(TD-288) (Residential Building)

SYSTEM LABOUR MATERIAL SITE STAFF TOTAL COST


PLUMBING 70,600.00 356,298.08 42,672.06 469,570.13
DRAINAGE 38,640.00 175,668.00 175,668.00 389,976.00
HVAC 285,540.00 2,262,510.00 270,969.63 2,819,019.63
GAS 35,000.00 250,000.00 29,941.26 314,941.26
FIRE FIGHTING 100,190.00 462,390.00 55,378.16 617,958.16

TOTAL 529,970.00 3,506,866.08 574,629.11 4,611,465.19

Staff Nu.
PM 1
MECH. ENGR 1
FOREMAN 3
(TD-288) (Residential Building)

OVER HEAD10% PROFIT 40 % SELL


46,957.01 187,828.05 704,355.20
38,997.60 155,990.40 584,964.00
281,901.96 1,127,607.85 4,228,529.44
31,494.13 125,976.51 472,411.89
61,795.82 247,183.27 926,937.24

461,146.52 1,844,586.08 6,917,197.78

Salary Duration Total


20,000 3 60,000
15,000 12 180,000
5,000 12 180,000
TOTAL 420,000
PLUMBING 42,672.06
DRAINAGE 175,668.00
HVAC 270,969.63
GAS 29,941.26
FIRE FIGHTING 55,378.16
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM

FIRE FIGHTING SYSTEM INSTALLATION

Supply, installation, testing, commissioning handing over


and guarantee the following works:

Electrical fire pump 500 US GPM discharge at 10 bar head


horizontal split case pump in accordance with NFPA-20
including air release valve, suction, and discharge pressure
gauges , fittings and all necessary accessories, complete
A with electrical drive motor pump control panel , nr 1 105000
connections to fire protection piping system and electrical
connection to local outlets

Diesel Fire pump 500 US GPM discharge at 10 bar head


Horizontal split case pump in accordance with NFPA- 20
including air release valve,suction and discharge pressure
gauges, fittings, deisel tank 250 gallons and all necessary
B accessories, complete with Deisel engine driven as nr 1 115000
specified, pump control panel and connections to fire
protection piping system

Jockey Fire pump 50 US GPM discharge at 10.5 bar head nr 1


vertical Multi-stage centrifugal pump in accordance with
NFPA- 20 including air release valve, suction and discharge
pressure gauges,fittings and all necessary
C accessories,complete with pump control panel and 55000
connections to fire protection piping system and electrical
connection to local outlets

Mechanical works for Concrete RCC Fire water storage


tanks components c/w Stainless steel ladder ,puddle
flanges,float valves, balancing and over flow connections,
D nr 1 11000
all necessary accessories as required by the drawings,
standard and specifications

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

To Collection

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM
FIRE FIGHTING SYSTEM INSTALLATION

Supply, installation, testing, commissioning handling over


and guarantee the following works:

Fire fighting piping seamless galvanzed steel for


sprinkler pipe with grooved fittings and screw fittings for
smalles pipe , complete with rigid supports and hangers,
installed as per drawings, NFPA- 13 and specification as
follow:

A 25 0 mm m 610 55
B 32 0 mm m 135 60
C 40 0 mm m 140 65
D 50 0 mm m 130 75
E 65 0 mm m 305 80
F 80 0 mm m 55 85
G 100 0 mm m 145 110
H 125 0 mm m 25 125
J 150 0 mm m 50 150

Sprinklers Ul-listed and FM Approved complete as


specified and installed in accordance with NFPA -13 and
fire department approved complete with reducer; including
MSPT inlets; jointing to pipework.

K Pendent sprinkler nr 96 40

L Upright sprinkler nr 169 35

M Side wall sprinkler nr 24 50

N Zone control valve 150 0 mm nr 6 2950

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

To Collection

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

BILLS OF QUANTITIES
Item Description Unit Qty Rate

SECTION S
PIPED SUPPLY SYSTEM

FIRE FIGHTING SYSTEM INSTALLATION Condt...

32 0 mm Automatic air vent as specified to NFPA 13


, FM approved and UL listed complete with gate
valve and all accessories

Stainless steel Fire Hose Reel Cabinet to accommodate


automatice Swing type Hose Reel with 30 Mtrs. length
of High pressure Hose, Bottom side protection frame,
25 0 mm Valve and 2 nos fire Extinguishers as per
specifications.

B FHC nr 12 3800

Portable fire extinguishers ABC type complete as


specified in the drawings and specs. including supports
and fixing brackets as necessary and wall mounted.

C 6.0 kg dry Powder extinguisher; ref. FE-1 nr 26 200

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

To Collection

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM

Portable fire extinguishers for kitchen complete as specified


in the drawings and specs. including supports and fixing
brackets as necessary and wall mounted.

A 6 kg dry Powder extinguisher; ref. FE-2 nr 42 200

Fire blanket complete as specified in the drawings and


B specs nr 42 125

Supply and install all accessories for foam system, and


all necessary accessories as required by the drawings,
standard and specifications

C Generater Room ( Foam tank 13 Gallon) item 42 350

20 0 mm flushing connection complete as specified in the


D drawings and specs. including supports and fixing brackets nr 1 525
as necessary and wall mounted

ADDRESSABLE FIRE ALARM AND EMERGENCY


EVACUATION (13852)

Supply and install all accessories for foam system, and


all necessary accessories as required by the drawings,
standard and specifications

Alarm check valve and OS&Y Gate valve complete as


specified in the drawings and specs. including supports and
fixing brackets as necessary and wall mounted

E Alarm check valve 150 0 mm nr 1 7100

Breeching inlets complete as specified in the drawings,


specifications and to Fire Department's approval jointing to
pipework.

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

To Collection

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM

TESTING, ADJUSTING AND BALANCING (15950)

Allow for testing, adjusting, balancing and commissioning


A of the Mechanical systems, by an independent item EX
specialized company

Allow for operation, maintenance, and guarantee as per


B specifications item 1 20000

C Allow for tools and spare parts necessary for the


equipment, as per requirements item 1 EX

BUILDER'S WORK

Allow for marking the position of holes, mortises, chases


and the like in the structure, modifications, additional
coring of concrete, upstands, plinths, waterproofing for item 1 10000
builders work, pipe sleeves, platforms,

diversions of existing connections etc

D Builder's work item 1 15000

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

To Collection

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM

Collection

Page No. B1/S/1

Page No. B1/S/2

Page No. B1/S/3

Page No. B1/S/4

Page No. B1/S/5

Page No. B1/S/6

Page No. B1/S/7

Page No. B1/S/8

Page No. B1/S/9

Page No. B1/S/10

Page No. B1/S/11

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

PIPED SUPPLY SYSTEM Carried to Summary

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

Amount(QR)

105000

115000

55000

11000

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

286,000.00

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

Amount(QR)

33550
8100
9100
9750
24400
4675
15950
3125
7500

3840

5915

1200

17700

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

144,805.00

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

Amount(QR)

45600

5200

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

50,800.00

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

Amount(QR)

8400

5250

14700

525

7100

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

35,975.00

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

Amount(QR)

20000

10000

15000

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

45,000.00

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

Amount(QR)

286,000.00

144,805.00

50,800.00

35,975.00

45,000.00

R-0
BILL NO. 01 SECTION A PRELIMINARIES FOX HILL RESIDENTIAL A37

562,580.00

R-0
BILLS OF QUANTITIES
Item Description Unit Qty Rate

SECTION R DISPOSAL SYSTEMS


RAIN WATER ISTALLATION

Supply, installation, testing, commissioning handing over and


guarantee the following works:

75mm 0 UPVC Pipes class 4 and fittings as specified and drawn


A m 3 29

110mm 0 UPVC Pipes class 4 and fittings as specified and drawn


B m 110 37.5

160mm 0 UPVC Pipes class 4 and fittings as specified and drawn


C m 27 48

Roof Drain 75mm 0 installed complete as specified and drawn


D ceiling nr 8 275

Clean Outs installed complete as specified and


drawn

E 110mm 0 nr 7 225

F GARAGE DRAIN installed complete as specified and drawn nr 8 325


To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate

SECTION R DISPOSAL SYSTEMS


SEWERAGE SYSTEM INSTALLATION

Supply, installation, testing, commissioning handing


over and guarantee the following works

UPVC pipes including fitting and supports embedded in concrete


or floor screed complete as specified jointing to pipeworks.

A 50 mm 0 m 260 23
B 75 mm 0 m 410 29
C 110 mm 0 m 570 37.5
D 160 mm 0 m 525 48

Pressureized UPVC pipes including fitting and supports


embedded in concrete or floor screed complete as specified
jointing to pipeworks.

E 50 mm 0 including all fittings m 100 31

F 75 mm 0 including all fittings m 65 40

Vent Pipes UPVC class 3 and fittings as specified with solvent


welded joints for floor drain ; allow for insulation and vapor
sealing as necessary

G 50 mm 0 m 435 23

Floor Drain installed complete as specified and drawn


H 75mm 0 nr 148 225

Floor / ground Clean Outs installed complete as specified and


drawn

J 75mm 0 nr 153 165


K 110mm 0 nr 16 215
L 160mm 0 nr 16 265
To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate

SECTION R DISPOSAL SYSTEMS

Roof vent caps installed complete as specified and drawn


A 110mm 0 nr 22 35
B 160mm 0 nr 22 40

submersible pumps for wast water discharging, flow rate is


C 5m3/hr, 3 bar head complete with all accessories and not limited nr 2 7000
as per specification.

Mechanical works for concrete sump pit with dimension of 3m *


1.7m and depth 2 m as shown on the drawing,and all fittings,
supports, with all accessories, frame and cover of steel plate
D thickness 4 mm supported, cast iron stairs, ventilation, sleeves nr 1 2500
and not limited as per specification Garbage chute unit

Supply, install and complete garbage chute unit, ground to Upper


Roof level (approx 23m heigh) consisting with chute openings at
each floor and necessory accessories and equipments. also
provide floor drain in refuse room on each floor. Contractor shall
E prepare detailed shop drawings in complience with specification item ex
and requirement of qatar municipality. complete as per
requirement as per drawings (AR-00-613) and specification.

submersible pumps for wast water discharging, flow rate is


F 2m3/hr, 1.2bar head complete with all accessories and not limited nr 1 10500
as per specification.

submersible pumps for gray water overflow water discharging,


flow rate is 12m3/hr, 2bar head complete with all accessories and
G not limited as per specification. Inspection Chambers nr 2 12000

Complete with concrete work, cast iron cover, frame and all
H necessary accessories SLOW DOWN CHAMBERS nr 1 1500

Complete with block work, frame and cover and all necessary
J accessories, RHC nr 1 1900
To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate

SECTION R
DISPOSAL SYSTEMS
Collection

Page No. B1/R/1

Page No. B1/R/2

Page No. B1/R/3


DISPOSAL SYSTEMS Carried to Summary
Amount(QR)

87

4125

1296

2200

1575

2600
11,883.00
Amount(QR)

5980
11890
21375
25200

3100

2600

10005

33300

25245
3440
4240
146375
Amount(QR)

770
880

14000

2500

10500

24000

1500

1900
56050
Amount(QR)

11,883.00

146,375.00

56,050.00
214,308.00
BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM

COLD WATER SYSTEM INSTALLATION

Supply, installation, testing, commissioning handing over


and guarantee the following works (Specification ref.
15145) All HDPE pipes shall be manufactured from
approved raw materials in accordance with standard, for
cold water under ground. with all accessories according to
drawing and specification.

A 50 mm 0 m 35 58

All Copper pipes shall be manufactured from approved


raw materials in accordance with standard,for all rise
exposed areas and exposed at roof. The material is copper
random improved temperature resistance and including
gate valves, solenoid valves, strainers, check valves,
automatic reducing valve and all accessories according to
drawing and specification.

B 20 mm 0 m 50 56

C 50 mm 0 m 70 180

D 63 mm 0 m 85 210

E 75 mm 0 m 15 260
To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM

Main water meter and water meter cabinet in the full


compliance with KAHRAMAA standards cabinets with
heavy duty ductile iron covers, frames and all associated
builders work as necessary, the contractor shall be
supplied main water meter from KAHRAMA .

A main water meter 42 mm Diameter nr 1 950

Water meter in the full compliance with KAHRAMAA


standards, frames and all associated builders work as
necessary, sizes as shown on the drawing the contractor
shall be supplied water meter from KAHRAMA .

B water meter Diameters as shown on the drawing nr 44 150

COLD WATER SYSTEM INSTALLATION

All PPR pipes shall be manufactured from approved raw


materials in accordance with standard, for hot and cold
water inside wall. The material is a polypropylene random
improved temperature resistance and including gate

valves, solenoid valves, strainers, check valves,


automatic reducing valve and all accessories according to
drawing and specification
C 20 mm 0 m 620 16.08
D 25 mm 0 m 305 20.25
E 32 mm 0 m 510 26.85
F 40 mm 0 m 70 39.35
G 50 mm 0 m 80 55.85
H 63 mm 0 m 15 73.39
J 75 mm 0 m 10 102.05

HOT WATER SYSTEM INSTALLATION


Solar heater system of capacity 22 kw stand by electric
coil. all pipes,valves,control, solar collectors,....etc. shall
K be manufactured from approved raw materials in Item Ex
accordance with standard, complete with all accessories
according to drawing and specification

To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM
HOT WATER SYSTEM INSTALLATION

Supply, installation, testing, commissioning handing over


and guarantee the following works:

All PPR-CT pipes shall be manufactured from approved


raw materials in accordance with standard, for hot and
cold water inside wall. The material is a polypropylene
random improved temperature resistance and including
gate valves, solenoid valves, strainers, check valves,
automatic reducing valve and all accessories according to
drawing and specification

A 20 mm 0 m 585 16.08
B 25 mm 0 m 195 20.25
C 32 mm 0 m 225 26.85
D 40 mm 0 m 75 39.35
E 50 mm 0 m 55 55.85
F 63 mm 0 m 20 73.39

Supply, installation, testing, commissioning handing


over and guarantee the following works (Specification
ref. 15145)

Insulation for hot water imbedded and above False


Ceiling for PPR-CT pipes pipe shall be with flexible nitrite
rubber with thermal conductivity of 0.037 W/M°K at 24°C
suitable for use up to 75°C. It shall be preformed. The
complete insulation system shall be fire retarding and does
not exit toxic gas when expose to fire.

G 20 mm 0 m 585 28.00

H 25 mm 0 m 195 30.40

J 32 mm 0 m 225 33.40

K 40 mm 0 m 75 37.00

L 50 mm 0 m 55 43.00
M 63 mm 0 m 20 57.00

To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM
IRRIGATION WATER SYSTEM INSTALLATION

All pipes,valves,control,....etc. shall be manufactured from


approved raw materials in accordance with standard, for
cold water under ground. with all accessories according to
drawing and specification All PPR pipes shall be
manufactured from approved raw materials in accordance
A item EX EX
with standard, for hot and cold water inside wall. The
material is a polypropylene random improved temperature
resistance and including gate valves, solenoid valves,
strainers, check valves, automatic reducing valve and all
accessories according to drawing and specification

B 20 mm 0 m 25 EX

Mechaical Works at water (non potable water) tanks (33


m3) complete with all components c/w,float valves and
C over flow connections, all necessary pipes, fittings and nr 1 8500.00
accessories as required by the drawings, standard and
specifications

Mechaical Works at water ( potable water) tanks (33 m3)


complete with all components c/w,float valves and over
D flow connections, all necessary pipes , fittings and nr 1 8500.00
accessories as required by the drawings, standard and
specifications

Mechaical Works at gray water tanks (17m3) complete


with all components c/w,float valves and over flow
E nr 1 8500.00
connections, all necessary pipes, fittings and accessories
as required by the drawings, standard and specifications

Mechaical Works at treated water (non potable water)


tanks (40 m3) complete with all components c/w,float
F valves and over flow connections, all necessary pipes, nr 1 8500.00
fittings and accessories as required by the drawings,
standard and specifications
Mechaical Works at storm water (non potable water) tanks
(35 m3) complete with all components c/w,float valves
G and over flow connections, all necessary pipes, fittings and nr 1 8500.00
accessories as required by the drawings, standard and
specifications
To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM
IRRIGATION WATER SYSTEM INSTALLATION

Mechaical Works at storm water (non potable water) tanks


(35 m3) complete with all components c/w,float valves
A and over flow connections, all necessary pipes, fittings and nr 1 8500.00
accessories as required by the drawings, standard and
specifications

Mechaical Works at roof water (potable water) tanks (33


m3) complete with all components c/w, float valves and
B over flow connections, all necessary pipes, fittings and nr 1 35000.00
accessories as required by the drawings, standard and
specifications

Transfer pumps set (non-potable wate) Refer to the


schedule of pumps and drawings, flow rate 16 m 3/h and
C nr 2 13000.00
head 4.5 bar as per drawings, complete with all
accessories

Storm water transfer pumps set (non-potable water) Refer


to the schedule of pumps and drawings, flow rate 12 rrrVh
D nr 2 12500.00
and head 4bar as per drawings, complete with all
accessories

E HI-rate sand filter 16 g/m/ft2 D=600 mm, complete


with all accessories nr 1 27000.00

Roof Booster pumps set (potable water) Refer to the


schedule of pumps and drawings, flow rate 2m3/ h and
nr 2 7500.00
head 2.5 bar as per drawings,complete with pipes, fittings
and all accessories

Irrigation pumps set Refer to the schedule of pumps and


F drawings, flow rate 2 m3/h and head 4 as per drawings, nr 2 7500.00
complete with all accessories
Transfer pumps set treated (non-potable wate) Refer to the
schedule of pumps and drawings, flow rate 2 m3/h and
G nr 2 8000.00
head 4 bar as per drawings, complete with pipes,fittings
and all accessories

Transfer pumps set (non-potable wate) Refer to the


schedule of pumps and drawings, flow rate 10 m3/ h and
H nr 2 7500.00
head 4.5 bar as per drawings, complete with pipes,fittings
and all accessories
To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate
SECTION S
PIPED SUPPLY SYSTEM

SWIMMING POOL

Mechanical works For swimming pool with re circulation


rate 7.3 l/s and surge tank 5 m3 complete with all inlets,
A drain points, back flow oreventer, all components and all item 1 53000.00
necessary accessories as per the standard and
specifications

To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate

SECTION S
PIPED SUPPLY SYSTEM

Page No. B1/S/1

Page No. B1/S/2

Page No. B1/S/3

Page No. B1/S/4

Page No. B1/S/5

Page No. B1/S/6


PIPED SUPPLY SYSTEM Carried to Summary
Amount(QR)

2030

2800

12600

17850

3900
39180
Amount(QR)

950

6600

9968.91
6175.40
13691.41
2754.56
4467.97
1100.85
1020.48
46,729.56
Amount(QR)

9406.14
3948.20
6040.33
2951.31
3071.73
1467.80

16380.00

5928.00

7515.00

2775.00

2365.00
1140.00

62,988.52
Amount(QR)

8500.00

8500.00

8500.00

8500.00
8500.00

42,500.00
Amount(QR)

8500.00

35000.00

26000.00

25000.00

27000.00

15000.00

15000.00
16000.00

15000.00

182,500.00
Amount(QR)

53000.00

53000
Amount(QR)

39,180.00

46,729.56

62,988.52

42,500.00

182,500.00

53,000.00
426,898.08
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U
VENTILATION/AIR CONDITIONING SYSTEMS
BUILDER'S WORK

Allow for builder work in connection with ventilation, air-


conditioning installation.

A Holes, openings, chases, cutting back, building in pipes,


ductwork, sleeves, lintels over openings and making good item 1 7500 7500
finishing as necessary

B Concrete plinths including waterproofing for all


equipment and the like as necessary item 1 EX

C Additional structural steel support framing to duct work /


pipework in plant rooms or exposed on roof as necessary ; item 1 5000 5000
include for weather proof paint finish

D Fire stopping pipework or ductwork penetrating through


floors or walls item 1 75000 75000

E Weatherproof paint finishing as necessary to exposed pipe


supports and ductwork supports item 1 5000 5000
To Collection 92,500.00
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U
VENTILATION/AIR CONDITIONING SYSTEMS
A/C INSULATION

Duct Installation

Supply, installation, testing, commissioning, handing over


and guarantee the following works: Chilled water pipe
section, fiber glass thermal insulation,
for the chilled water piping complete with the aluminium
for all pipes and valves cladding after insulation 0.6mm
thick complete with all accessories, according to the
drawings, specifications and (SMACNA) standard and
ASHRAE standard

A (CH.W.P.) Insul. : 025 mm M 930 40 37200

B (CH.W.P.) Insul. : 032 mm M 426 46 19596

C (CH.W.P.) Insul. : 040 mm M 180 53 9540

D (CH.W.P.) Insul. : 050 mm M 75 60 4500

E (CH.W.P.) Insul. : 065 mm M 75 67 5025

F (CH.W.P.) Insul. : 080 mm M 25 72 1800

G (CH.W.P.) Insul. : 0125 mm M 115 85 9775


To Collection 87,436.00
BILLS OF QUANTITIES

Item Description Unit Qty Rate Amount(QR)

SECTION U VENTILATION/AIR CONDITIONING


'
SYSTEMS[Cont d]
Duct Insulation

Supply, installation, testing commissioning handing over


and guarantee the following works:

Fiber glass, thermal insulation for the supply and return air
ducts, with aluminum foil covered and aluminum tip and
A all accessories, as specified and according to the drawings item 1 185000 185000
and (SMACNA) standard

Ducted units shall be provided with pin., mixing box,


supply and return air duct, complete with acoustic lining
B insulation thickness and density as specified and as per item 1
(SMACNA) and standard codes

METER AND GAUGES

Supply, installation, testing, commissioning handing


over and guarantee the following works:

C BTU meter 20 mm diameter item 35 600 21000

D BTU meter 25 mm diameter item 21 700 14700


To Collection 220700
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U VENTILATION/AIR CONDITIONING

SYSTEMS[Cont'd] Heat Exchanger

Supply, installation, testing, commissioning handing over


and guarantee the following works plate heat exchanger
(P.H.E.) complete with all valves, fittings, insulation, and
all necessary accessories required for

proper function and operation, and as per Marafeq


requirements.

A Plate heat exchanger P.H.E.-1,180 TR, 260 GPM, ref.


P.H.E.-1 nr 2 57500.00 115000.00

A/C PUMPS
SECONDARY CHILLED WATER PUMP

Supply, installation, testing, commissioning handing over


and guarantee the following works: Secondary chilled
water pump, horizontal split case, centrifugal type as
specified and complete with all necessary accessories
required for proper function and operation.

B CH.W.P,260 GPM, 20M head nr 2 25000.00 50000.00

PRESSURIZATION UNIT

Supply, installation, testing, commissioning handing


over and guarantee the following works:
C Chilled water pressurization unit with expansion tanks.
The unit consists of makeup tank, high pressure injection nr 1 19500.00 19500.00
pump, filters, all fittings and accessories
To Collection 184,500.00
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U VENTILATION/AIR CONDITIONING
SYSTEMS[Cont'd] HYDRONIC PIPING

Chilled Water Pipes

Supply, installation, testing, commissioning handing over


and guarantee the following works: Chilled water network,
seamless black steel type, complete with fittings, hangers,
supports, anti-rust

painting, vent cocks, and all accessories according to the


drawing and specifications for the following:

A (CH.W.P.) : 025 mm M 780 55.00 42900.00

B (CH.W.P.) : 032 mm M 355 60.00 21300.00

C (CH.W.P.) : 040 mm M 150 65.00 9750.00

D (CH.W.P.) : 050 mm M 60 75.00 4500.00

E (CH.W.P.) : 065 mm M 50 80.00 4000.00

F (CH.W.P.) : 080 mm M 20 85.00 1700.00

G (CH.W.P.) : 0125 mm M 95 110.00 10450.00


To Collection 94,600.00
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)

SECTION U VENTILATION/AIR
CONDITIONING
SYSTEMS[Cont'd]

Valves For A/C Piping

A Supply, installation, testing, commissioning handing over


and guarantee the following works: gate valves, double
regulating valve, non return valves, strainers, flexible
connections, automatic air vents, thermometers, gauges,
unions, flanges, ball valves, globe valves, pressure item
reducing valves, and all accessories according to the
drawing and specifications

20 mm diameter gate valves Nos 979 72 70488


20 mm diameter double regulating valves Nos 303 145 43935
20 mm Strainer Nos 303 77 23331
40mm diameter double regulating valves Nos 1 240 240
40mm diameter gate valves Nos 5 118 590
40mm diameter Strainer Nos 1 290 290
100mm diameter Isolating Valves Nos 10 666 6660
100 mm Automatic air vent Nos 4 560 2240
100 mm Check Valves Nos 2 1510 3020
PIC VLAVE 100 MM BEFORE HEAT EXCHANGER Nos 2 25500 51000

To Collection 201794
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U VENTILATION/AIR CONDITIONING

AIR HANDLING UNIT


Supply, installation, testing, commissioning, handing over
and guarantee the following works: Constant air volume,
double skin air handling unit, complete with the following:
Mixing box section with all

accessories, Primary-cleanable air filter section. Chilled


water coil section with strainer, air vent, and drain pipe to
nearest drain point, Supply air fan section (with constant
speed motor). Fresh air intake section, Supply

air plenum section with all accessories Control, safety,


balancing, measuring devices. Elect. Power control,
earthing network and elect. Cable power connections,
Control volume dampers, flexible connections, Vibration
isolators and Acoustic treatment supports and paint, rubber
pads, sealers for sound and leakage isolation and thermal
insulation of the unit complete with cladding, tags, labels,
flow indicators and colour code finishing, thermostat, ,
pressure gauge, thermometer, duct smoke detector and all
necessary accessories required for proper function and
operation.

A Fresh Air Handling Unit FAHU-01 ,8300 CFM, 16


TR ref. F.A.H.U-01 nr 1 67500 67500

Terminal Heating And Cooling unit


Supply, installation, testing, commissioning handing over
and guarantee the following works: fan coil unit ducted
horizontal ceiling suspended or decorative high wall type
complete with all necessary accessories for proper
function and operation.

B Ditto ;200 CFM, 0.60 TR ref. FCU-01 nr 88 1340 117920


C Ditto ;300 CFM,0 .8 TR ref. FCU-02 nr 43 1720 73960
D Ditto ;400 CFM, 1.15 TR ref. FCU-03 nr 78 2385 186030
E Ditto ;600 CFM, 1.6 TR ref. FCU-04 nr 35 3240 113400
F Ditto ;800 CFM, 2.125 TR ref. FCU-05 nr 48 4240 203520
G Ditto ;800 CFM, 2.6 TR ref. FCU-06 nr 10 5140 51400
H Ditto ;800 CFM, 3.10 TR ref. FCU-07 nr 1 6090 6090

Ditto ;400 CFM,1.50 TR ref. SP-01 nr 1 3050 3050

To Collection 822,870.00
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U V
ENTILATION/AIR CONDITIONING

ENERGY RECOVERY UNIT

Supply, installation, testing, commissioning handing over


and guarantee the following works: Energy Recovery unit
as shown and as specified
complete with all component and all necessary
accessories required for proper function and operation.

A Energy Recovery Units, 8300 CFM Fresh air, 9700 nr 1


CFM Exhaust air, 16 TR ref. ERU-01

METAL DUCTS
Supply, installation, testing, commissioning handing over
and guarantee the following works:

B Galvanized sheet metal duct work for the supply, return,


exhaust, duct, fresh air intake and exhaust for
ventilation unit, complete with hangers, supports,
flexible connections, access doors, flexible duct, spring
hanger, plenum box, mixing box, aluminium jacket
cladding for exposed duct, volume control and fire item 1 615000 615000
dampers, complete as specified; fixing in duct work and
all accessories, according to the drawings,
specifications, and (SMACNA) standard

DECOURATIVE UNIT

DIRECT EXPANSION

C 730 CFM ,3 TR ref SP.U-02 nr 4 5700 22800


To Collection 637,800.00
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U

VENTILATION/AIR CONDITIONING
CENTRIFUGAL FANS

Supply, installation, testing, commissioning handing


over and guarantee the following works: Exhaust and
Fresh air fans, centrifugal type complete with component
as specified and all necessary
accessories for proper function and operation.

A Upper Roof /Stair-1 8050 cfm Ref. PR.F-1 nr 1 16700 16700


B Lower Roof/ Stair-2 7600 cfm Ref. PR.F-2 nr 1 15700 15700
C Lower Roof / Kitchin 500 cfm ref. ex-06 nr 1 1450 1450
D Lower Roof / Kitchin 350 cfm ref. ex-07 nr 1 950 950
E Lower Roof / Kitchin 750 cfm ref. ex-08 nr 1 1700 1700
F Lower Roof / Kitchin 500 cfm ref. ex-09 nr 5 1300 6500
G Lower Roof / Kitchin 1000 cfm ref. ex-10 nr 1 2350 2350
H Lower Roof / Kitchin 850 cfm ref. ex-11 nr 1 1850 1850

Axial Fans
Supply, installation, balancing, testing, commissioning and
guarantee the following: Exhaust and ventilation fans, roof
tope type or in-line type, aerofoil axial flow duct mounted
types, complete with component as specified and all
necessary accessories for proper function and operation. .

J Basement / car park2 Speed Axial Fan 14.000/24.000 cfm


ref. EX.F-01 nr 2 25850 51700

K Basement / Fire Pump Room 800 cfm ref. EX.F-2 nr 1 1800 1800

L Basement / Domestic pump room 600 cfm ref. EX.F-03 nr 1 1400 1400

M Basement /Tratment room 900 cfm ref. EX.F-04 nr 1 2000 2000

N Basement /sorm p. room 750 cfm ref. EX.F-05 nr 1 1650 1650

P Basement /genrator room 500 cfm ref. EX.F-06 nr 1 1250 1250


Q Basement /genrator room 500 cfm ref. EX.F-06 nr 1 1250 1250

R BASMENT / PARK 14000/24000 CFM ref. S.A.F-01 nr 1 25850 25850

S BASMENT / FIRE P . ROOM 800 CFM ref.S.A.F-02 nr 1 1750 1750

To Collection 135850
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)

SECTION U

VENTILATION/AIR CONDITIONING

AIR OUTLET AND INLET


A
Supply, installation, testing, commissioning handing over
and guarantee the following works: Powder coated
aluminium for supply, return, exhaust, fresh air outlets
(ceiling diffusers, side wall grilles, exhaust air grilles and
linear slot diffusers) complete with flexible connections, item 1 70000 70000
volume dampers, sand trap louver, door louver, and all
accessories as mentioned on the drawings and
specifications

To Collection 70,000.00
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U VENTILATION/AIR CONDITIONING

BUILDING MANAGEMENT SYSTEM

Supply, installation, testing, commissioning handing over


and guarantee the following works:

A A high quality Building Management System (BMS) . The


system offered shall be completely modular in structure
and freely expandable at any stage. Each level of the
system shall operate independently of the next level up.
The system shall fully be consistent with the latest
industry standards, shall be PC Based, operating on
Windows server or later, allowing the user to make full use
of the features provided with these operating systems. It item
shall combine the latest state-of-the-art technology with
simple operating techniques and shall be used to control,
manage alarms/reports and monitor the building service
installations

Refer to the Specification for the interface systems


/ items to the BMS.

B Control connections of all equipment to the building


management system complete with input & output
devices, wiring connections and all accessories according item EX
to the specifications, and data point schedule

TESTING, ADJUSTING AND BALANCING

C Allow for testing, adjusting, balancing and commissioning


of the Mechanical systems, by an independent specialized item
company

D Allow for operation, maintenance, and guarantee as per


specifications item

Allow for tools and spare parts necessary


for the equipment, as per requirements
To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)
SECTION U VENTILATION/AIR CONDITIONING

GAS SYSTEM

PR.S UNIT nr 1

ISOLATING VALVES

A 20 mm nr 42

B 32 mm nr 9

C GAS METERS seamless galvanzed steel For Gas nr 42

D 20 mm m 115
E 25 mm m 35
F 32 mm m 50
G 40 mm m 35
H 50 mm m 25
To Collection
BILLS OF QUANTITIES
Item Description Unit Qty Rate Amount(QR)

SECTION U

VENTILATION/AIR CONDITIONING

Collection

Page No. B1/U/1 92,500.00


Page No. B1/U/2 87,436.00
Page No. B1/U/3 220,700.00
Page No. B1/U/4 184,500.00
Page No. B1/U/5 94,600.00
Page No. B1/U/6 201,794.00
Page No. B1/U/7 822,870.00
Page No. B1/U/8 637,800.00
Page No. B1/U/9 135,850.00
Page No. B1/U/10 70,000.00
Page No. B1/U/11 0
VENTILATION/AIR CONDITIONING SYSTEMS To Collection 2,548,050.00
SYNTHETIC NATURAL GAS SYSTEM

Mechanical works for SNG system with pressure reducing station,


main gas meter, units gas meters complete with pipes, fitting, all other
B components and all necessary accessories as per the drawing and item 1
specifications., all work shall done according to MARAFEQ
regulation and standard
285000.00 285000.00