You are on page 1of 4

Drawing Register & Transmittal

Project Title Mauritius Multi-Sports Complex


Asset Aquatic Center
Project No. 382196
25 Scott Street
Waverley
Johannesburg 2090
PO Box 7707 Johannesburg
Discipline. HVAC 2000 South Africa

30-Nov-17
Sheet No. 1 of 3 Date of Issue

Title Size Scale Drawing No.


General
Aquatic Centre : Drawing List - Heating Ventilation & Air-
A1 NTS 382196-IOG-B00-XX-DR-H-0001 P01
conditioning
General Notes,legends & abbreviations - Heating Ventilation &
A1 NTS 382196-IOG-Z00-XX-DR-H-0001 P01
Air-conditioning
Aquatic Centre

Aquatic Centre : Heating & cooling system schematic diagram A1 NTS 382196-IOG-B00-ZZ-DR-H-0001 P01
Aquatic Centre : Ventilation system schematic diagram (Sheet
A1 NTS 382196-IOG-B00-ZZ-DR-H-0002 P01
01 of 03)
Aquatic Centre : Ventilation system schematic diagram (Sheet
A1 NTS 382196-IOG-B00-ZZ-DR-H-0003 P01
02 of 03)
Aquatic Centre : Ventilation system schematic diagram (Sheet
A1 NTS 382196-IOG-B00-ZZ-DR-H-0004 P01
03 of 03)
Aquatic Centre : Basement Level,Extraction Layout,Key plan A1 1:200 382196-IOG-B00-B1-DR-H-0001 P01
Aquatic Centre : Basement Level,Extraction Layout,(Sheet 01
A1 1:100 382196-IOG-B00-B1-DR-H-0002 P01
of 04)
Aquatic Centre : Basement Level,Extraction Layout,(Sheet 02
A1 1:100 382196-IOG-B00-B1-DR-H-0003 P01
of 04)
Aquatic Centre : Basement Level,Extraction Layout,(Sheet 03
A1 1:100 382196-IOG-B00-B1-DR-H-0004 P01
of 04)
Aquatic Centre : Basement Level,Extraction Layout,(Sheet 04
A1 1:100 382196-IOG-B00-B1-DR-H-0005 P01
of 04)
Aquatic Centre : Ground Storey,Freshair & Supply air Layout
A1 1:200 382196-IOG-B00-00-DR-H-0001 P01
Key plan
Aquatic Centre : Ground Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-00-DR-H-0002 P01
(Sheet 01 of 04)
Aquatic Centre : Ground Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-00-DR-H-0003 P01
(Sheet 02 of 04)
Aquatic Centre : Ground Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-00-DR-H-0004 P01
(Sheet 03 of 04)
Aquatic Centre : Ground Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-00-DR-H-0005 P01
(Sheet 04 of 04)
Aquatic Centre : Ground Storey,Refrigerant & Condensate
A1 1:200 382196-IOG-B00-00-DR-H-0006 P01
piping Layout Key plan
Aquatic Centre : Ground Storey,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-00-DR-H-0007 P01
piping Layout (Sheet 01 of 04)
Aquatic Centre : Ground Storey,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-00-DR-H-0008 P01
piping Layout (Sheet 02 of 04)
Aquatic Centre : Ground Storey,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-00-DR-H-0009 P01
piping Layout (Sheet 03 of 04)
Aquatic Centre : Ground Storey,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-00-DR-H-0010 P01
piping Layout (Sheet 04 of 04)
Aquatic Centre : Ground Storey,Extraction Layout,Key plan A1 1:200 382196-IOG-B00-00-DR-H-0011 P01
Aquatic Centre : Ground Storey,Extraction Layout,(Sheet 01 of
A1 1:100 382196-IOG-B00-00-DR-H-0012 P01
04)
Distribution Number of copies / Medium
Ruben Reddy Architects
Vinay Ramsundara - South Africa Team
Richard G. Hall - U.K Team

Office copy PW
Record Copy PW

State the purpose of issue: Purpose of issue


Example: IF = For Information
PRE = Preliminary
APR = Approval (External)
FC = For Construction
T

T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC Drawings 1 of 3 Page 1 of 4


Drawing Register & Transmittal

Project Title Mauritius Multi-Sports Complex


Asset Aquatic Center
Project No. 382196
25 Scott Street
Waverley
Johannesburg 2090
PO Box 7707 Johannesburg
Discipline. HVAC 2000 South Africa

30-Nov-17
Sheet No. 2 of 3 Date of Issue

Title Size Scale Drawing No.


Aquatic Centre : Ground Storey,Extraction Layout,(Sheet 02 of
A1 1:100 382196-IOG-B00-00-DR-H-0013 P01
04)
Aquatic Centre : Ground Storey,Extraction Layout,(Sheet 03 of
A1 1:100 382196-IOG-B00-00-DR-H-0014 P01
04)
Aquatic Centre : Ground Storey,Extraction Layout,(Sheet 04 of
A1 1:100 382196-IOG-B00-00-DR-H-0015 P01
04)
Aquatic Centre : First Storey,Freshair & Supply air Layout,Key
A1 1:200 382196-IOG-B00-01-DR-H-0001 P01
plan
Aquatic Centre : First Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-01-DR-H-0002 P01
(Sheet 01 of 04)
Aquatic Centre : First Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-01-DR-H-0003 P01
(Sheet 02 of 04)
Aquatic Centre : First Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-01-DR-H-0004 P01
(Sheet 03 of 04)
Aquatic Centre : First Storey,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-01-DR-H-0005 P01
(Sheet 04 of 04)
Aquatic Centre : First Storey,Refrigerant & Condensate Piping
A1 1:200 382196-IOG-B00-01-DR-H-0006 P01
Layout Key plan
Aquatic Centre : First Storey,Refrigerant & Condensate Piping
A1 1:100 382196-IOG-B00-01-DR-H-0007 P01
Layout (Sheet 01 of 04)
Aquatic Centre : First Storey,Refrigerant & Condensate Piping
A1 1:100 382196-IOG-B00-01-DR-H-0008 P01
Layout (Sheet 02 of 04)
Aquatic Centre : First Storey,Refrigerant & Condensate Piping
A1 1:100 382196-IOG-B00-01-DR-H-0009 P01
Layout (Sheet 03 of 04)
Aquatic Centre : First Storey,Refrigerant & Condensate piping
A1 1:100 382196-IOG-B00-01-DR-H-0010 P01
Layout (Sheet 04 of 04)
Aquatic Centre : Concourse level,Freshair & Supply air
A1 1:200 382196-IOG-B00-02-DR-H-0001 P01
Layout,Key plan
Aquatic Centre : Concourse level,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-02-DR-H-0002 P01
(Sheet 01 of 04)
Aquatic Centre : Concourse level,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-02-DR-H-0003 P01
(Sheet 02 of 04)
Aquatic Centre : Concourse level,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-02-DR-H-0004 P01
(Sheet 03 of 04)
Aquatic Centre : Concourse level,Freshair & Supply air Layout
A1 1:100 382196-IOG-B00-02-DR-H-0005 P01
(Sheet 04 of 04)
Aquatic Centre : Concourse level,Refrigerant & Condensate
A1 1:200 382196-IOG-B00-02-DR-H-0006 P01
Piping Layout, Key plan
Aquatic Centre : Concourse level,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-02-DR-H-0007 P01
Piping Layout (Sheet 01 of 04)
Aquatic Centre : Concourse level,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-02-DR-H-0008 P01
Piping Layout (Sheet 02 of 04)
Aquatic Centre : Concourse level,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-02-DR-H-0009 P01
Piping Layout (Sheet 03 of 04)
Aquatic Centre : Concourse level,Refrigerant & Condensate
A1 1:100 382196-IOG-B00-02-DR-H-0010 P01
Piping Layout (Sheet 04 of 04)
Aquatic Centre : Concourse level,Extraction Layout,Key plan A1 1:200 382196-IOG-B00-02-DR-H-0011 P01
Aquatic Centre : Concourse level,Extraction Layout (Sheet 01
A1 1:100 382196-IOG-B00-02-DR-H-0012 P01
of 04)
Distribution Number of copies / Medium
Ruben Reddy Architects
Vinay Ramsundara - South Africa Team
Richard G. Hall - U.K Team

Office copy PW
Record Copy PW

State the purpose of issue: Purpose of issue


Example: IF = For Information
PRE = Preliminary
APR = Approval (External)
FC = For Construction
T

T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC Drawings 2 of 3 Page 2 of 4


Drawing Register & Transmittal

Project Title Mauritius Multi-Sports Complex


Asset Aquatic Center
Project No. 382196
25 Scott Street
Waverley
Johannesburg 2090
PO Box 7707 Johannesburg
Discipline. HVAC 2000 South Africa

30-Nov-17
Sheet No. 3 of 3 Date of Issue

Title Size Scale Drawing No.


Aquatic Centre : Concourse level,Extraction Layout (Sheet 02
A1 1:100 382196-IOG-B00-02-DR-H-0013 P01
of 04)
Aquatic Centre : Concourse level,Extraction Layout (Sheet 03
A1 1:100 382196-IOG-B00-02-DR-H-0014 P01
of 04)
Aquatic Centre : Concourse level,Extraction Layout (Sheet 04
A1 1:100 382196-IOG-B00-02-DR-H-0015 P01
of 04)
Aquatic Centre : Concourse Roof level,HVAC Layout,Key plan A1 1:200 382196-IOG-B00-05-DR-H-0001 P01
Aquatic Centre : Concourse Roof level,HVAC Layout (Sheet 01
A1 1:100 382196-IOG-B00-05-DR-H-0002 P01
of 04)
Aquatic Centre : Concourse Roof level,HVAC Layout (Sheet 02
A1 1:100 382196-IOG-B00-05-DR-H-0003 P01
of 04)
Aquatic Centre : Concourse Roof level,HVAC Layout (Sheet 03
A1 1:100 382196-IOG-B00-05-DR-H-0004 P01
of 04)
Aquatic Centre : Concourse Roof level,HVAC Layout (Sheet 04
A1 1:100 382196-IOG-B00-05-DR-H-0005 P01
of 04)

Distribution Number of copies / Medium


Ruben Reddy Architects
Vinay Ramsundara - South Africa Team
Richard G. Hall - U.K Team

Office copy PW
Record Copy PW

State the purpose of issue: Purpose of issue


Example: IF = For Information
PRE = Preliminary
APR = Approval (External)
FC = For Construction
T

T= Tender

State the medium employed: C = CDROM; D = Diskette;


E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC Drawings 3 of 3 Page 3 of 4


Document Register & Transmittal

Project Title Mauritius Multi-Sports Complex


Asset Aquatic Building
25 Scott Street
Project No. 382196 Waverley
Johannesburg 2090
PO Box 7707 Johannesburg
Discipline. HVAC - Calculation 2000 South Africa

30-Nov-17
Date of Issue

Title Size Scale Document No.

Aquatic Centre

Aquatic Centre : Heat load calculations A4 NTS 382196-IOG-B0-XX-CA-H-0001 P01

Aquatic Centre : Equipment selection with power Consumption A3 NTS 382196-IOG-B0-XX-CA-H-0002 P01
Aquatic Centre :Air distribution ducts, Piping,condensate etc (
A4 NTS 382196-IOG-B0-XX-CA-H-0003 P01
Quantity from Revit Model)
Aquatic Centre : Ventilation calculation A3 NTS 382196-IOG-B0-XX-CA-H-0004 P01

Distribution Number of copies / Medium

Vinay Ramsundara - South Africa Team


Richard G. Hall - U.K Team

Office Copy PW
Record Copy PW
Purpose Of issue
State the purpose of issue:
Example: IF = For Information
PRE = Preliminary
APR = Approval (External)
T

FC = For Construction
T= Tender
State the medium employed: C = CDROM; D = Diskette;
E = Email; I = Internet; N = Negative; P = Paper
S=Server Shared Drive

HVAC Calculation Page 4 of 4