You are on page 1of 3
Wisdom « Integrity - Excellence W TAYLOR'S UNIVERSITY SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Centre for Modern Architecture Studies in Southeast Asia (MASSA) Bachelor of Science (Honours) (Architecture) BUILDING SERVICES (BLD 60903 / ARC 2423) Project 2: Application of Building Services Total assessment: 30% Prerequisite: None Submission date: Week 12 (24 Novernber 2017) 12.00 noon Introduction Project 2is an individual assignment on application of basic buiding services. This is an individual project fo apply building services systems to a domestic sized building, This exercise requires students to demonstrate thet understanding on the application by producing technical drawings incorporating the necessary building services. Cer The objectives of this project are as follows: 1, To develop the students’ understanding and knowledge of building services systems in design and construction. 2. To apply appropriate buiting services system and solution for a specific design. 3. To demonstrate a comprehensive understanding of applicabily of specific builling services systems in the design in response to practical considerations 4, To develop students’ abit to resolve issues related to spectic bulding services systems. PELE Upon completion ofthis assignment, students willbe able to: 1. Identity relevant information related to water and electrical supply, quid waste disposal, sanitary end rainwater management system. 2 Describe the planning of building services within the design and construction peripheries. 3, Propose the more/most suitable systems for a spectic type of building Tasks - Methodology Ina group of 2, students wil design their own double storey bungalow (requirements are in the site plan given). The purpose ofthis exercise isto familiarize the students with the application of the systems and apply them in the design proposais. twill also demonstrate the students’ understanding in applying what they have leamt from the module Bulking Services (BLD 60903 / ARC 2423): August 2017 1 This assignment requies a site plan, building plans and roof plan. ‘Students wll demonstrate their understanding of building services by providing the most appropriate systems forthe building, which include: i) electrical supply system il) cold water and hot water supply system ii) sewerage and sanitary system |v) rainwater! surface water drainage system ‘These systems form part ofthe plans required for Building Ptan Approval to Locel Authorities. Hence, it is essential to understand the systems and its operations, ‘The drawings must be reproduced into @ computer-aided drawing with annotations which describe the planning and installation of all building services required. Students may also include specific clauses from the Uniform Building By- Law (UBBL) or other relevant Acts, Laws or guidelines that narrate to the proposed systems into their presentation drawings. (Students are advised to read and perform some research on building services literature/materials on their own). ‘Students are required to prepare the following: 1, A product catalogue ofthe systems used inthe busing in BS size. 2. Drawing ofthe systems on A2 paper, compiled in a clear plastic envelope, Required plans in A2 sizad drawing (imited to 2 pieoes of A2): Plans/ Drawings Information required 1 |= Site plan (1:200) = Acoess, assumed service Ine ~ Ground floorplan (1:100) ~ surface water drainage, sewerage layout (solidhwaste water, saritary plumbing layout 2 _ | = First floor plan! typical foor plan (1:100) | - Sanitary plumbing layout, location of water tank (ifat roof level) ~ Roof plan (1:100) = rainwater drainege system 3 _ | = Reflected celing plan (1:700) electrical fitings, points layout, meter and DB layout ~ Schematic diagram (NTS) ~ sewerage (solidiwaste water) system, water supply system 3, Exepott submission (shared ink to be given at later dete) ‘Suggested Format of Submission Cover page (wth subject heading) - Name arc Students D number and group photo shouki be writen carly (TU Loge) ‘Bulking Services (BLD 60903 / ARC 2423) August 2017 a ‘The assessment for this assignment will be based on the following: ‘© Quality of drawings, diagrams and images for each building services system including appropriate drawing ‘standards and conventions. ‘+ Clary of descriptions and specications of all buiding services components both in drewings and catalogues. ‘© Understanding ofthe project and all elated butding services systems, Marks shall be distributed as follows: i. Understanding in systems proposed = 5% ii, Descriptions and specications - 2% Presentation format = 20% References - 5% (Marks will be converted to 30%) Sree Chudley, Roy. 1988. Building Finishes, Fitings and Domestic Services. 2nd Edition, Longman. Greeno, R. 2000, Building Services Equipment. §* Edtion. Longman Hall, Frederick E. 1997. Bulding Services and Equipment, Volume 2. 2nd Editon. Hall, Frederick €, 1999. Bulking Services, Technology end Design. 3# Edition. Longman. Stein, Benjamin & Reynolds, John S. 2000, Mechanical and Electrical Equipment for Buings. New York, John Wiley. Prepared by: Approved by: (tc HfeeSateeran H), Hassan) (Mohd, Adib Rami) Module Coordinator Programme Director Office No.: 0356295352 B. So, Architecture (Hons) Office Location: Academic Suite C9 Date: 3098/2017 Date: gig [9/19 Remarks: 41, The Project Bret is tobe distributed to the students inthe fist week ofthe semester. 2. Any changes to the Project Brief shall be communicated (in writing) to the Programme Director and the approved revised version must be communicated tothe students. Biking Series (BLD 60803 / ARC 2423): August 2017 3

You might also like