Power Plant Engineering - Maximum Expected Demand Form

TRANSFORMER No.
Residential Lighting:
Type A
Maximum Demand = at kW for customers x 0.5 = 0 kW
Type B
Maximum Demand = at kW for customers x 0.5 = 0 kW
Type C
Maximum Demand = at kW for customers x 0.5 = 0 kW
Total Residential Lighting 0 kW
Commercial Lighting :
Street Lighting at kW ( x ) x 0.70 = 0 kW
Restaurants at kW ( x ) x 0.70 = 0 kW
Stores at kW ( x ) x 0.70 = 0 kW
Offices at kW ( x ) x 0.70 = 0 kW
Theater at kW ( x ) x 0.60 = 0 kW
Small Industries at kW ( x ) x 0.60 = 0 kW
Schools at kW ( x ) x 0.55 = 0 kW
Churches at kW ( x ) x 0.55 = 0 kW
Hotels at kW ( x ) x 0.50 = 0 kW
Hospitals at kW ( x ) x 0.70 = 0 kW
Barber Shop at kW ( x ) x 0.70 = 0 kW
Refreshment at kW ( x ) x 0.70 = 0 kW
Parlors
Total Commercial Lighting 0 kW
General Power Services: (For electric fans, ventilation, refrigeration, freezers, heaters,
airconditioners, power tools,home appliances, etc )
1/8 hp ( x 0.125 x 0.746/0.72### x 0.75 = 0.00 kW
1/4 hp ( x 0.25 x 0.746/0.72### x 0.75 = 0.00 kW
1/2 hp ( x 0.5 x 0.746/0.72### x 0.75 = 0.00 kW
3/4 hp ( x 0.75 x 0.746/0.72### x 0.75 = 0.00 kW
1.0 hp ( x 1 x 0.746/0.72### x 0.75 = 0.00 kW
1.50 hp ( x 1.5 x 0.746/0.72### x 0.75 = 0.00 kW
2 hp ( x 2 x 0.746/0.72### x 0.75 = 0.00 kW
5 hp ( x 5 x 0.746/0.72### x 0.75 = 0.00 kW
10 hp ( x 10 x 0.746/0.72### x 0.75 = 0.00 kW
hp ( x x 0.746/0.72### x 0.75 = 0.00 kW
Total General Power 0.0 kW
Maximum Expected Demand for Transformer No. ______
(TRL) (TCL+TGP)
Maximum Expected Demand = ( 0.0 / 3.5) + ( 0.0 / 1.5) = 0.00 kVA
With Power Factor of 85%
0 kVA / 0.85 = 0 kVA say kVA