TRAMO
SUSPENSIONES
FECHA DE SUSPENSION
FECHA DE REANUDACION
PRORROGA
VALORES
ADICION
VALOR ACTUALIZADO $ 97,037,920,450.00
PERIODO DE PAGO
PREACTA No 23
INICIO DICIEMBRE DE 2017
FIN
FECHA ELABORACION DICIEMBRE DE 2017
MES DICIEMBRE DE 2017
FACTURA
INTERVENTORIA
INTERVENTORÍA PARA LA MEJORAMIENTO, GESTIÓN
SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO
"TRANSVERSAL DE BOYACA" TRAMOS OTANCHE -
OBJETO CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE
BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
MODULO 3
CONTRATISTA CONSORCIO INTERVIAL EQUIDAD 115
TRAMO
FECHA DE TERMINACION
SUSPENSIONES
FECHA DE SUSPENSION
FECHA DE REANUDACION
PRORROGA
VALORES
ADICION
VALOR ACTUALIZADO
PERIODO DE PAGO
INVIAS
TERRITORIAL BOYACA
ACTA No 23
RUTA 6007. (Chiquinquirá - Otanche)
REPRESENTANTE LEGAL
GUSTAVO SANCHEZ JIMENEZ
C.E. 413.418
DIRECTOR DE OBRA
CARLOS ALBERTO GIRALDO JIMENEZ
63202-52234 QND
INGENIERO RESIDENTE
MAX ALEXANDER MARTINEZ BARRAGAN
25202-148715 CND
ENCARGADO DE MEDICIONES
INGENIERO TOPOGRAFO EDWIN DAVID LOPEZ MUÑOZ
25335-281216
INGENIERO ENCARGADO
INGENIERO RESIDENTE
NELSON GOMEZ BELTRAN
25202-129478 CND
INGENIERO AUXILIAR
EDWIN YESID GONZALEZ TORRES
M.P. 01111 10509
TOPOGRAFO INSPECTOR
JOSE FERNANDO PINO GUERRERO
C.C. 7,757,950 DE ARMENIA
ACTA Nº 23
PREACTA RUTA 6007
PREACTA DE OBRA
ACTA Nº 23
PRE-ACTA MENSUAL DE INVERSIÓN
SOCIAL
ACTA Nº 23
INFORME EJECUT
FISICO - FINANCIER
OBRA
TRANSVERSAL BOYACA
SECTORES DE INTERVENCION A
ESTADO FINANCIERO
VIGENCIAS
100%
95%
90%
100%
95%
90%
85%
80%
75%
70%
65%
60%
55%
50%
45%
40%
35%
30%
25%
20%
15%
10%
5%
0%
AÑO 2016 AÑO 2017 AÑO 2018
POR FACTURAR FACTURADO
RELACION EJECUTADO / PROGRAMADO O
$ 70,000,000,000.00
$ 60,000,000,000.00
$ 50,000,000,000.00
$ 40,000,000,000.00
$ 30,000,000,000.00
$ 20,000,000,000.00
$ 10,000,000,000.00
$-
0 2 4 6 8 10 12 14 16 18 20 22 24 26
ITEM PROGRAMADO %
OBRA BASICA $ 83,392,372,742.22 100.00%
AJUSTE $ 6,368,902,180.61 100.00%
PROVISION $ 547,418,984.73 100.00%
ESTUDIOS Y DISEÑOS $ 816,640,000.00 100.00%
GESTIÓN SOCIAL Y PREDIAL $ 3,915,472,687.00 100.00%
GESTIÓN AMBIENTAL (INCLUYE PAGA) $ 1,997,113,855.00 100.00%
VALOR TOTAL $ 97,037,920,449.55 100.00%
2.88%
GESTIÓN AMBIENTAL (INCLUYE PAGA)
5.70%
GESTIÓN SOCIAL Y PREDIAL
ESTUDIOS Y DISEÑOS
0.00%
PROVISION
18.88%
AJUSTE
24.99%
OBRA BASICA
PROGRAMADO EJECUTADO
EJECUCION FINANCIERA POR VENT
10 $ 188,688,557.05
$ 132,301,247.00
9 $ 1,651,386,278.11
$ 448,844,220.00
8 $ 44,625,106.95
$ 41,387,640.00
7 $ 545,940,686.32
$ 617,019,375.00
6 $ 907,707,645.35
$ 657,325,104.00
5 $ 2,528,171,0
$ 2,445,306,064
4
3 $ 370,035,913.69
$ 370,035,913.69
2 $ 515,913,942.03
$ 515,913,942.03
1 $ 322,304,683.48
$ 317,041,780.00
$ 0.00
$ 500,000,000.00
$ 750,000,000.00
$ 250,000,000.00
$ 1,000,000,000.00
$ 1,500,000,000.00
$ 2,000,000,000.00
$ 2,250,000,000.00
$ 2,500,000,000.00
$ 2,750,000,000.00
$ 1,250,000,000.00
$ 1,750,000,000.00
10
11
12
13
1
2
3
4
5
6
7
8
9
0.00%
0.00%
1
$ 0.00
$ 250,000,000.00
10.00%
$ 500,000,000.00
27.18%
32.14%
$ 317,041,780.00
$ 750,000,000.00
$ 322,304,683.48
20.00%
$ 1,000,000,000.00
$ 1,250,000,000.00
30.00%
59.89%
61.60%
$ 1,500,000,000.00
70.12%
$ 1,750,000,000.00
72.42%
40.00%
79.93%
EJECUTADO
$ 2,000,000,000.00
88.25%
PROGRAMADO
$ 2,250,000,000.00
PROGRAMADO
92.75%
96.72%
50.00%
98.37%
EJECUTADO
$ 2,500,000,000.00
100.00%
113.02%
$ 2,750,000,000.00
PORCENTAJE DE EJECUCION POR S
SECTOR ESTRUCTURA H (m)
MEJORAMIENTO 0,10-0,30
11 BASE GRANULAR 0.30
PAVIMENTO HIDRAULICO 0.23
EXPLANACION 124.14
0
SEÑALIZACION
CUNETAS 124.14
0 20 40 60 80 100 120
SECTOR 13
0
CUNETAS
CONSTRUCCION DE MUROS 8
0
RASANTE RIGIDA
BASE 98
MEJORAMIENTO 54
FILTRO LATERAL 11
0
EXPLANACION
Column L Column M
0 20 40 60 80 100 120
SECTOR 14
0
CUNETAS
CONSTRUCCION DE MUROS 6
0
RASANTE RIGIDA
0
BASE
0
MEJORAMIENTO
0
FILTRO LATERAL
0
EXPLANACION
Column L Column M
0 5 10 15 20 25 30 35 40
SECTOR 15
0.00
CUNETAS
0.00
CONSTRUCCION DE MUROS
0.00
RASANTE RIGIDA
BASE 1242.32
MEJORAMIENTO 1853.53
EXPLANACION 300.00
Column L Column M
0 200 400 600 800 1000 1200 1400
SECTOR 21
711.56
EXPLANACION
711.56
FILTRO LATERAL
48
CONSTRUCCION DE MUROS
711.56
GRANULARES
662
RASANTE RIGIDA
179.295
CUNETAS
LONG PROGRAMADA LONG INTERVENIDA
0 100 200 300 400 500 600 700
SECTOR 22
40
EXPLANACION
70
FILTRO LATERAL
35
CONSTRUCCION DE MUROS
0
GRANULARES
0
RASANTE RIGIDA
0
CUNETAS
0 20 40 60LONG PROGRAMADA
80 100LONG INTERVENIDA
120 140 160
SECTOR 23
0
EXPLANACION
0
FILTRO LATERAL
0
CONSTRUCCION DE MUROS
0
GRANULARES
0
RASANTE RIGIDA
0
CUNETAS
LONG PROGRAMADA
0 10 20 30 40 LONG INTERVENID
50 A 60
SECTOR 24
65.65
EXPLANACION
0
FILTRO LATERAL
65.65
CONSTRUCCION DE MUROS
0
GRANULARES
0
RASANTE RIGIDA
0
CUNETAS
LONG PROGRAMADA
0 10 20 30 40 LONG INTERVENID
50 A 60
SECTOR 25
10.5
EXPLANACION
10.5
FILTRO LATERAL
8
CONSTRUCCION DE MUROS
10.5
GRANULARES
10.5
RASANTE RIGIDA
0
CUNETAS
SECTOR 26
EXPLANACION 104
CONSTRUCCION DE MUROS 50
CONSTRUCCION DE ALCANTARILLAS 1
GRANULARES 103.15
SECTOR 28
0
EXPLANACION
0
FILTRO LATERAL
CONSTRUCCION DE MUROS0
CONSTRUCCION DE ALCANTARILLAS0
0
GRANULARES
0
RASANTE ASFALTICA
0
CUNETAS
0 10 20 30 40 50 60 70 80
LONG PROGRAMADA LONG INTERVENIDA
SECTOR 29
86
EXPLANACION
86
FILTRO LATERAL
86
GRANULARES
70.5
RASANTE ASFALTICA
0
CUNETAS
0 10 20 30 40 50 60 70 80
LONG PROGRAMADA LONG INTERVENIDA
SECTOR 30
25.5
EXPLANACION
25.5
0
FILTRO LATERAL
25.5
25.5
GRANULARES
25.5
0
RASANTE ASFALTICA
25.5
0
CUNETAS
25.5
LONG PROGRAMADA Linear (LONG PROGRAMADA) LONG INTERVENIDA
0 5 10 15 20 25
SECTOR 31
52
EXPLANACION
69.2
FILTRO LATERAL
52
GRANULARES
0
RASANTE ASFALTICA
0
CUNETAS
0 10 20 30LONG PROGRAMADA
40 50 60
LONG INTERVENIDA
70
SECTOR 32
EXPLANACION 15
GRANULARES 20.2
0
RASANTE ASFALTICA
0
CUNETAS
0 5 10 15 20
RUTA 6006
CUNETAS 300
SUBBASE 160
0
BASE
EXPLANACION 120
ALCANTARILLAS0
0
FILTRO LATERAL
0 200 400 600 800 1000 1200 1400 1600
BRA
NSVERSAL BOYACA
DE INTERVENCION ACTUAL
TADO FINANCIERO
VIGENCIAS
$ - 100.00%
VALOR FACTURADO:
CORRESPONDE AL MONTO
$ 13,234,771,456.00 44.62% FACTURADO MENOS SALDO DE
VIGENCIA 2016
$ 27,750,000,000.00 0.00%
$ 42,337,920,450.00 0.00%
$ 83,322,691,906.00
AÑO 2018
POR FACTURAR FACTURADO AÑO 2019
O / PROGRAMADO OBRAS MENSUAL
AMADO EJECUTADO
18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
E DICIEMBRE DE 2017
L FACTURADO ACUMULADO FACTURADO
% INVERSION VALOR %
3.84% EJECUTADO $ 20,716,805,871.00 24.99%
4.36% PROGRAMADO $ 20,092,489,450.00 24.24%
PROGRAMADO-
0.52% EJECUTADO -$ 624,316,421.00 -0.75%
88.00% RELACION E/P 103.11%
EJECUTADO %
$ 20,842,362,270.22 24.99%
$ 1,202,517,269.94 18.88%
$ 0.00 0.00%
$ 816,640,000.00 100.00%
$ 223,265,010.00 5.70%
$ 57,515,612.00 2.88%
$ 23,142,300,161.00 23.85%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
PROGRAMADO EJECUTADO
FINANCIERA POR VENTANAS
6,278.11
$ 2,528,171,005.82
$ 2,445,306,064.00
$ 4,642,578,923.71
$ 4,642,578,923.71
$ 2,000,000,000.00
$ 2,250,000,000.00
$ 2,500,000,000.00
$ 2,750,000,000.00
$ 3,000,000,000.00
$ 4,000,000,000.00
$ 4,250,000,000.00
$ 4,500,000,000.00
$ 3,250,000,000.00
$ 3,500,000,000.00
$ 3,750,000,000.00
%
TADO
$ 2,000,000,000.00
88.25%
PROGRAMADO
$ 2,250,000,000.00
PROGRAMADO
92.75%
96.72%
50.00%
98.37%
EJECUTADO
$ 2,500,000,000.00
100.00%
113.02%
$ 2,750,000,000.00
60.00%
$ 3,000,000,000.00
72.82%
$ 3,250,000,000.00
E EJECUCION POR SECTORES
67.86%
70.00% $ 3,500,000,000.00
$ 3,750,000,000.00
80.00% $ 4,000,000,000.00
40.11%
38.40%
$ 4,250,000,000.00
29.88%
27.58%
$ 4,500,000,000.00
90.00%
20.07%
11.75%
7.25%
3.28%
100.00%
1.63%
LONG (km) VALOR VALOR POR KM
0.12414 $ - $0 km
0.12414 $ 83,576,745.00 $673,245,892 km
0.12414 $ 168,700,860.00 $1,358,956,501 km
TOTAL $2,032,202,392 km
124.14
124.14
124.14
124.14
100 120
SECTOR 13
0 120
SECTOR 14
35 40
SECTOR 15
1242.32
1853.53
84.50
1400
SECTOR 21
SECTOR 22
SECTOR 23
SECTOR 24
SECTOR 25
SECTOR 26
104
103.15
80 100
SECTOR 28
60 70 80
SECTOR 29
86
86
86
70.5
70 80
SECTOR 30
NIDA
SECTOR 31
SECTOR 32
15
20.2
20.2
15 20
RUTA 6006
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
UNIDAD EJECUTORA SUBDIRECCION DE LA RED NACIONAL DE CARRETERAS
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
Biodiversidad y
Manejo del descapote y cobertura
PBSE 4-2-11 servicios Inventario forestal X X X
vegetal
ecosistemicos
UNIDAD EJECUTORA SUBDIRECCION DE LA RED NACIONAL DE CARRETERAS
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
Mantenimiento a la reforestación
Biodiversidad y Proyecto de realizada, según lo que se exija por
PBSE 4-2-12 servicios recuperación de áreas parte de la Autoridad Ambiental, X
ecosistemicos afectadas Corpoboyaca. Se estiman 3
mantenimientos por hectárea.
UNIDAD EJECUTORA SUBDIRECCION DE LA RED NACIONAL DE CARRETERAS
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
V
UNIDAD EJECUTORA SUBDIRECCION DE LA RED NACIONAL DE CARRETERAS
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
NOTAS
1. Las cantidades y valores consignados en la presente Preacta son responsabilidad exclusiva del Contratista de Obra e
2. El interventor certifica que revisó, verificó y aprobó las actividades ambientales de responsabilidad del contratista.
3. Las cantidades, precios unitarios y valores totales consignados en la presente preacta no pueden superar los estable
4. El número de la presente preacta debe coincidir con el número del Acta de Recibo Parcial de Obra correspondiente. S
UNIDAD EJECUTORA SUBDIRECCION DE LA RED NACIONAL DE CARRETERAS
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
Firma
Nombre: Gustavo Sanchez Jimenez
Representante Legal o Apoderado
Contratista CONSORCIO VIAL 081
Matricula No. : C.E 413418
UNIDAD EJECUTORA SUBDIRECCION DE LA RED NACIONAL DE CARRETERAS
MEDIDA A
NOMBRE DEL INSUMO O ITEM
EJECUTAR
COMPENSACIÓN
PREVENCIÓN
MITIGACIÓN
CORRECIÓN
CODIGO
CONTROL
/
FICHA PROGRAMA PROYECTO ACTIVIDAD
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
INSTITUTO NACION
GESTIÓN SOCIAL Y AMBIENTAL EN PRO
MANUAL DE INTERVENTOR
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
Firma
Nombre: Oscar Javier Garzon
Representante Legal o Apoderado
Interventoría: CONSORCIO INTEGRAL EQUIDAD 115
Matricula No. : 25202-27254 CND
INSTITUTO NACION
GESTIÓN SOCIAL Y AMBIENTAL EN PRO
MANUAL DE INTERVENTOR
1. DATOS DEL P
2. ACTIVIDADES A
IVA ($)
VR. UNITARIO
VR. BASE
CANTIDAD UNIDAD BASICO (sin % IVA
GRAVABLE ($)
IVA) ($)
OBRA OTRO
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
$ 31,593,840 $ 31,593,840 0 $ - $ - $ - $ -
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
$ 7,230 $ 216,889,146 0 $ - $ - $ - $ -
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
$ 1,115,368 $ 55,768,393 0 $ - $ - $ - $ -
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
$ 27,381,328 $ 27,381,328 0 $ - $ - $ - $ -
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
$ 10,355,400 $ 528,125,400 0 $ - $ - $ - $ -
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
$ 6,489,384 $ 661,917,168 0 $ - $ - $ - $ -
INSTITUTO NACIONAL DE VÍAS
MBIENTAL EN PROYECTOS DE INFRAESTRUCTURA
DE INTERVENTORÍA OBRA PÚBLICA
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
ACTIVIDADES AMBIENTALES
VALOR
VR. BASICO VR ITEM NO
UNITARIO + VR. TOTAL ($) CANT IVA ($) VR. TOTAL ($)
MES ($) PREVISTO ($)
IVA ($)
CÓDIGO MSOAMB-MN-IN-1-F
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
$ - 0 $ 0.00 50 $ 55,768,393
CÓDIGO MSOAMB-MN-IN-1-F
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
$ - 0 $ 0.00 1 $ 27,381,328
CÓDIGO MSOAMB-MN-IN-1-F
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
$ - 0 $ 0.00 51 $ 528,125,400
CÓDIGO MSOAMB-MN-IN-1-F
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
VERSIÓN 1
PÁGINA DE
TIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACÁ" TRAMOS OTANCHE -
OS Y MEDIO) - OTANCHE (RUTA 6006), EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VÍAS
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
MSOAMB-MN-IN-1-FR-3
0
(Año)
OBSERVACIONES
UNIDAD EJECUTORA SUBDIRECCION DE LA RED NACIONAL DE CARRETERAS
LICENCIADO
CONTRATISTA CONSORCIO
CODIGO / FICHA
PROGRAMA PROYECTO
Servicios de ev
Programa de Desarrollo y Aplicación de
seguimiento,
DAGA 1-3-03 la Cumplimiento de requerimientos legales
ambientales por
Gestión Ambiental.
ocupa
Proyecto Manejo y Disposición Final de
PAC-2.4-07 Programa de actividades constructivas Empradización de
Escombros
Desarrollo de los
PGH-3.1-09 Programa de Gestión hídrica Manejo de aguas superficiales
por la inter
PBSE 4-2-11 Biodiversidad y servicios ecosistemicos Inventario forestal Manejo del des
Plantación de Árb
PBSE 4-2-12 Biodiversidad y servicios ecosistemicos Proyecto de recuperación de áreas afectadas densidad 1100 hec
parte de la Autorid
Mantenimiento a la
lo que se exija
PBSE 4-2-12 Biodiversidad y servicios ecosistemicos Proyecto de recuperación de áreas afectadas
Ambiental, Co
mantenim
NOTAS
1. Las actividades, cantidades y precios consignados en el presente Plan de Inversion Ambiental son responsabilidad del Contratista y
2. A partir del Plan de Inversion Ambiental No. 2 la aprobación de cantidades y precios son responsabilidad de la Interventoría.
3. La aprobacion del Plan de Inversión Ambiental esta sujeto al cumplimiento de los recursos asignados para la Gestión Ambiental así
Firma
Nombre: Gustavo Sanchez Jimenez
Representante Legal o Apoderado
Contratista: CONSORCIO VIAL 081
Matricula No. : C.E 413418
ENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45
RTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
MEDIDA A EJECUTAR
COMPENSACIÓN
CORRECCIÓN
PREVENCIÓN
MITIGACIÓN
CONTROL
VR. UNITARIO
ACTIVIDAD CANTIDAD UNIDAD BASICO (sin IVA)
($)
$ 70,484,859.75
ontratista y del Interventor y deben corresponder a los recursos y obligaciones previstos contractualemente.
Firma
Nombre: Oscar Javier Garzon
Representante Legal o Apoderado
Interventoría: CONSORCIO INTEGRAL EQUIDAD 115
Matricula No. : 25202-27254 CND
S
TOS DE INFRAESTRUCTURA
PÚBLICA
NTAL
O
NO LICENCIADO (PMA o PAGA)
EL CONTRATO DE OBRA
CONDICIONES PROYECTADAS
TOS DE INFRAESTRUCTURA
PÚBLICA
NTAL
$ 1,481,421,789.00
$ 40,253,486.24
$ 1,521,675,275.24
S
TOS DE INFRAESTRUCTURA
PÚBLICA
NTAL
VERSIÓN 2
PÁGINA 1 DE 1
FECHA:
2 5 2017
(Día) (Mes) (Año)
X
(indicar con una X)
$ 31,593,840.00
CÓDIGO MSOAMB-MN-IN-1-FR-2
VERSIÓN 2
PÁGINA 1 DE 1
FECHA:
2 5 2017
(Día) (Mes) (Año)
$ 216,889,146.00
$ 55,768,393.24
$ 27,381,328.00
$ 528,125,400.00
$ 661,917,168.00
$ 1,406,931,714.00 $ 114,743,561.24
CÓDIGO MSOAMB-MN-IN-1-FR-2
VERSIÓN 2
PÁGINA 1 DE 1
FECHA:
2 5 2017
(Día) (Mes) (Año)
Apr-16
1 148.38 153.23 1.03269 $0 $0 $0 $0 $0 $0
2 160.10 170.04 1.06209 $ 1,557,400 $0 $ 1,557,400 $ 1,654,099 $ 96,699 $ 96,699
3 150.49 153.51 1.02007 $0 $0 $0 $0 $0 $0
4 4 138.31 139.93 1.01171 $0 $0 $0 $0 $0 $0
5 133.36 137.66 1.03224 $0 $0 $0 $0 $0 $0
6 160.22 166.07 1.03651 $0 $0 $0 $0 $0 $0
7 145.93 150.47 1.03111 $0 $0 $0 $0 $0 $0
8 167.99 172.05 1.02417 $0 $0 $0 $0 $0 $0
$ 1,557,400 TOTALES $ 1,557,400 $0 $ 1,557,400 $ 1,654,099 $ 96,699 $ 96,699
Apr-16
1 148.38 153.23 1.03269 $ 4,662,720 $0 $ 4,662,720 $ 4,815,144 $ 152,424 $ 152,424
2 160.10 170.04 1.06209 $0 $0 $0 $0 $0 $ 96,699
3 150.49 153.51 1.02007 $0 $0 $0 $0 $0 $0
6 4 138.31 139.93 1.01171 $0 $0 $0 $0 $0 $0
5 133.36 137.66 1.03224 $0 $0 $0 $0 $0 $0
6 160.22 166.07 1.03651 $0 $0 $0 $0 $0 $0
7 145.93 150.47 1.03111 $0 $0 $0 $0 $0 $0
8 167.99 172.05 1.02417 $0 $0 $0 $0 $0 $0
$ 4,662,720 TOTALES $ 4,662,720 $0 $ 4,662,720 $ 4,815,144 $ 152,424 $ 249,123
Apr-16
1 148.38 153.23 1.03269 $ 398,682 $0 $ 398,682 $ 411,715 $ 13,033 $ 165,457
2 160.10 170.04 1.06209 $0 $0 $0 $0 $0 $ 96,699
3 150.49 153.51 1.02007 $ 1,102,636 $0 $ 1,102,636 $ 1,124,765 $ 22,130 $ 22,130
4 138.31 139.93 1.01171 $0 $0 $0 $0 $0 $0
7 5 133.36 137.66 1.03224 $0 $0 $0 $0 $0 $0
6 160.22 166.07 1.03651 $ 8,701,176 $0 $ 8,701,176 $ 9,018,856 $ 317,680 $ 317,680
7 145.93 150.47 1.03111 $0 $0 $0 $0 $0 $0
8 167.99 172.05 1.02417 $ 1,813,186 $0 $ 1,813,186 $ 1,857,011 $ 43,825 $ 43,825
TOTALES $ 12,015,680 $ - $ 12,015,680 $ 12,412,347 $ 396,668 $ 645,791
May-16
1 148.38 153.56 1.03491 $ 1,347,648 $0 $ 1,347,648 $ 1,394,694 $ 47,046 $ 212,503
2 160.10 170.84 1.06708 $0 $0 $0 $0 $0 $ 96,699
3 150.49 153.72 1.02146 $ 3,727,193 $0 $ 3,727,193 $ 3,807,178 $ 79,986 $ 102,116
7 4 138.31 140.62 1.01670 $0 $0 $0 $0 $0 $0
5 133.36 137.26 1.02924 $0 $0 $0 $0 $0 $0
6 160.22 166.21 1.03739 $ 29,412,222 $0 $ 29,412,222 $ 30,511,944 $ 1,099,723 $ 1,417,403
7 145.93 150.63 1.03221 $0 $0 $0 $0 $0 $0
8 167.99 172.31 1.02572 $ 6,129,038 $0 $ 6,129,038 $ 6,286,677 $ 157,639 $ 201,464
TOTALES $ 40,616,100 $0 $ 40,616,100 $ 42,000,494 $ 1,384,394 $ 2,030,185
Jun-16
1 148.38 153.60 1.03518 $ 875,571 $0 $ 875,571 $ 906,373 $ 30,803 $ 243,306
2 160.10 170.96 1.06783 $0 $0 $0 $0 $0 $ 96,699
3 150.49 153.73 1.02153 $ 2,421,569 $0 $ 2,421,569 $ 2,473,705 $ 52,136 $ 154,252
7 4 138.31 140.58 1.01641 $0 $0 $0 $0 $0 $0
5 133.36 138.82 1.04094 $0 $0 $0 $0 $0 $0
6 160.22 166.18 1.03720 $ 19,109,209 $0 $ 19,109,209 $ 19,820,072 $ 710,863 $ 2,128,266
7 145.93 150.64 1.03228 $0 $0 $0 $0 $0 $0
8 167.99 172.79 1.02857 $ 3,982,055 $0 $ 3,982,055 $ 4,095,822 $ 113,767 $ 315,231
$ 79,020,183 TOTALES $ 26,388,403 $0 $ 26,388,403 $ 27,295,972 $ 907,569 $ 2,937,754
Jun-16
1 148.38 153.60 1.03518 $ 5,251,957 $0 $ 5,251,957 $ 5,436,721 $ 184,764 $ 428,070
2 160.10 170.96 1.06783 $0 $0 $0 $0 $0 $ 96,699
3 150.49 153.73 1.02153 $ 6,507,181 $0 $ 6,507,181 $ 6,647,281 $ 140,100 $ 294,352
8 4 138.31 140.58 1.01641 $0 $0 $0 $0 $0 $0
5 133.36 138.82 1.04094 $0 $0 $0 $0 $0 $0
6 160.22 166.18 1.03720 $ 8,668,115 $0 $ 8,668,115 $ 8,990,569 $ 322,454 $ 2,450,720
7 145.93 150.64 1.03228 $0 $0 $0 $0 $0 $0
8 167.99 172.79 1.02857 $ 431,654 $0 $ 431,654 $ 443,986 $ 12,332 $ 327,563
TOTALES $ 20,858,907 $0 $ 20,858,907 $ 21,518,557 $ 659,650 $ 3,597,404
Jul-16
1 148.38 153.90 1.03720 $ 3,804,658 $0 $ 3,804,658 $ 3,946,191 $ 141,533 $ 569,603
2 160.10 171.22 1.06946 $0 $0 $0 $0 $0 $ 96,699
3 150.49 154.60 1.02731 $ 4,713,976 $0 $ 4,713,976 $ 4,842,715 $ 128,739 $ 423,091
8 4 138.31 140.58 1.01641 $0 $0 $0 $0 $0 $0
5 133.36 138.88 1.04139 $0 $0 $0 $0 $0 $0
6 160.22 166.41 1.03863 $ 6,279,415 $0 $ 6,279,415 $ 6,521,988 $ 242,574 $ 2,693,294
7 145.93 150.88 1.03392 $0 $0 $0 $0 $0 $0
8 167.99 173.11 1.03048 $ 312,701 $0 $ 312,701 $ 322,233 $ 9,531 $ 337,094
$ 35,969,657 TOTALES $ 15,110,750 $0 $ 15,110,750 $ 15,633,127 $ 522,377 $ 4,119,781
Jul-16
1 148.38 153.90 1.03720 $ 482,390 $0 $ 482,390 $ 500,335 $ 17,945 $ 587,548
2 160.10 171.22 1.06946 $ 28,273,137 $0 $ 28,273,137 $ 30,236,989 $ 1,963,852 $ 2,060,551
3 150.49 154.60 1.02731 $ 615,065 $0 $ 615,065 $ 631,863 $ 16,797 $ 439,888
9 4 138.31 140.58 1.01641 $0 $0 $0 $0 $0 $0
5 133.36 138.88 1.04139 $0 $0 $0 $0 $0 $0
6 160.22 166.41 1.03863 $ 21,725,953 $0 $ 21,725,953 $ 22,565,226 $ 839,274 $ 3,532,568
7 145.93 150.88 1.03392 $0 $0 $0 $0 $0 $0
8 167.99 173.11 1.03048 $ 1,762,515 $0 $ 1,762,515 $ 1,816,237 $ 53,721 $ 390,815
TOTALES $ 52,859,060 $0 $ 52,859,060 $ 55,750,649 $ 2,891,589 $ 7,011,370
Aug-16
1 148.38 153.92 1.03734 $ 620,290 $0 $ 620,290 $ 643,451 $ 23,162 $ 610,710
2 160.10 170.92 1.06758 $ 36,355,541 $0 $ 36,355,541 $ 38,812,449 $ 2,456,907 $ 4,517,458
3 150.49 154.57 1.02711 $ 790,893 $0 $ 790,893 $ 812,334 $ 21,441 $ 461,329
9 4 138.31 140.54 1.01612 $0 $0 $0 $0 $0 $0
5 133.36 139.01 1.04237 $0 $0 $0 $0 $0 $0
6 160.22 166.55 1.03951 $ 27,936,722 $0 $ 27,936,722 $ 29,040,502 $ 1,103,780 $ 4,636,348
7 145.93 150.94 1.03433 $0 $0 $0 $0 $0 $0
8 167.99 173.11 1.03048 $ 2,266,363 $0 $ 2,266,363 $ 2,335,442 $ 69,079 $ 459,894
TOTALES $ 67,969,810 $0 $ 67,969,810 $ 71,644,179 $ 3,674,369 $ 10,685,739
Sep-16
1 148.38 153.97 1.03767 $ 2,133,192 $0 $ 2,133,192 $ 2,213,549 $ 80,357 $ 691,067
2 160.10 170.92 1.06758 $ 125,027,591 $0 $ 125,027,591 $ 133,476,955 $ 8,449,365 $ 12,966,823
3 150.49 154.44 1.02625 $ 2,719,901 $0 $ 2,719,901 $ 2,791,298 $ 71,397 $ 532,726
9 4 138.31 140.35 1.01475 $0 $0 $0 $0 $0 $0
5 133.36 138.45 1.03817 $0 $0 $0 $0 $0 $0
6 160.22 164.30 1.02546 $ 96,075,068 $0 $ 96,075,068 $ 98,521,139 $ 2,446,071 $ 7,082,419
7 145.93 150.29 1.02988 $0 $0 $0 $0 $0 $0
8 167.99 173.75 1.03429 $ 7,794,079 $0 $ 7,794,079 $ 8,061,338 $ 267,259 $ 727,153
TOTALES $ 233,749,830 $0 $ 233,749,830 $ 245,064,279 $ 11,314,449 $ 22,000,188
Oct-16
1 148.38 154.05 1.03821 $ 2,399,784 $0 $ 2,399,784 $ 2,491,480 $ 91,696 $ 782,763
2 160.10 171.13 1.06889 $ 140,652,731 $0 $ 140,652,731 $ 150,342,298 $ 9,689,567 $ 22,656,390
3 150.49 154.45 1.02631 $ 3,059,817 $0 $ 3,059,817 $ 3,140,320 $ 80,504 $ 613,230
9 4 138.31 139.71 1.01012 $0 $0 $0 $0 $0 $0
5 133.36 138.66 1.03974 $0 $0 $0 $0 $0 $0
6 160.22 163.99 1.02353 $ 108,081,909 $0 $ 108,081,909 $ 110,625,076 $ 2,543,167 $ 9,625,586
7 145.93 150.30 1.02995 $0 $0 $0 $0 $0 $0
8 167.99 173.42 1.03232 $ 8,768,133 $0 $ 8,768,133 $ 9,051,519 $ 283,386 $ 1,010,539
$ 617,541,074 TOTALES $ 262,962,374 $0 $ 262,962,374 $ 275,650,694 $ 12,688,320 $ 34,688,508
Oct-16
1 148.38 154.05 1.03821 $ 9,118,943 $0 $ 9,118,943 $ 9,467,378 $ 348,435 $ 1,131,198
2 160.10 171.13 1.06889 $ 17,320,529 $0 $ 17,320,529 $ 18,513,740 $ 1,193,211 $ 23,849,601
3 150.49 154.45 1.02631 $ 21,124,870 $0 $ 21,124,870 $ 21,680,665 $ 555,795 $ 1,169,025
10 4 138.31 139.71 1.01012 $ 5,796,613 $0 $ 5,796,613 $ 5,855,274 $ 58,662 $ 58,662
5 133.36 138.66 1.03974 $0 $0 $0 $0 $0 $0
6 160.22 163.99 1.02353 $ 51,260,398 $0 $ 51,260,398 $ 52,466,555 $ 1,206,157 $ 10,831,743
7 145.93 150.30 1.02995 $0 $0 $0 $0 $0 $0
8 167.99 173.42 1.03232 $ 447,914 $0 $ 447,914 $ 462,391 $ 14,477 $ 1,025,016
TOTALES $ 105,069,266 $0 $ 105,069,266 $ 108,446,003 $ 3,376,737 $ 38,065,245
Nov-16
1 148.38 153.88 1.03707 $ 60,133,022 $0 $ 60,133,022 $ 62,362,153 $ 2,229,131 $ 3,360,329
2 160.10 171.09 1.06864 $ 114,216,721 $0 $ 114,216,721 $ 122,056,557 $ 7,839,836 $ 31,689,437
3 150.49 154.22 1.02479 $ 139,303,678 $0 $ 139,303,678 $ 142,757,016 $ 3,453,338 $ 4,622,363
10 4 138.31 139.14 1.00600 $ 38,224,588 $0 $ 38,224,588 $ 38,453,936 $ 229,348 $ 288,010
5 133.36 139.24 1.04409 $0 $0 $0 $0 $0 $0
6 160.22 163.29 1.01916 $ 338,026,321 $0 $ 338,026,321 $ 344,502,905 $ 6,476,584 $ 17,308,327
7 145.93 149.93 1.02741 $0 $0 $0 $0 $0 $0
8 167.99 173.37 1.03203 $ 2,953,680 $0 $ 2,953,680 $ 3,048,286 $ 94,606 $ 1,119,622
$ 797,927,277 TOTALES $ 692,858,011 $0 $ 692,858,011 $ 713,180,854 $ 20,322,843 $ 58,388,088
Dec-16
1 148.38 153.91 1.03727 $ 48,445,229 $0 $ 48,445,229 $ 50,250,783 $ 1,805,554 $ 5,165,883
2 160.10 170.97 1.06790 $ 268,434,600 $0 $ 268,434,600 $ 286,661,309 $ 18,226,709 $ 49,916,146
3 150.49 154.22 1.02479 $ 75,592,204 $0 $ 75,592,204 $ 77,466,135 $ 1,873,931 $ 6,496,294
11 4 138.31 138.91 1.00434 $ 83,792,713 $0 $ 83,792,713 $ 84,156,373 $ 363,660 $ 651,670
5 133.36 139.32 1.04469 $ 46,680,000 $0 $ 46,680,000 $ 48,766,129 $ 2,086,129 $ 2,086,129
6 160.22 161.94 1.01074 $ 596,855,644 $0 $ 596,855,644 $ 603,265,874 $ 6,410,230 $ 23,718,557
7 145.93 149.68 1.02570 $0 $0 $0 $0 $0 $0
8 167.99 173.10 1.03042 $ 38,948,678 $0 $ 38,948,678 $ 40,133,497 $ 1,184,819 $ 2,304,441
$ 1,158,749,068 TOTALES $ 1,158,749,068 $0 $ 1,158,749,068 $ 1,190,700,100 $ 31,951,032 $ 90,339,120
Jan-17
1 148.38 155.80 1.05001 $ 18,222,887 $0 $ 18,222,887 $ 19,134,214 $ 911,327 $ 6,077,210
2 160.10 173.77 1.08538 $ 136,956,600 $0 $ 136,956,600 $ 148,649,955 $ 11,693,355 $ 61,609,501
3 150.49 155.78 1.03515 $ 27,309,885 $0 $ 27,309,885 $ 28,269,827 $ 959,942 $ 7,456,236
12 4 138.31 140.69 1.01721 $ 129,841,720 $0 $ 129,841,720 $ 132,076,296 $ 2,234,576 $ 2,886,246
5 133.36 141.27 1.05931 $ 31,120,000 $0 $ 31,120,000 $ 32,965,727 $ 1,845,727 $ 3,931,856
6 160.22 163.32 1.01935 $ 612,224,802 $0 $ 612,224,802 $ 624,071,352 $ 11,846,550 $ 35,565,107
7 145.93 150.89 1.03399 $0 $0 $0 $0 $0 $0
8 167.99 177.43 1.05619 $ 11,764,643 $0 $ 11,764,643 $ 12,425,698 $ 661,055 $ 2,965,496
$ 967,440,537 TOTALES $ 967,440,537 $0 $ 967,440,537 $ 997,593,069 $ 30,152,532 $ 120,491,652
Feb-17
1 148.38 158.04 1.06510 $ 82,258,159 $0 $ 82,258,159 $ 87,613,165 $ 5,355,006 $ 11,432,216
2 160.10 177.09 1.10612 $ 192,069,900 $0 $ 192,069,900 $ 212,452,358 $ 20,382,458 $ 81,991,959
3 150.49 157.57 1.04705 $ 104,813,949 $0 $ 104,813,949 $ 109,745,445 $ 4,931,496 $ 12,387,732
13 4 138.31 142.39 1.02950 $ 63,027,797 $0 $ 63,027,797 $ 64,887,117 $ 1,859,320 $ 4,745,566
5 133.36 143.47 1.07581 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 165.05 1.03015 $ 848,133,523 $0 $ 848,133,523 $ 873,704,749 $ 25,571,226 $ 61,136,333
7 145.93 152.86 1.04749 $0 $0 $0 $0 $0 $0
8 167.99 182.72 1.08768 $ 53,455,677 $0 $ 53,455,677 $ 58,142,671 $ 4,686,994 $ 7,652,490
TOTALES $ 1,343,759,005 $0 $ 1,343,759,005 $ 1,406,545,505 $ 62,786,500 $ 183,278,152
Mar-17
1 148.38 159.10 1.07225 $ 44,931,778 $0 $ 44,931,778 $ 48,178,099 $ 3,246,321 $ 14,678,537
2 160.10 177.09 1.10612 $ 270,673,950 $0 $ 270,673,950 $ 299,397,870 $ 28,723,920 $ 110,715,879
3 150.49 157.76 1.04831 $ 136,019,400 $0 $ 136,019,400 $ 142,590,497 $ 6,571,097 $ 18,958,829
14 4 138.31 142.48 1.03015 $ 31,043,128 $0 $ 31,043,128 $ 31,979,078 $ 935,950 $ 5,681,516
5 133.36 144.01 1.07986 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 165.38 1.03221 $ 511,213,869 $0 $ 511,213,869 $ 527,680,068 $ 16,466,199 $ 77,602,532
7 145.93 153.37 1.05098 $0 $0 $0 $0 $0 $0
8 167.99 183.64 1.09316 $ 35,300,815 $0 $ 35,300,815 $ 38,589,439 $ 3,288,624 $ 10,941,114
TOTALES $ 1,029,182,940 $0 $ 1,029,182,940 $ 1,088,415,051 $ 59,232,111 $ 242,510,263
Apr-17
1 148.38 159.20 1.07292 $ 118,538,684 $0 $ 118,538,684 $ 127,182,525 $ 8,643,841 $ 23,322,378
2 160.10 176.70 1.10369 $ 180,468,300 $0 $ 180,468,300 $ 199,181,058 $ 18,712,758 $ 129,428,637
3 150.49 157.85 1.04891 $ 177,963,289 $0 $ 177,963,289 $ 186,667,473 $ 8,704,184 $ 27,663,013
15 4 138.31 142.21 1.02820 $ 56,068,822 $0 $ 56,068,822 $ 57,649,963 $ 1,581,141 $ 7,262,657
5 133.36 143.19 1.07371 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 164.61 1.02740 $ 458,716,872 $0 $ 458,716,872 $ 471,285,714 $ 12,568,842 $ 90,171,374
7 145.93 153.09 1.04906 $0 $0 $0 $0 $0 $0
8 167.99 183.94 1.09495 $ 11,742,583 $0 $ 11,742,583 $ 12,857,541 $ 1,114,958 $ 12,056,072
TOTALES $ 1,003,498,550 $0 $ 1,003,498,550 $ 1,054,824,275 $ 51,325,724 $ 293,835,987
May-17
1 148.38 159.44 1.07454 $ 126,262,607 $0 $ 126,262,607 $ 135,674,222 $ 9,411,615 $ 32,733,993
2 160.10 176.84 1.10456 $ 561,786,300 $0 $ 561,786,300 $ 620,526,676 $ 58,740,376 $ 188,169,013
3 150.49 157.97 1.04970 $ 167,408,272 $0 $ 167,408,272 $ 175,728,463 $ 8,320,191 $ 35,983,204
16 4 138.31 141.89 1.02588 $ 26,530,607 $0 $ 26,530,607 $ 27,217,219 $ 686,612 $ 7,949,269
5 133.36 142.80 1.07079 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 164.16 1.02459 $ 522,439,734 $0 $ 522,439,734 $ 535,286,527 $ 12,846,793 $ 103,018,167
7 145.93 152.81 1.04715 $0 $0 $0 $0 $0 $0
8 167.99 184.27 1.09691 $ 35,221,180 $0 $ 35,221,180 $ 38,634,465 $ 3,413,285 $ 15,469,357
TOTALES $ 1,439,648,700 $0 $ 1,439,648,700 $ 1,533,067,571 $ 93,418,872 $ 387,254,859
Jun-17
1 148.38 159.52 1.07508 $ 25,129,275 $0 $ 25,129,275 $ 27,015,981 $ 1,886,706 $ 34,620,699
2 160.10 176.86 1.10468 $ 520,431,900 $0 $ 520,431,900 $ 574,910,711 $ 54,478,811 $ 242,647,824
3 150.49 157.99 1.04984 $ 41,445,517 $0 $ 41,445,517 $ 43,511,162 $ 2,065,645 $ 38,048,849
17 4 138.31 141.43 1.02256 $ 46,372,835 $0 $ 46,372,835 $ 47,419,006 $ 1,046,171 $ 8,995,440
5 133.36 142.80 1.07079 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 163.97 1.02341 $ 452,027,225 $0 $ 452,027,225 $ 462,609,182 $ 10,581,957 $ 113,600,124
7 145.93 152.52 1.04516 $0 $0 $0 $0 $0 $0
8 167.99 183.98 1.09518 $ 174,589,256 $0 $ 174,589,256 $ 191,206,661 $ 16,617,405 $ 32,086,762
TOTALES $ 1,259,996,008 $0 $ 1,259,996,008 $ 1,346,672,704 $ 86,676,695 $ 473,931,554
Jul-17
1 148.38 159.61 1.07568 $ 39,748,206 $0 $ 39,748,206 $ 42,756,350 $ 3,008,144 $ 37,628,843
2 160.10 176.89 1.10487 $ 582,204,450 $0 $ 582,204,450 $ 643,260,231 $ 61,055,781 $ 303,703,605
3 150.49 158.09 1.05050 $ 59,597,154 $0 $ 59,597,154 $ 62,606,810 $ 3,009,656 $ 41,058,505
18 4 138.31 141.48 1.02292 $ 43,341,938 $0 $ 43,341,938 $ 44,335,335 $ 993,397 $ 9,988,837
5 133.36 143.24 1.07409 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 163.92 1.02309 $ 531,131,998 $0 $ 531,131,998 $ 543,395,836 $ 12,263,838 $ 125,863,962
7 145.93 152.47 1.04482 $0 $0 $0 $0 $0 $0
8 167.99 183.99 1.09524 $ 280,428,141 $0 $ 280,428,141 $ 307,136,117 $ 26,707,976 $ 58,794,738
TOTALES $ 1,536,451,887 $0 $ 1,536,451,887 $ 1,643,490,679 $ 107,038,792 $ 580,970,346
Aug-17
1 148.38 159.70 1.07629 $ 127,010,574 $0 $ 127,010,574 $ 136,700,211 $ 9,689,637 $ 47,318,480
2 160.10 176.91 1.10500 $ 552,878,250 $0 $ 552,878,250 $ 610,930,466 $ 58,052,216 $ 361,755,821
3 150.49 158.12 1.05070 $ 107,203,591 $0 $ 107,203,591 $ 112,638,813 $ 5,435,222 $ 46,493,727
19 4 138.31 141.58 1.02364 $ 25,202,025 $0 $ 25,202,025 $ 25,797,801 $ 595,776 $ 10,584,613
5 133.36 143.57 1.07656 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 164.29 1.02540 $ 531,984,771 $0 $ 531,984,771 $ 545,497,184 $ 13,512,413 $ 139,376,375
7 145.93 152.57 1.04550 $0 $0 $0 $0 $0 $0
8 167.99 184.10 1.09590 $ 243,983,237 $0 $ 243,983,237 $ 267,381,229 $ 23,397,992 $ 82,192,730
TOTALES $ 1,588,262,448 $0 $ 1,588,262,448 $ 1,698,945,704 $ 110,683,256 $ 691,653,602
Sep-17
1 148.38 159.61 1.07568 $ 61,670,136 $0 $ 61,670,136 $ 66,337,332 $ 4,667,196 $ 51,985,676
2 160.10 177.18 1.10668 $ 484,782,850 $0 $ 484,782,850 $ 536,499,484 $ 51,716,634 $ 413,472,455
3 150.49 158.10 1.05057 $ 75,019,603 $0 $ 75,019,603 $ 78,813,344 $ 3,793,741 $ 50,287,468
20 4 138.31 144.73 1.04642 $ 49,801,863 $0 $ 49,801,863 $ 52,113,665 $ 2,311,802 $ 12,896,415
5 133.36 144.38 1.08263 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 164.40 1.02609 $ 835,635,400 $0 $ 835,635,400 $ 857,437,128 $ 21,801,728 $ 161,178,103
7 145.93 152.67 1.04619 $0 $0 $0 $0 $0 $0
8 167.99 184.30 1.09709 $ 184,981,314 $0 $ 184,981,314 $ 202,941,150 $ 17,959,836 $ 100,152,566
TOTALES $ 1,691,891,166 $0 $ 1,691,891,166 $ 1,794,142,103 $ 102,250,937 $ 793,904,539
Oct-17
1 148.38 159.66 1.07602 $ 71,231,510 $0 $ 71,231,510 $ 76,646,529 $ 5,415,019 $ 57,400,696
2 160.10 178.06 1.11218 $ 517,593,850 $0 $ 517,593,850 $ 575,657,528 $ 58,063,678 $ 471,536,133
3 150.49 158.10 1.05057 $ 108,190,771 $0 $ 108,190,771 $ 113,661,978 $ 5,471,207 $ 55,758,675
21 4 138.31 147.91 1.06941 $ 30,488,628 $0 $ 30,488,628 $ 32,604,844 $ 2,116,216 $ 15,012,631
5 133.36 144.88 1.08638 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 164.36 1.02584 $ 431,333,298 $0 $ 431,333,298 $ 442,478,950 $ 11,145,652 $ 172,323,755
7 145.93 152.70 1.04639 $0 $0 $0 $0 $0 $0
8 167.99 184.22 1.09661 $ 245,203,968 $0 $ 245,203,968 $ 268,893,123 $ 23,689,155 $ 123,841,721
TOTALES $ 1,404,042,025 $0 $ 1,404,042,025 $ 1,509,942,953 $ 105,900,927 $ 899,805,467
Nov-17
1 148.38 159.73 1.07649 $ 110,907,405 $0 $ 110,907,405 $ 119,390,712 $ 8,483,307 $ 65,884,003
2 160.10 178.07 1.11224 $ 587,605,900 $0 $ 587,605,900 $ 653,558,786 $ 65,952,886 $ 537,489,019
3 150.49 158.11 1.05063 $ 139,995,610 $0 $ 139,995,610 $ 147,083,588 $ 7,087,978 $ 62,846,653
22 4 138.31 150.32 1.08683 $ 218,982,031 $0 $ 218,982,031 $ 237,996,241 $ 19,014,210 $ 34,026,841
5 133.36 145.22 1.08893 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 164.60 1.02734 $ 79,362,775 $0 $ 79,362,775 $ 81,532,553 $ 2,169,778 $ 174,493,533
7 145.93 152.82 1.04721 $0 $0 $0 $0 $0 $0
8 167.99 184.42 1.09780 $ 441,091,581 $0 $ 441,091,581 $ 484,230,338 $ 43,138,757 $ 166,980,478
TOTALES $ 1,577,945,302 $0 $ 1,577,945,302 $ 1,723,792,218 $ 145,846,916 $ 1,045,652,383
Dec-17
1 148.38 159.73 1.07649 $ 118,978,074 $0 $ 118,978,074 $ 128,078,707 $ 9,100,633 $ 74,984,636
2 160.10 178.07 1.11224 $ 404,222,400 $0 $ 404,222,400 $ 449,592,322 $ 45,369,922 $ 582,858,941
3 150.49 158.11 1.05063 $ 76,841,397 $0 $ 76,841,397 $ 80,731,877 $ 3,890,480 $ 66,737,133
23 4 138.31 150.32 1.08683 $ 88,904,094 $0 $ 88,904,094 $ 96,623,636 $ 7,719,542 $ 41,746,383
5 133.36 145.22 1.08893 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 164.60 1.02734 $ 2,270,968,990 $0 $ 2,270,968,990 $ 2,333,057,282 $ 62,088,292 $ 236,581,825
7 145.93 152.82 1.04721 $0 $0 $0 $0 $0 $0
8 167.99 184.42 1.09780 $ 219,344,969 $0 $ 219,344,969 $ 240,796,907 $ 21,451,938 $ 188,432,416
TOTALES $ 3,179,259,924 $0 $ 3,179,259,924 $ 3,328,880,732 $ 149,620,807 $ 1,195,273,190
Jan-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
24 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Feb-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
25 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Mar-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
26 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Apr-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
27 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
May-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
28 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Jun-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
29 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Jul-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
30 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Aug-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
31 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Sep-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
32 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Oct-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
33 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Nov-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
34 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Dec-18
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
35 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Jan-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
36 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Feb-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
37 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Mar-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
38 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Apr-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
39 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
May-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
40 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Jun-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
41 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Jul-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
42 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Aug-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
43 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Sep-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
44 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Oct-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
45 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Nov-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
46 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Dec-19
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
47 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
Jan-20
1 148.38 0.00 0.00000 $0 $0 $0 $0 $0 $ 74,984,636
2 160.10 0.00 0.00000 $0 $0 $0 $0 $0 $ 582,858,941
3 150.49 0.00 0.00000 $0 $0 $0 $0 $0 $ 66,737,133
48 4 138.31 0.00 0.00000 $0 $0 $0 $0 $0 $ 41,746,383
5 133.36 0.00 0.00000 $0 $0 $0 $0 $0 $ 3,931,856
6 160.22 0.00 0.00000 $0 $0 $0 $0 $0 $ 236,581,825
7 145.93 0.00 0.00000 $0 $0 $0 $0 $0 $0
8 167.99 0.00 0.00000 $0 $0 $0 $0 $0 $ 188,432,416
TOTALES $0 $0 $0 $0 $0 $ 1,195,273,190
$ 3,662,867,916
MENOS VALOR ACTA AJUSTE PROVISIONAL ________________ VALOR POR PAGAR : $ 62,786,500 $ 183,278,152
PORCENTAJE AMORTIZADO ___________ (%) (tres decimales) VALOR IVA $ 380,524 $ 1,110,777
VALOR TOTAL $ 63,167,024 $ 184,388,929
EJECUTADO
ACTA 1 ACTA 2 ACTA 3 ACTA 4 ACTA 5
AJUSTES Feb-16 Mar-16 Apr-16 May-16 Jun-16
VALOR % VALOR % VALOR % VALOR % VALOR %
1 $0.00 0.00% $0.00 0.00% 0.00% $0.00 0.00%
2 $0.00 0.00% $0.00 0.00% 0.00% $1,557,400.00 100.00%
3 $0.00 0.00% $0.00 0.00% 0.00% $0.00 0.00%
4 $0.00 0.00% $0.00 0.00% 0.00% $0.00 0.00%
5 $0.00 0.00% $0.00 0.00% 0.00% $0.00 0.00%
6 $0.00 0.00% $0.00 0.00% 0.00% $0.00 0.00%
7 $0.00 0.00% $0.00 0.00% 0.00% $0.00 0.00%
8 $0.00 0.00% $0.00 0.00% 0.00% $0.00 0.00%
TOTALES $ - 0.00% $ - 0.00% $ - $0.00 $ 1,557,400 100.00% $ -
PROGRAMADO
ACTA No PROGRAMADO MES 1 PROGRAMADO MES 2 PROGRAMADO MES 3 PROGRAMADO MES 4 PROGRAMADO MES 5
Feb-16 Mar-16 Apr-16 May-16 Jun-16
$ - $ - $ 18,235,800 $ 40,616,100 $ 47,247,310
1
2
3
4 $1,557,400.00
5
6 $4,662,720.00
7 $12,015,680.00 $40,616,100.00 $26,388,403.00
8 $20,858,907.00
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
$18,235,800.00 $40,616,100.00 $47,247,310.00
$0.00 $0.00 $0.00 $0.00 $0.00
EJECUTADO
ACTA 6 ACTA 7 ACTA 8 ACTA 9 ACTA 10
Jul-16 Aug-16 Sep-16 Oct-16 Nov-16
VALOR % VALOR % VALOR % VALOR % VALOR %
$4,662,720.00 100.00% $2,621,900.00 3.32% $9,056,615.00 25.18% $5,635,655.00 0.91% $69,251,965.00 8.68%
$0.00 0.00% $0.00 0.00% $0.00 0.00% $330,309,000.00 53.49% $131,537,250.00 16.48%
$0.00 0.00% $7,251,397.00 9.18% $11,221,157.00 31.20% $7,185,676.00 1.16% $160,428,548.00 20.11%
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $44,021,201.00 5.52%
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
$0.00 0.00% $57,222,607.00 72.42% $14,947,530.00 41.56% $253,819,652.00 41.10% $389,286,719.00 48.79%
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
$0.00 0.00% $11,924,279.00 15.09% $744,355.00 2.07% $20,591,091.00 3.33% $3,401,594.00 0.43%
$ 4,662,720 100.00% $ 79,020,183 100.00% $ 35,969,657 100.00% $ 617,541,074 100.00% $ 797,927,277 100.00%
PROGRAMADO
PROGRAMADO MES 6 PROGRAMADO MES 7 PROGRAMADO MES 8 PROGRAMADO MES 9 PROGRAMADO MES 10
Jul-16 Aug-16 Sep-16 Oct-16 Nov-16
$ 67,969,810 $ 67,969,810 $ 233,749,830 $ 368,031,640 $ 635,406,010
$15,110,750.00
$52,859,060.00 $67,969,810.00 $233,749,830.00 $262,962,374.00
$105,069,266.00 $ 692,858,011
$67,969,810.00 $67,969,810.00 $233,749,830.00 $368,031,640.00 $692,858,011.00
$0.00 $0.00 $0.00 $0.00 -$57,452,001.00
EJECUTADO
ACTA 11 ACTA 12 ACTA 13 ACTA 14
Dec-16 Jan-17 Feb-17 Mar-17
VALOR % VALOR % VALOR % VALOR %
$48,445,229.00 4.18% $18,222,887.00 1.88% $82,258,159.00 6.12% $44,931,778.00 4.37%
$268,434,600.00 23.17% $136,956,600.00 14.16% $192,069,900.00 14.29% $270,673,950.00 26.30%
$75,592,204.00 6.52% $27,309,885.00 2.82% $104,813,949.00 7.80% $136,019,400.00 13.22%
$83,792,713.00 7.23% $129,841,720.00 13.42% $63,027,797.00 4.69% $31,043,128.00 3.02%
$46,680,000.00 4.03% $31,120,000.00 3.22% $0.00 0.00% $0.00 0.00%
$596,855,644.00 51.51% $612,224,802.00 63.28% $848,133,523.00 63.12% $511,213,869.00 49.67%
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
$38,948,678.00 3.36% $11,764,643.00 1.22% $53,455,677.00 3.98% $35,300,815.00 3.43%
$ 1,158,749,068 100.00% $ 967,440,537 100.00% $ 1,343,759,005 100.00% $ 1,029,182,940 100.00%
PROGRAMADO
PROGRAMADO MES 11 PROGRAMADO MES 12 PROGRAMADO MES 13 PROGRAMADO MES 14
Dec-16 Jan-17 Feb-17 Mar-17
$ 598,229,630 $ 787,455,090 $ 1,011,258,110 $ 1,060,992,120
$1,119,083,308.00
$967,440,537.00
$1,343,759,005.00
$1,029,182,940.00
$1,119,083,308.00 $967,440,537.00 $1,343,759,005.00 $1,029,182,940.00
-$520,853,678.00 -$179,985,447.00 -$332,500,895.00 $31,809,180.00
EJECUTADO
ACTA 15 ACTA 16 ACTA 17 ACTA 18
Apr-17 May-17 Jun-17 Jul-17
VALOR % VALOR % VALOR % VALOR %
$118,538,684.00 11.81% $126,262,607.00 8.77% $25,129,275.00 1.99% $39,748,206.00 2.59%
$180,468,300.00 17.98% $561,786,300.00 39.02% $520,431,900.00 41.30% $582,204,450.00 37.89%
$177,963,289.00 17.73% $167,408,272.00 11.63% $41,445,517.00 3.29% $59,597,154.00 3.88%
$56,068,822.00 5.59% $26,530,607.00 1.84% $46,372,835.00 3.68% $43,341,938.00 2.82%
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
$458,716,872.00 45.71% $522,439,734.00 36.29% $452,027,225.00 35.88% $531,131,998.00 34.57%
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
$11,742,583.00 1.17% $35,221,180.00 2.45% $174,589,256.00 13.86% $280,428,141.00 18.25%
$ 1,003,498,550 100.00% $ 1,439,648,700 100.00% $ 1,259,996,008 100.00% $ 1,536,451,887 100.00%
PROGRAMADO
PROGRAMADO MES 15 PROGRAMADO MES 16 PROGRAMADO MES 17 PROGRAMADO MES 18
Apr-17 May-17 Jun-17 Jul-17
$ 1,135,593,120 $ 1,305,517,640 $ 1,483,731,160 $ 1,483,731,160
$1,003,498,550.00
$1,439,648,700.00
$1,259,996,008.00
$1,536,451,887.00
O PROGRAMAD
PROGRAMADO MES 19 PROGRAMADO MES 20 PROGRAMADO MES 21 PROGRAMADO MES 22
Aug-17 Sep-17 Oct-17 Nov-17
$ 1,492,020,160 $ 1,492,020,160 $ 1,574,910,170 $ 1,574,910,170
$1,588,262,448.00
$1,691,891,166.00
$1,404,042,025.00
$1,577,945,302.00
PROGRAMADO
PROGRAMADO MES 23 PROGRAMADO MES 24 PROGRAMADO MES 25 PROGRAMADO MES 26 PROGRAMADO MES 27
Dec-17 Jan-18 Feb-18 Mar-18 Apr-18
$ 3,612,894,450 $ 1,614,241,480 $ 2,235,916,550 $ 2,119,870,540 $ 2,202,760,550
$3,179,259,924.00
PROGRAMADO
PROGRAMADO MES 27 PROGRAMADO MES 28 PROGRAMADO MES 29 PROGRAMADO MES 30 PROGRAMADO MES 31
Apr-18 May-18 Jun-18 Jul-18 Aug-18
2,202,760,550 $ 2,486,700,270 $ 2,064,599,010 $ 2,640,787,550 $ 2,468,479,210
$0.00 $0.00 $0.00 $0.00 $0.00
$2,202,760,550.00 $2,486,700,270.00 $2,064,599,010.00 $2,640,787,550.00 $2,468,479,210.00
$ - $ - $ - $ - $ -
EJECUTADO
ACTA 32 ACTA 33 ACTA 34 ACTA 35 ACTA 36
Sep-18 Oct-18 Nov-18 Dec-18 Jan-19
VALOR % VALOR % VALOR % VALOR % VALOR
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$ - 0.00% $ - 0.00% $ - 0.00% $ - 0.00% $ -
PROGRAMADO
PROGRAMADO MES 32 PROGRAMADO MES 33 PROGRAMADO MES 34 PROGRAMADO MES 35 PROGRAMADO MES 36
Sep-18 Oct-18 Nov-18 Dec-18 Jan-19
$ 2,478,411,270 $ 2,561,301,280 $ 2,644,191,290 $ 2,420,388,260 $ 2,171,718,240
$0.00 $0.00 $0.00 $0.00 $0.00
$2,478,411,270.00 $2,561,301,280.00 $2,644,191,290.00 $2,420,388,260.00 $2,171,718,240.00
$ - $ - $ - $ -
EJECUTADO
ACTA 36 ACTA 37 ACTA 38 ACTA 39 ACTA 40
Jan-19 Feb-19 Mar-19 Apr-19 May-19
% VALOR % VALOR % VALOR % VALOR %
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $ - 0.00% $ - 0.00% $ - 0.00% $ - 0.00%
PROGRAMADO
PROGRAMADO MES 36 PROGRAMADO MES 37 PROGRAMADO MES 38 PROGRAMADO MES 39 PROGRAMADO MES 40
Jan-19 Feb-19 Mar-19 Apr-19 May-19
2,171,718,240 $ 2,618,919,230 $ 2,768,526,300 $ 2,736,340,900 $ 3,133,242,340
$0.00 $0.00 $0.00 $0.00 $0.00
$2,171,718,240.00 $2,618,919,230.00 $2,768,526,300.00 $2,736,340,900.00 $3,133,242,340.00
$ - $ - $ - $ - $ -
EJECUTADO
ACTA 41 ACTA 42 ACTA 43 ACTA 44 ACTA 45
Jun-19 Jul-19 Aug-19 Sep-19 Oct-19
VALOR % VALOR % VALOR % VALOR % VALOR
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00
$ - 0.00% $ - 0.00% $ - 0.00% $ - 0.00% $ -
PROGRAMADO
PROGRAMADO MES 41 PROGRAMADO MES 42 PROGRAMADO MES 43 PROGRAMADO MES 44 PROGRAMADO MES 45
Jun-19 Jul-19 Aug-19 Sep-19 Oct-19
$ 3,547,692,390 $ 3,547,692,390 $ 3,564,270,390 $ 3,149,820,340 $ 1,972,855,160
$0.00 $0.00 $0.00 $0.00 $0.00
$3,547,692,390.00 $3,547,692,390.00 $3,564,270,390.00 $3,149,820,340.00 $1,972,855,160.00
$ - $ - $ - $ -
EJECUTADO
ACTA 45 ACTA 46 ACTA 47 ACTA 48 ACTA 49
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20
% VALOR % VALOR % VALOR % VALOR %
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00% $0.00 0.00%
0.00% $ - 0.00% $ - 0.00% $ - 0.00% $ - 0.00%
PROGRAMADO
PROGRAMADO MES 45 PROGRAMADO MES 46 PROGRAMADO MES 47 PROGRAMADO MES 48 PROGRAMADO MES 49
Oct-19 Nov-19 Dec-19 Jan-20 Feb-20
1,972,855,160 $ 2,628,254,850 $ 2,074,854,920 $ 945,684,890
$0.00 $0.00 $0.00 $0.00 $0.00
$1,972,855,160.00 $2,628,254,850.00 $2,074,854,920.00 $945,684,890.00 $0.00
$ - $ - $ - $ - $ -
ACTA 50 ACUMULADOS
Mar-20
VALOR %
$0.00 0.00% $1,084,563,381.07
$0.00 0.00% $ 5,723,512,905
$0.00 0.00% $ 1,483,487,422
$0.00 0.00% $ 937,419,403
$0.00 0.00% $ 77,800,000
$0.00 0.00% $ 9,397,305,417
$0.00 0.00% $ -
$0.00 0.00% $ 2,012,717,362
$ - 0.00% $ 20,716,805,890
ACUMULADOS
PROGRAMADO MES 50 ACUMULADOS
Mar-20
$ 82,890,009,050
$ 1,557,400
$ -
$ 4,662,720
$ 79,020,183
$ 35,969,657
$ 617,541,074
$ 797,927,277
$ 1,119,083,308
$0.00 $ 20,677,140,111
$0.00
$ -
Colombia, Indice de Costos de la Construcción Pesada (ICCP) Indices serie empalme, según canasta general y grupos de obra 2000 - 2
134.68 134.63 134.90 135.00 134.95 134.98 134.96 134.99 136.34 137.51 137.92
151.59 151.96 152.15 152.17 150.98 150.52 150.00 149.31 151.02 153.19 153.49
128.82 128.82 129.23 129.20 129.20 129.20 129.20 129.20 129.66 130.80 131.00
169.29 169.29 169.35 169.35 169.35 169.84 169.84 169.84 173.39 177.07 178.19
162.53 162.58 162.71 162.80 163.08 163.20 163.14 163.15 164.75 167.34 167.86
153.56 153.60 153.90 153.92 153.97 154.05 153.88 153.91 155.80 158.04 159.10
170.84 170.96 171.22 170.92 170.92 171.13 171.09 170.97 173.77 177.09 177.09
153.72 153.73 154.60 154.57 154.44 154.45 154.22 154.22 155.78 157.57 157.76
140.62 140.58 140.58 140.54 140.35 139.71 139.14 138.91 140.69 142.39 142.48
137.26 138.82 138.88 139.01 138.45 138.66 139.24 139.32 141.27 143.47 144.01
166.21 166.18 166.41 166.55 164.30 163.99 163.29 161.94 163.32 165.05 165.38
150.63 150.64 150.88 150.94 150.29 150.30 149.93 149.68 150.89 152.86 153.37
172.31 172.79 173.11 173.11 173.75 173.42 173.37 173.10 177.43 182.72 183.64
2016 2016 2016 2016 2016 2016 2016 2016 2017 2017 2017
May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17
153.56 153.60 153.90 153.92 153.97 154.05 153.88 153.91 155.80 158.04 159.10
170.84 170.96 171.22 170.92 170.92 171.13 171.09 170.97 173.77 177.09 177.09
153.72 153.73 154.60 154.57 154.44 154.45 154.22 154.22 155.78 157.57 157.76
140.62 140.58 140.58 140.54 140.35 139.71 139.14 138.91 140.69 142.39 142.48
137.26 138.82 138.88 139.01 138.45 138.66 139.24 139.32 141.27 143.47 144.01
166.21 166.18 166.41 166.55 164.30 163.99 163.29 161.94 163.32 165.05 165.38
150.63 150.64 150.88 150.94 150.29 150.30 149.93 149.68 150.89 152.86 153.37
neral y grupos de obra 2000 - 2016
172.31 172.79 173.11 173.11 173.75 173.42 173.37 173.10 177.43 182.72 183.64
Abril Mayo Junio Julio Agosto Septiembre Octubre Noviembre Diciembre Enero
2017 2017 2017 2017 2017 2017 2017 2017 2017 2018
2017 2017 2017 2017 2017 2017 2017 2017 2017 2018
Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18
159.20 159.44 159.52 159.61 159.70 159.61 159.66 159.73 159.73 0.00
176.70 176.84 176.86 176.89 176.91 177.18 178.06 178.07 178.07 0.00
157.85 157.97 157.99 158.09 158.12 158.10 158.10 158.11 158.11 0.00
142.21 141.89 141.43 141.48 141.58 144.73 147.91 150.32 150.32 0.00
143.19 142.80 142.80 143.24 143.57 144.38 144.88 145.22 145.22 0.00
164.61 164.16 163.97 163.92 164.29 164.40 164.36 164.60 164.60 0.00
153.09 152.81 152.52 152.47 152.57 152.67 152.70 152.82 152.82 0.00
183.94 184.27 183.98 183.99 184.10 184.30 184.22 184.42 184.42 0.00
Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre Octubre Noviembre
2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
2018 2018 2018 2018 2018 2018 2018 2018 2018 2018
Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Diciembre Enero Febrero Marzo Abril Mayo Junio Julio Agosto Septiembre
2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
2018 2019 2019 2019 2019 2019 2019 2019 2019 2019
Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Octubre Noviembre Diciembre Enero
2039 2040 2041 2042
EXPLANACIONES
1 200.2 200-13 Desmonte y limpieza en zonas no boscosas Ha 6.00
PAVIMENTOS ASFÁLTICOS
16 420.2 420-13 Riego de imprimación con emulsión asfáltica CRL ‐1 m2 99,953.00
PAVIMENTOS DE CONCRETO
20 500.1 500-13 Pavimento de concreto Hidraulico m3 7,501.00
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
ESTRUCTURAS Y DRENAJES
21 600.1.1 600-13 Excavaciones varias sin clasificar m3 10,911.00
25 610.1P 610.1P Relleno detrás de las cunetas con material de excavacion m3 200.00
26 610.2 610-13 Rellenos para estructuras con recebo m3 17,973.00
27 610.3 610-13 Rellenos para estructuras con material granular tipo SBG. m3 1,000.00
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
31 630.3.1P 630.3.1P Concreto clase C para para Zapatas, Estribos y Aletas m3 4,120.00
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
36 630.4.1P 630.4.1P Concreto lanzado para pantallas ancladas (f'c = 21 Mpa) m3 100.00
47 663.3P 663.3P Tuberia para filtro PVC perforada diametro 100 mm m 8,572.00
54 674 674-13 Dren horizontal de longitud mayor a diez (10) metros. m 3,360.00
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
SEÑALIZACIÓN Y SEGURIDAD
56 700.1 700-13 Líneas de Demarcación con pintura en frio m 69,328.00
57 700.3 700-13 Marca Vial con pintura en frío m2 3,814.00
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
NP02 810,1P Protección de taludes con geomanto para control de erosión (incluído semillas) m2
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
NP04 621.1.1P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. m
Incluye empleo de trépano, brocas de widia o diamante en caso de ser necesario.
Distancia máxima de transporte hasta 30 km.
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.70 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
NP05 621.1.2P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. m
Incluye empleo de trépano, brocas de widia o diamante en caso de ser necesario.
Distancia máxima de transporte hasta 30 km.
Ajuste al peso
* SUBTOTAL OBRAS (A)
* PROVISION PARA AJUSTES, OBRAS COMPLEMENTARIAS Y/O ADICIONALES (B)
* PROVISION PARA JORNADAS DE TRABAJO 24 HORAS DIARIAS 7 DIAS DE LA SEMANA ( C)
* VALOR BASICO DEL CONTRATO INCLUYE OBRAS COMPLEMENTARIAS Y AJUSTES D=(A+B+C)
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
GR.
Con base en la Revisión PART.y/o unificación y/o complementación
y Ajuste DESCRIPCIÓN ITEM
y/o actualización UND CANTIDAD
y/o adaptación y/o Modificación y/u optimización d
del corredor vial en las debidas condiciones de seguridad para los usuarios del mismo, garantizando la estabilidad geotécnica y geológica
de las obras definidas en los estudios y diseños.
ÍTEMS PREVISTOS Y/O NO PREVISTOS QUE SE AFECTAN CON LA MODIFICACIÓN (campo obligatorio):
Con Base en la causales de la modificación, se incluyen los siguientes: NP 02 Protección de taludes con Geomanto para control de erosió
tipo TRM, Guadua o similar. - NP-04 Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye excavaciones, revest
de widia o diamante en caso de ser necesario. Distancia máxima de transporte hasta 30 km. - NP-05 Pilote excavado de concreto tre
estimación del 30% de los pilotes. Incluye empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima de
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
GR. de laPART.
Con Base en la causales DESCRIPCIÓN
modificación, se incluyen los siguientes: NP 02ITEM UND para
Protección de taludes con Geomanto CANTIDAD
control de erosió
tipo TRM, Guadua o similar. - NP-04 Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye excavaciones, revest
de widia o diamante en caso de ser necesario. Distancia máxima de transporte hasta 30 km. - NP-05 Pilote excavado de concreto tre
estimación del 30% de los pilotes. Incluye empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima de
Debido a la Inclucion de los Item No Previstos anteriores, se realizo el ajuste de las cantidades de los diferentes item previstos en la propu
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
La presente acta de modificación de cantidades de obra se suscribe por el Jefe de la Unidad Ejecutora con base en la evaluación y justificación técnica presentada por e
INSTITUTO NAC
PROCESO GESTIÓN DE LA
MANUAL DE INTERVEN
ACTA DE MODIFICACIÓN D
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
$ 544,028,277.00 $ 544,028,277.00 $ 0.00
$ 90,308,693,908.00 $ 90,308,693,908.00 $ 0.00
$ 704,000,000.00 $ 704,000,000.00 $ 0.00
$ 112,640,000.00 $ 112,640,000.00 $ 0.00
OS Y DISEÑOS I=G+H $ 816,640,000.00 $ 816,640,000.00 $ 0.00
$ 3,915,472,687.00 $ 3,915,472,687.00 $ 0.00
$ 1,997,113,855.00 $ 1,997,113,855.00 $ 0.00
INSTITUTO NACIONAL DE VÍAS
CESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
ANUAL DE INTERVENTORÍA OBRA PUBLICA
E MODIFICACIÓN DE CANTIDADES DE OBRA
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
$ 97,037,920,450.00 $ 97,037,920,450.00 $ 0.00
y/u optimización de los estudios y diseños de referencia realizada por el contratista de obra, se definieron todas las obras necesarias y complementa
cnica y geológica de todos los taludes y cortes durante la construcción del proyecto; generándose la necesidad de incluir y pactar un cierto número d
INSTITUTO NACIONAL DE VÍAS
CESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
ANUAL DE INTERVENTORÍA OBRA PUBLICA
E MODIFICACIÓN DE CANTIDADES DE OBRA
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
control de erosión (incluido semillas) - NP 03 Trincho formado por estacones de madera D=3" de 1,5m de longitud, separados 1m y clavados 0,5m,
avaciones, revestimiento soporte temporal (de ser necesario), concreto tremie bombeado, incluye lodos de perforación con una estimación del 30% d
o de concreto tremie fc=280 kg/cm2 (diámetro 0.70 m), incluye excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie b
ancia máxima de transporte hasta 30 km. - NP 08 Concreto Clase C de resistencia 28 Mpa - NP 09 Geomalla de refuerzo en polyester
INSTITUTO NACIONAL DE VÍAS
CESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
ANUAL DE INTERVENTORÍA OBRA PUBLICA
E MODIFICACIÓN DE CANTIDADES DE OBRA
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
vistos en la propuesta del Procesos de licitacion, siendo estas acordes a los estudios y diseños y alcance definido para la ejecucion del contrato de ob
INSTITUTO NACIONAL DE VÍAS
CESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
ANUAL DE INTERVENTORÍA OBRA PUBLICA
E MODIFICACIÓN DE CANTIDADES DE OBRA
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
Firma:
re: OSCAR JAVIER GARZÓN DÍAZ Nombre: JUAN JOSÉ OYUELA SOLER
sentante Legal o su Apoderado Jefe Unidad Ejecutora
SORCIO INTERVIAL EQUIDAD 115 Matricula No. : 25202-157094 CND
ula No.: 25202-27254 CND
INSTITUTO NACIONAL DE VÍAS
CESO GESTIÓN DE LA INFRAESTRUCTURA VIAL
ANUAL DE INTERVENTORÍA OBRA PUBLICA
E MODIFICACIÓN DE CANTIDADES DE OBRA
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
MODIFICACIONES
CONDICIONES ACTUALIZADAS
ÓMICA APROBADA)
ACTA ANTERIOR PRESENTES
ACTA No. FECHA
VALOR UNITARIO VALOR TOTAL CANTIDAD VALOR +/- CANTIDAD VALOR
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
CÓDIGO MINFRA-MN-IN-7-FR-1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00
CÓDIGO MINFRA-MN-IN-7-FR-1
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00
CÓDIGO MINFRA-MN-IN-7-FR-1
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
CÓDIGO MINFRA-MN-IN-7-FR-1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
- $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00
CÓDIGO MINFRA-MN-IN-7-FR-1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
$ 17,537,545,947.00 $ 82,890,009,051.00
$ 899,805,467.00 $ 6,330,535,300.00
$ 0.00 $ 544,121,280.00
$ 18,437,351,414.00 $ 89,764,665,631.00
CÓDIGO MINFRA-MN-IN-7-FR-1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
VERSIÓN 1
PÁGINA 1 DE 1
“MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL
OBJETO: DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD”
CONTRATISTA: CONSORCIO VIAL 081 LOCALIZACIÓN (RUTAY TRAMO): TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006)
CONTRATO DE INTERVENTORÍA No : 1746 del 2015 INTERVENTOR: CONSORCIO INTERVIAL EQUIDAD 115
% Programado
(VALOR IN IC IA L OBRA (% ) EJEC UTAD O / VALOR
PROGRAMA DA) ((%) OBRA PROGRAMADA) TOTAL OB RA $ Va lor 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Miles de pesos PROGR AMAD A
progr ama do
GRANDES PARTIDAS DE PAGO ( GPP)
03-FEB a 02-
VA LOR ACTUA LIZADO OB RA VALOR OBR A EJ ECUTADA $ Valor Ejecutado 03-MAR a 02- 03-ABR a 02-
PROGRAMA DA Mile s de (% ) AC TU ALIZAD O OBRA ACU MULADA MAR ABR MAY 03-MAY a 02-JUN 03-JUN a 02-JUL 03-JUL a 02-AGO 03-AGO a 02-SEP 03-SEP a 02-OCT 03-OCT a 02-NOV 03-NOV a 02-DIC 03-DIC/16 a 02-ENE 03-ENE a 02-FEB 03-FEB a 02-MAR 03-MAR a 02-ABR 03-ABR a 02-MAY 03-MAY a 02-JUN 03-JUN a 02-JUL 03-JUL a 02-AGO 03-AGO a 02-SEP 03-SEP a 02-OCT 03-OCT a 02-NOV 03-NOV a 02-DIC 03-DIC/17 a 02-ENE 03-ENE a 02-FEB 03-FEB a 02-MAR 03-MAR a 02-ABR 03-ABR a 02-MAY 03-MAY a 02-JUN 03-JUN a 02-JUL 03-JUL a 02-AGO 03-AGO a 02-SEP 03-SEP a 02-OCT 03-OCT a 02-NOV 03-NOV a 02-DIC 03-DIC/18 a 02-ENE 03-ENE a 02-FEB 03-FEB a 02-MAR 03-MAR a 02-ABR 03-ABR a 02-MAY
PROGRAMAD A 2016 2016 2016 2016 2016 2016 2016 2016 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2017 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2018 2019 2019 2019 2019 2018
pes os Miles de pe sos % Ejecutado 2016 2016
Explanaciones 6,049,663.06 7.30% 1.05% %P 0.000% 0.000% 0.014% 0.014% 0.014% 0.014% 0.014% 0.014% 0.080% 0.070% 0.103% 0.010% 0.020% 0.030% 0.040% 0.200% 0.200% 0.200% 0.200% 0.200% 0.200% 0.500% 0.500% 0.020% 0.020% 0.020% 0.020% 0.020% 0.183% 0.100% 0.060% 0.060% 0.060% 0.060% 0.060% 0.010% 0.050% 0.050% 0.080%
Items (1,2,3,4,5,6,7,8,9,10,11) $P 0.00 0.00 11,604.60 11,604.60 11,604.60 11,604.60 11,604.60 11,604.60 66,312.01 58,023.01 85,376.71 8,289.00 16,578.00 24,867.00 33,156.00 165,780.02 165,780.02 165,780.02 165,780.02 165,780.02 165,780.02 414,450.05 414,450.05 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 151,315.82 82,890.01 49,734.01 49,734.01 49,734.01 49,734.01 49,734.01 8,289.00 41,445.00 41,445.00 66,312.01
$E 0.00 0.00 0.00 0.00 0.00 4,662.72 2,621.90 9,056.62 5,635.66 69,251.97 48,791.73 18,272.39 86,506.16 50,059.78 119,513.08 126,312.11 25,129.28 41,632.71 127,246.57 61,670.14 71,231.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3,246,734.16 3.92% 867,594.30 %E 0.000% 0.000% 0.000% 0.000% 0.000% 0.006% 0.003% 0.011% 0.007% 0.084% 0.059% 0.022% 0.104% 0.060% 0.144% 0.152% 0.030% 0.050% 0.154% 0.074% 0.086% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Sub-base y Afirmado 6,249,564.55 7.54% 1.17% %P 0.000% 0.000% 0.000% 0.002% 0.002% 0.002% 0.002% 0.102% 0.010% 0.020% 0.014% 0.010% 0.020% 0.030% 0.040% 0.050% 0.200% 0.200% 0.200% 0.200% 0.200% 0.280% 0.720% 0.250% 0.100% 0.100% 0.100% 0.100% 0.100% 0.250% 0.300% 0.250% 0.250% 0.250% 0.100% 0.080% 0.100% 0.080% 0.180%
Item (12,13,14) $P 0.00 0.00 0.00 1,657.80 1,657.80 1,657.80 1,657.80 84,547.81 8,289.00 16,578.00 11,604.60 8,289.00 16,578.00 24,867.00 33,156.00 41,445.00 165,780.02 165,780.02 165,780.02 165,780.02 165,780.02 232,092.03 596,808.07 207,225.02 82,890.01 82,890.01 82,890.01 82,890.01 82,890.01 207,225.02 248,670.03 207,225.02 207,225.02 207,225.02 82,890.01 66,312.01 82,890.01 66,312.01 149,142.72
$E 0.00 0.00 0.00 1,557.40 0.00 0.00 0.00 0.00 22,039.65 0.00 1,537.65 19,135.20 0.00 87,646.05 110,539.95 156,156.90 70,731.90 105,072.75 132,408.75 144,359.95 117,136.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4,520,761.80 5.45% 968,322.15 %E 0.000% 0.000% 0.000% 0.002% 0.000% 0.000% 0.000% 0.000% 0.027% 0.000% 0.002% 0.023% 0.000% 0.106% 0.133% 0.188% 0.085% 0.127% 0.160% 0.174% 0.141% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Base 3,840,438.00 4.63% 4.51% %P 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.050% 0.004% 0.008% 0.002% 0.010% 0.010% 0.010% 0.020% 0.015% 0.020% 0.020% 0.030% 0.030% 0.030% 0.080% 0.080% 0.017% 0.017% 0.017% 0.017% 0.050% 0.050% 0.325% 0.500% 0.500% 0.500% 1.000% 1.000% 1.000% 1.400% 1.000% 1.000%
Item (15) $P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41,445.00 3,315.60 6,631.20 1,429.85 8,289.00 8,289.00 8,289.00 16,578.00 12,433.50 16,578.00 16,578.00 24,867.00 24,867.00 24,867.00 66,312.01 66,312.01 14,464.31 14,464.31 14,464.31 14,464.31 41,445.00 41,445.00 269,311.75 414,450.05 414,450.05 414,450.05 828,900.09 828,900.09 828,900.09 1,160,055.07 828,900.09 828,900.09
$E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 308,269.35 131,537.25 266,896.95 117,821.40 163,241.10 183,027.90 69,928.35 405,629.40 449,700.00 477,131.70 420,469.50 340,422.90 400,457.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
15,604,590.00 18.83% 3,734,533.65 %E 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.372% 0.159% 0.322% 0.142% 0.197% 0.221% 0.084% 0.489% 0.543% 0.576% 0.507% 0.411% 0.483% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Pavimentos Flexible y Rigido 12,584,674.45 15.18% 6.12% %P 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.050% 0.020% 0.025% 0.030% 0.100% 0.150% 0.200% 0.250% 0.300% 0.350% 0.350% 0.350% 0.350% 0.350% 0.350% 1.050% 0.450% 0.450% 0.100% 0.130% 0.490% 0.710% 0.710% 0.510% 0.520% 0.513% 0.500% 0.600% 0.070% 0.090% 0.090% 0.090%
Items (16,17,18,19,20,NP09) $P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41,445.00 16,578.00 20,722.50 24,867.00 82,890.01 124,335.01 165,780.02 207,225.02 248,670.03 290,115.03 290,115.03 290,115.03 290,115.03 290,115.03 290,115.03 870,345.10 373,005.04 373,005.04 82,890.01 107,757.01 406,161.04 588,519.06 588,519.06 422,739.05 431,028.05 425,615.64 414,450.05 497,340.05 58,023.01 74,601.01 74,601.01 74,601.01
$E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 157,573.00 318,743.20 402,004.81 334,383.20 641,074.91 261,421.31 221,803.40 308,218.20 412,571.78 601,090.24 496,063.16 611,355.25 304,281.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16,161,886.40 19.50% 5,070,583.69 %E 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.190% 0.385% 0.485% 0.403% 0.773% 0.315% 0.268% 0.372% 0.498% 0.725% 0.598% 0.738% 0.367% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Estructuras y obras de drenaje 42,341,889.84 51.08% 4.89% %P 0.000% 0.000% 0.000% 0.025% 0.025% 0.050% 0.050% 0.050% 0.030% 0.090% 0.060% 0.600% 0.500% 0.500% 0.500% 0.500% 0.500% 0.500% 0.500% 0.500% 1.090% 0.500% 1.500% 1.100% 1.803% 2.300% 2.400% 2.210% 2.200% 1.900% 1.922% 1.960% 1.500% 0.920% 0.680% 1.300% 1.200% 1.800% 1.900%
Ite ms $P 0.00 0.00 0.00 20,722.50 20,722.50 41,445.00 41,445.00 41,445.00 24,867.00 74,601.01 49,734.01 497,340.05 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 903,501.09 414,450.05 1,243,350.14 911,790.10 1,494,133.86 1,906,470.21 1,989,360.22 1,831,869.20 1,823,580.20 1,574,910.17 1,593,357.11 1,624,644.18 1,243,350.14 762,588.08 563,677.69 1,077,570.12 994,680.11 1,492,020.16 1,574,910.17
(21 ,2 2,23 ,2 4,25,26 ,2 7,28 ,2 9,30,31 ,3 2,33 ,3 4,35,
$E 0.00 0.00 0.00 0.00 0.00 0.00 69,146.89 15,691.89 116,837.74 117,966.31 363,925.73 450,518.47 348,122.89 311,008.51 303,750.48 275,923.82 259,629.00 251,180.31 304,870.87 459,063.33 402,744.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36 ,3 7,38 ,3 9,40,41 ,4 2,43 ,4 4,45,46 ,4 7,48 ,4 9,50,5
1,52 ,53,54 ,5 5, N P04, NP0 5, N P08) 35,422,355.51 42.73% 4,050,380.87 %E 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.083% 0.019% 0.141% 0.142% 0.439% 0.544% 0.420% 0.375% 0.366% 0.333% 0.313% 0.303% 0.368% 0.554% 0.486% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Señalización y control de tránsito 652,762.27 0.79% 0.00% %P 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.150% 0.409% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.020% 0.100% 0.100% 0.100% 0.100% 0.100%
Items (56,57,58,59,60,,61,62,63,64) - $P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 124,335.01 338,739.08 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 82,890.01 82,890.01 82,890.01 82,890.01 82,890.01
$E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,989,934.13 2.40% 0.00 %E 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Obras varias y de mitigación ambiental 656,227.98 0.79% 0.00% %P 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.028% 0.020% 0.020% 0.010% 0.020% 0.010% 0.020% 0.020% 0.020% 0.020% 0.020% 0.030% 0.070% 0.080% 0.080% 0.080% 0.080% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.050% 0.010% 0.010% 0.010%
Items (65,66,67,NP02,NP03) $P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23,209.20 16,578.00 16,578.00 8,289.00 16,578.00 8,289.00 16,578.00 16,578.00 16,578.00 16,578.00 16,578.00 24,867.00 58,023.01 66,312.01 66,312.01 66,312.01 66,312.01 41,445.00 41,445.00 41,445.00 41,445.00 41,445.00 41,445.00 41,445.00 41,445.00 41,445.00 8,289.00 8,289.00 8,289.00
$E 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 788.54 747.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,023,130.97 1.23% 1,535.57 %E 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.001% 0.001% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
Transportes 10,514,788.91 12.69% 1.53% %P 0.000% 0.000% 0.008% 0.008% 0.016% 0.016% 0.016% 0.016% 0.300% 0.554% 0.485% 0.200% 0.500% 0.500% 0.500% 0.500% 0.500% 0.500% 0.500% 0.500% 0.010% 0.010% 0.030% 0.010% 0.010% 0.020% 0.020% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010%
Items (69,69) $P 0.00 0.00 6,631.20 6,631.20 13,262.40 13,262.40 13,262.40 13,262.40 248,670.03 458,850.29 402,008.25 165,780.02 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 414,450.05 8,289.00 8,289.00 24,867.00 8,289.00 8,289.00 16,578.00 16,578.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00
$E 0.00 0.00 0.00 0.00 0.00 0.00 7,251.40 11,221.16 7,185.68 160,428.55 75,592.20 27,309.89 104,813.95 136,019.40 177,963.29 167,408.27 41,445.52 59,597.15 107,203.59 75,019.60 108,190.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4,920,616.08 5.94% 1,266,650.41 %E 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.009% 0.014% 0.009% 0.194% 0.091% 0.033% 0.126% 0.164% 0.215% 0.202% 0.050% 0.072% 0.129% 0.091% 0.131% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
VALOR BÁSICO DE OBRA ( A ) 82,890,009.05 15,959,600.65 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
PROGRAMACION INICIAL
VALOR BÁSICO DE OBRAACTUALIZADO ( A' ) 82,890,009.05 CONVENCIONES
TI PO DE
PROGRAMADO REPROGRAMACION 1 REPROGRAMACION 2 EJECUTADO
DI BUJO
REPROGRAMACION 2
BARRAS REPROGRAMACION 1
CURVAS
%
0.000% 0.000% 0.022% 0.049% 0.057% 0.082% 0.082% 0.282% 0.444% 0.767% 0.722% 0.950% 1.220% 1.280% 1.370% 1.575% 1.790% 1.790% 1.800% 1.800% 1.900% 1.900% 4.359% 1.947% 2.500% 2.657% 2.787% 2.950% 3.323% 3.365% 3.372% 3.370% 2.903% 2.810% 2.600% 2.620% 2.960% 3.140% 3.370%
INVERSIÓN OBRAPROGRAMADAMES
VALOR (Miles de Pesos)
0.00 0.00 18,235.80 40,616.10 47,247.31 67,969.81 67,969.81 233,749.83 368,031.64 635,406.01 598,229.63 787,455.09 1,011,258.11 1,060,992.12 1,135,593.12 1,305,517.64 1,483,731.16 1,483,731.16 1,492,020.16 1,492,020.16 1,574,910.17 1,574,910.17 3,612,894.45 1,614,241.48 2,072,250.23 2,202,760.55 2,310,517.56 2,445,255.27 2,754,062.11 2,789,168.03 2,795,262.24 2,793,393.31 2,406,686.85 2,329,209.25 2,155,165.87 2,171,718.24 2,453,139.21 2,602,746.28 2,793,334.01
% 0.000% 0.000% 0.022% 0.071% 0.128% 0.210% 0.292% 0.574% 1.018% 1.785% 2.506% 3.456% 4.676% 5.956% 7.326% 8.901% 10.691% 12.481% 14.281% 16.081% 17.981% 19.881% 24.240% 26.187% 28.687% 31.345% 34.132% 37.082% 40.405% 43.770% 47.142% 50.512% 53.415% 56.225% 58.825% 61.445% 64.405% 67.545% 70.915%
INVERSIÓN OBRAPROGRAMADAACUMULADA
VALOR (Miles de Pesos)
0.00 0.00 18,235.80 58,851.90 106,099.21 174,069.02 242,038.83 475,788.66 843,820.30 1,479,226.31 2,077,455.94 2,864,911.03 3,876,169.14 4,937,161.26 6,072,754.38 7,378,272.02 8,862,003.18 10,345,734.34 11,837,754.50 13,329,774.66 14,904,684.83 16,479,595.00 20,092,489.45 21,706,730.93 23,778,981.16 25,981,741.71 28,292,259.27 30,737,514.54 33,491,576.65 36,280,744.68 39,076,006.92 41,869,400.23 44,276,087.08 46,605,296.33 48,760,462.20 50,932,180.44 53,385,319.65 55,988,065.93 58,781,399.94
% 0.000% 0.000% 0.000% 0.002% 0.000% 0.006% 0.095% 0.043% 0.745% 0.963% 1.398% 1.167% 1.621% 1.242% 1.211% 1.737% 1.520% 1.854% 1.916% 2.041% 1.694% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
INVERSIÓN OBRAEJECUTADAMES
VALOR (Miles de Pesos)
0.00 0.00 0.00 1,557.40 0.00 4,662.72 79,020.18 35,969.66 617,541.07 797,927.28 1,158,749.07 967,440.54 1,343,759.01 1,029,182.94 1,003,498.55 1,439,648.70 1,259,996.01 1,536,451.89 1,588,262.45 1,691,891.17 1,404,042.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000% 0.000% 0.000% 0.002% 0.002% 0.008% 0.103% 0.146% 0.891% 1.854% 3.252% 4.419% 6.040% 7.282% 8.492% 10.229% 11.749% 13.603% 15.519% 17.560% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254%
%
INVERSIÓN OBRAEJECUTADAACUMULADA
VALOR (Miles de Pesos) 0.00 0.00 0.00 1,557.40 1,557.40 6,220.12 85,240.30 121,209.96 738,751.03 1,536,678.31 2,695,427.38 3,662,867.92 5,006,626.92 6,035,809.86 7,039,308.41 8,478,957.11 9,738,953.12 11,275,405.00 12,863,667.45 14,555,558.62 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65
* Estos conceptos deben corresponder a los relacionados en la propuesta económica aprobada o modificación contratual.
NOTAS:
VALOR INICIAL VALOR MES EJECUTADO
PROVISIONES*
1. Indicar los ítems de pago agrupados en cada GPP.
V AL OR E JE CUTADO
VALOR ACTUALIZADO
2. El programa de inversiones debe ser consistente con el programa de obra aprobado.
Firma:___________________________
ACUMULADO
$
6,330,535.30 $
544,121.28 $
793,904.54
-
4. El programa de inversiones se calcula considerando el Valor básico de la obra (sin incluir provisiones e IVA.).
5. El porcentaje correspondiente al Valor básico de la obra programada se calcula con respecto al Valor Básico de Obra ( A ) o el Valor Básico de Obra Actualizado ( A' ). Nombre: Gustavo Sanchez Jimenez Nombre: Gustavo Gamaliel Fernandez
PROVISION PARAJORNADAS DETRABAJO 24 HORAS DIARIAS 7 DIAS DE LASEMANA
$ 544,121.28 $ -
6. El Programa de inversiones o la Reprogramación al programa de inversiones se considera aprobado una vez suscrito el presente formato por las partes. Representante Legal Supervisor Contrato de Interventoría
PROVISION PARAIVADE OBRA,AJUSTESYJORNADAS DETRABAJO 7 POR 24
$ 544,028.28 $ 8,509.35
7. Para los contratos en los cuales se tengan considerados ítems de obra que no se puedan clasificar por GPP, se debe diligenciar el formato con los ítems de obra. Contratista: Consorcio vial 081 MATRICULA No: 1521917469 BYC
$
$
544,028.28 $
704,000.00 $
101,536.40
- ITEMS NO PREVISTOS: Con base en la Revisión y Ajuste y/o unificación y/o complementación y/o actualización y/o adaptación y/o Modificación y/u optimización de los estudios y diseños de referencia realizada por el contratista de obra, se definieron
C.E. 413.418
RE VI SI ÓN, A JUSTE Y /O ACTUA LIZ ACI ÓN Y/ O M ODI FICA CIÓN Y/ O
COM PLE ME NTACI ÓN DE E S TUDIOS Y DI SE ÑOS
$ 704,000.00 $ 704,000.00 todas las obras necesarias y complementarias que permitirán el adecuado funcionamiento del corredor vial en las debidas condiciones de seguridad para los usuarios del mismo, garantizando la estabilidad geotécnica y geológica de todos los taludes y
I VA - REV IS I ÓN, A JUSTE Y / O ACT UALI ZA CI ÓN Y/O M ODIF ICA CIÓN Y/ O $ 112,640.00 $ - cortes durante la construcción del proyecto; generándose la necesidad de incluir y pactar varios PRECIOS NO PREVISTOS para la ejecución de las obras definidas en los estudios y diseños, lo que originó la modificación de las cantidades de obra No 1 y
COM PLE ME NTACI ÓN DE E S TUDIOS Y DI SE ÑOS $ 112,640.00 $ 112,640.00
por ende la reprogramación No 2 al programa de obra inicial.
$ 3,915,472.69 $ 100,475.35
GESTION SOCIALYPREDIAL (Incluye IVA)
TRASLADO DE VIGENCIAS: Con base en la Modificación No 3 al contrato principal en las CONSIDERACIONES se establece: “1- Que mediante comunicación No. CV081-236-2016 del 4 de septiembre de 2017. EL CONTRATISTA
$ 3,915,472.69 $ 150,900.35
solicita la reprogramación de recursos de la vigencia 2019 a la vigencia 2017 argumentando lo siguiente “(…) se solicita formalmente el traslado de recursos por valor de $6.000.000.000.00 m/cte de la vigencia Firma:_____________________________ Revisó Firma:_____________________________
GESTION AMBIENTAL (Incluye PAGAe IVA)
$ 1,997,113.86 $ -
correspondiente al año 2019 para ser ejecutados durante la vigencia del presente año 2017, sin que en todo caso se afecte de manera alguna el valor contractual y/o las metas físicas” y con el fin de cumplir con parte Nombre: Oscar Javier Garzon Diaz Nombre: Gustavo Gamaliel Fernandez
de estos recursos se realiza la Reprogramación No 1 al programa de inversiones inicial.
Director territorial
$ 1,997,113.86 $ 2,094.07
VERSIÓN 1
PÁGINA 1 DE 1
FECHA DE INICIACION DEL CONTRATO: 3 DE FEBRERO DE 2016 FECHA DE VENCIMIENTO ACTUAL: N/A
(Indique día/mes/año) (Incluidas las suspensiones, indique día/mes/año)
VALOR INICIAL (incluido IVA) (A): $ 97,037,920,450.00 VALOR ADICIONES (incluido IVA) (B): N/A
(Según contrato principal)
39 40 41 42 43 44 45 46 47 48
03-ABR a 02-MAY 03-MAY a 02-JUN 03-JUN a 02-JUL 03-JUL a 02-AGO 03-AGO a 02-SEP 03-SEP a 02-OCT 03-OCT a 02-NOV 03-NOV a 02-DIC 03-DIC/19 a 02-ENE 03-ENE a 02-FEB
2018 2019 2019 2019 2019 2019 2019 2019 2020 2020
0.080% 0.080% 0.080% 0.080% 0.050% 0.050% 0.067% 0.000% 0.000% 0.000% 100%
66,312.01 66,312.01 66,312.01 66,312.01 41,445.00 41,445.00 55,841.70 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 90%
0.180% 0.080% 0.080% 0.080% 0.080% 0.080% 0.080% 0.080% 0.000% 0.000%
149,142.72 66,312.01 66,312.01 66,312.01 66,312.01 66,312.01 66,312.01 66,312.01 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 80%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
1.000% 1.000% 2.000% 2.000% 2.000% 1.000% 1.013% 1.000% 0.000% 0.000%
828,900.09 828,900.09 1,657,800.18 1,657,800.18 1,657,800.18 828,900.09 839,443.35 828,900.09 0.00 0.00 70%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.090% 1.000% 1.000% 1.000% 1.000% 1.500% 1.000% 1.000% 1.000% 0.700% 60%
74,601.01 828,900.09 828,900.09 828,900.09 828,900.09 1,243,350.14 828,900.08 828,900.09 828,900.09 579,832.62
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 50%
1.900% 1.400% 0.800% 0.900% 1.000% 0.900% 1.000% 0.600% 0.969% 0.000%
1,574,910.17 1,160,460.13 663,120.07 746,010.08 828,900.09 746,010.08 828,900.09 497,340.05 803,479.45 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40%
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.100% 0.100% 0.100% 0.100% 0.150% 0.150% 0.150% 0.070% 0.070% 0.232%
82,890.01 82,890.01 82,890.01 82,890.01 124,335.01 124,335.01 124,335.01 58,023.01 58,023.01 192,330.89 30%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.046%
8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 38,397.66 20%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.010% 0.008% 10%
8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 8,289.00 6,436.09
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0%
0 0 0 0 0 0 0 0 0 0
3.370% 3.680% 4.080% 4.180% 4.300% 3.700% 3.330% 2.770% 2.059% 0.986%
2,793,334.01 3,050,352.33 3,381,912.37 3,464,802.38 3,564,270.39 3,066,930.33 2,760,310.25 2,296,053.25 1,706,980.55 816,997.26
70.915% 74.595% 78.675% 82.855% 87.155% 90.855% 94.185% 96.955% 99.014% 100.000%
58,781,399.94 61,831,752.27 65,213,664.64 68,678,467.02 72,242,737.41 75,309,667.74 78,069,977.99 80,366,031.24 82,073,011.79 82,890,009.05
0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000% 0.000%
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254% 19.254%
15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65 15,959,600.65
PAVIMENTOS ASFALTICOS
PAVIMENTOS DE CONCRETO
ESTRUCTURAS Y DRENAJES
SEÑALIZACIÓN Y SEGURIDAD
OBRAS VARIAS
TRANSPORTES
$ 85,000,000,000.00
$ 80,000,000,000.00
$ 75,000,000,000.00
$ 70,000,000,000.00
$ 65,000,000,000.00
$ 80,000,000,000.00
$ 75,000,000,000.00
$ 70,000,000,000.00
$ 65,000,000,000.00
$ 60,000,000,000.00
$ 55,000,000,000.00
$ 50,000,000,000.00
$ 45,000,000,000.00
$ 40,000,000,000.00
$ 35,000,000,000.00
$ 30,000,000,000.00
$ 25,000,000,000.00
$ 20,000,000,000.00
$ 15,000,000,000.00
$ 10,000,000,000.00
$ 5,000,000,000.00
$- 1 2 3 4 5
0.000%
0.000%
0.000%
0.000%
0.022%
0.000%
0.049%
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
0.057%
6
0.000%
0.082%
7
0.006%
0.082%
8
0.095%
0.282%
9
0.043%
0.444%
10
0.745%
0.767%
0.963%
11
0.722%
12
$ 1,557,400 0.002% $ 1,557,400
$ 1,557,400 0.002% $0
12
0.950%
1.167%
13
1.220%
1.621%
14
1.280%
1.242%
15
1.370%
1.211%
16
1.575%
1.737%
17
1.790%
1.520%
18
1.790%
1
$ 2,695,427,379 3.252% $ 1,158,749,068
PROGRAMADO VS EJECUTADO
18
1.854%
19
1.800%
1.916%
20
1.800%
2.041%
21
1.900%
1.694%
22
1.900%
1.904%
4.359%
23
3.836%
1.947%
24
PROGRAMADO VS EJECUTADO
0.000%
2.697%
25
$ 11,275,405,006 13.603% $ 1,536,451,887
$0 0.000% $0
2.557%
26
0.000%
2.657%
27
0.000%
3.000%
28
0.000%
2.491%
29
0.000%
3.186%
30
0.000%
2.978%
31
0.000%
2.990%
32
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
3.090%
33
0.000%
3.190%
34
0.000%
2.920%
35
0.000%
2.620%
0.000%
36
3.160%
0.000%
37
3.340%
0.000%
38
3.301%
39
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
39
3.780%
0.000%
40
4.280%
0.000%
41
4.280%
0.000%
42
4.300%
0.000%
43
3.800%
0.000%
44
2.380%
0.000%
45
3.171%
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
24.993%
44
45
0.000%
46
2.503%
0.000%
47
1.141%
0.000%
48
$0 0.000% $0
$0 0.000% $0
$0 0.000% $0
269 DE 501
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
EXPLANACIONES
1 1 200-13 Desmonte y limpieza en zonas no boscosas
2 6 201-13 Demolición de Estructuras
3 6 201.13 Remoción de alcantarillas
4 6 201-13 Remoción de cercas de alambre
5 1 210-13 Excavación en roca de la explanación y canales
6 1 210-13 Excavaciones en material común de la Explanación y Canales
7 1 211-13 Remoción de Derrumbes
8 1 220-13 Terraplenes
9 1 230.1P Mejoramiento de la subrasante con adición de materiales
10 1 230P Material adicionado para mejoramiento de subrasante
11 1 2P Conformación de sitios de disposicion de sobrantes
SUBTOTAL
SUBBASES, BASES Y AFIRMADOS
12 2 310-13 Conformación de la calzada existente
13 2 311-13 Afirmado
14 2 320-13 Subbase Granular clase A
15 2 330-13 Base granular clase A
SUBTOTAL
270 DE 501
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
PAVIMENTOS ASFALTICOS
16 8 420-13 Riego de imprimación con emulsión asfáltica CRL ‐1
17 8 450.2P Mezcla densa en caliente Tipo MDC-19
18 8 464-13 Geotextil para repavimentación
SUBTOTAL
PAVIMENTOS DE CONCRETO
20 6 500-13 Pavimento de concreto Hidraulico
SUBTOTAL
ESTRUCTURAS Y DRENAJES
21 6 600-13 Excavaciones varias sin clasificar
22 6 600-13 Excavaciones varias en roca en seco
23 6 600-13 Excavaciones varias en material comun en seco
24 6 600-13 Excavaciones varias en material comun bajo agua
25 6 610.1P Relleno detrás de las cunetas con material de excavacion
26 6 610-13 Rellenos para estructuras con recebo
271 DE 501
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
SUBTOTAL
TRANSPORTES
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
SUBTOTAL
SUBTOTAL OBRAS
PROVISIÓN PARA AJUSTES, OBRAS COMPLEMENTARIAS Y/O ADICIONALES
PROVISIÓN PARA JORNADAS DE TRABAJO 24 HORAS DIARIAS 7 DIAS A LA SEMANA
VALOR BÁSICO DEL CONTRATO INCLUYE OBRAS COMPLEMENTARIAS Y AJUSTES
VALOR IVA (OBRA) (16% SOBRE UTILIDAD OBRA)
SUBTOTAL OBRAS (INCLUYE IVA)
REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS
IVA - REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS
TOTAL ESTUDIOS Y DISEÑOS, REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓ
GESTIÓN SOCIAL Y PREDIAL
IVA 16% GESTION SOCIAL Y PREDIAL
GESTIÓN AMBIENTAL (INCLUYE PAGA)
IVA 16% GESTION AMBIENTAL
VALOR BASICO (SIN IMPUESTOS)
VALOR TOTAL
AIU ( 32) % Utilidad (5)%
278 DE 501
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
279 DE 501
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
% Amortización:_________________
% Honorarios:_________________
Saldo Anticipo: $
NOTA:
1: El Interventor Certifica que revisó, verificó y constató el pago de los Parafisicales de Ley por parte del contratista, con base en los soportes presentados por ést
2: Las cantidades y valores consignados en la presente Acta son responsabilidad exclusiva del Contratista e Interventor. El pago de la presente acta se realizará
280 DE 501
ESPECIFICACIÓN
GRUPO DE
No. DE ORDEN
AJUSTE
GRAL. PART. ITEM DE PAGO
Firma
Nombre : GUSTAVO SANCHEZ JIMENEZ
REPRESENTANTE LEGAL O APODERADO (s)
Contratista CONSORCIO VIAL 081
C.E. 413.418
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
m2 2,396.00 $ 650.00
m3 29.00 $ 124,500.00
m3 36,549.00 $ 170,850.00
m3 17,080.00 $ 224,850.00
MINISTERIO DE TRANSPORTE
INSTITUTO NACIONAL DE VÍAS
SECRETARÍA GENERAL TÉCNICA
282 DE 501
PROCESO, SUPERVISION, EJECUCION Y SEGUIMIENTO
MANUAL DE INTERVENTORÍA OBRA PUBLIC
ACTA DE RECIBO PARCIAL DE OBRA
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
m3 7,501.00 $ 782,000.00
m3 10,911.00 $ 28,300.00
m3 11,596.00 $ 74,300.00
n en seco m3 13,419.00 $ 27,300.00
n bajo agua m3 1,678.00 $ 50,000.00
erial de excavacion m3 200.00 $ 52,000.00
m3 17,973.00 $ 70,550.00
MINISTERIO DE TRANSPORTE
INSTITUTO NACIONAL DE VÍAS
SECRETARÍA GENERAL TÉCNICA
283 DE 501
PROCESO, SUPERVISION, EJECUCION Y SEGUIMIENTO
MANUAL DE INTERVENTORÍA OBRA PUBLIC
ACTA DE RECIBO PARCIAL DE OBRA
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
m3 366.00 $ 670,000.00
das (f'c = 21 Mpa) m3 100.00 $ 1,198,000.00
m3 464.00 $ 526,000.00
m3 453.00 $ 455,000.00
m 200.00 $ 572,000.00
kg 1,829,149.00 $ 5,545.00
Tf-m 400,004.00 $ 2,600.00
Kg 97,362.00 $ 5,295.00
u 16.00 $ 566,692.00
m 275.00 $ 47,754.00
m 22.00 $ 1,959,373.00
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
m2 41,142.00 $ 9,122.00
m3 8,700.00 $ 184,500.00
m3 1,740.00 $ 75,000.00
nsidad hdpe de 40 mils m2 3,029.00 $ 22,211.00
z (10) metros. m 3,360.00 $ 185,000.00
o entrelazado m3 1,080.00 $ 210,266.00
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
u 6.00 $ 215,225.00
m 1,785.00 $ 185,000.00
u 48.00 $ 86,572.00
u 228.00 $ 15,848.00
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
a m3 $ 915,600.00
m2 $ 21,019.00
MINISTERIO DE TRANSPORTE
INSTITUTO NACIONAL DE VÍAS
SECRETARÍA GENERAL TÉCNICA
289 DE 501
PROCESO, SUPERVISION, EJECUCION Y SEGUIMIENTO
MANUAL DE INTERVENTORÍA OBRA PUBLIC
ACTA DE RECIBO PARCIAL DE OBRA
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
Y DISEÑOS
DIOS Y DISEÑOS
/O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS
MINISTERIO DE TRANSPORTE
INSTITUTO NACIONAL DE VÍAS
SECRETARÍA GENERAL TÉCNICA
290 DE 501
PROCESO, SUPERVISION, EJECUCION Y SEGUIMIENTO
MANUAL DE INTERVENTORÍA OBRA PUBLIC
ACTA DE RECIBO PARCIAL DE OBRA
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
OBRA
ESTUDIOS Y DISEÑOS
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
G.P.P.
EXPLANACIONES
SUBBASES, BASES Y AFIRMADOS
PAVIMENTOS ASFALTICOS
PAVIMENTOS DE CONCRETO
ESTRUCTURAS Y DRENAJES
SEÑALIZACIÓN Y SEGURIDAD
OBRAS VARIAS
TRANSPORTES
72,680,401,401 ACUMULADOS
SEIS MILLONES SEISCIENTOS TREINTA Y SIETE MIL OCHOCIENTOS NOVENTA Y SEIS PESOS CON 00 CENTAVOS
que hace referencia al citado contrato de obra.
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA
CONDICIONES ORIGINALES
Firma
Nombre: OSCAR JAVIER GARZÓN DÍAZ
REPRESENTANTE LEGAL O APODERADO (s)
Interventoria CONSORCIO INTERVIAL EQUIDAD 115
Matricula No.: 25202-27254 CND
NISTERIO DE TRANSPORTE
TUTO NACIONAL DE VÍAS
RETARÍA GENERAL TÉCNICA
293 DE 501
EJECUCION Y SEGUIMIENTO A PROYECTOS
NTERVENTORÍA OBRA PUBLICA
RECIBO PARCIAL DE OBRA
6,718,892,450.00 7,871,195,400.00
3,478,440,000.00 0.00 $ -
NISTERIO DE TRANSPORTE
TUTO NACIONAL DE VÍAS
RETARÍA GENERAL TÉCNICA
296 DE 501
EJECUCION Y SEGUIMIENTO A PROYECTOS
NTERVENTORÍA OBRA PUBLICA
RECIBO PARCIAL DE OBRA
1,601,106,000.00 0.00 $ -
2,398,550,000.00 0.00 $ -
1,291,350.00 0.00 $ -
330,225,000.00 5,189.00 $ 959,965,000
4,155,456.00 372.00 $ 32,204,784
3,613,344.00 1,347.00 $ 21,347,256
652,762,266.00 1,989,934,133.00
10,514,788,905.00 4,920,616,080.00
0.00 $ 10,170,880,190
$ 82,890,009,051.00 $ 82,890,009,051.00
$ 6,330,535,300.00 $ 6,330,535,300.00
$ 544,121,280.00 $ 544,121,280.00
$ 89,764,665,631.00 $ 89,764,665,631.00
$ 544,028,276.55 $ 544,028,276.55
$ 90,308,693,908.00 $ 90,308,693,908.00
$ 704,000,000.00 $ 704,000,000.00
$ 112,640,000.00 $ 112,640,000.00
$ 816,640,000.00 $ 816,640,000.00
$ 3,375,407,489.00 $ 3,375,407,489.00
$ 540,065,198.00 $ 540,065,198.00
$ 1,721,649,875.00 $ 1,721,649,875.00
$ 275,463,980.00 $ 275,463,980.00
$ 95,565,722,995.00 $ 95,565,722,995.00
$ 97,037,920,450.00 $ 97,037,920,450.00
NISTERIO DE TRANSPORTE
TUTO NACIONAL DE VÍAS
RETARÍA GENERAL TÉCNICA
302 DE 501
EJECUCION Y SEGUIMIENTO A PROYECTOS
NTERVENTORÍA OBRA PUBLICA
RECIBO PARCIAL DE OBRA
$ -
LA SEMANA E ILUMINACIÓN $ -
$ -
$ 58,417,450
$ 18,960,522
$ -
$ 3,256,637,896
NISTERIO DE TRANSPORTE
TUTO NACIONAL DE VÍAS
RETARÍA GENERAL TÉCNICA
303 DE 501
EJECUCION Y SEGUIMIENTO A PROYECTOS
NTERVENTORÍA OBRA PUBLICA
RECIBO PARCIAL DE OBRA
$ 130,698,974 $ 1,097,479,779
$ 404,222,400 $ 5,694,684,100
$ 217,502,325 $ 1,866,560,115
$ - $ 4,219,124,600
$ 2,349,994,828 $ 4,852,002,355
$ - $ -
$ - $ 1,535,574
$ 76,841,397.00 $ 1,483,487,420.00
$ 3,179,259,924.00 $ 19,214,873,943.00
ON 00 CENTAVOS
alizan las mediciones en campo y las revisiones efectuadas por parte de la interventoria.
NISTERIO DE TRANSPORTE
TUTO NACIONAL DE VÍAS
RETARÍA GENERAL TÉCNICA
304 DE 501
EJECUCION Y SEGUIMIENTO A PROYECTOS
NTERVENTORÍA OBRA PUBLICA
RECIBO PARCIAL DE OBRA
PÁGINA
OBRA EJECUTADA
PÁGINA
OBRA EJECUTADA
- $ - - $
217,502,325.00 $ 1,866,560,
- $ - 5,395.30 $ 4,219,124,
0.00 $ 4,219,124,6
PÁGINA
OBRA EJECUTADA
- $ - 138.60 $ 28,828,
- $ - 200.00 $ 77,800,
- $ - - $
- $ - - $
- $ - - $
- $ - - $
- $ - - $
CÓDIGO MSE-FR-07
PÁGINA
OBRA EJECUTADA
- $ - - $
- $ - 271.50 $ 144,314,
PÁGINA
OBRA EJECUTADA
- $ - - $
- $ - - $
- $ - - $
- $ - - $
- $ - - $
- $ - - $
CÓDIGO MSE-FR-07
PÁGINA
OBRA EJECUTADA
- $ - - $
- $ - - $
- $ - - $
- $ - - $
0.00 $
- $ - 111.00 $ 1,535,
- $ - - $
- $ - - $
0.00 $ 1,535,5
PÁGINA
OBRA EJECUTADA
76,841,397.00 $ 1,483,487,4
- $ - - $
- $ - - $
CÓDIGO MSE-FR-07
PÁGINA
OBRA EJECUTADA
- $ - - $
- $ - - $
CÓDIGO MSE-FR-07
PÁGINA
OBRA EJECUTADA
$ 1,501,931,928 $ 1,501,931,9
$ 3,179,259,924 $ 20,716,805,8
$ 1,195,273,
$ - $
$ 3,179,259,924 $ 21,912,079,0
$ 19,268,241 $ 132,800,
$ 3,198,528,165 $ 22,044,879,5
$ 704,000,
$ - $ 112,640,
$ - $ 816,640,0
$ 58,417,450 $ 212,130,6
$ 522,208 $ 11,134,3
$ 18,960,522 $ 57,111,8
$ 115,673 $ 403,7
$ 3,256,637,896 $ 22,885,321,5
$ 3,276,544,018 $ 23,142,300,1
TOTALES
CÓDIGO MSE-FR-07
PÁGINA
OBRA EJECUTADA
$ 19,268,241 $ 3,198,528,165
$ - $ -
$ - $ -
$ - $ -
$ 522,208 $ 58,939,658
$ 115,673 $ 19,076,195
$ - $ -
$ 19,906,122 $ 3,276,544,018
CÓDIGO MSE-FR-07
PÁGINA
OBRA EJECUTADA
1 $ 118,978,074 $ 1,084,563,
2 $ 404,222,400 $ 5,723,512,
3 $ 76,841,397 $ 1,483,487,
4 $ 88,904,094 $ 937,419,
5 $ - $ 77,800,
6 $ 2,270,968,990 $ 9,397,305,
7 $ - $
8 $ 219,344,969 $ 2,012,717,
ACUMULADOS $ 3,179,259,924 $ 20,716,805,
CÓDIGO MSE-FR-07
PÁGINA
OBRA EJECUTADA
2 317 DE 501
DE 2017 AL
E DE 2017
LOR
944,000
8,378,000
4,356,000
182,400
181,868,800
206,719,999
239,792,000
-
71,963,280
230,403,550
152,871,750
1,097,479,779
69,745,000
-
1,187,749,200
4,437,189,900
5,694,684,100
FR-07
2 318 DE 501
DE 2017 AL
E DE 2017
LOR
180,573,000
1,573,679,115
112,308,000
1,866,560,115
4,219,124,600
4,219,124,600
208,650,240
60,212,720
-
-
7,800,000
174,512,480
FR-07
2 319 DE 501
DE 2017 AL
E DE 2017
LOR
28,828,800
77,800,000
-
-
-
-
-
FR-07
2 320 DE 501
DE 2017 AL
E DE 2017
LOR
883,864,000
-
101,307,600
96,278,000
-
937,419,402
-
-
-
-
-
144,314,468
136,664,410
1,377,603,600
FR-07
2 321 DE 501
DE 2017 AL
E DE 2017
LOR
146,157,245
445,235,400
-
-
22,200,000
3,153,990
4,852,002,355
-
-
-
-
FR-07
2 322 DE 501
DE 2017 AL
E DE 2017
LOR
-
-
-
-
-
1,535,574
-
-
1,535,574
1,042,760,196
FR-07
2 323 DE 501
DE 2017 AL
E DE 2017
LOR
440,727,224
1,483,487,420
-
FR-07
2 324 DE 501
DE 2017 AL
E DE 2017
LOR
1,307,275,368
194,656,560
-
FR-07
2 325 DE 501
DE 2017 AL
E DE 2017
LOR
1,501,931,928
,716,805,871
1,195,273,190
-
,912,079,061
132,800,479
,044,879,540
704,000,000
112,640,000
816,640,000
212,130,659
11,134,351
57,111,874
403,738
,885,321,594
,142,300,162
ALES
FR-07
2 326 DE 501
DE 2017 AL
E DE 2017
LOR
UMULADO
1,084,563,379
5,723,512,900
1,483,487,420
937,419,402
77,800,000
9,397,305,410
-
2,012,717,360
20,716,805,871
FR-07
2 327 DE 501
DE 2017 AL
E DE 2017
LOR
VALORES BASICOS
1 $ - $ -
2 $ - $ -
3 $ - $ -
4 $ 1,557,400.00 $ 88,878.00
5 $ -
6 $ 4,662,720.00 $ 158,256.00
7 $ 79,020,183.00 $ 3,091,971.00 $ 1,668,103.00
8 $ 35,969,657.00 $ 1,304,513.00
9 $ 617,541,074.00 $ 30,644,512.00
10 $ 797,927,277.00 $ 25,751,326.00 $ 70,400,000.00
11 $ 1,158,749,068.00 $ 39,890,543.00 $ 70,400,000.00
12 $ 967,440,537.00 $ 19,561,654.00
13 $ 1,343,759,005.00 $ 62,786,500.00
14 $ 1,029,182,940.00 $ 59,232,111.00
15 $ 1,003,498,550.00 $ 51,325,724.00 $ 19,743,533.00
16 $ 1,439,648,700.00 $ 93,418,872.00
17 $ 1,259,996,008.00 $ 86,676,695.00 $ 10,851,292.00
18 $ 1,536,451,887.00 $ 107,038,792.00
19 $ 1,588,262,448.00 $ 110,683,256.00 $ 11,206,900.00
20 $ 1,691,891,166.00 $ 102,250,937.00 $ 563,200,000.00
21 $ 1,404,042,025.00 $ 105,900,927.00 $ 6,493,964.00 $ 87,387,316.00 $ 4,788,825.00
$ 1,668,103.00
$ - $ 2,079,494.00 $ 2,079,494.00 $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ - $ - $ -
$ 19,743,533.00 $ - $ -
$ - $ - $ -
$ 10,851,292.00 $ - $ -
$ - $ - $ -
$ 11,206,900.00 $ - $ -
$ - $ - $ -
$ 98,670,105.00 $ - $ -
$ -
$ -
$ -
$ 1,646,278.00
$ -
$ 4,820,976.00
$ 83,780,257.00
$ 39,353,664.00
$ 648,185,586.00
$ 894,078,603.00
$ 1,269,039,611.00
$ 987,002,191.00
$ 1,406,545,505.00
$ 1,088,415,051.00
$ 1,074,567,807.00
$ 1,533,067,572.00
$ 1,357,523,995.00
$ 1,643,490,679.00
$ 1,710,152,604.00
$ 2,357,342,103.00
$ 1,608,613,057.00
$ 1,771,437,352.00
$ 3,406,258,703.00
$ -
$ 22,885,321,594.00
TOTAL
VALOR IVA
IVA basico obra (7) IVA basico ajustes IVA + IVA basico Estudios IVA basico Gestión IVA basico ADMON TOTAL PREDIAL
(8) (OBRA+AJUSTES) y Diseños (9) Predial (10) PREDIAL
$ -
$ - $ - $ - $ -
$ - $ - $ - $ -
$ - $ - $ - $ -
$ 9,439.00 $ 539.00 $ 9,978.00 $ -
$ - $ - $ - $ -
$ 28,259.00 $ 959.00 $ 29,218.00 $ -
$ 478,910.00 $ 18,739.00 $ 497,649.00 $ 266,897.00 $ 266,897.00
$ -
$ - $ $- - $ -
$ - $ $- - $ -
$ - $ $- - $ -
$ - $ 9,978.00 $ 1,656,256.00 $ 1,656,256.00
$ - $ - $ - $ 1,656,256.00
$ - $ 29,218.00 $ 4,850,194.00 $ 6,506,450.00
$ - $ 764,546.00 $ 84,544,803.00 $ 91,051,253.00
$ -
$ 14,571.00 $ 14,571.00 $ 240,475.00 $ 39,594,139.00 $ 130,645,392.00
$ - $ - $ 3,928,397.00 $ 652,113,983.00 $ 782,759,375.00
$ - $ - $ 16,255,992.00 $ 910,334,595.00 $ 1,693,093,970.00
$ - $ - $ 18,528,483.00 $ 1,287,568,094.00 $ 2,980,662,064.00
$ - $ - $ 5,981,831.00 $ 992,984,022.00 $ 3,973,646,086.00
$ - $ - $ 8,524,518.00 $ 1,415,070,023.00 $ 5,388,716,109.00
$ - $ - $ 6,596,454.00 $ 1,095,011,505.00 $ 6,483,727,614.00
$ - $ - $ 9,551,839.00 $ 1,084,119,646.00 $ 7,567,847,260.00
$ - $ - $ 9,291,319.00 $ 1,542,358,891.00 $ 9,110,206,151.00
$ - $ - $ 9,897,859.00 $ 1,367,421,854.00 $ 10,477,628,005.00
$ - $ - $ 9,960,550.00 $ 1,653,451,229.00 $ 12,131,079,234.00
$ - $ - $ 12,089,745.00 $ 1,722,242,349.00 $ 13,853,321,583.00
$ - $ - $ 100,985,589.00 $ 2,458,327,692.00 $ 16,311,649,275.00
$ - $ 10,956,416.00 $ 1,619,569,473.00 $ 17,931,218,748.00
DESCRIPCIÓN
BÁSICO TOTAL BÁSICO + IVA BÁSICO TOTAL BÁSICO + IVA
GESTIÓN AMBIENTAL
$ 1,721,649,875.00 $ 1,997,113,855.00 $ 57,111,874.00 $ 57,515,612.00
(INCLUYE PAGA)
VALOR TOTAL $ 95,565,722,995.00 $ 97,037,920,450.00 $ 22,885,321,594.00 $ 23,165,106,716.00
F
SALDO
$ 62,173,203,180.00 $ 62,550,010,472.00
$ 5,135,262,110.00 $ 5,166,384,911.00
$ 544,121,280.00 $ 547,418,985.00
$ - $ -
$ 3,163,276,830.00 $ 3,669,401,123.00
$ 1,664,538,001.00 $ 1,939,598,243.00
$ 72,680,401,401.00 $ 73,872,813,734.00
1 2 3 4
ITEMS
Feb-16 Mar-16 Apr-16 May-16
VALOR BASICO 0 0 0 $ 1,557,400.00
24 HORAS DE TRABAJO
IVA VALOR BASICO $ 9,439.00
AJUSTES $ 88,878.00
IVA AJUSTES $ 539.00
SUBTOTAL $ 1,656,256.00
VALOR BASICO E Y D
IVA VALOR BASICO E Y D
SUBTOTAL
GESTIÓN SOCIAL Y PREDIAL $ - $ - $ - $ -
IVA SOCIAL Y PREDIAL $ - $ - $ - $ -
SUBTOTAL $ - $ - $ - $ -
GESTIÓN AMBIENTAL (INCLUYE PAGA)
IVA AMBIENTAL
SUBTOTAL $ - $ - $ - $ -
TOTAL $ 1,656,256.00
TOTAL ACUMULADO $ - $ - $ - $ 1,656,256.00
2016
2017
2018
2019
5 6 7 8
Jun-16 Jul-16 Aug-16 Sep-16
$ - $ 4,662,720.00 $ 79,020,183.00 $ 35,969,657.00
$ - $ - $ 1,668,103.00 $ -
$ - $ - $ 266,897.00 $ -
$ - $ - $ 1,935,000.00 $ -
$ 2,079,494.00
$ 14,571.00
$ - $ - $ - $ 2,094,065.00
$ - $ 4,850,194.00 $ 84,544,803.00 $ 39,594,139.00
$ 1,656,256.00 $ 6,506,450.00 $ 91,051,253.00 $ 130,645,392.00
9 10 11
Oct-16 Nov-16 Dec-16
$ 617,541,074.00 $ 797,927,277.00 $ 1,158,749,068.00
$ - $ - $ -
$ 652,113,983.00 $ 828,670,595.00 $ 1,287,568,094.00
$ 782,759,375.00 $ 1,611,429,970.00 $ 2,898,998,064.00
$ 2,898,998,064.00
12 13 14 15
Jan-17 Feb-17 Mar-17 Apr-17
$ 967,440,537.00 $ 1,343,759,005.00 $ 1,029,182,940.00 $ 1,003,498,550.00
$ - $ - $ - $ -
$ 1,074,648,022.00 $ 1,415,070,023.00 $ 1,095,011,505.00 $ 1,084,119,646.00
$ 3,973,646,086.00 $ 5,388,716,109.00 $ 6,483,727,614.00 $ 7,567,847,260.00
16 17 18 19
May-17 Jun-17 Jul-17 Aug-17
$ 1,439,648,700.00 $ 1,259,996,008.00 $ 1,536,451,887.00 $ 1,588,262,448.00
$ - $ 10,851,292.00 $ - $ 11,206,900.00
$ - $ 1,736,207.00 $ - $ 1,793,104.00
$ - $ 12,587,499.00 $ - $ 13,000,004.00
$ - $ - $ - $ -
$ 1,542,358,891.00 $ 1,367,421,854.00 $ 1,653,451,229.00 $ 1,722,242,349.00
$ 9,110,206,151.00 $ 10,477,628,005.00 $ 12,131,079,234.00 $ 13,853,321,583.00
20 21 22 23
Sep-17 Oct-17 Nov-17 Dec-17
$ 1,691,891,166.00 $ 1,404,042,025.00 $ 3,179,259,924.00 $ 2,554,943,503.00
$ 21,451,585,141.74
24 25 26 27
Jan-18 Feb-18 Mar-18 Apr-18
$ 1,614,241,480.00 $ 2,072,250,230.00 $ 2,202,760,550.00 $ 2,310,517,560.00
$ - $ - $ - $ -
$ - $ - $ - $ -
$ 1,739,330,520.08 $ 2,232,830,784.33 $ 2,373,454,468.05 $ 2,489,561,666.76
$ 26,089,913,725.82 $ 28,322,744,510.15 $ 30,696,198,978.20 $ 33,185,760,644.96
28 29 30 31
May-18 Jun-18 Jul-18 Aug-18
$ 2,445,255,270.00 $ 2,754,062,110.00 $ 2,789,168,030.00 $ 2,795,262,240.00
$ - $ - $ - $ -
$ - $ - $ - $ -
$ 2,634,740,324.17 $ 2,967,476,886.81 $ 3,005,303,196.13 $ 3,011,869,652.04
$ 35,820,500,969.13 $ 38,787,977,855.94 $ 41,793,281,052.07 $ 44,805,150,704.11
32 33 34 35
Sep-18 Oct-18 Nov-18 Dec-18
$ 2,793,393,310.00 $ 2,406,686,850.00 $ 2,329,209,250.00 $ 2,155,165,870.00
$ 940,978,805.00
$ - $ - $ - $ 940,978,805.00
$ 250,000,000.00
$ - $ - $ - $ 250,000,000.00
$ 3,009,855,897.01 $ 2,593,183,202.35 $ 2,509,701,792.75 $ 3,513,150,436.77
$ 47,815,006,601.12 $ 50,408,189,803.47 $ 52,917,891,596.22 $ 56,431,042,032.99
$ 32,080,458,827.25
36 37 38 39
Jan-19 Feb-19 Mar-19 Apr-19
$ 2,171,718,240.00 $ 2,453,139,210.00 $ 2,602,746,280.00 $ 2,793,334,010.00
$ - $ - $ - $ -
$ - $ - $ - $ -
$ 2,342,191,541.28 $ 2,645,703,204.12 $ 2,807,053,976.16 $ 3,012,602,264.72
$ 58,773,233,574.27 $ 61,418,936,778.39 $ 64,225,990,754.55 $ 67,238,593,019.27
40 41 42 43
May-19 Jun-19 Jul-19 Aug-19
$ 3,050,352,330.00 $ 3,381,912,370.00 $ 3,464,802,380.00 $ 3,564,270,390.00
$ - $ - $ - $ -
$ - $ - $ - $ -
$ 3,289,795,744.76 $ 3,647,382,243.64 $ 3,736,778,867.36 $ 3,844,054,815.08
$ 70,528,388,764.03 $ 74,175,771,007.67 $ 77,912,549,875.03 $ 81,756,604,690.11
44 45 46 47
Sep-19 Oct-19 Nov-19 Dec-19
$ 3,066,930,330.00 $ 2,760,310,250.00 $ 2,296,053,250.00 $ 1,706,980,550.00
$ 544,121,280.00
$ 18,587,457.00 $ 16,729,153.00 $ 13,915,474.00 $ 13,643,041.00
$ 220,818,983.76 $ 198,742,338.00 $ 165,315,834.00 $ 122,902,599.60
$ 1,338,297.00 $ 1,204,499.00 $ 1,001,914.00 $ 744,864.00
$ 3,307,675,067.76 $ 2,976,986,240.00 $ 2,476,286,472.00 $ 2,388,392,334.60
$ 2,612,103,530.00
$ - $ - $ - $ 2,612,103,530.00
$ 1,710,768,504.00
$ - $ - $ - $ 1,710,768,504.00
$ 3,307,675,067.76 $ 2,976,986,240.00 $ 2,476,286,472.00 $ 6,711,264,368.60
$ 85,064,279,757.87 $ 88,041,265,997.87 $ 90,517,552,469.87 $ 97,228,816,838.47
48
ACUMULADO PROGRAMADO
Jan-20
$ 816,997,261.00 $ 84,491,323,673.00 $ 82,890,009,051.00
$ 544,121,280.00 $ 544,121,280.00
$ 4,951,499.00 $ 515,366,335.00 $ 505,661,396.00
$ 58,823,802.79 $ 5,790,783,357.27 $ 6,330,535,300.00
$ 356,508.00 $ 35,095,657.00 $ 38,366,881.00
$ 881,129,070.79 $ 91,376,690,302.27 $ 90,308,693,908.00
$ 704,000,000.00 $ 704,000,000.00
$ 112,640,000.00 $ 112,640,000.00
$ 816,640,000.00 $ 816,640,000.00
$ 3,906,795,544.00 $ 3,375,407,489.00
$ 10,612,143.00 $ 540,065,198.00
$ - $ 3,917,407,687.00 $ 3,915,472,687.00
$ 1,999,114,785.00 $ 1,721,649,875.00
$ 93,135.00 $ 275,463,980.00
$ - $ 1,999,207,920.00 $ 1,997,113,855.00
$ 881,129,070.79 $ 98,109,945,909.27 $ 97,037,920,450.00
$ 98,109,945,909.27 PROGRAMADO
$ 2,898,998,064.00 $ 3,050,000,000.00
$ 21,451,585,141.74 $ 23,900,000,000.00
$ 32,080,458,827.25 $ 27,750,000,000.00
$ 41,678,903,876.27 $ 41,678,903,876.27 $ 42,337,920,450.00
TOTAL $ 98,109,945,909.27 $ 97,037,920,450.00
SALDO POR
VIGENCIAS VALOR ASIGNADO FACTURADO % FACTURACION OBSERVACIONES
FACTURAR
AÑO 2016 $ 3,050,000,000.00 $ 2,980,662,064.00 $ 69,337,936.00 97.73% PASA EN RESERVA PARA VIGENCIA 2017
VALOR FACTURADO: CORRESPONDE AL MONTO FACTURADO MENOS
AÑO 2017 $ 23,900,000,000.00 $ 20,161,638,098.00 $ 3,738,361,902.00 84.36% SALDO DE VIGENCIA 2016
AÑO 2018 $ 27,750,000,000.00 $ 27,750,000,000.00 0.00%
AÑO 2019 $ 42,337,920,450.00 $ 42,337,920,450.00 0.00%
TOTALES $ 97,037,920,450.00 $ 23,142,300,162.00 $ 73,895,620,288.00 23.85%
PROGRAMACION DE RECURSOS
DESCRIPCION AÑO 2016 Y 2017 AÑO 2018 AÑO 2019 RESUMEN CONTRATO
SUBTOTAL OBRAS (A) $ 21,693,804,072.00 $ 28,667,972,750.00 $ 34,129,546,851.00 $ 84,491,323,673.00 $ 82,890,009,051.00
PROVISION PARA AJUSTES, OBRAS COMPLEMENTARIAS Y/O ADICIONALES (B) $ 1,298,029,919.00 $ 2,035,426,065.00 $ 3,088,054,611.00 $ 6,421,510,595.00 $ 6,330,535,300.00
PROVISION PARA JORNADAS DE TRABAJO 24 HORAS DIARIAS 7 DIAS DE LA SEMANA ( C) $ 544,121,280.00 $ 544,121,280.00 $ 544,121,280.00
VALOR BASICO DEL CONTRATO INCLUYE OBRAS COMPLEMENTARIAS Y AJUSTES D=(A+B+C) $ 22,991,833,991.00 $ 30,703,398,815.00 $ 37,761,722,742.00 $ 91,456,955,548.00 $ 89,764,665,631.00
VALOR IVA (OBRA) ( E) $ 139,344,448.00 $ 186,081,205.00 $ 228,858,926.00 $ 554,284,579.00 $ 544,028,277.00
VALOR OBRAS (INCLUYE IVA) F=(D´+E) $ 23,131,178,439.00 $ 30,889,480,020.00 $ 37,990,581,668.00 $ 92,011,240,127.00 $ 90,308,693,908.00
TOTAL ESTUDIOS Y DISEÑOS, REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O
COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS I=G+H $ 816,640,000.00 $ 816,640,000.00 $ 816,640,000.00
GESTION SOCIAL Y PREDIAL (Incluye IVA) (J) $ 362,390,352.00 $ 940,978,805.00 $ 2,612,103,530.00 $ 3,915,472,687.00 $ 3,915,472,687.00
GESTION AMBIENTAL (Incluye PAGA e IVA) (K) $ 36,345,351.00 $ 250,000,000.00 $ 1,710,768,504.00 $ 1,997,113,855.00 $ 1,997,113,855.00
TOTAL $ 24,346,554,142.00 $ 32,080,458,825.00 $ 42,313,453,702.00 $ 98,740,466,669.00 $ 97,037,920,450.00
ACUMULADOS $ 24,346,554,142.00 $ 56,427,012,967.00 $ 98,740,466,669.00
VIGENCIAS $ 26,950,000,000.00 $ 27,750,000,000.00 $ 42,337,920,450.00 $ 97,037,920,450.00 $ 97,037,920,450.00
VIGENCIAS ACUMULADAS $ 26,950,000,000.00 $ 54,700,000,000.00 $ 97,037,920,450.00
356 DE 501
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
72 621.1.1P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes.
Incluye empleo de trépano, brocas de widia o diamante en caso de ser necesario.
Distancia máxima de transporte hasta 30 km.
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.70 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
73 621.1.2P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes.
Incluye empleo de trépano, brocas de widia o diamante en caso de ser necesario.
Distancia máxima de transporte hasta 30 km.
359 DE 501
SUBTOTAL OBRAS
PROVISIÓN PARA AJUSTES, OBRAS COMPLEMENTARIAS Y/O ADICIONALES
PROVISIÓN PARA JORNADAS DE TRABAJO 24 HORAS DIARIAS 7 DIAS A LA SEMANA
VALOR BÁSICO DEL CONTRATO INCLUYE OBRAS COMPLEMENTARIAS Y AJUSTES
VALOR IVA (OBRA) (16% SOBRE UTILIDAD OBRA)
SUBTOTAL OBRAS (INCLUYE IVA)
REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS
IVA - REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS
TOTAL ESTUDIOS Y DISEÑOS, REVISIÓN, AJUSTE Y/O ACTUALIZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN D
GESTIÓN SOCIAL Y PREDIAL
Valor adquisicion predial + ADM 5,48%
IVA 16% GESTION SOCIAL Y PREDIAL
GESTIÓN AMBIENTAL (INCLUYE PAGA)
IVA 16% GESTION AMBIENTAL
VALOR BASICO (SIN IMPUESTOS)
VALOR TOTAL
360 DE 501
###
DE CANTIDADES DE OBRA
ACTA 18
UND P/UNITARIO VALOR
($) ($)
Ha $ 1,180,000.00
###
m3 $ 118,000.00
###
m $ 49,500.00
###
m $ 3,200.00
###
m3 $ 39,250.00
###
m3 $ 6,430.00
###
m3 $ 5,600.00
###
m3 $ 9,250.00
###
m3 $ 7,200.00
###
m3 $ 24,650.00
###
m3 $ 2,250.00
###
###
m2 $ 650.00
###
m3 $ 124,500.00
###
m3 $ 170,850.00
###
m3 $ 224,850.00
###
###
m2 $ 3,000.00
###
m3 $ 593,550.00
###
m2 $ 8,400.00
###
m3 $ 820,000.00
###
###
m3 $ 782,000.00
###
###
m3 $ 28,300.00
###
m3 $ 74,300.00
###
m3 $ 27,300.00
###
m3 $ 50,000.00
###
m3 $ 52,000.00
###
m3 $ 70,550.00
###
m3 $ 208,000.00
###
m $ 389,000.00
###
361 DE 501
###
DE CANTIDADES DE OBRA
ACTA 18
UND P/UNITARIO VALOR
($) ($)
m3 $ 1,345,000.00
###
m3 $ 1,365,000.00
###
m3 $ 1,000,000.00
###
m3 $ 1,080,500.00
###
m3 $ 1,515,000.00
###
m3 $ 1,579,000.00
###
m3 $ 670,000.00
###
m3 $ 1,198,000.00
###
m3 $ 526,000.00
###
m3 $ 455,000.00
###
m $ 572,000.00
###
kg $ 5,545.00
###
Tf-m $ 2,600.00
###
Kg $ 5,295.00
###
u $ 566,692.00
###
m $ 47,754.00
###
m $ 1,959,373.00
###
m $ 531,545.00
###
m $ 33,497.00
###
m3 $ 642,000.00
###
m3 $ 550,000.00
###
m2 $ 9,122.00
###
m3 $ 184,500.00
###
m3 $ 75,000.00
###
m2 $ 22,211.00
###
m $ 185,000.00
###
m3 $ 210,266.00
###
###
m $ 1,960.00
###
m2 $ 22,844.00
###
u $ 6,974.00
###
u $ 309,077.00
###
362 DE 501
###
DE CANTIDADES DE OBRA
ACTA 18
UND P/UNITARIO VALOR
($) ($)
u $ 256,229.00
###
u $ 215,225.00
###
m $ 185,000.00
###
u $ 86,572.00
###
u $ 15,848.00
###
###
m $ 13,834.00
###
m2 $ 20,000.00
###
m2 $ 23,000.00
###
###
m3-km $ 1,110.00
###
m3-km $ 1,141.00
###
###
m2 $ 40,983.00
###
m $ 51,206.00
###
m $ 1,814,477.00
###
m $ 1,713,336.00
###
363 DE 501
###
DE CANTIDADES DE OBRA
ACTA 18
UND P/UNITARIO VALOR
($) ($)
m3 $ 915,600.00
###
m2 $ 21,019.00
###
###
###
DICIONALES ###
7 DIAS A LA SEMANA ###
TARIAS Y AJUSTES ###
###
###
O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS ###
N Y/O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS ###
ZACIÓN Y/O MODIFICACIÓN Y/O COMPLEMENTACIÓN DE ESTUDIOS Y DISEÑOS ###
###
###
###
###
###
###
###
364 DE 501
Nov-17 Dec-17
ACTA 22 ACTA 23
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
- $ - 0.80 $ 944,000
(66.00) $ (7,788,000) 66.00 $ 7,788,000
(79.00) $ (3,910,500) 79.00 $ 3,910,500
(7.00) $ (22,400) 7.00 $ 22,400
2,904.00 $ 113,982,000 916.00 $ 35,953,000
3,636.00 $ 23,379,480 574.30 $ 3,692,749
(7,951.00) $ (44,525,600) 10,445.00 $ 58,492,000
- $ - - $ -
84.00 $ 604,800 186.50 $ 1,342,800
83.50 $ 2,058,275 186.50 $ 4,597,225
6,848.20 $ 15,408,450 6,202.80 $ 13,956,300
$ 99,186,505.00 $ 130,698,974.00
- $ - - $ -
$ 432,404,700.00 $ 217,502,325.00
- $ - - $ -
- $ - - $ -
(934.00) $ (625,780,000) 953.70 $ 638,979,000
- $ - - $ -
13.80 $ 7,258,800 13.70 $ 7,206,200
47.20 $ 21,476,000 - $ -
- $ - - $ -
39,491.80 $ 218,982,031 16,033.20 $ 88,904,094
- $ - - $ -
- $ - - $ -
- $ - - $ -
- $ - - $ -
- $ - - $ -
69.00 $ 36,676,605 - $ -
259.90 $ 8,705,870 51.00 $ 1,708,347
341.70 $ 219,371,400 126.10 $ 80,956,200
- $ - - $ -
952.30 $ 8,686,881 202.00 $ 1,842,644
147.40 $ 27,195,300 30.00 $ 5,535,000
- $ - - $ -
- $ - - $ -
- $ - - $ -
- $ - - $ -
-$ 46,441,413.00 $ 848,062,900.00
- $ - - $ -
- $ - - $ -
- $ - - $ -
- $ - - $ -
366 DE 501
Nov-17 Dec-17
ACTA 22 ACTA 23
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
- $ - - $ -
- $ - - $ -
- $ - - $ -
- $ - - $ -
- $ - - $ -
$ 0.00 $ 0.00
- $ - - $ -
- $ - - $ -
- $ - - $ -
$ 0.00 $ 0.00
$ 139,995,610.00 $ 76,841,397.00
$ - - $ -
$ - - $ -
$ - - $ -
$ - 763.00 $ 1,307,275,368
367 DE 501
Nov-17 Dec-17
ACTA 22 ACTA 23
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - 212.60 $ 194,656,560
$ - - $ -
$ 0.00 $ 1,501,931,928.00
$ 1,577,945,302 $ 3,179,259,924
$ - $ -
$ - $ -
$ 1,577,945,302 $ 3,179,259,924
$ 9,563,305 $ 19,268,242
$ 1,587,508,607 $ 3,198,528,166
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ 1,577,945,302 $ 3,179,259,924
$ 1,587,508,607 $ 3,198,528,166
368 DE 501
Jan-18 Feb-18
ACTA 24 ACTA 25
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
369 DE 501
Jan-18 Feb-18
ACTA 24 ACTA 25
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ - $ -
$ - $ -
370 DE 501
Jan-18 Feb-18
ACTA 24 ACTA 25
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ - $ -
$ - $ -
371 DE 501
Jan-18 Feb-18
ACTA 24 ACTA 25
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - $ -
$ - $ -
$ 0.00 $ 0.00
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
$ - $ -
372 DE 501
Mar-18
ACUMULADOS
ACTA 26
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - 0.80 $ 944,000
$ - 71.00 $ 8,378,000
$ - 88.00 $ 4,356,000
$ - 57.00 $ 182,400
$ - 4,633.60 $ 181,868,800
$ - 32,149.30 $ 206,719,999
$ - 42,820.00 $ 239,792,000
$ - - $ -
$ - 9,994.90 $ 71,963,280
$ - 9,347.00 $ 230,403,550
$ - 67,943.00 $ 152,871,750
$ 0.00 $ 1,097,479,779.00
$ - 107,300.00 $ 69,745,000
$ - - $ -
$ - 6,952.00 $ 1,187,749,200
$ - 19,734.00 $ 4,437,189,900
$ 0.00 $ 5,694,684,100.00
$ - 60,191.00 $ 180,573,000
$ - 2,651.30 $ 1,573,679,115
$ - 13,370.00 $ 112,308,000
$ - - $ -
$ 0.00 $ 1,866,560,115.00
$ - 7,372.80 $ 208,650,240
$ - 810.40 $ 60,212,720
$ - - $ -
$ - - $ -
$ - 150.00 $ 7,800,000
$ - 2,473.60 $ 174,512,480
$ - 138.60 $ 28,828,800
$ - 200.00 $ 77,800,000
373 DE 501
Mar-18
ACUMULADOS
ACTA 26
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
$ - 1,319.20 $ 883,864,000
$ - - $ -
$ - 192.60 $ 101,307,600
$ - 211.60 $ 96,278,000
$ - - $ -
$ - 169,056.70 $ 937,419,402
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
$ - 271.50 $ 144,314,468
$ - 4,079.90 $ 136,664,410
$ - 2,145.80 $ 1,377,603,600
$ - - $ -
$ - 16,022.50 $ 146,157,245
$ - 2,413.20 $ 445,235,400
$ - - $ -
$ - - $ -
$ - 120.00 $ 22,200,000
$ - 15.00 $ 3,153,990
$ 0.00 $ 4,852,002,355.00
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
374 DE 501
Mar-18
ACUMULADOS
ACTA 26
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
$ - - $ -
$ 0.00 $ 0.00
$ - 111.00 $ 1,535,574
$ - - $ -
$ - - $ -
$ 0.00 $ 1,535,574.00
$ - 939,423.60 $ 1,042,760,196
$ - 386,264.00 $ 440,727,224
$ 0.00 $ 1,483,487,420.00
$ - - $ -
$ - - $ -
$ - - $ -
$ - 763.00 $ 1,307,275,368
375 DE 501
Mar-18
ACUMULADOS
ACTA 26
CANTIDAD VALOR ($) CANTIDAD VALOR ($)
$ - 212.60 $ 194,656,560
$ - - $ -
$ 0.00 $ 1,501,931,928.00
$ - $ 20,716,805,871
$ - $ 1,195,273,190
$ - $ -
$ - $ 21,912,079,061
$ - $ 132,800,479
$ - $ 22,044,879,540
$ - $ 704,000,000
$ - $ 112,640,000
$ - $ 816,640,000
$ - $ 61,778,448
$ 142,540,966
$ - $ 10,368,139
$ - $ 33,316,669
$ - $ 195,483
$ - $ 22,853,715,144
$ - $ 23,109,719,245
376 DE 501
ACUMULADOS
$ 944,000.00 $ 0.00
$ 8,378,000.00 $ 0.00
$ 4,356,000.00 $ 0.00
$ 182,400.00 $ 0.00
$ 181,868,800.00 $ 0.00
$ 206,719,999.00 $ 0.00
$ 239,792,000.00 $ 0.00
$ 0.00 $ 0.00
$ 71,963,280.00 $ 0.00
$ 230,403,550.00 $ 0.00
$ 152,871,750.00 $ 0.00
$ 69,745,000.00 $ 0.00
$ 0.00 $ 0.00
$ 1,187,749,200.00 $ 0.00
$ 4,437,189,900.00 $ 0.00
$ 180,573,000.00 $ 0.00
$ 1,573,679,115.00 $ 0.00
$ 112,308,000.00 $ 0.00
$ 0.00 $ 0.00
$ 4,219,124,600.00 $ 0.00
$ 208,650,240.00 $ 0.00
$ 60,212,720.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 7,800,000.00 $ 0.00
$ 174,512,480.00 $ 0.00
$ 28,828,800.00 $ 0.00
$ 77,800,000.00 $ 0.00
377 DE 501
ACUMULADOS
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 883,864,000.00 $ 0.00
$ 0.00 $ 0.00
$ 101,307,600.00 $ 0.00
$ 96,278,000.00 $ 0.00
$ 0.00 $ 0.00
$ 937,419,402.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 144,314,468.00 $ 0.00
$ 136,664,410.00 $ 0.00
$ 1,377,603,600.00 $ 0.00
$ 0.00 $ 0.00
$ 146,157,245.00 $ 0.00
$ 445,235,400.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 22,200,000.00 $ 0.00
$ 3,153,990.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
378 DE 501
ACUMULADOS
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 1,535,574.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 1,042,760,196.00 $ 0.00
$ 440,727,224.00 $ 0.00
$ 1,483,487,420.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 0.00 $ 0.00
$ 1,307,275,368.00 $ 0.00
379 DE 501
ACUMULADOS
$ 194,656,560.00 $ 0.00
$ 0.00 $ 0.00
20,716,805,871.00 0.00
793,904,540.00 401,368,650.00
0.00 0.00
21,510,710,411.00 401,368,650.00
130,367,942.00 $ 2,432,537.00
21,641,078,353.00 $ 403,801,187.00
704,000,000.00 0.00
112,640,000.00 0.00
816,640,000.00 0.00
49,963,792.00 11,814,656.00
87,387,316.00 55,153,650.00
7,994,206.96 2,373,932.04
2,079,494.00 31,237,175.00
14,571.00 180,912.00
$ 22,354,141,013 499,574,131.00
$ 22,605,157,733 504,561,512.04
OTROS VENTANA 1 VENTANA 2 VENTANA 3 VENTANA 4 VENTANA 5 VENTANA 6 VENTANA 7 VENTANA 8 VENTANA 9 VENTANA 10 VENTANA 11 VENTANA 12 VENTANA 13 VENTANA 14 VENTANA 15 VENTANA 16 VENTANA 17 VENTANA 18 VENTANA 19 VENTANA 20 VENTANA 21
380 DE 501
No. ITEM DE PAGO DESCRIPCION UND P/UNITARIO ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($)
EXPLANACIONES
1 200.2 Desmonte y limpieza en zonas no boscosas Ha $ 1,180,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
2 201.7 Demolición de Estructuras m3 $ 118,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 32.29 $ 3,809,748.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 0.30 $ 34,810.00
3 201.15 Remoción de alcantarillas m $ 49,500.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 45.07 $ 2,230,965.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
4 201.16 Remoción de cercas de alambre m $ 3,200.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 57.00 $ 182,400.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
5 210.2.1 Excavación en roca de la explanación y canales m3 $ 39,250.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
6 210.2.2 Excavaciones en material común de la Explanación y Canales m3 $ 6,430.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 156.70 $ 1,007,581.00 - $ 0.00 344.00 $ 2,211,920.00 - $ 0.00 - $ 0.00 - $ 0.00 238.50 $ 1,533,555.00 116.10 $ 746,523.00 376.60 $ 2,421,538.00 - $ 0.00 8,066.40 $ 51,866,952.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 982.10 $ 6,314,903.00
7 211.1 Remoción de Derrumbes m3 $ 5,600.00 11,409.00 $ 63,890,400.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 2,570.00 $ 14,392,000.00 704.00 $ 3,942,400.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1,539.00 $ 8,618,400.00
8 220.1 Terraplenes m3 $ 9,250.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
9 230.1P Mejoramiento de la subrasante con adición de materiales m3 $ 7,200.00 647.60 $ 4,662,720.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 341.70 $ 2,460,240.00 - $ 0.00 223.80 $ 1,611,360.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 144.00 $ 1,036,800.00 - $ 0.00 3,521.70 $ 25,356,240.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1,184.20 $ 8,526,240.00
10 230P Material adicionado para mejoramiento de subrasante m3 $ 24,650.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 341.70 $ 8,422,905.00 - $ 0.00 223.80 $ 5,516,670.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 144.00 $ 3,549,600.00 - $ 0.00 3,521.70 $ 86,809,905.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1,184.20 $ 29,190,530.00
11 2P Conformación de sitios de disposicion de sobrantes m3 $ 2,250.00 7,828.00 $ 17,613,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 295.20 $ 664,200.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 309.70 $ 696,825.00 369.30 $ 830,925.00 570.30 $ 1,283,175.00 - $ 0.00 8,628.56 $ 19,414,260.00 704.00 $ 1,584,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 3,844.76 $ 8,650,710.00
SUBTOTAL $ 86,166,120.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 12,554,926.00 $ 0.00 $ 9,339,950.00 $ 0.00 $ 0.00 $ 0.00 $ 2,230,380.00 $ 1,577,448.00 $ 8,291,113.00 $ 0.00 $ 204,062,470.00 $ 5,526,400.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 61,335,593.00
BASES, SUBBASES Y AFIRMADOS
12 310.1 Conformación de la calzada existente m2 $ 650.00 2,396.00 $ 1,557,400.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
13 311.1 Afirmado m3 $ 124,500.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
14 320.1 Subbase Granular clase A m3 $ 170,850.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
15 330.1 Base granular clase A m3 $ 224,850.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 305.50 $ 68,691,675.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 371.70 $ 83,576,745.00 146.10 $ 32,850,585.00 260.90 $ 58,663,365.00 - $ 0.00 3,317.00 $ 745,827,450.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 2,227.80 $ 500,920,830.00
SUBTOTAL $ 1,557,400.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 68,691,675.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 83,576,745.00 $ 32,850,585.00 $ 58,663,365.00 $ 0.00 $ 745,827,450.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 500,920,830.00
PAVIMENTOS ASFALTICOS
16 420.2 Riego de imprimación con emulsión asfáltica CRL‐1 m2 $ 3,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
17 450.2P Mezcla densa en caliente Tipo MDC-19 m3 $ 593,550.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
18 464.1 Geotextil para repavimentación m2 $ 8,400.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 743.00 $ 6,241,200.00 - $ 0.00 743.00 $ 6,241,200.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 365.00 $ 3,066,000.00 645.00 $ 5,418,000.00 - $ 0.00 6,043.00 $ 50,761,200.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
Me zcla s a sfá ltica s en ca lien te co n cem e nto a sfá ltico
19 467.13P mo dific ad o con g ra no d e cau ch o re ciclad o (G CR) m3 $ 820,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
(M -G CR- 19)
SUBTOTAL $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 6,241,200.00 $ 0.00 $ 6,241,200.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 3,066,000.00 $ 5,418,000.00 $ 0.00 $ 50,761,200.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
PAVIMENTOS DE CONCRETO
20 500.1 Pavimento de concreto Hidraulico m3 $ 782,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 170.30 $ 133,174,600.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 215.73 $ 168,700,860.00 83.80 $ 65,531,600.00 147.40 $ 115,266,800.00 - $ 0.00 1,892.80 $ 1,480,169,600.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1,306.40 $ 1,021,604,800.00
SUBTOTAL $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 133,174,600.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 168,700,860.00 $ 65,531,600.00 $ 115,266,800.00 $ 0.00 $ 1,480,169,600.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 1,021,604,800.00
ESTRUCTURAS Y DRENAJES
21 600.1.1 Excavaciones varias sin clasificar m3 $ 28,300.00 122.10 $ 3,455,430.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 279.00 $ 7,895,700.00 - $ 0.00 92.40 $ 2,614,920.00 - $ 0.00 - $ 0.00 - $ 0.00 38.10 $ 1,078,230.00 198.20 $ 5,609,060.00 193.70 $ 5,481,710.00 - $ 0.00 1,518.30 $ 42,967,890.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1,131.56 $ 32,023,148.00
22 600.2.1 Excavaciones varias en roca en seco m3 $ 74,300.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 18.00 $ 1,337,400.00 - $ 0.00 - $ 0.00 - $ 0.00 33.10 $ 2,459,330.00 55.00 $ 4,086,500.00 - $ 0.00 - $ 0.00 97.60 $ 7,251,680.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 191.70 $ 14,243,310.00
23 600.2.3 Excavaciones varias en material comun en seco m3 $ 27,300.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
24 600.2.4 Excavaciones varias en material comun bajo agua m3 $ 50,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
25 610.1P Relleno detrás de las cunetas con material de excavacion m3 $ 52,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 10.00 $ 520,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 122.00 $ 6,344,000.00
26 610.2 Rellenos para estructuras con recebo m3 $ 70,550.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 110.90 $ 7,823,995.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 145.50 $ 10,265,025.00 95.70 $ 6,751,635.00 - $ 0.00 496.40 $ 35,021,020.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 477.27 $ 33,671,399.00
27 610.3 Rellenos para estructuras con material granular tipo SBG. m3 $ 208,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 5.50 $ 1,144,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 133.10 $ 27,684,800.00
28 623.1 Anclaje tipo activo m $ 389,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
29 630.1.1P Concreto clase A, para vigas puentes tipo 1. m3 $ 1,345,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
30 630.1.2P Concreto clase A, para placa superior puentes m3 $ 1,365,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
31 630.3.1P Concreto clase C para para Zapatas, Estribos y Aletas m3 $ 1,000,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
32 630.3.2P Concreto clase C para pilas o columnas puentes m3 $ 1,080,500.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
Caiss on s c on cre to cla se C fc= 28 0 kg /cm 2 (d iám et ro
1.2 m, in cluy e exc ava cion es , for m alet a (b ien s ea
33 630.3.3P me tálic a o a nillos d e co nc ret o) s op or te te mp o m3 $ 1,515,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
34 630.3.4P m3 $ 1,579,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
35 630.4 Concreto clase D m3 $ 670,000.00 28.50 $ 19,095,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 67.10 $ 44,957,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 54.80 $ 36,716,000.00 74.30 $ 49,781,000.00 - $ 0.00 262.80 $ 176,076,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 220.89 $ 147,996,300.00
36 630.4.1P Concreto lanzado para pantallas ancladas (f'c = 21 Mpa) m3 $ 1,198,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
37 630.6 Concreto clase F m3 $ 526,000.00 26.60 $ 13,991,600.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 6.40 $ 3,366,400.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 3.40 $ 1,788,400.00 9.10 $ 4,786,600.00 - $ 0.00 38.10 $ 20,040,600.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 15.28 $ 8,037,280.00
38 630.7 Concreto clase G m3 $ 455,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1.90 $ 864,500.00 - $ 0.00 - $ 0.00 32.30 $ 14,696,500.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 2.77 $ 1,260,350.00
39 632.1P Baranda Metalica en acero m $ 572,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
40 640.1 Acero de refuerzo Fy=420 Mpa. kg $ 5,545.00 2,278.30 $ 12,633,174.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 4,292.00 $ 23,799,140.00 - $ 0.00 177.90 $ 986,456.00 - $ 0.00 - $ 0.00 - $ 0.00 356.30 $ 1,975,684.00 4,284.50 $ 23,757,553.00 5,396.00 $ 29,920,820.00 - $ 0.00 20,836.00 $ 115,535,620.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 22,388.14 $ 124,142,236.00
41 641.1 Acero de Preesfuerzo Tf-m $ 2,600.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
42 640.2 Malla de refuerzo Fy = 459,2 Mpa. Kg $ 5,295.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
43 642.1 Apoyo elastomérico u $ 566,692.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
44 642.2 Sello para juntas de puentes m $ 47,754.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
45 642.3P Junta FREYSINET M80 o similar m $ 1,959,373.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
46 661.1 Tubería de Concreto Reforzado de 900mm de diámetro interior m $ 531,545.00 63.45 $ 33,726,530.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 9.20 $ 4,890,214.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 56.45 $ 30,005,715.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
47 663.3P Tuberia para filtro PVC perforada diametro 100 mm m $ 33,497.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 134.50 $ 4,505,347.00 - $ 0.00 184.00 $ 6,163,448.00 - $ 0.00 - $ 0.00 - $ 0.00 123.10 $ 4,123,481.00 26.40 $ 884,321.00 28.30 $ 947,965.00 - $ 0.00 1,184.50 $ 39,677,197.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 754.63 $ 25,277,841.00
48 671.1P Berma cuneta en concreto clase D m3 $ 642,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 65.80 $ 42,243,600.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 55.00 $ 35,310,000.00 19.00 $ 12,198,000.00 29.50 $ 18,939,000.00 - $ 0.00 439.40 $ 282,094,800.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 355.00 $ 227,910,000.00
49 671.1 m3 $ 550,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
50 673.1 Geotextil m2 $ 9,122.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 456.00 $ 4,159,632.00 - $ 0.00 644.00 $ 5,874,568.00 - $ 0.00 - $ 0.00 - $ 0.00 430.90 $ 3,930,670.00 77.80 $ 709,692.00 81.80 $ 746,180.00 - $ 0.00 4,247.20 $ 38,742,958.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 2,707.91 $ 24,701,509.00
51 673.2 Material granular drenante m3 $ 184,500.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 73.40 $ 13,542,300.00 - $ 0.00 110.40 $ 20,368,800.00 - $ 0.00 - $ 0.00 - $ 0.00 71.20 $ 13,136,400.00 8.10 $ 1,494,450.00 8.50 $ 1,568,250.00 - $ 0.00 730.20 $ 134,721,900.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 453.62 $ 83,692,521.00
52 673.3 Material de cobertura tipo SBG m3 $ 75,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
53 673.13P Geomenbrana de polietileno de alta densidad hdpe de 40 mils m2 $ 22,211.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
54 674.2 Dren horizontal de longitud mayor a diez (10) metros. m $ 185,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 120.00 $ 22,200,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
55 681.1 Gaviones de malla de alambre de acero entrelazado m3 $ 210,266.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
SUBTOTAL $ 82,901,734.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 157,183,328.00 $ 0.00 $ 37,345,592.00 $ 0.00 $ 0.00 $ 0.00 $ 62,533,795.00 $ 98,373,501.00 $ 118,923,160.00 $ 0.00 $ 960,175,880.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 756,984,694.00
SEÑALIZACIÓN Y SEGURIDAD
56 700.1 Líneas de Demarcación con pintura en frio m $ 1,960.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
57 700.3 Marca Vial con pintura en frío m2 $ 22,844.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
58 701.1 Tacha Reflectiva u $ 6,974.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
59 710.1.1 u $ 309,077.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
60 710.1.2 u $ 256,229.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
61 720.1 Poste de referencia u $ 215,225.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
62 730.1 Defensa metalica m $ 185,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
63 730.2 Sección final u $ 86,572.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
64 740.1 Captafaros u $ 15,848.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
SUBTOTAL $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
OBRAS VARIAS
65 800.1 Cerca de Alambre de Púas con postes de madera m $ 13,834.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 110.60 $ 1,530,040.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
66 810.1 Protección de Taludes con bloques de césped m2 $ 20,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
67 810.2 Proteccion de taludes con tierra organica m2 $ 23,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
SUBTOTAL $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 1,530,040.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
TRANSPORTES
68 900.2 m3-km $ 1,110.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 19,614.20 $ 21,771,762.00 - $ 0.00 15,810.60 $ 17,549,766.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1,039.60 $ 1,153,956.00 10,141.90 $ 11,257,509.00 - $ 0.00 224,790.00 $ 249,516,900.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 63,916.81 $ 70,947,658.00
69 900.3 m3-km $ 1,141.00 119,910.55 $ 136,817,938.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 16,439.40 $ 18,757,355.00 12,578.80 $ 14,352,411.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 29,371.16 $ 33,512,489.00
SUBTOTAL $ 136,817,938.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 21,771,762.00 $ 0.00 $ 17,549,766.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 1,153,956.00 $ 11,257,509.00 $ 0.00 $ 268,274,255.00 $ 14,352,411.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 104,460,147.00
LIQUIDACIÓN BASICA TOTAL PRESENTE PREACTA DE OBRA $ 307,443,192.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 399,617,491.00 $ 0.00 $ 70,476,508.00 $ 0.00 $ 0.00 $ 0.00 $ 317,041,780.00 $ 202,553,090.00 $ 317,819,947.00 $ 0.00 $ 3,710,800,895.00 $ 19,878,811.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 2,445,306,064.00
VENTANA 22 VENTANA 23 VENTANA 24 VENTANA 25 VENTANA 26 VENTANA 27 VENTANA 28 VENTANA 29 VENTANA 30 VENTANA 31 VENTANA 32
381 DE 501
CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($) CANTIDAD VALOR ($)
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 18.73 $ 2,210,140.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 1.73 $ 204,140.00 - $ 0.00 0.84 $ 99,120.00 13.54 $ 1,597,720.00 3.00 $ 354,000.00
- $ 0.00 9.20 $ 455,400.00 - $ 0.00 - $ 0.00 8.00 $ 396,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
719.80 $ 28,252,150.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 81.20 $ 3,187,100.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
2,409.70 $ 15,494,371.00 2,362.80 $ 15,192,804.00 439.50 $ 2,825,985.00 50.80 $ 326,644.00 1,665.30 $ 10,707,879.00 - $ 0.00 731.10 $ 4,700,973.00 213.70 $ 1,374,091.00 65.28 $ 419,750.00 352.10 $ 2,264,003.00 157.10 $ 1,010,153.00
- $ 0.00 - $ 0.00 1,240.50 $ 6,946,800.00 - $ 0.00 - $ 0.00 296.50 $ 1,660,400.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
248.00 $ 1,785,600.00 512.30 $ 3,688,560.00 216.20 $ 1,556,640.00 20.00 $ 144,000.00 109.60 $ 789,120.00 - $ 0.00 124.00 $ 892,800.00 - $ 0.00 25.70 $ 185,040.00 112.20 $ 807,840.00 33.90 $ 244,080.00
248.00 $ 6,113,200.00 512.30 $ 12,628,195.00 216.20 $ 5,329,330.00 20.00 $ 493,000.00 109.60 $ 2,701,640.00 - $ 0.00 124.00 $ 3,056,600.00 - $ 0.00 25.70 $ 633,505.00 112.20 $ 2,765,730.00 33.90 $ 835,635.00
3,378.00 $ 7,600,500.00 1,808.80 $ 4,069,800.00 1,850.14 $ 4,162,804.00 84.51 $ 190,148.00 1,858.67 $ 4,181,996.00 296.50 $ 667,125.00 951.90 $ 2,141,775.00 286.90 $ 645,525.00 65.28 $ 146,880.00 414.60 $ 932,850.00 166.80 $ 375,300.00
$ 59,245,821.00 $ 38,244,899.00 $ 20,821,559.00 $ 1,153,792.00 $ 18,776,635.00 $ 2,327,525.00 $ 14,183,388.00 $ 2,019,616.00 $ 1,484,295.00 $ 8,368,143.00 $ 2,819,168.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 129.00 $ 22,039,650.00 17.30 $ 2,955,705.00 80.50 $ 13,753,425.00 32.40 $ 5,535,540.00
475.30 $ 106,871,205.00 552.00 $ 124,117,200.00 182.50 $ 41,035,125.00 28.90 $ 6,498,165.00 306.70 $ 68,961,495.00 - $ 0.00 158.00 $ 35,526,300.00 120.90 $ 27,184,365.00 12.60 $ 2,833,110.00 80.50 $ 18,100,425.00 32.40 $ 7,285,140.00
$ 106,871,205.00 $ 124,117,200.00 $ 41,035,125.00 $ 6,498,165.00 $ 68,961,495.00 $ 0.00 $ 35,526,300.00 $ 49,224,015.00 $ 5,788,815.00 $ 31,853,850.00 $ 12,820,680.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 598.56 $ 1,795,680.00 89.25 $ 267,750.00 336.70 $ 1,010,100.00 136.50 $ 409,500.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 64.80 $ 38,462,040.00 10.30 $ 6,113,565.00 36.20 $ 21,486,510.00 17.00 $ 10,090,350.00
1,192.50 $ 10,017,000.00 2,220.00 $ 18,648,000.00 492.38 $ 4,135,950.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
$ 10,017,000.00 $ 18,648,000.00 $ 4,135,950.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 40,257,720.00 $ 6,381,315.00 $ 22,496,610.00 $ 10,499,850.00
274.30 $ 214,502,600.00 304.40 $ 238,040,800.00 113.20 $ 88,522,400.00 20.40 $ 15,952,800.00 212.50 $ 166,175,000.00 - $ 0.00 101.00 $ 78,982,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
$ 214,502,600.00 $ 238,040,800.00 $ 88,522,400.00 $ 15,952,800.00 $ 166,175,000.00 $ 0.00 $ 78,982,000.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
248.50 $ 7,032,550.00 1,272.60 $ 36,014,580.00 85.07 $ 2,407,481.00 16.71 $ 472,893.00 188.74 $ 5,341,343.00 - $ 0.00 122.40 $ 3,463,920.00 73.20 $ 2,071,560.00 - $ 0.00 62.50 $ 1,768,750.00 9.70 $ 274,510.00
- $ 0.00 13.00 $ 965,900.00 85.07 $ 6,320,701.00 - $ 0.00 4.60 $ 341,780.00 - $ 0.00 17.20 $ 1,277,960.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 14.00 $ 728,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 4.00 $ 208,000.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 874.00 $ 61,660,700.00 59.80 $ 4,218,890.00 6.94 $ 489,617.00 42.60 $ 3,005,430.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 200.00 $ 77,800,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
65.80 $ 44,086,000.00 180.30 $ 120,801,000.00 231.85 $ 155,339,500.00 9.65 $ 6,465,500.00 77.80 $ 52,126,000.00 - $ 0.00 44.80 $ 30,016,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
5.60 $ 2,945,600.00 14.10 $ 7,416,600.00 14.37 $ 7,560,124.00 0.67 $ 350,316.00 7.46 $ 3,922,343.00 - $ 0.00 2.20 $ 1,157,200.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 6.20 $ 2,821,000.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
5,877.80 $ 32,592,401.00 11,635.50 $ 64,518,848.00 22,958.35 $ 127,304,051.00 934.99 $ 5,184,520.00 6,813.53 $ 37,781,024.00 - $ 0.00 4,066.00 $ 22,545,970.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 9.60 $ 5,102,832.00 - $ 0.00 - $ 0.00 14.70 $ 7,813,712.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
210.30 $ 7,044,419.00 215.50 $ 7,218,604.00 - $ 0.00 7.40 $ 247,878.00 84.60 $ 2,833,846.00 - $ 0.00 57.25 $ 1,917,703.00 122.00 $ 4,086,634.00 - $ 0.00 138.40 $ 4,635,985.00 20.20 $ 676,639.00
58.70 $ 37,685,400.00 81.40 $ 52,258,800.00 29.40 $ 18,874,800.00 2.80 $ 1,797,600.00 32.60 $ 20,929,200.00 - $ 0.00 13.90 $ 8,923,800.00 20.70 $ 13,289,400.00 4.40 $ 2,824,800.00 16.20 $ 10,400,400.00 6.20 $ 3,980,400.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
725.30 $ 6,616,187.00 754.45 $ 6,882,093.00 260.00 $ 2,371,720.00 23.68 $ 216,009.00 296.26 $ 2,702,484.00 - $ 0.00 200.20 $ 1,826,224.00 427.00 $ 3,895,094.00 - $ 0.00 484.40 $ 4,418,697.00 70.70 $ 644,925.00
106.20 $ 19,593,900.00 129.30 $ 23,855,850.00 31.20 $ 5,756,400.00 3.11 $ 573,426.00 50.82 $ 9,376,290.00 - $ 0.00 34.30 $ 6,328,350.00 73.20 $ 13,505,400.00 - $ 0.00 62.50 $ 11,531,250.00 9.70 $ 1,789,650.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 7.00 $ 1,471,862.00 8.00 $ 1,682,128.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
$ 157,596,457.00 $ 391,716,669.00 $ 409,635,795.00 $ 15,797,759.00 $ 146,173,452.00 $ 0.00 $ 77,457,127.00 $ 37,056,088.00 $ 2,824,800.00 $ 32,755,082.00 $ 7,366,124.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
$ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
- $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
$ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00
98,281.10 $ 109,092,021.00 70,994.79 $ 78,804,221.00 16,577.00 $ 18,400,470.00 1,788.40 $ 1,985,124.00 43,925.80 $ 48,757,638.00 - $ 0.00 24,930.00 $ 27,672,300.00 3,372.80 $ 3,743,808.00 2,549.50 $ 2,829,945.00 2,650.05 $ 2,941,552.00 798.51 $ 886,347.00
- $ 0.00 - $ 0.00 30,208.66 $ 34,468,076.00 - $ 0.00 - $ 0.00 7,414.87 $ 8,460,369.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00 - $ 0.00
$ 109,092,021.00 $ 78,804,221.00 $ 52,868,546.00 $ 1,985,124.00 $ 48,757,638.00 $ 8,460,369.00 $ 27,672,300.00 $ 3,743,808.00 $ 2,829,945.00 $ 2,941,552.00 $ 886,347.00
$ 657,325,104.00 $ 889,571,789.00 $ 617,019,375.00 $ 41,387,640.00 $ 448,844,220.00 $ 10,787,894.00 $ 233,821,115.00 $ 132,301,247.00 $ 19,309,170.00 $ 98,415,237.00 $ 34,392,169.00
ACTA REAL 6006 N
382 DE 501
$ 4,597,225 - $ - Err:507
$ 2,638,350 5,030.20 $ 11,317,950 Err:507
$ 6,073,600 $ - Err:507
$ 146,076,750 75.00 $ 12,813,750 Err:507
$ 209,560,200 741.00 $ 166,613,850 Err:507
$ 15,237,000 228.00 $ 684,000 Err:507
$ 142,452,000 22.00 $ 13,058,100 Err:507
$ 966,000 - $ - Err:507
$ - (172.50) $ (134,895,000) Err:507
$ 13,060,450 27.00 $ 764,100 Err:507
$ 4,680,900 27.00 $ 2,006,100 Err:507
$ - 34.30 $ 2,419,865 Err:507
$ 36,381,000 64.60 $ 43,282,000 Err:507
$ 6,838,000 0.70 $ 368,200 Err:507
$ - - $ - Err:507
$ 35,871,160 (17,685.90) $ (98,068,316) Err:507
$ 7,441,630 - $ - Err:507
$ 1,708,347 - $ - Err:507
$ 82,111,800 130.00 $ 83,460,000 Err:507
$ 1,842,644 - $ - Err:507
$ 5,535,000 - $ - Err:507
385 DE 501
$ 9,863,127 (514,917.00) $ (571,557,870) Err:507
$ 24,021,473 $ - Err:507
Err:507 $ (444,187,332)
REAL NOV/2017 CANTIDADES COPADAS CANT 386
PROYECTADA
DE 501 NO
VALOR- CANT9 VALOR9 VALOR,7
$ 826,000 (73.00) $ (8,614,000)
$ - (79.00) $ (3,910,500)
$ - (7.00) $ (22,400)
$ 21,571,800 $ - 1,161.60
$ 2,376,657 $ - 1,445.00
$ 7,750,400 (9,335.00) $ (52,276,000)
$ 1,342,800 $ -
$ 4,597,225 $ -
$ 13,956,300 $ -
$ 6,073,600 (104,904.00) $ (68,187,600)
$ 158,890,500 $ - 2,328.00
$ 376,174,050 (1,259.00) $ (283,086,150)
$ 15,921,000 $ - 9,880.00
$ 155,510,100 $ - 390.00
$ 966,000 $ -
$ (134,895,000) $ - 172.50
$ 13,824,550 $ -
$ 6,687,000 $ -
$ 2,419,865 $ -
$ 79,663,000 (1,052.90) $ (705,443,000)
$ 7,206,200 $ -
$ - $ -
$ (62,197,156) $ - 27,250.00
$ 7,441,630 $ - 55.00
$ 1,708,347 $ -
$ 165,571,800 $ - 102.30
$ 1,842,644 $ -
$ 5,535,000 $ -
387 DE 501
$ (561,694,743) $ - 281,219.00
$ 323,091,042 $ (1,412,211,682)
YECTADA NOV /2017 ACTA PROYECTADA NOV /2017 388 DE 501
Err:507 $ 317,687,725
MINISTERIO DE TRANSPORTE
390 DE 501
INSTITUTO NACIONAL DE VIAS INVIAS-GOBERNACION DE BOYACA
PREACTA DE OBRA No
CONTRATISTA CONSORCIO VIAL 081
PERIODO DICIEMBRE DE 2017
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERS
OBJETO
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA
50 673.1 Geotextil
MINISTERIO DE TRANSPORTE
392 DE 501
INSTITUTO NACIONAL DE VIAS INVIAS-GOBERNACION DE BOYACA
PREACTA DE OBRA No
CONTRATISTA CONSORCIO VIAL 081
PERIODO DICIEMBRE DE 2017
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERS
OBJETO
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA
70 810,1P Protección de taludes con geomanto para control de erosión (incluído semillas)
MINISTERIO DE TRANSPORTE
393 DE 501
INSTITUTO NACIONAL DE VIAS INVIAS-GOBERNACION DE BOYACA
PREACTA DE OBRA No
CONTRATISTA CONSORCIO VIAL 081
PERIODO DICIEMBRE DE 2017
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERS
OBJETO
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
72 621.1.1P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye
empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima
de transporte hasta 30 km.
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.70 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
73 621.1.2P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye
empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima
de transporte hasta 30 km.
m3 - $ 820,000.00 $ 0.00
$ 217,502,325.00
m3 - $ 782,000.00 $ 0.00
$ 0.00
m3 - $ 1,515,000.00 $ 0.00
m3 - $ 1,579,000.00 $ 0.00
m3 - $ 550,000.00 $ 0.00
m - $ 1,960.00 $ 0.00
m2 - $ 22,844.00 $ 0.00
u - $ 6,974.00 $ 0.00
u - $ 309,077.00 $ 0.00
u - $ 256,229.00 $ 0.00
u - $ 215,225.00 $ 0.00
m - $ 185,000.00 $ 0.00
u - $ 86,572.00 $ 0.00
u - $ 15,848.00 $ 0.00
$ 0.00
m - $ 13,834.00 $ 0.00
m2 - $ 20,000.00 $ 0.00
m2 - $ 23,000.00 $ 0.00
$ 0.00
m2 - $ 40,983.00 $ 0.00
FECHA ELAB. DICIEMBRE
397 DEDE
5012017
N DE BOYACA PAGINA
23 VERSION 1
INTERVENTOR CONSORCIO INTERVIAL EQUIDAD 115
A ###
ECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y
PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
m - $ 51,206.00 $ 0.00
m - $ 1,814,477.00 $ 0.00
50 673.1 Geotextil
51 673.2 Material granular drenante
52 673.3 Material de cobertura tipo SBG
53 673.13P Geomenbrana de polietileno de alta densidad hdpe de 40 mils
54 674.2 Dren horizontal de longitud mayor a diez (10) metros.
55 681.1 Gaviones de malla de alambre de acero entrelazado
SUBTOTAL
SEÑALIZACIÓN Y SEGURIDAD
56 700.1 Líneas de Demarcación con pintura en frio
57 700.3 Marca Vial con pintura en frío
58 701.1 Tacha Reflectiva
59 710.1.1 Señal vertical de Tránsito Tipo I con lamina retroreflectiva de 75x75 cm
Señal vertical de Tránsito Tipo IV con lámina retrorreflectiva de 60x 75 cm ( delineador
60 710.1.2
horizontal)
61 720.1 Poste de referencia
62 730.1 Defensa metalica
63 730.2 Sección final
64 740.1 Captafaros
SUBTOTAL
OBRAS VARIAS
65 800.1 Cerca de Alambre de Púas con postes de madera
66 810.1 Protección de Taludes con bloques de césped
67 810.2 Proteccion de taludes con tierra organica
SUBTOTAL
TRANSPORTES
Transporte de materiales provenientes de la excavación de la explanación, canales y
68 900.2 préstamos para distancias mayores de mil metros (1000 m), medido a partir de cien metros
(100 m)
Transporte de materiales provenientes de derrumbes, medido a partir de cien metros
69 900.3
(100m)
SUBTOTAL
70 810,1P Protección de taludes con geomanto para control de erosión (incluído semillas)
MINISTERIO DE TRANSPORTE
400 DE 501
INSTITUTO NACIONAL DE VIAS INVIAS-GOBERNACION DE BOYACA
PREACTA DE OBRA RUTA 6006 No
CONTRATISTA CONSORCIO VIAL 081
PERIODO DICIEMBRE DE 2017
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVER
OBJETO
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAM
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
72 621.1.1P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye
empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima
de transporte hasta 30 km.
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.70 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
73 621.1.2P bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye
empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima
de transporte hasta 30 km.
74 630.3.4P Concreto Clase C de resistencia 28 Mpa
75 464-1P Geomalla de refuerzo en polyester
SUBTOTAL
LIQUIDACIÓN BASICA TOTAL PRESENTE PREACTA DE OB
Ha - $ 1,180,000.00 $ 0.00
m3 - $ 118,000.00 $ 0.00
m - $ 49,500.00 $ 0.00
m - $ 3,200.00 $ 0.00
m3 - $ 39,250.00 $ 0.00
m3 62.60 $ 6,430.00 $ 402,518.00
m3 2,494.00 $ 5,600.00 $ 13,966,400.00
m3 - $ 9,250.00 $ 0.00
m3 186.50 $ 7,200.00 $ 1,342,800.00
m3 186.50 $ 24,650.00 $ 4,597,225.00
m3 1,172.60 $ 2,250.00 $ 2,638,350.00
$ 22,947,293.00
m3 - $ 820,000.00 $ 0.00
$ 203,760,225.00
m3 - $ 782,000.00 $ 0.00
$ 0.00
m3 - $ 1,515,000.00 $ 0.00
m3 - $ 1,579,000.00 $ 0.00
m3 - $ 550,000.00 $ 0.00
m - $ 1,960.00 $ 0.00
m2 - $ 22,844.00 $ 0.00
u - $ 6,974.00 $ 0.00
u - $ 309,077.00 $ 0.00
u - $ 256,229.00 $ 0.00
u - $ 215,225.00 $ 0.00
m - $ 185,000.00 $ 0.00
u - $ 86,572.00 $ 0.00
u - $ 15,848.00 $ 0.00
$ 0.00
m - $ 13,834.00 $ 0.00
m2 - $ 20,000.00 $ 0.00
m2 - $ 23,000.00 $ 0.00
$ 0.00
m2 - $ 40,983.00 $ 0.00
FECHA ELAB. DICIEMBRE DE 2017
403 DE 501
ON DE BOYACA PAGINA
23 - 10 VERSION 1
INTERVENTOR CONSORCIO INTERVIAL EQUIDAD 115
A ###
OYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y
PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
m - $ 51,206.00 $ 0.00
m - $ 1,814,477.00 $ 0.00
m - $ 1,713,336.00 $ 0.00
CONTRATISTA
PERIODO
OBJETO
1 200.2
2 201.7
3 201.15
4 201.16
5 210.2.1
6 210.2.2
7 211.1
8 220.1
9 230.1P
10 230P
11 2P
12 310.1
13 311.1
14 320.1
15 330.1
16 420.2
17 450.2P
18 464.1
19 467.13P
20 500.1
21 600.1.1
22 600.2.1
23 600.2.3
24 600.2.4
405 DE 501
CONTRATISTA
PERIODO
OBJETO
33 630.3.3P
34 630.3.4P
35 630.4
36 630.4.1P
37 630.6
38 630.7
39 632.1P
40 640.1
41 641.1
42 640.2
43 642.1
44 642.2
45 642.3P
46 661.1
47 663.3P
48 671.1P
49 671.1
50 673.1
51 673.2
52 673.3
53 673.13P
406 DE 501
CONTRATISTA
PERIODO
OBJETO
56 700.1
57 700.3
58 701.1
59 710.1.1
60 710.1.2
61 720.1
62 730.1
63 730.2
64 740.1
65 800.1
66 810.1
67 810.2
68 900.2
69 900.3
70 810,1P
71 815P
407 DE 501
CONTRATISTA
PERIODO
OBJETO
72 621.1.1P
73 621.1.2P
74 630.3.4P
75 464-1P
LIQUIDACIÓN BASI
CONTRATISTA
FIRMA
NOMBRE
CARGO
T.P.
MINISTERIO DE TRANSPORTE 408 DE 501
INSTITUTO NACIONAL DE VIAS INVIAS-GOBERNACION DE BOYACA
PREACTA DE OBRA RUTA 6007 No 23
CONSORCIO VIAL 081
DICIEMBRE DE 2017 A
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMO
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDA
DESCRIPCION UND
EXPLANACIONES
Desmonte y limpieza en zonas no boscosas Ha
Demolición de Estructuras m3
Remoción de alcantarillas m
Remoción de cercas de alambre m
Excavación en roca de la explanación y canales m3
Excavaciones en material común de la Explanación y Canales m3
Remoción de Derrumbes m3
Terraplenes m3
Mejoramiento de la subrasante con adición de materiales m3
Material adicionado para mejoramiento de subrasante m3
Conformación de sitios de disposicion de sobrantes m3
SUBTOTAL
BASES, SUBBASES Y AFIRMADOS
Conformación de la calzada existente m2
Afirmado m3
Subbase Granular clase A m3
Base granular clase A m3
SUBTOTAL
PAVIMENTOS ASFALTICOS
Riego de imprimación con emulsión asfáltica CRL ‐1 m2
Mezcla densa en caliente Tipo MDC-19 m3
Geotextil para repavimentación m2
Mezclas asfálticas en caliente con cemento asfáltico modificado con grano de caucho
m3
reciclado (GCR) (M-GCR-19)
SUBTOTAL
PAVIMENTOS DE CONCRETO
Pavimento de concreto Hidraulico m3
SUBTOTAL
ESTRUCTURAS Y DRENAJES
Excavaciones varias sin clasificar m3
Excavaciones varias en roca en seco m3
Excavaciones varias en material comun en seco m3
Excavaciones varias en material comun bajo agua m3
MINISTERIO DE TRANSPORTE 409 DE 501
INSTITUTO NACIONAL DE VIAS INVIAS-GOBERNACION DE BOYACA
PREACTA DE OBRA RUTA 6007 No 23
CONSORCIO VIAL 081
DICIEMBRE DE 2017 A
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMO
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDA
DESCRIPCION UND
Relleno detrás de las cunetas con material de excavacion m3
Rellenos para estructuras con recebo m3
Rellenos para estructuras con material granular tipo SBG. m3
Anclaje tipo activo m
Concreto clase A, para vigas puentes tipo 1. m3
Concreto clase A, para placa superior puentes m3
Concreto clase C para para Zapatas, Estribos y Aletas m3
Concreto clase C para pilas o columnas puentes m3
Caissons concreto clase C fc=280 kg/cm2 (diámetro 1.2 m, incluye excavaciones, formaleta
(bien sea metálica o anillos de concreto) soporte temporal, concreto tremie bombeo, no m3
incluye acero de refuerzo) caissons
Caissons concreto clase C diametro interno 1,30 m, con anillos de 0,10 M (incluye
m3
escavacion y concreto)
Concreto clase D m3
Concreto lanzado para pantallas ancladas (f'c = 21 Mpa) m3
Concreto clase F m3
Concreto clase G m3
Baranda Metalica en acero m
Acero de refuerzo Fy=420 Mpa. kg
Acero de Preesfuerzo Tf-m
Malla de refuerzo Fy = 459,2 Mpa. Kg
Apoyo elastomérico u
Sello para juntas de puentes m
Junta FREYSINET M80 o similar m
Tubería de Concreto Reforzado de 900mm de diámetro interior m
Tuberia para filtro PVC perforada diametro 100 mm m
Berma cuneta en concreto clase D m3
Geotextil m2
Material granular drenante m3
Material de cobertura tipo SBG m3
Geomenbrana de polietileno de alta densidad hdpe de 40 mils m2
MINISTERIO DE TRANSPORTE 410 DE 501
INSTITUTO NACIONAL DE VIAS INVIAS-GOBERNACION DE BOYACA
PREACTA DE OBRA RUTA 6007 No 23
CONSORCIO VIAL 081
DICIEMBRE DE 2017 A
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMO
MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDA
DESCRIPCION UND
Dren horizontal de longitud mayor a diez (10) metros. m
Gaviones de malla de alambre de acero entrelazado m3
SUBTOTAL
SEÑALIZACIÓN Y SEGURIDAD
Líneas de Demarcación con pintura en frio m
Marca Vial con pintura en frío m2
Tacha Reflectiva u
Señal vertical de Tránsito Tipo I con lamina retroreflectiva de 75x75 cm u
Señal vertical de Tránsito Tipo IV con lámina retrorreflectiva de 60x 75 cm ( delineador
u
horizontal)
Poste de referencia u
Defensa metalica m
Sección final u
Captafaros u
SUBTOTAL
OBRAS VARIAS
Cerca de Alambre de Púas con postes de madera m
Protección de Taludes con bloques de césped m2
Proteccion de taludes con tierra organica m2
SUBTOTAL
TRANSPORTES
Transporte de materiales provenientes de la excavación de la explanación, canales y
préstamos para distancias mayores de mil metros (1000 m), medido a partir de cien metros m3-km
(100 m)
Transporte de materiales provenientes de derrumbes, medido a partir de cien metros
m3-km
(100m)
SUBTOTAL
DESCRIPCION UND
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye m
empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima
de transporte hasta 30 km.
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.70 m), incluye
excavaciones, revestimiento soporte temporal (de ser necesario), concreto tremie
bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye m
empleo de trépano, brocas de widia o diamante en caso de ser necesario. Distancia máxima
de transporte hasta 30 km.
Concreto Clase C de resistencia 28 Mpa m3
Geomalla de refuerzo en polyester m2
SUBTOTAL
LIQUIDACIÓN BASICA TOTAL PRESENTE PREACTA DE OBRA
- $ 820,000.00 $ 0.00
$ 13,742,100.00
- $ 782,000.00 $ 0.00
$ 0.00
- $ 1,515,000.00 $ 0.00
- $ 1,579,000.00 $ 0.00
- $ 550,000.00 $ 0.00
- $ 9,122.00 $ 0.00
- $ 184,500.00 $ 0.00
- $ 75,000.00 $ 0.00
- $ 22,211.00 $ 0.00
FECHA ELAB. DICIEMBRE DE 2017 414 DE 501
PAGINA
VERSION 1
INTERVENTOR CONSORCIO INTERVIAL EQUIDAD 115
###
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y
L PROGRAMA "VIAS PARA LA EQUIDAD"
- $ 1,960.00 $ 0.00
- $ 22,844.00 $ 0.00
- $ 6,974.00 $ 0.00
- $ 309,077.00 $ 0.00
- $ 256,229.00 $ 0.00
- $ 215,225.00 $ 0.00
- $ 185,000.00 $ 0.00
- $ 86,572.00 $ 0.00
- $ 15,848.00 $ 0.00
$ 0.00
- $ 13,834.00 $ 0.00
- $ 20,000.00 $ 0.00
- $ 23,000.00 $ 0.00
$ 0.00
- $ 40,983.00 $ 0.00
- $ 51,206.00 $ 0.00
FECHA ELAB. DICIEMBRE DE 2017 415 DE 501
PAGINA
VERSION 1
INTERVENTOR CONSORCIO INTERVIAL EQUIDAD 115
###
TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y
L PROGRAMA "VIAS PARA LA EQUIDAD"
- $ 1,814,477.00 $ 0.00
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.80
Constructor Interventor
_________________________ Pagina 417 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 66.00
Constructor Interventor
_________________________ Pagina 418 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
$ -
ARTICULO DESCRPCCION UND CANT PREACTA PERIODO FECHA ELABORACION
DICIEMBRE DE
201.15 Remoción de alcantarillas m 79.00 23 2017
12/30/1899 DICIEMBRE DE 2017
TOTAL 79.00
Constructor Interventor
_________________________ Pagina 419 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 7.00
Constructor Interventor
_________________________ Pagina 420 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 916.00
Constructor Interventor
_________________________ Pagina 421 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
511.70
Constructor Interventor
_________________________ Pagina 422 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 7,951.00
Constructor Interventor
_________________________ Pagina 423 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 424 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 425 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 426 de 501 _________________________
Firma Contratista Firma Interventor
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BO
ARTICULO DESCRPCCION
2P Conformación de sitios de disposicion de sobrantes
DESCRIPCION
ACTA No ACTIVIDAD RUTA MARGEN SECTOR
23 EXPLANACIÓN PARA SUBRASANTE DISEÑO 6007 DERECHA 15
23 EXPLANACIÓN PARA SUBRASANTE DISEÑO 6007 DERECHA 15
TOTAL
Constructor Interventor
_________________________ Pagina 427 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
ANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6
Constructor Interventor
_________________________ Pagina 428 de 501 _________________________
Firma Contratista Firma Interventor
O) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
INICIO
ES ACLARACIONES
CANT TOTAL SUB ACTIVIDAD OBSERVACIONES
ACUMULADO ACTAS
(10,133.86) DESCUENTO
ANTERIORES
15,164.10 VER ANEXO EXCAVACION ACTA23
5,030.20
Constructor Interventor
_________________________ Pagina 429 de 501 _________________________
Firma Contratista Firma Interventor
BASES, SUBBASES Y
AFIRMADOS
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 95,560.00
Constructor Interventor
_________________________ Pagina 431 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 432 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA
OBJETO
LA EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 75.00
Constructor Interventor
_________________________ Pagina 433 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO
OBJETO
DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO
TOTAL 414.00
Constructor Interventor
_________________________ Pagina 434 de 501 _________________________
Firma Contratista Firma Interventor
PAVIMENTOS ASFALTICOS
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
23 IMPRIMACION MDC-19 6007 CALZADA 5 1438 1574 K000+000 K000+015 15 6.5 1 1 97.50 EMPALME CON VIA EXISTENTE ANEXO PAVIMENTO ACTA 23
TOTAL 228.00
Constructor Interventor
_________________________ Pagina 436 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
23 MDC-19 6007 CALZADA 5 1438 1574 K000+000 K000+015 7.00 EMPALME CON VIA EXISTENTE VER ACUMULADO ACTA 23
23 MDC-19 6007 CALZADA 7 2910 3196 K000+240 K000+261 15.00 EMPALME CON VIA EXISTENTE VER ACUMULADO ACTA 23
23 MDC-19 6007 CALZADA 29 43276 43362 K000+000 K000+086 64.80
23 MDC-19 6007 izquierda 30 44680 44705.5 K000+000 K000+026 10.30
23 MDC-19 6007 Calzada 31 45360 45412 K000+018 K000+070 36.20
23 MDC-19 6007 Calzada 32 45475 45496 K000+010 K000+031 17.00
TOTAL 22.00
Constructor Interventor
_________________________ Pagina 437 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 438 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 439 de 501 _________________________
Firma Contratista Firma Interventor
PAVIMENTO RIGIDO
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 441 de 501 _________________________
Firma Contratista Firma Interventor
ESTRUCTURAS Y DRENAJES
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 27.00
Constructor Interventor
_________________________ Pagina 443 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 27.00
Constructor Interventor
_________________________ Pagina 444 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 445 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 446 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 447 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 34.30
Constructor Interventor
_________________________ Pagina 448 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 449 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 450 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 451 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 452 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 453 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 454 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
630.3.3P
Caissons concreto clase C fc=280 kg/cm2 (diámetro 1.2 m, incluye excavaciones, formaleta (bien sea metálica o anillos de concreto) soporte temporal, DICIEMBRE DE
m3 0.00 23 12/30/1899 DICIEMBRE DE 2017
concreto tremie bombeo, no incluye acero de refuerzo) caissons 2017
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 455 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 456 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 954.90
Constructor Interventor
_________________________ Pagina 457 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 458 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
OBJETO MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
TOTAL 0.70
Constructor Interventor
_________________________ Pagina 459 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 460 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 461 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 9,564.10
Constructor Interventor
_________________________ Pagina 462 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 463 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 464 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 465 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 466 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 467 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 468 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 469 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
Constructor Interventor
_________________________ Pagina 470 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 471 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 472 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 473 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 474 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 475 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 476 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 477 de 501 _________________________
Firma Contratista Firma Interventor
SEÑALIZACION
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 479 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 480 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 481 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 482 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 483 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 484 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 485 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 486 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 487 de 501 _________________________
Firma Contratista Firma Interventor
OBRAS VARIAS
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 489 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 490 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 491 de 501 _________________________
Firma Contratista Firma Interventor
TRANSPORTES
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
900.2 Transporte de materiales provenientes de la excavación de la explanación, canales y préstamos para distancias mayores de mil metros (1000 m), medido a DICIEMBRE DE
m3-km -233,698.00 23 2017
12/30/1899 DICIEMBRE DE 2017
partir de cien metros (100 m)
TOTAL -233,698.00
Constructor Interventor
_________________________ Pagina 493 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
INICIO
PEGAR
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 254,548.00
Constructor Interventor
_________________________ Pagina 494 de 501 _________________________
Firma Contratista Firma Interventor
NO PREVISTOS
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 496 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
815P
Trincho formado por estacones de madera D=3" de 1,5m de longitud, separados 1m y clavados 0,5m, rematados en superficie con paneles de esterilla tipo DICIEMBRE DE
m 0.00 23 12/30/1899 DICIEMBRE DE 2017
TRM, Guadua o similar. 2017
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 497 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.80 m), incluye excavaciones, revestimiento soporte temporal (de ser necesario), concreto
DICIEMBRE DE
621.1.1P tremie bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye empleo de trépano, brocas de widia o diamante en caso de m 0.00 23 12/30/1899 DICIEMBRE DE 2017
2017
ser necesario. Distancia máxima de transporte hasta 30 km.
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 498 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
Pilote excavado de concreto tremie fc=280 kg/cm2 (diámetro 0.70 m), incluye excavaciones, revestimiento soporte temporal (de ser necesario), concreto
DICIEMBRE DE
621.1.2P tremie bombeado, incluye lodos de perforacion con una estimación del 30% de los pilotes. Incluye empleo de trépano, brocas de widia o diamante en caso de m 763.00 23 12/30/1899 DICIEMBRE DE 2017
2017
ser necesario. Distancia máxima de transporte hasta 30 km.
TOTAL 763.00
Constructor Interventor
_________________________ Pagina 499 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE
OBJETO
BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO
TOTAL 55.30
Constructor Interventor
_________________________ Pagina 500 de 501 _________________________
Firma Contratista Firma Interventor
PREACTA DE OBRA
MEJORAMIENTO, GESTIÓN SOCIAL, PREDIAL Y AMBIENTAL DEL PROYECTO "TRANSVERSAL DE BOYACA" TRAMOS OTANCHE - CHIQUINQUIRA (RUTA 6007) Y CRUCE RUTA 45 (DOS Y MEDIO) - OTANCHE (RUTA 6006). EN EL DEPARTAMENTO DE BOYACÁ, PARA EL PROGRAMA "VIAS PARA LA
OBJETO
EQUIDAD"
CONTRATISTA CONSORCIO VIAL 081 CONTRATO 1699 DE 2015 COPIAR Y
PEGAR INICIO
INTERVENTORIA CONSORCIO INTERVIAL EQUIDAD 115 CONTRATO 1746 DE 2015
TOTAL 0.00
Constructor Interventor
_________________________ Pagina 501 de 501 _________________________
Firma Contratista Firma Interventor