CALIFORNIA CITY STRUCTURAL COMMENTS

9.1 Structural engineer of record shall stamp and sign all sheets of plans and first page of design
calculations.

9.2 Geotechnical engineer shall review foundation designs and construction documents for general
conformance with the geotechnical report requirements and provide statement on the plans indicating
same with engineers seal and stamp thereon.

9.3 Submit a copy of soil investigate report to verify seismic design criteria used on calculation.

9.4 Submit wind load design calculation and connection for exterior wall SIP panel for out of plane loads.
Provide proper connection details at top and bottom of wall panel.

9.5 Comply with CBC 1705 required special inspection and testing. Print special inspection program on
plan.

9.6 Comply with CBC 1704 structural observation requirement, print observation form on plan.

9.7 Submit calculation design 14 thick structural floor slab for transformer pad. Provide calculation design
mechanical anchorage per ASCE7-10 section 13.3.1, provide connection detail on plan.

9.8 Submit design calculation for chain link fence and CMU wall show on sheet C0-06.

9.9 Submit calculation design pad footing under steel moment frame.

9.10 Submit structural calculation design / detail roof top equipment anchorage.

9.11 Provide ICC-ESR approved number for steel roof and floor deck system. Specify diaphragm capacity
on schedule. Provide manufacture specification of wall and floor/ roof panel on plan.

9.12 The latest approved edition of structural software shall be used for the proposed project. The
proposed building is to comply with all 2016 CBC structural requirements.

9.13 Provide proper connection detail of floor panel connected to steel beam, detail 9 & 10/S2.03 do not
match.

9.14 Provide structural connection detail for roof and floor panels connected to steel deck. Specify size
and spacing of connector.

9.15 Submit structural calculation / shop drawing for new stairway, provide connection to floor framing
system.

9.16 Submit complete calculation design steel column base plate, anchor bolt and gusset plate show on
sheet S1.04.

9.17 Submit complete calculation design steel column base plate, anchor bolt and gusset plate show on
sheet S1.04.

9.18 Revise detail 3 & 8/ S2.03 to specify size and grade of anchor bolt on moment connection.
9.19 Refer to check set for additional comments.

Plans Red Mark Comments


7 Revise plans and provide shop drawing for access ladder. Also provide method of
connection to building structure
8 Revise plans and provide structural calcs and details for proposed application

1 Revise plans and provide structural calcs and details for anchoring tank
0
2 Revise plans and provide parapets as required by CBC Sec 705.11
0
2 Clarify the 3/16 weld is typical for all SIP panel top connections
2
2 Revise plans and provide method of connection for panel intersection
2
2 Revise plan and incorporate 2 additional columns for U-factor and S.H.G.C. as
7 required by the energy code
2 Revise plans and a standard mounting detail for all roof mounted equipment
9
3 The proposed total load is low, justify or re-calculate
0
3 The proposed live floor load maybe low. Provide an itemized list of elements
0 incorporated into the floor live load
3 Review CBC Volume 2 for seismic design and Mod. factor
0
3 Revise plans and incorporate a structural observation form for the proposed scope
0 of work
3 Revise plan, soil engineer of record must stamp and sign the proposed foundation
6
3 Provide structural calcs for 1/4" plate
7
3 Revise plan and indicate the spacing of the 3/8" screws
8
3 Revise plan, indicate size and gage of channel
8
3 Revise plan, indicate type and length of weld
8
3 Indicate spacing of 3/8" screws
8
3 Revise plans, indicate connection details. Provide structural calcs to support design
8
3 Revise plan, indicate size and gage of channel
8
3 Revise plan, provide cross section detail
9
3 Slab at 6" and 4" slab, clarify
9
3 Revise plan, rebar layout varies and not supported. Revise rebar layout and
9 support with calcs
4 Revise plan, provide stair framing details
0
4 Revise plan, provide stair framing details
0
4 Revise plan, provide deck material MFG and third party ESR#
1
4 Revise table, provide diaphragm shear capacity
1
4 Revise, provide all connections details
2
4 Revise, provide clip size and gage
2
4 Revise, these 2 details do not match, clarify
2
4 Revise, provide connections details for floor panel to metal decking
2
4 Revise, provide epoxy MFG and ESR#
2
4 Revise, indicate embed length
2
4 Revise, indicate spacing for anchor bolts
2
4 Revise, provide method of connection supported by calcs
2
4 Revise plans, on the roof plan indicate the min. pitch for condensate lines and
8 location of receptor