You are on page 1of 2

FLOW CHART OF SEWAGE TREATMENT

POTABLE WATER
RETURN SLUDGE AG 205 AG 206
B 201 A, B, C MEASURING AGITATOR AGITATOR
M M
BOX

P 209 A P 210 A
WASTE WATER CHLORINATION DEWATERING
AGEN AID
BLOWER MEASURING BOX DISSOLVING DISSOLVING
TANK TANK
TK 203 TK 204
P 209 B P 210 B

SEWAGE CHLORINATION CHLORINATION


A 203
AGEN DOSING PUMP AGEN DOSING PUMP
COMMINUTOR
NO. 1 PUMP
STATION M AGITATOR
(AG 202)
FRS

DIGESTOR
BAR SCREEN 201 AG 201 A AG 201 B AG 201 C AG 201 C M
SEWAGE
SEDIMENTATION
NO. 2 PUMP
BASIN

CHLORINATION BASIN
STATION

TREATED WATER
GRAVITY SAND AERATOR

BASIN
SEPARATOR

SEWAGE P 204 A, B, C, D, E
P 203
WASTE WATER PUMP
WASTE WATER
TRANSFER PUMP AERATION TREATED
BASIN WATER
P-205 A

P-205 B
P-206

P-205 C DEFORMING WATER PUMP


DEFORMING PIT
AGITATOR
AG 203 RETURN SLUDGE PUMP

M AGITATOR
M AG 204 A 204
SLUDGE
DEHYDRATOR

P-207
SUPERNATANT PUMP
SUPERNATANT PIT SLUDGE
COAGULATION
THICKENER
TANK A 205
P-208
BELT CONVEYOR
SLUDGE
TRANSFER COMPRESSOR
PUMP

C-201

CAKE HOPPER

You might also like