756688.61 28 1857213.63
580 214600.82 206502.32 1963190.92 29 2071814.45
581 230594.58 222597.70 2185788.62 30.00 2302409.03
582 245884.69 238239.64 2424028.26 31 2548293.72
583 261855.96 253870.33 2677898.58 32 2810149.68
278346.98 270101.47 2948000.05 33.00 28
296004.35 287175.67 3235175.72 34 29
313994.69 304999.52 3540175.24 35 30
332202.53 323098.61 3863273.85 36.00 31
351124.55 341663.54 4204937.39 37 32
371084.14 361104.35 4566041.73 38
392729.08 381906.61 4947948.34 39.00
412978.45 402853.77 5350802.11 40
440037.75 426508.10 5777310.21 41
464157.52 452097.64 6229407.84 42.00

Chart Title
45
Axis Title

f(x) = 0.0150991407 x^0.6200421132


40 R = 0.9254435588
35
30
25
20
15
10
5
0
0.00 100000.00 200000.00 300000.00 400000.00 500000.00
Axis Title
Altura Vs Volacum
45
f(x) = 0.0478661325 x^0.4439484547
40
Altura H

R = 0.96722082
35
30
25
20
15
45
f(x) = 0.0478661325 x^0.4439484547
40

Altura H
R = 0.96722082
35
30
25
20
15
10
5
0 Vacum
0.00 2000000.00 4000000.00 6000000.00 8000000.00
BALANCE MENSUAL DE APORTES, DISPONIBILIDAD
Y REQUERIMIENTOS DE AGUA DE EMBALSE EN CAIGUA
ALTURA UTIL 14.6344766
VOLUMEN ANUAL UTILIZABLE: 3,980,175 ALTURA PRESA 32.085
ALTURA OPERACIN 3
ALTURA SEDIMENTO 14.4505233674
30 31 31 30 31
MES JUN JUL AGO SEP OCT
OFERTA DE AGUA
TOTAL APORTE MES m3 23,313 5,656 1,266 288 389,107
RESTO MES ANTERIOR m3 2,395,603 1,676,823 1,105,783 479,889 24
TOTAL VOLUMEN m3 2,418,915 1,682,479 1,107,048 480,176 389,131
VOL. POR VERTED EXCED m3 0 0 0 0 0
VOL UTIL ALMACENADO m3 2,418,915 1,682,479 1,107,048 480,176 389,131
TOTAL VOL PRESA m3 3,063,365 2,326,929 1,751,498 1,124,626 1,033,581
PERDIDAS
Evaporacin (mm/mes) 74.000 102.000 131.00 155.00 198.00
Evaporacin (m3/mes) 21,285 24,451 26,015 22,950 27,722
Infiltracin (mm/da) 1 1 1 1 1
Infiltracin (m3/mes) 7,852 6,762 5,602 4,042 3,950
Caudal ecolgico m3/mes 25,920 26,784 26,784 25,920 26,784
TOTAL PERDIDAS m3 55,057 57,998 58,401 52,913 58,456
TOTAL APROVECHABLE (m3) 2,363,859 1,624,482 1,048,647 427,264 330,675
DEMANDA POR ZONAS DE RIEGO EN EL
REQUERIMIENTO m3/mes 687,035.52 518,698.94 568,758.24 427,239.36 109,787.62
TOTAL REQUERIDO m3 687,035.52 518,698.94 568,758.24 427,239.36 109,787.62

RESTO UTIL EMBALSE m3 1,676,823 1,105,783 479,889 24 220,888


AREA INUNDADA m2 287,629 239,719 198,587 148,067 140,011
Altura m 29.395 26.812 24.381 21.023 20.438
AREA INUNDADA m2 287628.762 239719.251 198587.0021 148066.961662681 140011.387

780,941.09
DISPONIBILIDAD
BALSE EN CAIGUA
CAPACIDAD DEL EMBALSE 3,980,174.6019 m3 3980174.6
VOLUMEN UTIL 3,335,725.1487 m3
ASUMIDO VOLUMEN DE OPERACIN 277782.786513 m3
VOLUMEN MUERTO 366,667 m3
30 31 31 28 31 30 31
NOV DIC ENE FEB MAR ABR MAY
OFERTA DE AGUA
727,265 982,417 1,054,736 1,115,000 1,202,411 441,980 107,672
0 617,903 1,518,023 2,483,208 3,047,189 3,162,956 3,133,924
727,265 1,600,320 2,572,759 3,598,208 4,249,600 3,604,936 3,241,596
0 0 0 -144,268 -86,384 -100,901 0
727,265 1,600,320 2,572,759 3,335,725 3,335,725 3,335,725 3,241,596
1,371,714 2,244,770 3,217,208 3,980,175 3,980,175 3,980,175 3,886,045
PERDIDAS
177.00 180.00 166.00 142.00 146.00 101.00 88.00
29,894 42,134 49,322 48,581 49,949 34,554 29,633
1 1 1 1 1 1 1
4,611 6,603 8,382 8,717 9,651 9,340 9,499
25,920 26,784 26,784 24,192 26,784 26,784 25,920
60,425 75,521 84,488 81,490 86,384 70,678 65,052
666,840 1,524,799 2,488,271 3,254,235 3,249,341 3,265,047 3,176,544
DA POR ZONAS DE RIEGO EN EL EMBALSE (m3)
48,936.96 6,776.35 5,062.18 62,778.24 0.00 30,222.72 780,941.09
48,936.96 6,776.35 5,062.18 62,778.24 0.00 30,222.72 780,941.09

617,903 1,518,023 2,483,208 3,047,189 3,162,956 3,133,924 2,395,603


168,894 234,077 297,121 342,119 342,119 342,119 336,736
22.467 26.491 29.880 32.085 32.085 32.085 31.829
168894.104 234076.74 297121.137 342118.523 342118.5232604 342118.523 336735.529
y = 0,1989x0,3345

TOTAL

6,051,110

-331,553

3,980,174.6018609

1,660
406,490

85,012
315,360
806,863 3918929

3,246,237.22
3,246,237.22
Tiempo (hrs) Elevacion (m) Volumen (m3) Almacenamiento S Caudal (m3/s)
1 0 0 3,980,174.6019 0.0000 0.00
2 0.06762 0.068627451 4,005,679.6155 25,505.0136 1.21
3 0.13524 0.137254902 4,031,293.1636 51,118.5617 3.43
4 0.20286 0.2058823529 4,057,015.4754 76,840.8735 6.31
5 0.27048 0.2745098039 4,082,846.7802 102,672.1783 9.71
6 0.3381 0.3431372549 4,108,787.3071 128,612.7052 13.57
7 0.40572 0.4117647059 4,134,837.2854 154,662.6836 17.84
8 0.47334 0.4803921569 4,160,996.9443 180,822.3424 22.47
9 0.54096 0.5490196078 4,187,266.5130 207,091.9111 27.46
10 0.60858 0.6176470588 4,213,646.2206 233,471.6187 32.77
11 0.6762 0.6862745098 4,240,136.2964 259,961.6945 38.38
12 0.74382 0.7549019608 4,266,736.9695 286,562.3677 44.27
13 0.81144 0.8235294118 4,293,448.4692 313,273.8673 50.45
14 0.87906 0.8921568627 4,320,271.0245 340,096.4227 56.88
15 0.94668 0.9607843137 4,347,204.8648 367,030.2629 63.57
16 1.0143 1.0294117647 4,374,250.2190 394,075.6172 70.50
17 1.08192 1.0980392157 4,401,407.3165 421,232.7146 77.67
18 1.14954 1.1666666667 4,428,676.3863 448,501.7844 85.06
19 1.21716 1.2352941176 4,456,057.6576 475,883.0558 92.67
20 1.28478 1.3039215686 4,483,551.3596 503,376.7577 100.50
21 1.3524 1.3725490196 4,511,157.7213 530,983.1194 108.54
22 1.42002 1.4411764706 4,538,876.9720 558,702.3701 116.78
23 1.48764 1.5098039216 4,566,709.3407 586,534.7388 125.22
24 1.55526 1.5784313725 4,594,655.0566 614,480.4547 133.86
25 1.62288 1.6470588235 4,622,714.3487 642,539.7469 142.68
26 1.6905 1.7156862745 4,650,887.4463 670,712.8445 151.69
27 1.75812 1.7843137255 4,679,174.5784 698,999.9766 160.88
28 1.82574 1.8529411765 4,707,575.9742 727,401.3723 170.25
29 1.89336 1.9215686275 4,736,091.8626 755,917.2608 179.80
30 1.96098 1.9901960784 4,764,722.4729 784,547.8711 189.52
31 2.0286 2.0588235294 4,793,468.0341 813,293.4323 199.40
32 2.09622 2.1274509804 4,822,328.7753 842,154.1735 209.46
33 2.16384 2.1960784314 4,851,304.9256 871,130.3238 219.67
34 2.23146 2.2647058824 4,880,396.7141 900,222.1122 230.05
35 2.29908 2.3333333333 4,909,604.3697 929,429.7679 240.59
36 2.3667 2.4019607843 4,938,928.1217 958,753.5199 251.28
37 2.43432 2.4705882353 4,968,368.1991 988,193.5972 262.12
38 2.50194 2.5392156863 4,997,924.8308 1,017,750.2290 273.12
39 2.56956 2.6078431373 5,027,598.2461 1,047,423.6442 284.27
40 2.63718 2.6764705882 5,057,388.6738 1,077,214.0719 295.56
41 2.7048 2.7450980392 5,087,296.3431 1,107,121.7413 307.00
42 2.77242 2.8137254902 5,117,321.4830 1,137,146.8812 318.59
43 2.84004 2.8823529412 5,147,464.3226 1,167,289.7207 330.31
44 2.90766 2.9509803922 5,177,725.0908 1,197,550.4889 342.18
45 2.97528 3.0196078431 5,208,104.0167 1,227,929.4148 354.18
46 3.0429 3.0882352941 5,238,601.3293 1,258,426.7275 366.33
47 3.11052 3.1568627451 5,269,217.2577 1,289,042.6558 378.61
48 3.17814 3.2254901961 5,299,952.0307 1,319,777.4289 391.02
49 3.24576 3.2941176471 5,330,805.8775 1,350,631.2757 403.56
50 3.31338 3.362745098 5,361,779.0271 1,381,604.4252 416.24
51 3.381 3.431372549 5,392,871.7084 1,412,697.1065 429.05
Tiempo (hrs)
1 0 0.00000 0 0
2 0.057962985 3.75985 3.76 3.7308028467
3 0.1159259699 18.79924 22.56 25.825746648
4 0.1738889549 40.10504 58.90 82.270193861
5 0.2318519398 70.18383 110.29 184.63484561
6 0.2898149248 107.78230 177.97 343.07381953
7 0.3477779098 150.39391 258.18 561.10736725
8 0.4057408947 193.00552 343.40 832.67122747
9 0.4347223872 208.04491 401.05 1121.9228495
10 0.4637038797 223.08430 431.13 1397.851693
11 0.5216668646 243.13682 466.22 1662.7642437
12 0.5796298496 250.65652 493.79 1908.7799026
13 0.6375928346 245.64339 496.30 2115.6373739
14 0.6955558195 230.60400 476.25 2269.8853814
15 0.724537312 220.57774 451.18 2375.9582513
16 0.7535188045 210.55148 431.13 2446.3282775
17 0.8114817894 187.99239 398.54 2477.1734379
18 0.8694447744 165.43330 353.43 2465.5264337
19 0.9274077594 140.36765 305.80 2417.0994251
20 1.0433337293 105.27574 245.64 2328.1267258
21 1.1592596992 80.21009 185.49 2205.3804919
22 1.2751856691 60.15756 140.37 2066.4271059
23 1.3911116391 45.11817 105.28 1921.4418028
24 1.507037609 32.58535 77.70 1776.7345107
25 1.5939820864 26.31893 58.90 1638.6917448
26 1.6229635789 24.56434 50.88 1514.5760109
27 1.7388895488 18.79924 43.36 1402.0427528
28 2.0287044736 9.02363 27.82 1291.907155
29 2.3185193984 4.51182 13.54 1184.2691446
30 2.6083343232 2.25591 6.77 1084.7092501
31 2.7532417856 1.50394 3.76 994.94670195
32 2.898149248 1.00263 2.51 914.87332571
33
34
35
36
37
38
39
40
41
42
43
44
45
46
(2s/t)+Q TP 1.64 0.16400
0 t= 590.4 S
87.6126277 C= 2.25
176.598241 L= 30 m
266.60675
357.513723
449.247576 0.06862745
541.760258
635.016704
728.989917
823.658332
919.00424 Grafica
Caudal(m3/s)

1015.01279 500.00
1111.67134 450.00
1208.96894 400.00 f(x) = 0.0022470481 x^1.4249957591
R = 0.9996952634
1306.89605 350.00
1405.44423 300.00
1504.60602 250.00
1604.37471 200.00
1704.74428 150.00
1805.70927 100.00
1907.26474 50.00
0.00 (2s/t)+Q
2009.40618 0 1000 2000 3000 4000 5000 6000
2112.12944
2215.43074
2319.30658
2423.75375
2528.76926
2634.35036
2740.49447
2847.19923
2954.46241
3062.28194
3170.65591
3279.5825
3389.06005
3499.08697
3609.6618
3720.78316
3832.44976
3944.6604
4057.41395
4170.70934
4284.54559
4398.92177
4513.83702
4629.29052
4745.28152
4861.8093
4978.87321
5096.47264
5214.60701
H
0.00 0 0
3.76 0.01452246 0.00359052
26.29 0.23207142 0.02277956
84.73 1.22991729 0.06924388
192.56 3.96210815 0.15103643
362.60 9.76357703 0.27555193 y = 0,0003x1,4489
601.25 20.0713331 0.4455006
904.51 35.9177849 0.65665489
1233.72 55.8994036 0.88186533
1553.05 77.600184 1.09741945
1864.07 100.654287 1.30522586
2156.56 123.888841 1.49905976
2405.08 144.721217 1.66271937
2591.88 160.999689 1.78517519
2721.07 172.554432 1.86959798
2807.09 180.379593 1.92570202
2844.87 183.849352 1.95031856
300
2830.60 182.536347 1.94102169
2771.33 177.11398 1.90238924
250
2662.74 167.308044 1.83150749
2513.61 154.116029 1.7339212
2345.75 139.660518 1.62372789 200
2171.70 125.13052 1.50905934
1999.15 111.205406 1.3949161 150
1835.64 98.4735239 1.28630455
1689.58 87.4995036 1.18887048 100
1557.94 77.9484179 1.10070014
1429.87 68.9792357 1.01455689 50
1305.44 60.5867312 0.93049883
1191.04 53.1638103 0.85285438 0
1088.47 46.761198 0.78292694 0 0.5 1 1.5 2 2.5 3 3.5
997.45 41.2899707 0.72059935

183.849352 1.95031856
5000 6000
2.5 3 3.5
DISEO DE LA OBRA DE TOMA
1.- ESTIMACIN DEL DIMETRO MEDIANTE:


Q= A 2 g ( Z 1 Z 2
Donde:
Longitud de la tuberia de la obra de toma: Ltuberia =

Caudal de max. Demanda (mes de octubre 30 dia


Aceleracion de la gravedad g=
Horas de operacin/dia=
Dias de operacin por mes=
Volumen maximo mensual=
Q=
Caudal de diseo
Q=
Carga hidraulica minima de diseo: hmin=h2 =
Coeficiente de descarga para orificios sumergidos: C=

REA DE UNA SECCIN CIRCULAR:

REEMPLAZANDO:
*D 2
Qdemanda=C*
4 ( )
( 2*g*( h2


4*Q demanda
D=
C** ( 2*g*( h hf ))
2

D= 0.694647865
D= 27.34834115

DIMETRO COMERCIAL:
D= 28
D= 0.7112

2. CLCULO DE PRDIDAS:
2
Prdida en la rejilla. v2 An An

Donde:
h R =k R
2g
k R =1 . 45 0 . 45
At

( ) At

kR =
A = Coeficiente
Area neta que de prdidas en la rejilla.
deja la rejilla, descontando del
n
rea total las reas de barrotes, hojas, palos, basura,
etc.
At
= (m
Area
2
). total de la rejilla(m2).
En este caso se ha empleado una relacin de An/At =
0.5
0.50, que es lo usual en este tipo de clculos.
Q V2/2g= 0.9829124824 m
V2 demanda2
=0 . 082626857* 4
2*g D
Kr= 0.975
Hr= 0.9583396704 m.

Prdida en la entrada. v
2
he =k e
2g
Ke= coef. De entrada que depende de la geometra= 0.35

He= 0.3440193689 m.

Prdidas por friccin: L v2 1 3 . 71*D


h f =f
D 2g f
= 2*log ( )
Donde:
hf = prdida de energa en el flujo a causa de la
friccin (m)
f = Coeficiente de friccin
D = Dimetro interno del tubo (m) =
L = Longitud del conducto donde se produce hf (m) f=
= Rugosidad relativa para tubos de hierro galvanizado [mm]. hf =

2
Prdidas por vlvulas: V
h v= k v
2*g

kv = Coeficiente de descarga correspondiente al porcentaje de abertura de la valvula y al tipo de valvula. De ac


los fabricantes de valvulas, los coeficientes de descargas establecidos para el caso de abertura del 100% s
Coeficiente
Tipo de de prdida HV
Vlvula kV

Vlvula de
0.07 0.068803874
cortina

Vlvula
0.38 0.373506743
mariposa
Vlvula
4 NO
multichorro
Fuente: Manuales Saint Gobain y Alstom.
2
v
Prdida en la salida salida
h s= k s
2g
Ks= Coeficiente de salida = 0.8 asumido
Hs= 0.786329986 m.

CONDICIN: h f h 2
h f =h R +he + hf +h v +h s 2.914379736 m. < h2= 3m

CUMPLE!
3.- Caudales y velocidades de operacin en la obra de toma margen derecha 2*D=150 [mm.] para diferentes niveles de emba
partiendo desde el punto mas favorable (NANE) hasta el punto mas desfavorable (NVM) .
OMA

2 g ( Z 1Z 2 h12 )
20.00 [m]

manda (mes de octubre 30 dias):


9.81 m/s^2
12 horas
26 dias
3918928.99673983 m3/mes
1744.54 lt/s
1.7445 [m/seg]
3.00 [m]
0.60

A = *D 2
4

*D2
4 )
( 2*g*( h2 ht ))

manda

( 2*g*( h hf ))
2

m
plg.

plg.
m.

2
An An
At

( ) At
0.15
0.01387
0.3833800937 m.

a y al tipo de valvula. De acuerdo a investigaciones efectuadas por


so de abertura del 100% se presentan en el siguiente cuadro:

HV= 0.44231062 m.
ra diferentes niveles de embalse,
rable (NVM) .
DISEO DEL VERTEDERO DE EXCEDENCIAS

N.A.M.E.= 34.035 [m]


N.A.N.E.= 32.085 [m]
DATOS Qmax= 183.85 [m/s]

Altura de presa (P)= 32.085 [m]

Como no hay canal de aproximacion, el vertedero esta en el cuerpo de la presa se tiene que:

He=Ho
Donde:

He: Carga total de diseo


Ho: Altura de laminacion igua a Ho= 1.95 [m] 0.4875

Diseo del cimacio tipo Wes con vertimiento libre

Calculo de m para determinar la longitud efectiva por la ecuacion del vertedor:

m=mO 1 2 3 4
mo: Coeficiente que se obtiene con la ecuacion siguiente:
P
0 .385+ 3. 9206
Ho
mo =
P
1+7 . 8192
Ho
Donde: P= 32.085 [m]
Ho= 1.950 [m]
mo= 0.501 [Adimensional]

1: Coeficiente que se obtiene con la ecuacion siguiente:


He
0 . 7917+0 . 7591
Ho
1=
He
1+0 . 5490
Ho

Donde: He= 1.950 [m]


Ho= 1.950 [m]
1= 1.001 [Adimensional]

2: Coeficiente que depende del tipo de paramento

Como el paramento aguas arriba se supone que es vertical entonces:

2= 1 [Adimensional]

3: Coeficiente que se obtiene con la ecuacion siguiente:


1. 5 2
P P P
3=0 .77+1. 115 1 . 197
He He ( ) ( )
+0. 306
He
Pero como la relacion P/He es muy grande entonces se adopta:

3= 1.000 [Adimensional]

4: Coeficiente que depende de flujo aguas abajo

Como el flujo aguas abajo sera supercritico entonces:

4= 1.000 [Adimensional]

Determinando que m de la siguiente ecuacion es igual a:

m=mO 1 2 3 4
m= 0.50109 [Adimensional]

Determinacion de la longitud efectiva de la ecuacion del vertedero:

3/2
Q=m 2 g LH
L= 30.419 [m]
L= 30.5 [m]
PERFIL DEL CIMACIO - TIPO WES

Con relacion P/Ho via abacos se tiene que:


no es valido las siguientes
P/Ho= relaciones, volver a adoptar de abacos

R2/Ho= 0.225 R2= 0.439 [m]

R1/Ho= 0.53 R1= 1.034 [m]


Yc/Ho= 0.124 Yc= 0.242 [m]

Xc/Ho= 0.28 Xc= 0.546 [m]

n= 1.868

K= 0.505

Calculo de las coordenadas "X", "Y" para la ubicacin de los puntos A y B que facilitan el trazado
2 2
2 Yc R 1Xc Yc
T= = 0.120 [m]
2 ( R 1R 2 )
R 1Yc
N= = 1.45
|Xc|
R 1T 1.67
M= =
Xc

M N 1+ N 2 M 2 =
Sen = 2
= 0.2806 16.2956
1+ N
X A =R1 Sen = -0.290 [m]

Y A =R 1 ( 1Cos )= 0.042 [m]

X B =( R1 R 2 ) Sen = -0.167 [m]

Y B =R 1( R1 R2 ) Cos = 0.463 [m]


Para graficar el perfil aguas abajo se parte de la siguiente ecuacion:

n
Y
Ho
=K
X
Ho [ ]

Y [m] X[m]
0 0.00
0.5 1.36
1 1.97
Perfil"x"del Cimacio
1.5 2.44
2 2.85 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00
0
2.5 3.21 2
3 3.54
4
3.5 3.84
6
"y"

4 4.13
8
4.5 4.40
10
5 4.65
12
5.5 4.90
14
6 5.13
16
6.5 5.36
7 5.57
7.5 5.78
8 5.98
8.5 6.18
9 6.37
9.5 6.56
10 6.74
10.5 6.92
11 7.10
11.5 7.27
12 7.44
12.5 7.60
13 7.76
13.5 7.92
14 8.08
14.5 8.23
15 8.38

Para la presa el perfil se debe acomodar a la forma calculada estructuralmente.

Clculo de la curva de capacidad de servicio del Aliviadero.

Ho [m] mo 1 2 3 4 m
0.4875 0.501 1.001 1 1 1 0.501501
0.975 0.501 1.001 1 1 1 0.501501
1.4625 0.501 1.001 1 1 1 0.501501
1.95 0.501 1.001 1 1 1 0.501501

Con los resultados de la tabla anterior se pueden obtener las curvas: de capacidad de
servicio del aliviadero Ho vs Q y Ho vs m.

Grafica Ho Vs Q
200
180
Q(m3/s)

160
140
120
100
80
60
40
20
0
0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 2.2
Ho(m)
fil"x"del Cimacio
4.00 5.00 6.00 7.00 8.00 9.00
Vertedero:
De laminacion para distinta altura de
carga se tiene un caudal diferente

L[m] Q[m/s]
30.74961781 23.25
30.52941203 65.29
30.40586713 119.46
30.39417868 183.85

2 2.2
ESTANQUE AMORTIGADOR
CARACTERISTICAS GEOMETRICAS Y FUNCIONAMIENTO DE LA RAPIDA
DESCRIPCION SIMBOLO MAGNITUD UNIDAD
CAUDAL DE DISEO Q 183.850 m3/s
ANCHO DE LA RAPIDA B 30 m3/s
CAUDAL UNITARIO q 7.35 m2/s
PENDIENTE DE LA RAPIDA S 0.3 m/m
TIRANTE A LA ENTRADA DEL ESTANQUE Y1 0.231 m
CALCULO DEL TIRANTE AGUAS ABAJO
CAUDAL DE DISEO Q 183.850 m3/s
ANCHO DEL CANAL b 25 m
PENDIENTE DEL CANAL S3 1 %
PENDIENTE DEL CANAL S3 0.01 m/m
TALUD DEL CANAL m 0 %
RUGOSIDAD DEL CANAL h 0.018

TIRANTE AGUAS ABAJO DEL RIO

ITERADO Y3= 0.265 m

CALCULO DE LA VELOCIDAD A LA ENTRADA


DEL ESTANQUE

V1= 31.8171 m/s

CALCULO DEL NUMERO DE FROUDE A LA


ENTRADA DEL ESTANQUE

FR1= 21.1298

FR>4,5 ==> SALTO ESTABLE


V1>15 m/s ==> ESTANQUE TIPO III
DISEO DEL ESTANQUE TIPO III

CALCULO DEL VALOR DE TA


=1(1,46910,318)

TA= 7.1008 m

2=1/2((81^2+1)1)
CALCULO DEL TIRANTE CONJUGADO
Y2= 6.7921 m

CALCULO DE LA LONGITUD DEL 1=2(3,550,0610,00015 1 ^2)


ESTANQUE AMORTIGADOR
L1= 30.1141 m

DIMENSIONES DE LOS DIENTES DEFLECTORES


ALTURA Y1= 0.23 m
ANCHO Y1= 0.23 m
LARGO 2Y1= 0.5 m
ESPACIO ENTRE DIENTES Y1= 0.23 m
ESPACIO FRACCIONAL "EF" 0,5*Y1= 0.12 m
=/(21)
CALCULO DEL NUMERO
DE DIENTES
n= 54.0813 Calculado
n= 53 Asumido
DIMENSIONES DEL UMBRAL TERMINAL
ALTURA 0,2Y2 1.36 m
ANCHO 0,15Y2 1.02 m
ESPACIO ENTRE DIENTES 0,15Y2 1.02 m
BORDE LIBRE
CALCULO DEL BORDE LIBRE
DESCRIPCION SIMBOLO MAGNITUD UNIDAD
DATOS
Velocidad del viento V= 100 Km/hr
Longitud del fetch Fetch = 4 Km
Altura libre o borde de seguridad AL = 2 m

Calculo por la formula de WORF: Ho=(0.005V 0. 068 ) F


Altura de la ola Ho = 0.986 m

Calculo por la expresion h 5=2 . 33Ho


Borde libre de la presa h5 = 2.298 m

Calculo por la expresion h 5=Ho+ AL


Borde libre de la presa h5 = 2.986 m
Borde libre asumido para la presa h5 = 3.00 m

NIVELES DE EMBALSE
DESCRIPCION SIMBOLO MAGNITUD UNIDAD
DATOS
Nivel del volumen muerto N.V.M = = 563.145 m.s.n.m
Nivel de aguas minimas N.A.Mmin = 567.76 m.s.n.m
Nivel de aguas normales N.A.N.E = 579.25 m.s.n.m
Nivel de aguas maximas extraordinarias N.A.M.E = 581.250 m.s.n.m
ALTURA EN EL EMBALSE
DESCRIPCION SIMBOLO MAGNITUD UNIDAD
DATOS
Altura del volumen muerto h1 = 14.45 m
Altura del N.V.M al N.A.Min h2 = 3.00 m
Altura util (N.A.N.E - N.A.Min) h3 = 14.63 m
Altura del caudal de crecidas h4 = 1.95 m
Altura del borde libre h5 = 3.00 m
Altura total de la presa Htotal = 37.03 m
DISENO OBRA DE TOMA
Datos.-
Volumen de maxima demanda: 780,941.09 [m3]
Longitud de la tuberia de la obra de toma: Ltuberia =
50.64 [m]
Dias de trabajo 27.00 [dias]
Horas de trabajo 12.00 [h]
Caudal de max. Demanda (mes de mayo 31 dias): Qdemanda = 0.67 [m3/s]
Carga hidraulica minima de diseo: hmin=h2 = 3.00 [m]
Pendiente de la obra de toma: S= 0.02
Coeficiente de descarga para orificios sumerg C= 0.88 [adimensional]


Qdemanda=C*A* ( 2*g*h 2 )

h2=h-hf

Q_demanda=CA2g(h-hf)

Perdidas de carga
Todas las perdidas de carga en funcion al caudal de demanda:

v^2/
(2g)=0.0826Q^2/D^4 0.28570416

Perdida de carga por entrada


Ke= 0.5

he=Kev^2/(2g) 0.14285208

Perdida de carga por rejilla

La relacion An/At= 0.5


2
A A
k R=1. 450 .45* n n
At A t ( ) 0.975

hr=Ktv^2/ 0.27856156
(2g)

Perdida de carga por friccion


1 3 . 71*D
f
=2*log ( )
f= 1/ 0.01436711
(2log3.71D/) ^2
f= 1/
(2log3.71D/) ^2

= 0.00015

L V2
h f =f*
D 2*g

h_f=(1/(2log 0.34644021
(3.71D)/E))^2*L/d*(V^2/2*g)

Perdida de carga por valvulas

Tipo de vlvula Coef. de descarga


Vlvula de regulacin 0.19
Vlvula mariposa 0.15
Vlvula multichorro 4

Kvmariposa= 0.15
Kvregulacion 0.19

hv=Kvv^2/(2g) 0.04285562
1.14281666

Perdidas de carga por salida


Ks= 1
hs=Ksv^2/(2g) 0.28570416

Todas las perdidas de carga se ponen en funcion al diametro y al caudal de demanda


para luego encontrar un diametro efectivo.

D= 0.6 m
D= 24 plg 24 pulg
0.6 m

hf= 2.2392303

hf<=h ok!!
CAUDAL Y VELOCIDAD DE LAS TUBERIAS Q_demanda=CA2g(h-hf)

Cota h=(z1-z2) Q (1 tubo 650) Velocidad Q (2 tubo 650)


Area del tubo [m] k [----]
[m.s.n.m.] [m] [m/seg] [m/seg]
[m/seg]
582.508 17.634 0.283 4.028 2.281 8.067 4.562
582 17.126 0.283 4.028 2.248 7.951 4.496
581 16.126 0.283 4.028 2.181 7.714 4.362
580 15.126 0.283 4.028 2.112 7.470 4.224
579 14.126 0.283 4.028 2.041 7.219 4.082
578 13.126 0.283 4.028 1.968 6.960 3.936
577 12.126 0.283 4.028 1.891 6.688 3.782
576 11.126 0.283 4.028 1.812 6.409 3.624
575 10.126 0.283 4.028 1.728 6.112 3.456
574 9.126 0.283 4.028 1.641 5.804 3.282
573 8.126 0.283 4.028 1.548 5.475 3.096
572 7.126 0.283 4.028 1.450 5.128 2.900
571 6.126 0.283 4.028 1.344 4.753 2.688
570 5.126 0.283 4.028 1.230 4.350 2.460
569 4.126 0.283 4.028 1.103 3.901 2.206
568.5 3.626 0.283 4.028 1.034 3.657 2.068
568 3.126 0.283 4.028 0.960 3.395 1.920
567.5 2.626 0.283 4.028 0.880 3.112 1.760
567 2.126 0.283 4.028 0.792 2.801 1.584
566 1.126 0.283 4.028 0.000 0.000
565 0.126 0.283 4.028 0.000 0.000
564.874 0 0.283 4.028

CURVA DE FUNCIONAMIENTO DE LA OBRA DE TOMA

Grafica Cotas Vs Q
Cota (msnm)

585

580

575

570 Colum
nA
565

560

555
0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000
Q(m3/s)

CURVA DE DESCARGA
A=Q/(C(2g(h-hf))) %A_abierta=A/A_(tubo
lleno)

A_(tubo 0.28274334
lleno)=(^2)/4

Cota h=(z1-z2) Caudal Q % Area 1T % Area 2T


hf [m]
[m.s.n.m.] [m] (m3/s) Compuerta Compuerta
582.508 17.634 1.151 0.670 14.604 7.302
582 17.126 1.151 0.670 14.823 7.411
581 16.126 1.151 0.670 15.285 7.642
580 15.126 1.151 0.670 15.793 7.896
579 14.126 1.151 0.670 16.355 8.177
578 13.126 1.151 0.670 16.982 8.491
577 12.126 1.151 0.670 17.687 8.844
576 11.126 1.151 0.670 18.488 9.244
575 10.126 1.151 0.670 19.409 9.704
574 9.126 1.151 0.670 20.482 10.241
573 8.126 1.151 0.670 21.756 10.878
572 7.126 1.151 0.670 23.301 11.651
571 6.126 1.151 0.670 25.231 12.616
570 5.126 1.151 0.670 27.736 13.868
569 4.126 1.151 0.670 31.175 15.588
568.5 3.626 1.151 0.670 33.456 16.728
568 3.126 1.151 0.670 36.323 18.161
567.5 2.626 1.151 0.670 40.081 20.041
567 2.126 1.151 0.670 45.315 22.658
566 1.126 1.151 0.670 68.038 34.019
565 0.126 1.151 0.670 Err:502 Err:502
564.874 0 1.151 0.670
% Area abierta

%Aabierta Vs Altura de Carga


80.000
70.000
60.000
50.000
40.000
30.000
20.000
10.000
0.000
0 2 4 6 8 10 12 14 16 18 20
Altura de Carga (m)
DESCARGADOR DE FONDO

DATOS
Caudal medio: Qp= 2.41759831 [m3/s]
Longitud de la tuberia de la obra de toma: Ltuberia = 76.6 [m]
Caudal de diseno (60%*Qp): Qdemanda = 2.41759831 [m/seg]
Carga hidraulica de diseo (N.A.N.E): hmin=h2 = 30.585 [m]
Coeficiente de descarga para orificios sumergidos: C= 0.88


Q demanda=C*A* ( 2*g*h 2 )

h2=h-hf

Q_demanda=CA2g(h-hf)

Perdidas de carga
Todas las perdidas de carga en funcion al caudal de demanda:

v^2/
(2g)=0.0826Q^2/D^4 5.27591242

Perdida de carga por entrada


Ke= 0.5

he=Kev^2/(2g) 2.63795621

Perdida de carga por rejilla

La relacion An/At= 0.5


2
A A
k R=1 . 450 . 45* n n
At ( )
At
0.975

hr=Krv^2/ 5.14401461
(2g)

Perdida de carga por friccion


1 3 . 71*D
f
=2*log ( )
f= 1/ 0.01463099
(2log3.71D/) ^2
= 0.00015 [m]
2
L V
h f =f*
D 2*g

h_f= 1/ 10.7507123
(2log(3.71D/)) ^2L/DV^2/
(2g)
Perdida de carga por valvulas

Tipo de vlvula Coef. de descarga


Vlvula de regulacin 0.19
Vlvula mariposa 0.15
Vlvula multichorro 4

Kvmariposa= 0.15
Kvregulacion 0.19

hv=Kvv^2/(2g) 0.79138686
1.00242336

Perdidas de carga por salida


Ks= 1
hs=Ksv^2/(2g) 5.27591242

Todas las perdidas de carga se ponen en funcion al diametro y al caudal de demanda


para luego encontrar un diametro efectivo.

D= 0.55 m
D= 22 plg 22 plg pulg
0.55 m m

hf= 25.6024058

hf<=h ok!!
CAUDALES Y VELOCIDADES PARA LAS DIFERENTES ALTURAS DE CARGA PARTIENDO DEL
NANE HASTA LA BASE DE LA PRESA.
Q_demanda=CA2g(h-hf)
A_(tubo 0.23758294
lleno)=(^2)/4

Cota h=(z1-z2) Area del tubo Q (1 tubo ) Velocidad


k [----] Q (2 tubo )
[m.s.n.m.] [m] [m] [m/seg] [m/seg]
582.508 30.585 0.23758294 4.85269727 2.348 9.8828643 4.696
582 30.077 0.23758294 4.85269727 2.329 9.80289223 4.658
581 29.077 0.23758294 4.85269727 2.29 9.63873903 4.58
580 28.077 0.23758294 4.85269727 2.25 9.47037678 4.5
579 27.077 0.23758294 4.85269727 2.21 9.30201453 4.42
578 26.077 0.23758294 4.85269727 2.168 9.12523416 4.336
577 25.077 0.23758294 4.85269727 2.126 8.94845379 4.252
576 24.077 0.23758294 4.85269727 2.084 8.77167343 4.168
575 23.077 0.23758294 4.85269727 2.04 8.58647495 4.08
574 22.077 0.23758294 4.85269727 1.995 8.39706741 3.99
573 21.077 0.23758294 4.85269727 1.949 8.20345082 3.898
572 20.077 0.23758294 4.85269727 1.902 8.00562517 3.804
571 19.077 0.23758294 4.85269727 1.855 7.80779952 3.71
570 18.077 0.23758294 4.85269727 1.805 7.5973467 3.61
569 17.077 0.23758294 4.85269727 1.755 7.38689389 3.51
568 16.077 0.23758294 4.85269727 1.702 7.1638139 3.404
567 15.077 0.23758294 4.85269727 1.649 6.94073391 3.298
566 14.077 0.23758294 4.85269727 1.593 6.70502676 3.186
565 13.077 0.23758294 4.85269727 1.535 6.46090149 3.07
564 12.077 0.23758294 4.85269727 1.477 6.21677622 2.954
563 11.077 0.23758294 4.85269727 1.413 5.94739662 2.826
562 10.077 0.23758294 4.85269727 1.348 5.67380795 2.696
561 9.077 0.23758294 4.85269727 1.279 5.38338307 2.558
560 8.077 0.23758294 4.85269727 1.207 5.08033101 2.414
559 7.077 0.23758294 4.85269727 1.129 4.75202461 2.258
558 6.077 0.23758294 4.85269727 1.047 4.40688199 2.094
557 5.077 0.23758294 4.85269727 0.957 4.02806692 1.914
556 4.077 0.23758294 4.85269727 0.857 3.60716129 1.714
555 3.077 0.23758294 4.85269727
554 2.077 0.23758294 4.85269727
553 1.077 0.23758294 4.85269727
552 0.077 0.23758294 4.85269727
551.923 0 0.23758294 4.85269727

El uso de las dos tuberias a presion garantiza que la evacuacion de las aguas se acelera en una
proporcion igual al numero de tuberias a utilizar para este fin.
Cota (msnm) Grafica H Vs Q
585
580
575
570
565
Caudal Una tuberia
560 Caudal dos
555 tuberias
550
545
540
0.5 1 1.5 2 2.5 3 3.5 4 4.5 5
Q(m3/s)
RAPIDA no ok!

T
R
A X (m) DX (m)
M
O

1 0.000 3.873
1 3.873 3.873
2 7.746 3.873
3 11.619 3.873
4 15.492 3.873
5 19.365 3.873
6 23.238 3.873
7 27.111 3.873
8 30.984 3.873
9 34.857 3.873
10 38.730 3.873
CARACTERISTICAS GEOMETRICAS Y DE FUNCIONAMIENTO
DESCRIPCION SIMBOLO MAGNITUD UNIDAD
DATOS CALCULO DEL BORDE LIBRE
Talud aguas de m= 0.8 m Y BL h
Angulo de incli = 51.34 2.0499 0.8482 2.8981
Desnivel de la h= 32.09 m 1.9105 1.0850 2.9955
Longitud de la Lrapida= 38.73 m 1.5108 1.1807 2.6915
pendiente de l S= 0.829 m/m 0.9453 1.1580 2.1033
Caudal de dise Q= 183.85 m3/s 0.5312 1.0779 1.6091
Ancho de la ra B= 20 m 0.4859 1.0993 1.5851
Numero de tr N= 10 0.4515 1.1176 1.5690
Rugosidad h= 0.025 0.4244 1.1335 1.5579
Velocidad max Vmax= 15 m/s 0.4023 1.1477 1.5500
0.3841 1.1603 1.5444
0.3687 1.1717 1.5404

DESCRIPCION SIMBOLO MAGNITUD UNIDAD

CALCULO DEL TIRANTE CRITICO

Yc= 2.0499 m
CALCULO DEL
TIRANTE A
PARTIR DE LA
SECCION CON
Vmax
CALCULO DEL
TIRANTE A
PARTIR DE LA
SECCION CON
Vmax Y= 0.6128 m

CALCULO DEL
RADIO
HIDRAULICO
R= 0.5774 m

CALCULO DEL
COEFICIENTE
DE CHEZY
C= 21.6800 m0,5/s

CALCULO DEL
COEFICIENTE
DE DARCY
l= 0.1670
CALCULO DE TIPO 1
LA M= 0.0500
GEOMETRIA
DEL N= 14.0000
OBSTACULO k= 0.9000
POR LA EXPRESION 1

D= 5.293 m
POR LA EXPRESION 2

D= 1.0455 m

COMPROBACI
ON DE LA
GEOMETRIA
0.1158

SEPARACION
ENTRE
UMBRALES
Lu= 42.3 m

AEREACION
DEL FLUJO
Vcrit= 5.3314 m/s
CALCULO DE LOS TIRANTES DE LA RAPIDA

E+So*DX SE Semed Semed*DX


So (m/m) Y (m) V (m/s) E (m)
(m) (m/m) (m/m) (m)

0.829 2.0499 4.484 3.075 6.286 0.0010


0.829 1.9105 9.263 6.284 9.495 0.0012 0.0011 0.0042
0.829 1.5108 12.516 9.495 12.706 0.0023 0.0018 0.0068
0.829 0.9453 15.193 12.710 15.921 0.0096 0.0060 0.0232
0.829 0.5312 17.307 15.797 19.008 0.0613 0.0355 0.1373
0.829 0.4859 18.920 18.730 21.941 0.0820 0.0716 0.2774
0.829 0.4515 20.360 21.580 24.791 0.1043 0.0931 0.3607
0.829 0.4244 21.662 24.342 27.553 0.1278 0.1160 0.4494
0.829 0.4023 22.848 27.011 30.221 0.1523 0.1401 0.5424
0.829 0.3841 23.934 29.582 32.792 0.1775 0.1649 0.6386
0.829 0.3687 24.934 32.055 35.266 0.2031 0.1903 0.7369

2.5

1.5

15
1

0.5

0
0 5 10 15 20 25 30 35 40 45
E+Semed*DX
(m)

6.288
9.502
12.733
15.935
19.008
21.941
24.791
27.553
30.220
32.792