Professional Documents
Culture Documents
PROJECT SUMMARY
Work Completed
January 2018
LOCATION :
Batang – Semarang, Central Java
CLIENT:
PT. Waskita Karya, Tbk
SITE WORK:
Bored Pile Installation for Diameter 1 m
and 1,5m with depth 15-30m
Main Bridge 5 Unit and JPO Bridge 4
Unit with total 700 Point of bored pile
Schedule December 2016 until January
2018
EQUIPMENT:
Hydroulic Piling Rig Sany SR200C (2
unit)
Cawler Crane 70 Ton (1 unit)
Excavator Sany SR 215 (1 unit)
Standart Bucket drilling, Core Barel and
Special core for river stone bucket
Toll Road Jakarta Cikampek II (Elevated)
Bored Pile Project
PROJECT SUMMARY
Work On Going
Start November 2017
LOCATION :
Bekasi, West Java
CLIENT:
PT. Waskita Karya, Tbk
SITE WORK:
Bored Pile Installation with polymer
Diameter 1,2 m with depth 30-40 m
EQUIPMENT:
Hydroulic Piling Rig Sany SR200C (1
unit)
Cawler Crane 70 Ton (1 unit)
Excavator Sany SR 215 (1 unit)
Standart Bucket drilling, Core Barel and
Polymer Slurry Tools
Meikarta
Bored Pile Project
PROJECT SUMMARY
Work Completed
October 2017
LOCATION :
Lippo Cikarang, West Java
CLIENT:
CSCEC-SAJR JO
SITE WORK:
Bored Pile Installation for Diameter 1 m
with depth 30-40 m
3 unit Building with total 700 Point of
bored pile
Schedule April 2017 until October 2017
EQUIPMENT:
Hydroulic Piling Rig Sany SR200C (2
unit)
Cawler Crane 70 Ton (2 unit)
Excavator Sany SR 215 (2 unit)
Standart Bucket drilling, Core Barel and
Polymer Tools