You are on page 1of 2

Benefits

Increasing capacity and reach


Increases the capacity of the local transport network, catering to an expected population of two
million in the Western Corridor of the Greater Kuala Lumpur/Klang Valley by 2020.
Extends reach to Klang, Shah Alam, Petaling Jaya and Subang Jaya via 26 stations.

Improving accessiblity within the Western Corridor


Connecting you to the
Western Corridor
The corridor provides access to Port Klang - the 13th busiest port in the world - as well as other pockets
of industrial hubs located around the Shah Alam district. The LRT3 alignment will add tremendous
capacity to existing transportation linkages.

Boosting economic growth


Supporting regeneration and the development across the Western Corridor.
SUNGAI BULOH 9 BANDAR UTAMA - JOHAN SETIA
Kampung
LRT3 will spur the revitalisation of communities in Petaling Jaya, Shah Alam and Klang by encouraging Selamat

high density, mixed-use real estate development around the stations with an emphasis on Transit Kwasa
Damansara
Damansara
Utama
Oriented Developments. Kwasa
Sentral Integrates
LRT3 links townships together into integrated regions that can then function as a single, stronger Kota
with
Damansara MRT
economy.
Surian
Shah Alam BANDAR
UTAMA
Akan datang.
LRT3 broadens labour markets and offers workers a wider network of employers to choose from. Stesen Projek MRT

9 LALUAN MRT SUNGAI BULOH - KAJANG Laluan Sungai Buloh - Kajang


Dalam Mutiara
State
pembinaan COMING SOON. MRT STATIONS ON
MRT SUNGAI BULOH - KAJANG LINE Damansara SUNGAI BULOH - KAJANG LINE
UNDER CONSTRUCTION
Cochrane
Mosque
10 LALUAN LRT 3
LRT BANDAR UTAMA - JOHAN SETIA
Dalam
pembinaan
UNDER CONSTRUCTION
(S1) BANDAR
UTAMA Tun Razak UiTM
Shah Alam
Stadium Glenmarie
Exchange
10 Taman Tun Taman
Dr Ismail Pertama

Facilities S2 Phileo
Damansara
Taman
Midah Section 7 Kelana Jaya
Merdeka Integrates
Pusat Bandar Taman
Pick-up & Drop-off : Bus/ taxi lay-bays, Park & Ride, Kiss & Ride, special parking bays for people S3 Damansara Mutiara with
Kelana Jaya Line
Semantan Muzium Negara
facilities with disabilities (OKU). Akan datang.
Stesen Projek LRT3
Taman
Connaught Integrates
Laluan Bandar Utama
- Johan Setia S4 with
Taman
Pedestrian Walkways/ : Covered walkways, pedestrian bridges, facilities for people with disabilities COMING SOON. LRT3 STATIONS ON
BANDAR UTAMA - JOHAN SETIA LINE Suntex Bus Rapid Transit

Bridges (OKU). S5
Sri Raya Integrates
Bandar Tun Shah Alam with
Hussein Onn Town Centre Bus Rapid Transit
Public Facilities : Lifts & escalators for enhanced access, ramps for people with disabilities Bukit
S6
(OKU), public toilets, surau, shopping & retail space. Dukung Integrates
with
Taman KTM Komuter
Ticket Sale & Top Up : Ticket vending machine, customer service counter. S9 S8
(S7
)
Koperasi
Cuepacs
S10
Sungai
S11 Kantan
S14 S13 S12
KAJANG 9 Bandar
Kajang Klang
S15
Town Centre Taman
S16 Sri Andalas
S17
S18 Bandar
S19
(S20)
Bukit Tinggi
Klang
S21 Bandar
S22 Botanik
S23
S24
S25 PU
TR
AH
JOHAN EIG
SETIA HT
S
10
JOHAN
(S26)

SETIA

1800-18-2585 www.lrt3.com.my enquiries@mrcbgk.com


*for illustration purposes only, final station design may vary
What is LRT3 The Alignment
Light Rail Transit 3 (LRT3) is the third LRT system in the Greater Kuala Lumpur/Klang Valley (GKL/KV) LRT3 is a double track rail alignment of approximately 37 km operating between Bandar Utama to
region and will serve an estimated population of two million in the Western Corridor by 2020. The LRT3 Johan Setia.
is estimated to benefit 500,000 commuters along the alignment. LRT3 alignment will have 26 stations including 5 stations that integrate with existing and future public
transport systems.
LRT3 is a project developed in line with the Urban Rail Development Plan (URDP) of the GKL/KV Land
Public Transport Master Plan under the Land Public Transport Commission (SPAD). Total transit time of approximately 58 minutes.
The line will cover the areas of Bandar Utama, Shah Alam and Klang before terminating at Johan
LRT3 is part of a reliable, efficient, integrated and sustainable land public transport system targeted Setia. *for illustration purposes only, final station design may vary
at enhancing socio-economic development and quality of life.
STATION
Prasarana Malaysia Berhad is the project owner that formulated the brief of the project and will SUNGAI KLANG 18

KAWASAN
assume operations of the project upon completion.
PERINDUSTRIAN
19 BUKIT RAJA

STATION
KAWASAN KAWASAN
19
KTM 18 17
MRCB George Kent (MRCBGK) is the appointed Project Delivery Partner (PDP) for the LRT3 and is TELUK PULAI
TAMAN
DESA ALAM

responsible for the successful completion of the project within a predetermined cost and time frame. KTM KG. TELUK STATION
ENG ANN STATION
17
TELUK GADONG GADONG 20 TAMAN MRT PJU 5
BERKELEY KOTA DAMANSARA

KAWASAN KLANG TOWN


6 CENTRE BANDAR BARU SECTION 7
KLANG STATION
KTM SUBANG AIRPORT

LRT3 Features
16
KLANG STATION
BUKIT 15
KUDA
I-CITY MRT SURIAN
BAYU KAWASAN MUTIARA
PERDANA TAMAN 1 DAMANSARA
CHI LIUNG
An Integrated Network STATION
21 UiTM SHAH
MRT MUTIARA DAMANSARA
ALAM CAMPUS
Five integrated stations designed to provide a more convenient travel STATION
TROPICANA GOLF &
experience and better connectivity for passengers. LRT3 interchanges 14 TROPICANA
BUKIT TINGGI SECTION 2 COUNTRY RESORT ONE UTAMA
STATION TAMAN KAMPUNG PADANG
SHAH ALAM
with existing and future public transportation services at five points:
22 SRI ANDALAS JAWA STATION BANDAR
TOWN CENTRE
KTM 13 UTAMA
BUKIT BADAK SECTION 16 STATION
TAMAN KTM STATION ARA DAMANSARA STATION
Station 1 : Integration with MRT Line 1
BANDAR 12 4
KLANG RIA PADANG JAWA STATION STATION 1 MRT BANDAR UTAMA
BUKIT TINGGI 1
11 LAMAN GLENMARIE 3
2 STATION
STATION 5 TAMAN TUN
Station 7 : Integration with Kelana Jaya Line 23 SECTION 11 SECTION 13
SAUJANA GOLF &
DR ISMAIL
KAMPUNG
BANDAR STATION COUNTRY CLUB SUNGAI
Station 10 : Integration with BRT Federal Line (future) BUKIT TINGGI 2
STATION
SECTION 12 10
HICOM GLENMARIE ARA DAMANSARA
LEMBAH SUBANG
STATION
AMAN SURIA
DAMANSARA
KAYU ARA STATION
2
24 SECTION 15 INDUSTRIAL PARK STATION TAMAN
Station 13 : Integration with BRT Federal Line (future) GLENMARIE GOLF &
STATION
MAYANG
DAMANSARA
STATION COUNTRY CLUB
6 UTAMA
KTM 9
Station 20 : Integration with KTM Komuter Port Klang Line AMBANG BOTANIK MRT TTDI
BANDAR BOTANIK SHAH ALAM STATION
8 KELANA JAYA
STATION
PETALING JAYA
SECTION 20 KTM GLENMARIE GLENMARIE KELANA JAYA
STATION BATU TIGA
Train
AMBANG BOTANIK 2 COURTS STATION
25 STATION 7
TAMAN BAHAGIA

SUBANG JAYA
STATION
Legend
BANDAR PUTERI
STATION
KLANG
KOTA BAYUMAS
SUBANG JAYA LRT3 Alignment
STATION TAMAN TEKNOLOGI KTM SUBANG
26 TINGGI SUBANG SUBANG JAYA COUNTRY CLUB
SS15 Underground Alignment
JOHAN SETIA STATION PARAMOUNT
BANDAR STATION Station location
PARKLANDS

Integration
Module: 6-coach train, Speed: 80 km/h Capacity: 36,720 passengers Frequency: Minimum of SS18
STATION Kelana Jaya Line
accessible end-to-end maximum speed per hour per direction 2 minutes headway
LRT3 ALIGNMENT MAP
ASIA JAYA
STATION
KTM Port Klang Line

First rail project with green technology in Malaysia USJ 7


STATION
Length Number of stations Integration at
Key features include rainwater harvesting technology, noise
reduction system, energy management system and natural
37km with 2 km underground tunnel 26 1 underground station
including 5 stations

ventilation

Ridership Parking bays at stations

Feeder bus network 74,000 passengers / day in 2020 6,000 in 2020


Feeder bus to expand transit's catchment area beyond walking
distance (more than 400m)
Coverage Distance - up to 3km from station End-to-end journey time
Travel Distance Time - 30 minutes 58 minutes
from Bandar Utama to Johan Setia

*for illustration purposes only, final station design may vary

You might also like