You are on page 1of 4

Compliance report to Quality Control remarks RIR No.KK/RJY/12/DEE/05/1 st dt.22.12.

2016

Name of work : Construction of Railway Over Bridge at Biccavolu in lieu of LC no.419 at Railway Km 611/21-23 of Vijayawada - Visakhapatnam section
corresponding Km 14/4 of Narasapurapupeta - Katravulapalli Road in East Godavari District.

S.No. Q.C.Remarks Compliance to the Q.C. Report

1 2 3
1 5 % of work is completed and balance work is in progress No remark
2 Steel Reinforcement for NP-9 Hammer Head Bed Block is verified and found to fairly No remark
tallying with the required numbers
3 Inner to Inner distance between Piers NP-7 & NP8 & NP-8 & NP9 are verified and found to No remark
be fairly tallying with the required measurements
4 Steel Reinforcement for NP-8 Pier is verified and found to fairly tallying with the required No remark
numbers
5 Diameter of the Piers NP8 & NP9 are verified and found to be fairly tallying with the No remark
specified diameter
6 Levels have been taken on top of piers (NP-6,NP-7 &NP-8) and found to be fairly tallying No remark
with the specified levels.
7 As per MoRT&H clause 1714, the exposed bars and bolts after removal of form work shall No remark
be cut inside the concrete number to a depth of atleast 50mm below the surface of the
concrete and resulting holes shall be filled with same grade of concrete.
8 On the day of inspection there was no concreting of any element was observed to be in No remark
progress
9 Regarding test results as per para 1.11 of IRC Special Publication-11,70% tests are to be No remark
conducted by the AEE/AE, 20 % by the Deputy Engineer and remaining 10 % by the
Executive Engineer.
.12.2016

Vijayawada - Visakhapatnam section

Date on which rectification


work / Q.C recovery carried
out, if not the reasons for it.
4
-
-

-
Compliance report to Quality Control remarks RIR No.KK/RJY/03/DEE/1/2 nd & part dt.09.03.2017

Name of work : Construction of Railway Over Bridge at Biccavolu in lieu of LC no.419 at Railway Km 611/21-23 of Vijayawada - Visakhapatnam
section corresponding Km 14/4 of Narasapurapupeta - Katravulapalli Road in East Godavari District.

Date on which rectification


Compliance to the Q.C.
S.No. Q.C.Remarks work / Q.C recovery carried
Report
out, if not the reasons for it.
1 2 3 4
1 10 % of work is completed and balance work is in progress No remark -
2 Length and width of the slab(16.60m X 12.00m) between A1 and NP11 & NP10 and NP9 No remark -
are verified and found tallied with the required measurements
3 Levels have been taken on slab @ center, Inner Kerb on both sides towards No remark -
Narasapurapupeta and Katravulapalli sides betaween A1 and NP11 & NP10 and NP9 and
found to be fairly tallying with the specified levels.
4 Unit weight of steel samples of dia 32mm,28mm,20mm and 16mm are verified randomly No remark -
and found tallied with the required unit weights respectively.
5 As per MoRT&H clause 1714, the exposed bars and bolts after removal of form work shall No remark -
be cut inside the concrete number to a depth of atleast 50mm below the surface of the
concrete and resulting holes shall be filled with same grade of concrete.
6 On the day of inspection there was no concreting of any element was observed to be in No remark -
progress. The field officers are requested to test the compressive strength of concrete
cubes frequently and get themselves satisfied before making payment
Compliance report to Quality Control remarks QCR No.KK/RJY/03/SE/01/2 rd & part dt.24.03.2017

Name of work : Construction of Railway Over Bridge at Biccavolu in lieu of LC no.419 at Railway Km 611/21-23 of Vijayawada - Visakhapatnam
section corresponding Km 14/4 of Narasapurapupeta - Katravulapalli Road in East Godavari District.

Date on which rectification


Compliance to the Q.C.
S.No. Q.C.Remarks work / Q.C recovery carried
Report
out, if not the reasons for it.
1 2 3 4
1 As on date of inspection 11 % of work is completed and balance work is in progress No remark -
2 Length and width of the slab(16.60m X 12.00m) between A1 and NP11 & NP10 and NP9 No remark -
are verified and found tallied with the required measurements
3 Levels have been taken on slab @ center, Inner Kerb on both sides towards No remark -
Narasapurapupeta and Katravulapalli sides betaween A1 and NP11 & NP10 and NP9 and
found to be fairly tallying with the specified levels.
4 Inner to Inner distance between Piers NP-7 & NP8 & NP-8 & NP9 are verified and found to No remark -
be fairly tallying with the required measurements
5 Diameter of the Piers NP8 & NP9 are verified and found to be fairly tallying with the No remark -
specified diameter
6 Unit weight of steel samples of dia 32mm,28mm,20mm and 16mm are verified randomly No remark -
and found tallied with the required unit weights respectively.
8 Honey combing is observed here and there. The field officers are instructed to rectify this since attended 6.04.2017
as per MoRTH clause 1714. i.e Honeycomb spots can be throughly cleaned, saturated with
water and carefully pointed with mortar of cement and fineaggregate used in the grade of
concrete that is being rectified.
9 The field officers have not furnished mix design for M25 grade Concrete used in the work Mix design for M25 has
been done JNTUK
Consulting Services
10 The field officers have not furnished the log register for the cement used in the work during Noted for future -
the QC inspection reference
11 The field officers have not furnished the test results of steel and cement at the time of QC Noted for future
inspection reference
12 The field officers have not produced the relavant LF books or M books during the QC Noted for future -
inspection. This is pointed out. reference