You are on page 1of 27

DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SO

USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 17/08/2017


14/08/2017

.Title of Test: Compaction of soil with 6%


4% Saw dust

Total weight of Sample... 5000g MDD: 1.535g/cm


1.53g/cm 33
OPT.MC:
OPT.MC:19.8%
20.8%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3375.00 3425.00 3500.00 3600.00 3675.00 3725.00
`````` 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1475.00 1525.00 1600.00 1700.00 1775.00 1825.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.49 1.54 1.62 1.72 1.79 1.84
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 52.80 40.30 40.60 27.30 38.50 43.00 40.60 41.90 33.20 43.90 31.40
Wt. of Dry soil & container (g) 49.60 38.00 37.90 25.80 35.60 39.30 37.00 38.00 30.40 39.40 28.30
Wt. of Container (g) 15.30 13.60 13.80 12.80 13.80 11.90 13.20 12.80 14.70 14.70 13.30
Wt. of dry soil (Wd) g 34.30 24.40 24.10 13.00 21.80 27.40 23.80 25.20 15.70 24.70 15.00
Wt. of Moisture (Wm) g 3.20 2.30 2.70 1.50 2.90 3.70 3.60 3.90 2.80 4.50 3.10
Moistur Content 100(Wm/Wd) % 9.33 9.43 11.20 11.54 13.30 13.50 15.13 15.48 17.83 18.22 20.67
Average Moisture Content (m) % 9.38 11.37 13.40 15.30 18.03 20.74
Dry Density = Pb/1+ (m/100) (g/cm3) 1.36 1.38 1.43 1.49 1.52 1.53
C.B.R. (mseen of top & bottom) %

1.55

1.50

1.45
Dry Density

1.40

1.35

1.30

1.25
8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00

Moisture Content
Y RELATION OF SOIL
ON

OPT.MC:
OPT.MC:19.8%
20.8%

3725.00 3750.00 3725.00 3700.00


1900.00 1900.00 1900.00 1900.00
1825.00 1850.00 1825.00 1800.00

1.84 1.87 1.84 1.82


S. Mould, X = 990cm 3

CB6 CT7 CB7 CT8 CB8 CT9 CB9


33.50 30.70 36.20 28.20 31.10 32.00 36.80
29.90 27.30 32.00 25.30 27.30 27.80 32.00
12.60 11.70 13.30 13.20 11.70 11.30 13.80
17.30 15.60 18.70 12.10 15.60 16.50 18.20
3.60 3.40 4.20 2.90 3.80 4.20 4.80
20.81 21.79 22.46 23.97 24.36 25.45 26.37
20.74 22.13 24.16 25.91
1.53 1.53 1.48 1.44

9.38
11.37
13.40
15.30
18.03
20.74
22.13
24.16
25.91

24.00 26.00 28.00


1.36
1.38
1.43
1.49
1.52
1.53
1.53
1.48
1.44
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 6% SAW DUST
DESCRIPTION DATE: 18/09/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 36 48 55 70 90 108 132 149 162 174
Load (KN) 0.00 0.39 0.53 0.60 0.77 0.98 1.18 1.44 1.63 1.77 1.90
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 34 41 50 65 87 95 123 128 140 155
Load (KN) 0.00 0.37 0.45 0.55 0.71 0.95 1.04 1.35 1.40 1.53 1.70
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 7.43 8.17
TOP 7.18 7.01
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
190
2.08

12.50
185
2.02

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SO
USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 17/08/2017

.Title of Test: Compaction of soil with 6% Saw dust and 0.5% quarry dust

Total weight of Sample... 5000g MDD: 1.536g/cm3 OPT.MC: 22.4%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3400.00 3450.00 3525.00 3600.00 3675.00 3725.00
`````` 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1500.00 1550.00 1625.00 1700.00 1775.00 1825.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.52 1.57 1.64 1.72 1.79 1.84
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 42.60 45.70 37.10 33.30 41.20 42.20 39.70 31.20 32.90 39.50 33.30
Wt. of Dry soil & container (g) 40.20 42.60 34.50 31.20 38.00 38.40 36.00 28.40 30.20 35.60 29.70
Wt. of Container (g) 16.50 12.40 13.50 14.30 15.50 12.80 13.20 11.80 15.50 14.70 11.90
Wt. of dry soil (Wd) g 23.70 30.20 21.00 16.90 22.50 25.60 22.80 16.60 14.70 20.90 17.80
Wt. of Moisture (Wm) g 2.40 3.10 2.60 2.10 3.20 3.80 3.70 2.80 2.70 3.90 3.60
Moistur Content 100(Wm/Wd) % 10.13 10.26 12.38 12.43 14.22 14.84 16.23 16.87 18.37 18.66 20.22
Average Moisture Content (m) % 10.20 12.40 14.53 16.55 18.51 20.51
Dry Density = Pb/1+ (m/100) (g/cm3) 1.37 1.39 1.43 1.47 1.51 1.53
C.B.R. (mseen of top & bottom) %

1.55

1.50

1.45
Dry Density

1.40

1.35

1.30

1.25
8.00 13.00 18.00 23.00 28.00

Moisture Content
1.25
8.00 13.00 18.00 23.00 28.00

Moisture Content
Y RELATION OF SOIL
ON

OPT.MC: 22.4%

3725.00 3750.00 3775.00 3750.00


1900.00 1900.00 1900.00 1900.00
1825.00 1850.00 1875.00 1850.00

1.84 1.87 1.89 1.87


S. Mould, X = 990cm 3

CB6 CT7 CB7 CT8 CB8 CT9 CB9


38.80 26.20 30.90 30.20 26.90 27.60 31.60
34.60 23.40 27.50 26.70 24.00 24.40 27.50
14.40 10.90 12.70 12.50 12.60 12.50 12.60
20.20 12.50 14.80 14.20 11.40 11.90 14.90
4.20 2.80 3.40 3.50 2.90 3.20 4.10
20.79 22.40 22.97 24.65 25.44 26.89 27.52
20.51 22.69 25.04 27.20
1.53 1.52 1.51 1.47

10.20
12.40
14.53
16.55
18.51
20.51
22.69
25.04
27.20

23.00 28.00
23.00 28.00
1.37
1.39
1.43
1.47
1.51
1.53
1.52
1.51
1.47
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 6% SAW DUST AND 0.5% QUARRY DUST
DESCRIPTION DATE: 18/09/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 38 50 58 74 92 108 135 150 160 175
Load (KN) 0.00 0.42 0.55 0.63 0.81 1.01 1.18 1.48 1.64 1.75 1.91
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 36 40 56 65 91 96 120 133 142 158
Load (KN) 0.00 0.39 0.44 0.61 0.71 1.00 1.05 1.31 1.45 1.55 1.73
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 7.60 8.22
TOP 7.52 7.29
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
190
2.08

12.50
185
2.02

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SO
USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 17/08/2017


14/08/2017

.Title of Test: Compaction of soil with 6%


4% Saw dust and 1.0% Quarry dust

Total weight of Sample... 5000g MDD: 1.535g/cm3


1.538g/cm OPT.MC: 20.8%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3400.00 3450.00 3525.00 3600.00 3675.00 3750.00
`````` 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1500.00 1550.00 1625.00 1700.00 1775.00 1850.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.52 1.57 1.64 1.72 1.79 1.87
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 48.60 39.30 35.90 45.60 28.00 33.80 29.30 34.60 29.70 36.40 27.10
Wt. of Dry soil & container (g) 45.50 36.90 33.60 42.20 26.30 31.20 27.20 31.50 27.50 32.90 24.70
Wt. of Container (g) 15.30 13.60 13.80 12.80 13.80 11.90 13.20 12.80 14.70 14.70 13.30
Wt. of dry soil (Wd) g 30.20 23.30 19.80 29.40 12.50 19.30 14.00 18.70 12.80 18.20 11.40
Wt. of Moisture (Wm) g 3.10 2.40 2.30 3.40 1.70 2.60 2.10 3.10 2.20 3.50 2.40
Moistur Content 100(Wm/Wd) % 10.26 10.30 11.62 11.56 13.60 13.47 15.00 16.58 17.19 19.23 21.05
Average Moisture Content (m) % 10.28 11.59 13.54 15.79 18.21 21.77
Dry Density = Pb/1+ (m/100) (g/cm3) 1.37 1.40 1.45 1.48 1.52 1.53
C.B.R. (mseen of top & bottom) %

1.55

1.50

1.45
Dry Density

1.40

1.35

1.30

1.25
8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 26.00 28.00
Moisture Content
Y RELATION OF SOIL
ON

OPT.MC: 20.8%

3750.00 3750.00 3750.00 3725.00


1900.00 1900.00 1900.00 1900.00
1850.00 1850.00 1850.00 1825.00

1.87 1.87 1.87 1.84


S. Mould, X = 990cm 3

CB6 CT7 CB7 CT8 CB8 CT9 CB9


33.30 26.70 24.90 29.60 35.10 26.50 30.70
29.50 23.90 22.70 26.40 30.40 23.40 27.20
12.60 11.70 13.30 13.20 11.70 11.30 13.80
16.90 12.20 9.40 13.20 18.70 12.10 13.40
3.80 2.80 2.20 3.20 4.70 3.10 3.50
22.49 22.95 23.40 24.24 25.13 25.62 26.12
21.77 23.18 24.69 25.87
1.53 1.52 1.50 1.46

10.28
11.59
13.54
15.79
18.21
21.77
23.18
24.69
25.87

26.00 28.00
1.37
1.40
1.45
1.48
1.52
1.53
1.52
1.50
1.46
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 6% SAW DUST AND 1.0% QUARRY DUST
DESCRIPTION DATE: 18/09/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 40 55 60 75 95 105 140 155 170 180
Load (KN) 0.00 0.44 0.60 0.66 0.82 1.04 1.15 1.53 1.70 1.86 1.97
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 35 45 55 70 90 100 135 150 160 175
Load (KN) 0.00 0.38 0.49 0.60 0.77 0.98 1.09 1.48 1.64 1.75 1.91
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 7.85 8.49
TOP 7.43 8.22
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
200
2.19

12.50
195
2.13

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SO
USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 18/08/2017

.Title of Test: Compaction of soil with 6% Saw dust and 1.5% quarry dust

Total weight of Sample... 5000g MDD: 1.536g/cm3 OPT.MC: 22.5%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3400.00 3475.00 3550.00 3625.00 3700.00 3775.00
`````` 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1500.00 1575.00 1650.00 1725.00 1800.00 1875.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.52 1.59 1.67 1.74 1.82 1.89
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 39.70 49.30 43.00 40.90 40.40 35.00 32.90 30.60 35.20 32.20 26.80
Wt. of Dry soil & container (g) 37.60 45.90 39.80 38.00 37.30 32.20 30.10 27.90 32.00 29.30 24.00
Wt. of Container (g) 16.50 12.40 13.50 14.30 15.50 12.80 13.20 11.80 15.50 14.70 11.90
Wt. of dry soil (Wd) g 21.10 33.50 26.30 23.70 21.80 19.40 16.90 16.10 16.50 14.60 12.10
Wt. of Moisture (Wm) g 2.10 3.40 3.20 2.90 3.10 2.80 2.80 2.70 3.20 2.90 2.80
Moistur Content 100(Wm/Wd) % 9.95 10.15 12.17 12.24 14.22 14.43 16.57 16.77 19.39 19.86 23.14
Average Moisture Content (m) % 10.05 12.20 14.33 16.67 19.63 23.39
Dry Density = Pb/1+ (m/100) (g/cm3) 1.38 1.42 1.46 1.49 1.52 1.53
C.B.R. (mseen of top & bottom) %

1.55

1.50

1.45
Dry Density

1.40

1.35

1.30

1.25
5.00 10.00 15.00 20.00 2

Moisture Content
Y RELATION OF SOIL
ON

T.MC: 22.5%

3775.00 3775.00 3775.00 3750.00


1900.00 1900.00 1900.00 1900.00
1875.00 1875.00 1875.00 1850.00

1.89 1.89 1.89 1.87


S. Mould, X = 990cm 3

CB6 CT7 CB7 CT8 CB8 CT9 CB9


32.70 30.30 32.30 31.90 33.10 27.70 30.90
29.20 26.60 28.50 28.00 28.90 24.50 26.90
14.40 10.90 12.70 12.50 12.60 12.50 12.60
14.80 15.70 15.80 15.50 16.30 12.00 14.30
3.50 3.70 3.80 3.90 4.20 3.20 4.00
23.65 23.57 24.05 25.16 25.77 26.67 27.97
23.39 23.81 25.46 27.32
1.53 1.53 1.51 1.47

10.05
12.20
14.33
16.67
19.63
23.39
23.81
25.46
27.32

0 20.00 25.00 30.00

isture Content
1.38
1.42
1.46
1.49
1.52
1.53
1.53
1.51
1.47
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 6% SAW DUST AND 1.5% QUARRY DUST
DESCRIPTION DATE: 18/09/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 40 50 70 85 100 115 140 150 170 180
Load (KN) 0.00 0.44 0.55 0.77 0.93 1.09 1.26 1.53 1.64 1.86 1.97
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 40 55 65 90 105 120 135 150 165 185
Load (KN) 0.00 0.44 0.60 0.71 0.98 1.15 1.31 1.48 1.64 1.80 2.02
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 8.26 8.22
TOP 8.67 8.22
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
195
2.13

12.50
200
2.19

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SO
USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 20/08/2017


14/08/2017

.Title of Test: Compaction of soil with 6%


4% Saw dust and 2.0% Quarry dust

Total weight of Sample... 5000g MDD: 1.535g/cm3


1.546g/cm OPT.MC: 23.0%
20.8%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3500.00 3575.00 3625.00 3650.00 3700.00 3775.00
`````` 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1600.00 1675.00 1725.00 1750.00 1800.00 1875.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.62 1.69 1.74 1.77 1.82 1.89
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 40.20 48.50 41.30 35.20 40.50 34.10 34.70 41.10 31.20 30.10 35.10
Wt. of Dry soil & container (g) 37.70 44.90 37.90 32.40 36.80 31.00 31.60 36.90 28.50 27.70 31.00
Wt. of Container (g) 15.30 13.60 13.80 12.80 13.80 11.90 13.20 12.80 14.70 14.70 13.30
Wt. of dry soil (Wd) g 22.40 31.30 24.10 19.60 23.00 19.10 18.40 24.10 13.80 13.00 17.70
Wt. of Moisture (Wm) g 2.50 3.60 3.40 2.80 3.70 3.10 3.10 4.20 2.70 2.40 4.10
Moistur Content 100(Wm/Wd) % 11.16 11.50 14.11 14.29 16.09 16.23 16.85 17.43 19.57 18.46 23.16
Average Moisture Content (m) % 11.33 14.20 16.16 17.14 19.01 23.37
Dry Density = Pb/1+ (m/100) (g/cm3) 1.45 1.48 1.50 1.51 1.53 1.54
C.B.R. (mseen of top & bottom) %
1.56

1.54

1.52

1.50

1.48
Axis Title

1.46

1.44

1.42

1.40

1.38
10.00 15.00 20.00 25.00 30

Axis Title
Y RELATION OF SOIL
ON

OPT.MC: 23.0%
20.8%

3775.00 3800.00 3800.00 3750.00


1900.00 1900.00 1900.00 1900.00
1875.00 1900.00 1900.00 1850.00

1.89 1.92 1.92 1.87


S. Mould, X = 990cm 3

CB6 CT7 CB7 CT8 CB8 CT9 CB9


32.00 33.50 37.00 30.10 35.40 28.20 31.20
28.30 29.30 32.20 26.50 30.20 24.40 27.10
12.60 11.70 13.30 13.20 11.70 11.30 13.80
15.70 17.60 18.90 13.30 18.50 13.10 13.30
3.70 4.20 4.80 3.60 5.20 3.80 4.10
23.57 23.86 25.40 27.07 28.11 29.01 30.83
23.37 24.63 27.59 29.92
1.54 1.54 1.50 1.44

11.33
14.20
16.16
17.14
19.01
23.37
24.63
27.59
29.92

25.00 30.00 35.00

xis Title
1.45
1.48
1.50
1.51
1.53
1.54
1.54
1.50
1.44
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 6% SAW DUST AND 2.0% QUARRY DUST
DESCRIPTION DATE: 18/09/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 35 45 65 90 110 125 135 175 185 190
Load (KN) 0.00 0.38 0.49 0.71 0.98 1.20 1.37 1.48 1.91 2.02 2.08
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 30 50 60 85 105 115 130 155 170 185
Load (KN) 0.00 0.33 0.55 0.66 0.93 1.15 1.26 1.42 1.70 1.86 2.02
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 9.08 9.59
TOP 8.67 8.49
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
200
2.19

12.50
195
2.13

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12