You are on page 1of 2

CURRICULUM VITAE

PERSONAL INFORMATION
Name : Anwar
Place & Date Of Birth : Kolisia/ July 19th, 1987
Gender : Male
Religion : Moslem
Marital Status : Single
High/ Weight : 164cm / 58kg
Hobbies : Reading, Football/Futsal, Traveling
Phone : 0853- 1329- 4680
E-mail : elektro_anwar07@yahoo.com
Address : Jln. Petogogan 1 Gg. Masjid No. 37 Gandaria Utara
Jakarta Selatan
EDUCATIONAL BACKGROUND
1. 2007- 2012 : Moslem University Of Indonesia
Faculty Of Engineering
Bachelor Of Electrical Engineering
Graduated with GPA 3.05
2. 2004- 2007 : SMK Negeri 1 Maumere
3. 2001- 2004 : SMP Negeri 3 Maumere
4. 1995- 2001 : SDK 079 Nangarasong
SKILLS
1. Familiar MS Office (MS Word, Excel, Power Point)
2. AutoCAD (Basic)
3. English Language (Fair)
4. Internet
ORGANIZATION EXPERIENCE
1. Chairman in Unit Kegiatan Mahasiswa Lembaga Dakwah Kampus Liga Dakwah
Mahasiswa (UKM LDK- LDM) at Moslem University Of Indonesia
2. Vice Chairman in Departement Seni dan Olahraga (DEPSO) at Kerukunan Pelajar
Mahasiswa Islam Flores Timur- Makassar
WORKING EXPERIENCE
1. PT KINDEN INDONESIA
Period of Service : October 16th , 2013 February 29th , 2016
Employee Status : Permanent
Departement/ Position : Electrical/ Engineer

Job Details
a. Responsibility :
Coordinate with Site Manager in Controlling the implementation of the project
work, including:
a.1. Project budget plan that has been set
a.2. Implementation time work , Quality of the work to fit the
castomers expectation
a.3. Project implementation progress report to the Director / GM
Ensuring the Quality Management System K3L ISO 9001 : 2008, OHSAS
18001: 2007 and ISO 14001:2004 as well as other requirements stipulated
Implement policies that have been set by the company
Report all activities of the project to Project Manager
b. Job Descriptions :
Preparing and making a work plan with Site Manager and report to the Project
Manager, including:
b.1. Technical Study: calculation, specification and quantity material
b.2. Schedule, design drawing, shop drawing, method statement, safety
working plan, health & safety plan, and man power schedule
b.3. Estimates BQ
Coordination with Site Manager to manage the project budget has been set
Manage and control the resources of the organization during the project
implementation
Controlling project documents that have been set
Ensuring Orderly Administration in the project
Monitor, inspect periodically the results of the implementation of the project
work
Monitor, maintain and control all the working equipment and material project
Coordinate with relevant section (Dept. others) in the implementation of project
work (Inspection, Test Commissioning) and Customers, Government Agencies
Perform repair or maintenance work an ongoing basis and report to the Project
Manager
Monitor project has been handed over (the warranty period)
Maintain a good relationship with the Customer and Supplier
Coordinate internal project in terms of project progress, project quality, K3L
Coordinate with customers in terms of the progress project, project quality, K3L

c. Authority:
The mobilization of workers according to the needs during the project
Propose Sub Contractors and equipment / material in accordance with the
specifications of the Project Manager
Manage and use the project budget according to needs
Carry out the necessary repairs during the project

You might also like