TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED


VIDYUT SOUDHA :: VIJAYAWADA
From To
The Additional Secretary , -#recretary General,
APTransco, APSEB Engineer's Association
Vidyut Soudha, (Regd'No' B74l 1795),
Vijayar,vada The General Secretary,
APSEB Asst. Engineers Association,
(Regd.No.1 185/ 1977\

Lr.No Addl.Secy / DS(L,IR&R )/AS(L,IR&R )/ PO(IR )173221t2 . dt.21,12.2017


Sir,
sub: APTransco -IR -- Meeting with APSEB Engineer's
Association (Regd.No. 874 of 1795) and APSEB Asst Engineers
Association (RegI.No.1185/ lg77) held on t2.12.2o17 -Record of
Discussions - Communicated - Reg'
Ref: 1. Lrs.dt.6.1 1.20 !7, 14.1 1.20L7, 20.1 1.20t7, 22.I1.2017 &
05.12.2O17 received from APSEB Engineer's Association
(Regd.No .874 of l7g5l and APSEB Asst Engineers Association
(Regd.No.118s/ 1977).
2. Lr.No. Add.SecyT nSll,ln&R)/AS (L,1R&R)/ Po(L&lR)/ JPo/F.No
1322 l12, Dt:7.12.2017

I am directed to forward the Record of Discussions, approved by

Chairman and Managing Director /APTRANSCO of the meeting held on


12.12.2017 on certain pending issues submitted by APSEB Engineer's
Association (Regd.No.874 of 1795) and APSEB Assistant Engineers
Association (Regd'No. 1 185/ 1977)'
Yours faithfullY,
Encl: As above
q) \\-
Additional
.-7- le-
qlr

Copv to
ff,. pS to CMD / APTransco/VS/ Vijayawada
The PS to JMD (HRD)/APTransco/VS/ Vijayawada
>
t

MINUTES OT' THE MEETING HELD WITH THE MEMBERS OF THE APSEB
ENGTNEERS ASSOCTATTON (REGD.NO,87411975) AND APSEB
ASST.ENGTNEERS ASSOCTATTON (REGD.NO.I185/t9771 ON L2.12.2O17 AT
5.O0 pM IN THE MEETING HALL, 3"a FLOOR, APGENCO, VIDYUT SOUDHA,
VIJAYAWADA.

The meeting was attended by the following officers.

Officers :

1. Sri. K.Vijayanand, IAS, CMD/APTRANSCO.


2. Sri. Dinesh Paruchuri, IRS JMD (HRD) /APTRANSCO
3. sri. P.Umapathi, IPS (Retd.) JMD (vigilance & Security)/ApTRANSCo
4. Sri. s.Subrahmanyam Director (projects & GTM)/APTRANSCO
5. Sri. G.Adinarayana Director (Finance)/ApGENCO
6. sri. ch.Nageswara Rao Director (HR,lR&Hydel)/ApGENCo
7. Smt.V.Usha Joint Secretary /APGENCO
8. Smt.G.V.Satya vani Additional Secretary/ApTRANSCo
And HODs of APTransco and APGenco

SEB eers & Asst.En ociation

]. Sri. S.Chandramouli
2. Sri.M.Veda Vyasa Rao
3. Sri. G.Ramakrishnudu
4. Sri. B.V.Nageswara Rao
5. Sri. B.Vamsi Srinivas
6. Sri. N.Lakshmana Rao
7. Sri. A.Murali Krishna
8. Sri. S.Pratap
A4d other rne..rbers of the Asscciations

The CMD and JMD (HRD) welcomed the members of the APSEB Engineers
Association(Regd.NO.874ll975\ and APSEB Asst. Engineers Association
(Regd.No.1185/ 1977) and requested to explain the issues.
:-'

2\Afteradetailedelaboratediscussion,themembersofboththe
CMD to resolve the issues'
Associations have requested the

3)TheRecordofDiscussionsareplacedasAnnexureenclosed'

4)Further,itisdecidedtoholdmonthlytechnicalmeetingwiththe and
Association(Regd'No'874 ll975l
members of the APSEB Engineers
APSEBAsst.EngineersAssociation(Regd.No.11s5/1977)withFunctionalthe
purely on Technical issues to resolve
Heads of Aprransco & ApGenco
apprehensionsandtoinviteanySuggestionsforbettermentoforganizatton.

5)Forthenextmeeting,CMD,sofAPSPDCLandAPEPDCLshallbe
issues pertaining to their Discoms'
invited to discuss on the technical

6)TheCMD/APTransco&MD/APGencoandJMD(HRD,Fin.,Comml,IPC
&IT)haverequestedtheAssociationmemberstodiscontinuethedisplayof
normal work atmosphere'
black batches and restore to a

7\ThemeetingwasconcludedwithathanknoteoftheCMD.

vr
Additional Secretary

,]

.
irIINr-I?ES OF THE MEETING HELD WITH THE, MEMBERS OF THE APSEB ENGTNEERS ASSOCIATTON (REGD.NO.874 I L9751AND APSEB
iissr.brcrNEERs AssocrATroN (REGD.No. 1 185/ L9771ON 12. L2.2OL7 AT 5.OO PM IN THE MEETING HALL, 3rd FLOOR, APGENCO, VIDWT
SOUDHA, VIJAYAWADA
S.No DEMANDS RECORD OF DISCUSSIONS
I APNPD CL: APNPDCL and APEPDCL are unaffected by State
bifurcation except the 7 Mandals in APNPDCL. For the employees
of 7 Mandals affected by state bifurcation, options were called by
APNPDCL as per established procedure and finalized the issue.
Thus it is a settled matter. Therefore there is no possibility for
negotiation with APNPDCL and they have to take back all the g2
relieved employees. The Bi-furcation Cell was formed with Chief Engineer/IPc & PS as a Nodal
officer along with Accounts and P&G Employees as members of the cell.
Therefore, all the Associations are hereby requested to pose any issue
pertaining to Bifurcation of the employees through Bifurcation Cel1.
AII possible steps been taken to resolve the issue of employees without any
2 APSPDCL: TSSPDCL (Erstwhile APCPDCL) has already allocated impact to existing employees.
Kurnool and Anantapur District freld man power along with posts The stand of APTransco/APGenco/APDiscoms remains s€une that bifurcation of
on as is where is basis and also allocated 26.370/0 (22 ernployees ) employees does not apply to the Discoms.
of the pro-rata of corporate employees. Thus the tem The Advocate General is highest legal office of the State. As such we may avail
allocation (order to serve basis ) is already done .Now options are his services on the issue of employees bifurcation before Hon'ble High Court to
to be called between these temporar5r allocated employees and the extent possible. However, at appropriate time, sen ices of Senior Counsel
TSSPDCL employees for Iinal allocation. There shall be no may also be availed on need basis.
supernumery posts created in APSPDCL, as already Ap power
sector employees are suffering due to heavy stagnation in career
progression. Further, it will also burden the organization. Only
cadre wise head to head swapping is to be done.

The field Engineers in both the corporations are already allocated


on temporarSr basis on as is where basis The head quarter
employees are shared in the population ratio. Now the steps to be
followed for final allocation of employees in APTRANSCO and
APGBNCO are
i) The final allocation of employees in both the states
shall be as on the posts sanctioned strength as on 2.6.2O14.

J
ii) The number of posts in the field as well as in
as on 2.6.2O 14 cadre wise shall be declared.
iii) There shall be no supernumery posts in Ap as already AF
Power Sector, employees are suffering with poor career
progression due to heavy stagnation. Further, it will also burden
the organization.

iv) There shall be a transparent, acceptable procedure (aJ


done by Sri Karnala Nathan Committee for State Govt.
employees or as per the DOPT Guidellines duly considering the
spouse and medica-l cases. Implemented, in other states during
bifurication of states) for final a-llocation of employees instead
arbitrar5r methods like nativity etc.,
Senior supreme court Advocate may be appointed to argue the
case on behalf of AP Power Utilities.

v) Options shall be given to each and every eligible employee


The Telangana Power Utilities are trying hard to push as
many employees as possible to Andhra Pradesh. Further, the
courts are also inclined for an amicable settlement than As above
delivering the judgement on the merits of the case. It is therefore
requested to the management that ttre results of the negotiation
process shall not be disadvantage to AP and be in line with the
above requirement which is as per law. It is also clearly evident
that the T.S Power Utilities want to take maximum mileage out
this issue. Therefore, the AP Power utilities shall firmly.stand in t:.
this situation, as AP will definitely with in the court cases.
However early settlement without adversely affecting the Ap
Power Sector is to be done.
i'
4 The AP Transco Sub- Stations shall be maintained in the existing 1. 40OKV & 22OKV Sub-stations, Operation & Maintenance will be done by
system only without resorting to outsourcing of services. APTRANSCO in the existing manning pattern.
2. For the existing arld upcoming 132 KV Substations, the present practice of
manning pattern will be maintained for operation and maintenance. However, 3
Nos upcoming 132KV Sub-stations (one per each zone) will be taken up for
operation & Maintenance serv"ice outsourcing under supervision of
AE(Maintenance) as a pilot project with the following conditions.
' A termination clause will be included in the contract for unsatisfactory
service.
' A committee consisting one member from each Association and Chief
Engineer/ Transmission wing to study techno-economic feasibility.
' Necessar5r clauses indicating the time to be taken, cost and penalty shall be
stipulated in the specilication for all the activities that are taken up in case of
O&M, breakdown maintenance and preventive maintenance

5 The additional posts in APTRANSCO and DISCOMS shall be 1) File is with Hon'ble Chief Minister Office regarding APTransco
sanctioned immediately 2) APDiscoms lile is under circulation. Files will be pursued in AP Secretariat
for early sanction cf posts, positively by 31st, January-2O18
3)APGenco: Rationalisation of the posts should be done. Wilt be examined by
APGENCO.

6 EPF to GPF and pension facility shall be examined to all the A detailed report with frnancial commitment will be addressed to Government
employees who are recruited up to O 1.09.2OO4 as per the AP State before 15th , Januar5r 2Ol8
Government Policy.
/, The cost of wind and sola-r power have come down drastically Renewable Energv Issues
Further CERC is insisting for competitive bidding whereas i) APDISCOMs have frlled petition (O.P.No. 5 of 2O17) in APERC on O4.O3.2OIZ
APDISCOMS are entering PPAs without bidding process (for with a request to permit DISCOMs to procure power from Wind power producers
wind). The existing PPAs of the wind and Solar energies may be in the state of AP from FY:2O18-19 onwards through
competitive bidding route
reviewed and refixed for bringing down the cost of power to the in consonance with the guide lines of MNRE,
GoI and National Tariff policy -
consumer. 2016
It was also prayed in the petition that duly considering the latest
technologz being adopted by wind generators, market discovered price and
formulating appropriate parameters such as Capital cost, Return on Equity, and
cuF etc., for determination of the wind tariff for Fy: 2oLZ-Lg.
The APERC is yet to dispose the said petition.
ii) The GoAP directed the APDISCOMs to sign tJ e PpA with the M/s Axis India
hrt. Ltd & M/s Suzlon Energr Ltd., for the year 2OlT-1g and seek consent of
APERC for the sarne and request APERC to determine the project specific tariff
for the above 600 MW after taking into consideration the pievailing competitive
bidding Tariff for wind power in the countqr.
In view the above, the said developer is not entitled the ApERC tariff
of Rs. 4.76 /KwH applicable for Fy: 2OtT-t8

iii) APTRANSCO is following the T.O.O. 4O6 Dated. 06.03.2017 scrupulously for
adopting the uniform procedures for s5rnchronisation of Wind and Solar
projects. Further APSLDC is ensuring the measurement of total harmonic
distortion, DC injection, flicker etc., for upcoming projects solar power projects
B APERC h as hxed the tariff of wind Energr at Rs.4.B4 by with the representatirres
of Transco, Discom, Vigilance and of Solar power
considering a PLF of 23.5h. Now it is observed that the wind Developer.
generators are achieving a PLF of 33 to 35 Yo. Therefore the
has to be lowered keeping the higher PLf into account. Karn, iv) No new wind PPA's are being signed by Ap Discoms as per orders of
and ramilnadu States have reduced the tariff on these rines. Government of AP MOM dt:1O.8.2O17.
v) While admitting the wind bills, the PLF is being restricted to only 23.5o/o
irrespective of whether the generation is generating more pLF. So, no loss to
Discoms.

9 Further the existing and upcoming solar pooling sub-stations


shall be given to APTRANSCO for O&M
10 APIRANSCO is constructing the Sub- Stations and lines 1) AP Govt. instructed that 400 KV projects will be constructed on TBCB Model.
efficiently at reasonable cost, APTRANSCO is able to meet the One complex 4OO KV Project will be takenup by TBCB Model on pilot basis.
targets of AP Government, much a head of many Government However, all 4OO KV Sub-stations in CRDA region will be constructed and
Departments be it Lift Irrigation Projects or natural calamities. maintained by APTransco.
Therefore TBCB model shall not be enforced on APTRANSCO and 2) Due to delay in Construction of 22O KV & 132 KV Projects, Project cost will
further, the CRDA NET WORK shatl be taken up by APTRANSCO be increased due to adding of IDC. APTransco decided to go for annuity model
only. for Construction of 22O KV & 132 KV Projects. The asset of project including
land is owned by APTransco. These sub-stations will be supervised, maintained
and operated by APTransco

11 Commi ttee on Seniority of Direct Recruited AE's Vs Conversion


AE's:
Vide Lr.No. Addl.Secy/DS (L,IR&R)/ AS(L,IR
&R)/PO(IRI / 610 / 2O15, dt:28.O3.2Ot2, Management has promised
to constitute a committee on this issue. Hence, we request the As promised, a Committee will be constituted.
Management to constitute a committee to resolve this issue on
top priority.
t2 The AP Genco employees are in panic regarding the survival of the APGENCO can recover 1O0%o frxed cost at 80 o/o availability and Hon'ble APERC
organisation. Instructions may be issued to run the ApGenco has issued order dated:26.03.2016 for recovery of full fixed cost based on
plants at a minimum of 80% PLF. availability.

PLF depends upon the real time operation which has minimal impact on the
finances of APGENCO. APPCC has assured first preference will be given to
ENCO in despatch as well as payment.APGENCo will take all necessa,ry
steps to achieve 80% PLF

In AAR for Financial Year 2018-19, APGENCO has been given'Must run- Must
Pay Stations'.

Hence the financial and operational viability of APGENCO has been ensured
13 Expansion of APGENCO in Non Conventional Energr: APGENCO is having 4LYo of share in Andhra Pradesh Solar Power Corporation
A11 the future expansions in the NCEs must be given to APGENCO Private Limited.
only as non convetional ener$/ share of APGENCO is very less in
total installed capacity of NCE share in the State APGENCO has already taken up 4OO MW solar Power Plant at Tadipatri, and
decision was taken to expand NCE capacity in future as per the regulations.

per Section -63 of Electricity Act, 2OO3 the future capacity addition has to
be made through competitive bidding only. Hence the projects can not be
allotted to APGENCO on nomination basis.

However, a decision has been taken that APGENCO will participate in bidding
process in future capacity additions in NCE Projects.