You are on page 1of 1

SAUDI ARAMCO ID/PID - 30 April 2013 - Rev 0 (Standards Cutoff - March 2013) Rev 1 31-Mar-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Geotechnical Investigation Reports SAIC-A-1010 30-Apr-13 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

All engineering calculations and the draft final geotechnical investigation


report must be peer-reviewed internally by the Contractor prior to
SAES-A-113
A1 submittal to Saudi Aramco for review. Both the primary engineer and the
Sec. 5.4.1
peer-reviewer must be practicing geotechnical engineers and the
signatures of both must appear in the report.

Two copies of the draft final geotechnical report, all engineering


calculations, and the geotechnical investigation Scope of Work shall be SAES-A-113
A2
submitted for review and approval to the Supervisor, Civil Engineering Sec. 5.4.2
Unit, Consulting Services Department.

The final report shall address all items in the scope of work including the SAES-A-113
A3
checklist "Required Geotechnical Services" (Appendix A, SAES A113) Sec. 7.1

The Geotechnical file number obtained from CSD must appear in the SAES-A-113
A4
report cover, the title page and on all field and laboratory test logs Sec. 7.2

SAES-A-113
A5 All boring logs must be in Saudi Aramco Boring Log format
Sec. 7.5
REMARKS:

REFERENCE DOCUMENTS:
1- SAES-A-113 -- Geotechnical Engineering Requirements, 19 June 2012

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Page 1 of 1

You might also like