QUALITY MANAGEMENT SYSTEM Page 4 of 32

MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
for CABLE ANCHORAGE ANC-QS-001-0
Steel Construction
The Cuu Long (Can Tho) Bridge Construction Project.
Co., Ltd. Revision: 0

SECTION 1. GENERAL

1.1 Scope of Application


This procedure shall be applied to preparation of full size drawings, fabrication, coating, packing,
transportation and delivery for the CABLE ANCHORAGE of the Main Bridge of The Cuu Long (Can
Tho) Bridge Construction Project (here in after called the Project) executed by Mitsui Thang Long
Steel Construction Co., Ltd. (MTSC) at shop.

1.2 Standards and Codes


Following standards and codes shall be applied to the fabrication of structural steel members and
accessories:
(1) Technical Specification of the Project.
(2) JIS / Japanese Standards Association.
(3) AWS D1.1 / The AWS D1.1 Structural Welding Code-Steel, 2004.
(4) ISO.

1.3 General Outline of the Project


(1) Project Name
The Cuu Long (Can Tho) Bridge Construction Project.
Cable Anchorage of the Main Bridge.

(2) Purchaser: Nippon Steel Engineering Co., Ltd. (NSEC)

(3) Scope of Work for MTSC

Detail Work TKN JO MTSC Remarks


Issue Detail drawings O
Full size drawings O
Steel materials (plate, shape, flat bar) O
HT Bolts and stud bolts O
Welding consumables O
Fabrication O
Galvanizing work O
Inspection and Testing including NDT O O
Packing, Marking, Loading onto truck and fastening O
Transportation to Can Tho Port O
Unloading onto Can Tho Port O
QUALITY MANAGEMENT SYSTEM Page 5 of 32
MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
for CABLE ANCHORAGE ANC-QS-001-0
Steel Construction
The Cuu Long (Can Tho) Bridge Construction Project.
Co., Ltd. Revision: 0

1.4 Fabrication Yard


(1) Name and Address of Factory
Mitsui Thang Long Steel Construction Co., Ltd.
Xam Duong, Ninh So, Thuong Tin, Ha Tay, Vietnam
TEL : 84-4-6100112/68600113 FAX : 84-4-6860107

(2) Organization
See Fig. - 1

(3) Fabrication Flow Chart


See Fig. - 2

(4) Location of Factory and Construction Site


See Fig. – 3

(5) MTSC Yard layout


See Fig. – 4

(6) List of Major Equipment


See Table -1
QUALITY MANAGEMENT SYSTEM Page 6 of 32
MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
for CABLE ANCHORAGE ANC-QS-001-0
Steel Construction
The Cuu Long (Can Tho) Bridge Construction Project.
Co., Ltd. Revision: 0

NSC / General Manager


Mr. Takasi Yamamoto

MTSC / Director General


Mr. Yasushi Yamaguchi

MTSC / Quality Assurance


Pham Duc Thang

MTSC / Deputy Director General


Ta Tuong Hai

MTSC / Fabrication Section MTSC / Technical Section MTSC / Administration Section


Bui Duc Bach Trinh Hong Thang Ta Tuong Hai

Marking / Logistic Trial Full Size Pro- Sub-


Assembly Welding
Cutting Lifting Assembly Drawing curement contract

Fig. 1- 1 Or ganizat ion Char t f or t he Pr oj ec t


QUALITY MANAGEMENT SYSTEM Page 7 of 32
MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
for CABLE ANCHORAGE ANC-QS-001-0
Steel Construction
The Cuu Long (Can Tho) Bridge Construction Project.
Co., Ltd. Revision: 0

TECHNICAL
PURCHASER PRODUCTION DEPARTMENT Q.A. DEPARTMENT
DEPARTMENT
(FAB. Activity) (Q.C. Activity) (Q.A. Activity)

FULLSIZE
DRAWINGS

CONSUMABLE
WITNESS MATERIAL RECIEPT MATERIAL CHECK
PROCUREMENTS

RECEIVING
INSPECTION

MARKING MARKING CHECK MONITORING

CUTTING CUTTING CHECK MONITORING

DRILLING DRILLING CHECK MONITORING

ASSEMBLY ASSEMBLY CHECK MONITORING

WELDING WELDING CHECK

WITNESS NDT INSPECTION

FINISHING COMPONENT CHECK


COMPONENT
WITNESS
INSPECTION
GALVANIZING GALV. CHECK

WITNESS GALV. INSPECTION

DIMENSIONAL, GALV.
FINAL INSPECTION
CHECK
PURCHASER
FINAL INSPECTION
ATTEND
PACKING COMPONENT CHECK
QUANTITY CHECK

TRANSPORT & DELIVERY QUANTITY CHECK

Fig. - 2 FABRICATION FLOW CHART


QUALITY MANAGEMENT SYSTEM Page 8 of 32
MTSC
Procedure Title: Fabrication Procedure Procedure No.:
Mitsui Thang Long
IBP-QS-001-0
Steel Construction of Boiler Steel Structure for The Project for Ichihara Biomass
Co., Ltd. Power Plant. Revision: 0

To Noi Bai Airport To Bac Ninh

Red River
Route 5

To Hai Phong
Hai Duong

Route 32

Hanoi Station

Route 1A

Rail Way

Road

Red River

To HCM
MTSC Fabrication Shop
(20 Km from Hanoi Station)

Fig. - 3 Location of Fabrication Yard (MTSC)