You are on page 1of 3

METHOD OF STATEMENT

FOR
INSTALLATION
OF
CERAMIC TILES

METHOD OF STATEMENT FOR INSTALLATION OF


CERAMIC TILE

SUMMARY: Method of Statement of Ceramic Tiles includes the following.

A. Unglazed Ceramic Tiles Transmittal # A-0098 Rev.3


B. Glazed Ceramic Wall Tiles Transmittal # A-0098 Rev.3
C. Job mix mortar and grout materials for setting with thick wall mortar beddings.
D. Portland Cement Transmittal # C-455
E. Latex Additive: Styrine Butodive rubber Trans.#C-0279Rev.5(Nitobond SBR
20) or Trans.# C-0269Rev.1 (SBR Latex CMCI)
F. Grout: Jitotile Grout Trans.# C-0279 Rev. 2

Related Disciplines:
A. Cold Applied Water Proofing separate Method of Statement.

1. Preparation:
A. Sand Bed under Floor Tiles, thickness should be maintained as necessary to
obtain finish floor levels indicated on Approved Shop Drawings.
B. Manual spreading and compaction to obtain uniform depth and distribution.
Remove stones and foreign materials.
C. Reinforcement for separation between dissimilar background must be applied:
Metal lathe 200 mm width & corner bead as specified and required.

METHOD OF STATEMENT (Installation of Ceramic Tile)Rev.2 22 Aug.-06


D. Background to receive wall tiles on vertical surfaces to finished with ceramic
wall tiles are to be coated with dash coat to be wet cured for a minimum of 2
days prior to setting of tiles.
E. Lightly Rinse with water prior to setting tiles.
F. Perform cutting and drilling of tile without marring visible surfaces.
G. Fit tile to electrical outlet, piping, fixtures and other penetration as shown in the
shop drawing.
H. Ceramic tiles are to be soak in water for one hour prior to setting in place.

2. Floor Tiles Installation.


A. Obtain center lines for both axis as per approved shop drawing.
B. Floor tiles are to be set using thick wet mortar bedding on uniformly distributed
sand beds. Mortar mix shall be 1:3 (1 part Portland cement and 3 part sand)
Thickness of bedding shall be between (20-25mm). Each tile is to be beaten to
ensure bedding of tiles.
C. Start installing tiles in 1 direction alongside of the centerline
D. Install tile on floor with 3mm paver tile. In wet areas provide slope to drains.
E. Install stone threshold as per approved shop drawing at location indicated.

3. Wall Tiles Installation.


A. Wall tiles are to set with thick wet mortar bedding on walls prepared. Mortar
mix 1:4 (1part Portland cement and 4 part sand) Thickness of beddings shall
range between (15-20mm). Tiles are to be beaten and set firmly in place to
ensure full contact between tile back and bedding in full area of tile.
B. Install tile on wall with 3mm paver tile.
C. In wet area; install ready skirting with continuous joint on the applied floor.
D. Comply prior to installing skirting with the preparation.
E. Maintain surfaces to receive skirting to have zero joint between surface of
plaster and backside of skirting.

4. Grouting
A. Clean joint by brush to ensure that thickness of tile is clear and free of foreign
material.
B. Add 5 kg of jitotile grout to 1.8 liter of water and mix until thick creamy paste is
produced; allow to stand for 10 minutes.
C. Apply jitotile grout to the joint spaces between tiles using a sponge or soft cloth.
Work the mixture into the joints grouting the ceramics tile thickness and
around the edges.
D. Remove surplus from the face of the tiles with dry cloth and run the tip as a
gloves finger or a rounded piece of wood along the grouting.
E. When the grout is dry, clean the tiles with a damp sponge.

4. Cleaning and Protecting


A. On completion of placement and grouting, clean all ceramic tile surfaces.

METHOD OF STATEMENT (Installation of Ceramic Tile)Rev.2 22 Aug.-06


Remove cement grout residue from tile as soon as possible.
B. Leave finished installation clean and free of cracked, chipped, broken, unbonded
and otherwise defective tile work.
C. Prohibit foot and wheel traffic from tiles floors at least 7 days after grouting is
completed.
D. Provide fixed protection or other heavy covering during construction period to
prevent staining, damage and wear.

METHOD OF STATEMENT (Installation of Ceramic Tile)Rev.2 22 Aug.-06