UNIDAD DE

INSUMOS (MANO DE OBRA - MATERIALES - EQUIPOS+HERREAMIENTAS) TRABAJO

OBRAS PROVISIONALES 64
ALMACEN, OFICINAS Y CASETA PROVISIONAL 8
CASETA DE GUARDIANIA Y ALMACEN 8
CARTEL DE IDENTIFICACIN DE OBRA 3.60 X2.40M 24
OFICIAL 8
PEON 16
CLAVOS PARA MADERA CON CABEZA DE 3" 0
HORMIGON 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
MADERA TORNILLO 0
BANNER 0
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 32
MOVILIZACIN Y DESMOVILIZACIN 32
OBRAS PRELIMINARES 655.53
LIMPIEZA Y DESBROCE DEL TERRENO h=0.30 m 217.43
PEON 217.43
TRAZO Y REPLANTEO INICAL 377.28
PEON 94.23
TOPOGRAFO 94.23
YESO BOLSA 20 kg 0
ESTACAS DE MADERA 0
NIVEL TOPOGRAFICO 47.2
ESTACION TOTAL 47.2
MIRAS 47.2
JALONES 47.2
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA 60.8
PEON 6.40
TOPOGRAFO 6.40
CLAVOS PARA MADERA CON CABEZA DE 3" 0
YESO BOLSA 20 kg 0
ESTACAS DE MADERA 0
NIVEL TOPOGRAFICO 12
ESTACION TOTAL 12
MIRAS 12
JALONES 12
MOVIMIENTO DE TIERRAS 1,019.52
ENCAUSAMIENTO DE CURSO DEL RIO 295.5
PEON 147.75
CONTROLADOR 73.88
EXCAVADORA SOBRE ORUGAS 115-165 HP 73.88
EXCAVACION PARA BASE DEL MURO DE CONTENCIN 574.88
OPERARIO 319.42
PEON 191.63
EXCAVADORA SOBRE ORUGAS 115-165 HP 63.83
ELIMINACION MASIVA MATERIAL EXCEDENTE C/VOLQUETE 149.13
PEON 59.58
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 29.85
TRACTOR DE ORUGAS CAT D6D 29.85
CAMION VOLQUETE DE 10 m3 29.85
MURO DE CONTENCIN DE GAVION 7,683.68
EXPLANACION DE TERRENO CON MAQUINARIA 38.8
OPERARIO 9.7
PEON 9.7
EXCAVADORA SOBRE ORUGAS 115-165 HP 9.7
TRACTOR DE ORUGAS CAT D6D 9.7
RELLENO SEMICOMPACTADO DE PLATAFORMA 72.78
OPERARIO 14.55
PEON 29.13
CARGADOR FRONTAL 14.55
TRACTOR DE ORUGAS CAT D6D 14.55
ACOPIO Y CARGUO DE ROCAS 3,472.57
PEON 3,472.57
TRASLADO DE ROCAS 555.62
OPERARIO 185.2
PEON 185.2
CARGADOR FRONTAL 92.6
CAMION VOLQUETE DE 10 m3 92.6
SUM. E INSTALACION DE GAVION TIPO CAJA DE 5X1X1M 1,019.22
OPERARIO 291.18
OFICIAL 145.62
PEON 582.42
ALAMBRE GALVANIZADO N 8 0
GAVION TIPO CAJA DE 5.0 x 1 x 1 m (2.7 mm) 0
ESTACAS DE MADERA 0
COLOCACION DE COLCHN ANTISOCAVANTE 209.67
OPERARIO 104.83
PEON 104.83
ALAMBRE GALVANIZADO N 8 0
ACOMODO DE ROCAS 2,315.03
PEON 2,315.03
MURO DE CONTENCIN DE CONCRETO ARMADO 2,660.25
CONCRETO CICLPEO f'c=140 kg/cm2 MEZCLA 1:12+70%PG 675.98
OPERARIO 104
OFICIAL 52
PEON 520
PIEDRA GRANDE 0
HORMIGON 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
CONCRETO PARA MURO DE CONTENCION f'c=210 kg/cm2 1,190.92
OPERARIO 125.37
OFICIAL 62.68
PEON 752.12
OPERADOR DE EQUIPO LIVIANO 125.37
ACEITE PARA MOTOR SAE-30 0
GASOLINA 84 OCTANOS 0
PIEDRA CHANCADA 3/4" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
VIBRADOR DE CONCRETO 4 HP 1.25" 62.68
MEZCLADORA DE CONCRETO 11 P3 (23 HP) 62.68
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 306.63
OPERARIO 153.32
OFICIAL 153.32
ALAMBRE NEGRO N 16 0
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 0
ENCOFRADO Y DESENCOFRADO 374.4
OPERARIO 299.52
PEON 74.88
ALAMBRE NEGRO RECOCIDO N 8 0
CLAVOS PARA MADERA CON CABEZA DE 3" 0
MADERA TORNILLO 0
JUNTAS ASFALTICAS 56.17
OPERARIO 37.43
PEON 18.72
ASFALTO RC-250 0
ARENA FINA 0
ENROCADO DE MURO CON MAQUINARIA 56.17
PEON 18.72
OPERADOR DE EQUIPO 18.72
PIEDRA GRANDE 0
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 18.72
SENSIBILIZACION, CAPACITACION Y MITIGACION AMBIENTAL 8
SENSIBILIZACION, CAPACITACION Y MITIGACION AMBIENTAL 8
SENSIBILIZACION CAPACITACION Y MITIGACION AMBIENTAL 8
FLETE 8
FLETE TERRESTRE 8
FLETE TERRESTRE 8
UNIDADES DE FACTOR DEL CATEGORA DE MANO DE OBRA Y EQUIPOS
ASIGNACIN RECURSO

OPERARIO
OFICIAL
1 1.00 PEON
OPERADOR DE EQUIPO
1 8.00 OPERADOR DE EQUIPO LIVIANO
2 16.00 TOPOGRAFO
1.5 1.50 CONTROLADOR
0.29 0.29 NIVEL TOPOGRAFICO
1 1.00 ESTACION TOTAL
80 80.00 MIRAS
1 1.00 JALONES
NIVEL TOPOGRAFICO
1 1.00 ESTACION TOTAL
MIRAS
JALONES
3.88 217.43 CARGADOR FRONTAL
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3
1.96 94.23 EXCAVADORA SOBRE ORUGAS 115-165 HP
1.96 94.23 TRACTOR DE ORUGAS CAT D6D
70.72 70.72 CAMION VOLQUETE DE 10 m3
88.4 88.40 VIBRADOR DE CONCRETO 4 HP 1.25"
0.98 47.20 MEZCLADORA DE CONCRETO 11 P3 (23 HP)
0.98 47.20
0.98 47.20
0.98 47.20

0.8 6.40
0.8 6.40
20 20.00
48 48.00
200 200.00
1.5 12.00
1.5 12.00
1.5 12.00
1.5 12.00

1.85 147.75
0.92 73.88
0.92 73.88

4.99 319.42
2.99 191.63
1 63.83
1.86 59.58
0.93 29.85
0.93 29.85
0.93 29.85

0.61 9.70
0.61 9.70
0.61 9.70
0.61 9.70

0.91 14.55
1.82 29.13
0.91 14.55
0.91 14.55

11.73 3,472.57

1.93 185.20
1.93 185.20
0.96 92.60
0.96 92.60

1.92 291.18
0.96 145.62
3.83 582.42
695.6 695.60
546 546.00
10.92 10.92

1.87 104.83
1.87 104.83
208.68 208.68

9.98 2,315.03

1.86 104.00
0.93 52.00
9.29 520.00
87.75 87.75
46.8 46.80
819 819.00

1.96 125.37
0.98 62.68
11.75 752.12
1.96 125.37
2.82 2.82
190.38 190.38
299.68 299.68
148.08 148.08
3173.04 3,173.04
0.98 62.68
0.98 62.68

0.96 153.32
0.96 153.32
1533.13 1,533.13
15331.28 15,331.28

1.97 299.52
0.49 74.88
74.88 74.88
205.92 205.92
11437.92 11,437.92

0.94 37.43
0.47 18.72
15.56 15.56
0.23 0.23

0.78 18.72
0.78 0.78
421.2 421.20
0.78 18.72

1 1.00

1 1.00
OBRAS PROVISIONALES 64
ALMACEN, OFICINAS Y CASETA PROVISIONAL 8
CASETA DE GUARDIANIA Y ALMACEN 8 100%
CARTEL DE IDENTIFICACIN DE OBRA 3.60 X2.40M 24
OFICIAL 8 100%
PEON 16 200%
CLAVOS PARA MADERA CON CABEZA DE 3" 0 150%
HORMIGON 0 29%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 100%
MADERA TORNILLO 0 8000%
BANNER 0 100%
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS 32
MOVILIZACIN Y DESMOVILIZACIN 32 100%
OBRAS PRELIMINARES 655.53
LIMPIEZA Y DESBROCE DEL TERRENO h=0.30 m 217.43
PEON 217.43 388%
TRAZO Y REPLANTEO INICAL 377.28
PEON 94.23 196%
TOPOGRAFO 94.23 196%
YESO BOLSA 20 kg 0 7072%
ESTACAS DE MADERA 0 8840%
NIVEL TOPOGRAFICO 47.2 98%
ESTACION TOTAL 47.2 98%
MIRAS 47.2 98%
JALONES 47.2 98%
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA 60.8
PEON 6.4 80%
TOPOGRAFO 6.4 80%
CLAVOS PARA MADERA CON CABEZA DE 3" 0 2000%
YESO BOLSA 20 kg 0 4800%
ESTACAS DE MADERA 0 20000%
NIVEL TOPOGRAFICO 12 150%
ESTACION TOTAL 12 150%
MIRAS 12 150%
JALONES 12 150%
MOVIMIENTO DE TIERRAS 1,019.52
ENCAUSAMIENTO DE CURSO DEL RIO 295.5
PEON 147.75 185%
CONTROLADOR 73.88 92%
EXCAVADORA SOBRE ORUGAS 115-165 HP 73.88 92%
EXCAVACION PARA BASE DEL MURO DE CONTENCIN 574.88
OPERARIO 319.42 499%
PEON 191.63 299%
EXCAVADORA SOBRE ORUGAS 115-165 HP 63.83 100%
ELIMINACION MASIVA MATERIAL EXCEDENTE C/VOLQUETE 149.13
PEON 59.58 186%
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 29.85 93%
TRACTOR DE ORUGAS CAT D6D 29.85 93%
CAMION VOLQUETE DE 10 m3 29.85 93%
MURO DE CONTENCIN DE GAVION 7,683.68
EXPLANACION DE TERRENO CON MAQUINARIA 38.8
OPERARIO 9.7 61%
PEON 9.7 61%
EXCAVADORA SOBRE ORUGAS 115-165 HP 9.7 61%
TRACTOR DE ORUGAS CAT D6D 9.7 61%
RELLENO SEMICOMPACTADO DE PLATAFORMA 72.78
OPERARIO 14.55 91%
PEON 29.13 182%
CARGADOR FRONTAL 14.55 91%
TRACTOR DE ORUGAS CAT D6D 14.55 91%
ACOPIO Y CARGUO DE ROCAS 3,472.57
PEON 3,472.57 1173%
TRASLADO DE ROCAS 555.62
OPERARIO 185.2 193%
PEON 185.2 193%
CARGADOR FRONTAL 92.6 96%
CAMION VOLQUETE DE 10 m3 92.6 96%
SUM. E INSTALACION DE GAVION TIPO CAJA DE 5X1X1M 1,019.22
OPERARIO 291.18 192%
OFICIAL 145.62 96%
PEON 582.42 383%
ALAMBRE GALVANIZADO N 8 0 69560%
GAVION TIPO CAJA DE 5.0 x 1 x 1 m (2.7 mm) 0 54600%
ESTACAS DE MADERA 0 1092%
COLOCACION DE COLCHN ANTISOCAVANTE 209.67
OPERARIO 104.83 187%
PEON 104.83 187%
ALAMBRE GALVANIZADO N 8 0 20868%
ACOMODO DE ROCAS 2,315.03
PEON 2,315.03 998%
MURO DE CONTENCIN DE CONCRETO ARMADO 2,660.25
CONCRETO CICLPEO f'c=140 kg/cm2 MEZCLA 1:12+70%PG 675.98
OPERARIO 104 186%
OFICIAL 52 93%
PEON 520 929%
PIEDRA GRANDE 0 8775%
HORMIGON 0 4680%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 81900%
CONCRETO PARA MURO DE CONTENCION f'c=210 kg/cm2 1,190.92
OPERARIO 125.37 196%
OFICIAL 62.68 98%
PEON 752.12 1175%
OPERADOR DE EQUIPO LIVIANO 125.37 196%
ACEITE PARA MOTOR SAE-30 0 282%
GASOLINA 84 OCTANOS 0 19038%
PIEDRA CHANCADA 3/4" 0 29968%
ARENA GRUESA 0 14808%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 317304%
VIBRADOR DE CONCRETO 4 HP 1.25" 62.68 98%
MEZCLADORA DE CONCRETO 11 P3 (23 HP) 62.68 98%
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 306.63
OPERARIO 153.32 96%
OFICIAL 153.32 96%
ALAMBRE NEGRO N 16 0 153313%
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 0 1533128%
ENCOFRADO Y DESENCOFRADO 374.4
OPERARIO 299.52 197%
PEON 74.88 49%
ALAMBRE NEGRO RECOCIDO N 8 0 7488%
CLAVOS PARA MADERA CON CABEZA DE 3" 0 20592%
MADERA TORNILLO 0 1143792%
JUNTAS ASFALTICAS 56.17
OPERARIO 37.43 94%
PEON 18.72 47%
ASFALTO RC-250 0 1556%
ARENA FINA 0 23%
ENROCADO DE MURO CON MAQUINARIA 56.17
PEON 18.72 78%
OPERADOR DE EQUIPO 18.72 78%
PIEDRA GRANDE 0 42120%
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 18.72 78%
SENSIBILIZACION, CAPACITACION Y MITIGACION AMBIENTAL 8
SENSIBILIZACION, CAPACITACION Y MITIGACION AMBIENTAL 8
SENSIBILIZACION CAPACITACION Y MITIGACION AMBIENTAL 8 100%
FLETE 8
FLETE TERRESTRE 8
FLETE TERRESTRE 8 100%