Project No.

DU Numbe DU Name HW Contra Customer ITEM COD Category* PP Line Description UOM* HW Actual BSPT PO Qty Actual Field QTY Product PO AmountService ProRemain Qt Remain Am
Leyte-Abuyog-
5532071 V0207 Capilian 000608160665975 88187EWBENGINEERC0C01007_Form works_VIS M*M 78.64 78.6400 79.77 0.00000 9210510 0.0000 0.00000
C0C02011_Supply & install
Leyte-Abuyog- Steel Gate 3m width with all
5532071 V0207 Capilian 000608160665975 88187QNGENGINEERaccessories_VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00005_Perimeter fence
Leyte-Abuyog- CHB wall, column & footing
5532071 V0207 Capilian 000608160665975 88187GEL ENGINEERworks_VIS M 41 41.0000 41 0.00000 9210510 0.0000 0.00000
C2I00002_Standard
Leyte-Abuyog- Penetration Test Service(SPT
5532071 V0207 Capilian 000608160665975 88187NVX ENGINEERneeded by Smart)_VIS SITE 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C0E01016_Install Obstruction
Light (Twin lights) with
Leyte-Abuyog- Photocell (Supply by
5532071 V0207 Capilian 000608160665975 88187MQRENGINEERHuawei)._VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00105_Install roofing
system (Sun shelter supply by
Leyte-Abuyog- Huawei) amd accessories for
5532071 V0207 Capilian 000608160665975 88187JFM ENGINEEROut Door equipment _VIS SITE 1 1.0000 1 0.00000 9210510 0.0000 0.00000
Leyte-Abuyog-
5532071 V0207 Capilian 000608160665975 88187ECB ENGINEERC0C01005_Lean concrete_VIS cu.m. 6.89 3.7000 3.7 0.00000 9210510 0.0000 0.00000
Leyte-Abuyog- C0C02013_Service Entrance
5532071 V0207 Capilian 000608160665975 88187NLN ENGINEERPedestal Works _VIS LOT 1 1.0000 0.00000 9210510 0.0000 0.00000
Leyte-Abuyog- C3S00017_75mm Thick
5532071 V0207 Capilian 000608160665975 88187PDY ENGINEERConcrete Apron Slab_VIS M*M 4.5 4.5000 4.5 0.00000 9210510 0.0000 0.00000
C2I00092_Supply & install
Leyte-Abuyog- Grounding Bus bar (16 holes -
5532071 V0207 Capilian 000608160665975 88187PEU ENGINEEREquipment pad)_VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00099_Supply & install
power cables (Ob light):- 2-
Leyte-Abuyog- 3.5mm2 THHN & 1-3.5mm2, in
5532071 V0207 Capilian 000608160665975 ENGINEER15mm Ø IMC Pipe._VIS M 55 55.0000 55 0.00000 9210510 0.0000 0.00000
C2I00083_Supply & install
Copper lightning arrester
Leyte-Abuyog- (25mm Ø x 3m) with
5532071 V0207 Capilian 000608160665975 ENGINEERaccessories._VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
Leyte-Abuyog-
5532071 V0207 Capilian 000608160665975 88187JFE ENGINEERC0C01006_Rebar works _VIS KG 5907.76 6649.3200 6738.88 0.00000 9210510 0.0000 0.00000
C2I00086_Supply & install
Leyte-Abuyog- 50mm² insulated copper wire
5532071 V0207 Capilian 000608160665975 ENGINEER(color green)_VIS M 51 95.0000 100 0.00000 9210510 0.0000 0.00000
C0C02002_Supply, level &
Leyte-Abuyog- compaction of imported
5532071 V0207 Capilian 000608160665975 88187JXQ ENGINEERsoil._VIS cu.m. 52 64.6200 56.32 0.00000 9210510 0.0000 0.00000
C0E01013_Install Outdoor
Leyte-Abuyog- electrical accessories (supply
5532071 V0207 Capilian 000608160665975 88187KGC ENGINEERby Huawei)_VIS LOT 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C0D01005_GF Tower erection
Leyte-Abuyog- works (≤ 40 m 3 Legged SST
5532071 V0207 Capilian 000608160665975 ENGINEERTower)_VIS LOT 1 1.0000 0.00000 9210510 0.0000 0.00000
Leyte-Abuyog- C0C01009_Concreting works
5532071 V0207 Capilian 000608160665975 88187FRP ENGINEERfor other civil works_VIS cu.m. 4.25 4.2500 4.25 0.00000 9210510 0.0000 0.00000
C2I00103_Supply and install
Leyte-Abuyog- photo cell (adaptable to
5532071 V0207 Capilian 000608160665975 88187LGQ ENGINEERperimeter light) _VIS SET 1 1.0000 0.00000 9210510 0.0000 0.00000
C2I00004_Supply, level &
Leyte-Abuyog- compaction of 100mm thick
5532071 V0207 Capilian 000608160665975 88187PWCENGINEERgravel _VIS M*M 101 104.0000 104 0.00000 9210510 0.0000 0.00000
C0F01007_Supply & install
300 x 300 x 400mm Grounding
Test Pit / handhole complete
Leyte-Abuyog- with steel plate cover with
5532071 V0207 Capilian 000608160665975 88187KFT ENGINEERhandle._VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00063_Supply & install
underground power cables:- 2-
Leyte-Abuyog- 50mm2 THHN & 1-14mm2, in
5532071 V0207 Capilian 000608160665975 ENGINEER40mm Ø PVC Pipe._VIS M 6 6.0000 7 0.00000 9210510 0.0000 0.00000

C0B01002_Mobilization,
Leyte-Abuyog- preliminaries & Demobilization
5532071 V0207 Capilian 000608160665975 88187ECQ ENGINEERservices for GF Site_VIS SITE 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00091_Supply & install
500mm x 500mm x 500mm
Grounding Test Pit / handhole
Leyte-Abuyog- complete with steel plate cover
5532071 V0207 Capilian 000608160665975 88187NMWENGINEERwith handle._VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000

C2I00095_Supply & install


Leyte-Abuyog- Grounding Bus bar (32 holes,
5532071 V0207 Capilian 000608160665975 88187GPV ENGINEER340mm x 100mm x 6mm)_VIS SET 3 3.0000 3 0.00000 9210510 0.0000 0.00000
C0E01002_Supply & install
Leyte-Abuyog- KWH meter and panel c/w
5532071 V0207 Capilian 000608160665975 88187GER ENGINEERsecurity grill_VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00102_Supply and install
pad lock with 3 keys (yale) - 2
Leyte-Abuyog- sets 20mm and 1 set 40mm
5532071 V0207 Capilian 000608160665975 88187QFV ENGINEERpad lock_VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000

C2I00074_Supply & install


underground power cables
(Perimeter Light):- 2-3.5mm2
THHN & 1-3.5mm2, in 10mm
Leyte-Abuyog- Ø PVC Pipe, concrete
5532071 V0207 Capilian 000608160665975 ENGINEERencased._VIS M 30 30.0000 42 0.00000 9210510 0.0000 0.00000
C0B01004_Delivery services
for other materials from
Leyte-Abuyog- Huawei Warehouse to Site
5532071 V0207 Capilian 000608160665975 88187KYR ENGINEER_VIS SITE 1 1.0000 0.00000 9210510 0.0000 0.00000
Leyte-Abuyog- C0C01008_Concreting works
5532071 V0207 Capilian 000608160665975 88187ELE ENGINEERfor Tower Foundations_VIS cu.m. 49.27 47.9000 49.45 0.00000 9210510 0.0000 0.00000

C2I00101_Supply & install of


sun shelter lighting 20watts
ESL, sucket, 2-3.5 mmsq
duplex wire power cable in
PVC flexible conduit (10 m)
Leyte-Abuyog- and complete
5532071 V0207 Capilian 000608160665975 88187LYR ENGINEERaccessories._VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00062_Supply & install
exposed (above ground) power
cables:- 2-50mm2 THHN & 1-
Leyte-Abuyog- 14mm2, in 40mm Ø IMC
5532071 V0207 Capilian 000608160665975 ENGINEERPipe._VIS M 6 6.0000 6 0.00000 9210510 0.0000 0.00000
C2I00089_Supply & install
Leyte-Abuyog- 50mm2 bare copper wire in
5532071 V0207 Capilian 000608160665975 ENGINEER20mm Ø PVC pipe. _VIS M 10 10.0000 10 0.00000 9210510 0.0000 0.00000
C2I00006_Perimeter fence
Leyte-Abuyog- barbed wire works (SMART
5532071 V0207 Capilian 000608160665975 88187JDJ ENGINEERSpec.)_VIS M 41 41.0000 41 0.00000 9210510 0.0000 0.00000
C0E01001_Supply & install all
electrical accessories for
Leyte-Abuyog- Service Entrance
5532071 V0207 Capilian 000608160665975 88187HQHENGINEERPedestal_VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000
Leyte-Abuyog- C0C01003_Excavation works
5532071 V0207 Capilian 000608160665975 88187NQX ENGINEERfor Soil_VIS cu.m. 144.67 159.0140 159.01 0.00000 9210510 0.0000 0.00000
C0C01004_Backing filling work
Leyte-Abuyog- & compaction works for tower
5532071 V0207 Capilian 000608160665975 88187PQD ENGINEERfoundation_VIS cu.m. 91.14 105.8420 109.48 0.00000 9210510 0.0000 0.00000
C0C04001_Supply & install
Leyte-Abuyog- 600mm width outdoor cable
5532071 V0207 Capilian 000608160665975 88187KDF ENGINEERtray._VIS M 10 10.0000 10 0.00000 9210510 0.0000 0.00000
C2I00090_Supply & install
Leyte-Abuyog- 16mm Ø. X 3m copper clad
5532071 V0207 Capilian 000608160665975 ENGINEERground rod._VIS PCS 5 9.0000 9 0.00000 9210510 0.0000 0.00000
C0B01003_Delivery services
for tower & related materials
from Huawei Warehouse to
Leyte-Abuyog- site (GF) (Total weight below or
5532071 V0207 Capilian 000608160665975 88187KDA ENGINEERequal 20 TON)_VIS SITE 1 1.0000 1 0.00000 9210510 0.0000 0.00000
C2I00088_Supply & install
Leyte-Abuyog- 50mm² bare copper wire.
5532071 V0207 Capilian 000608160665975 ENGINEER(underground ring)_VIS M 37 70.0000 70 0.00000 9210510 0.0000 0.00000
C0E01014_Supply & install
Leyte-Abuyog- perimeter light and all
5532071 V0207 Capilian 000608160665975 88187GEX ENGINEERaccessories._VIS SET 2 2.0000 0.00000 9210510 0.0000 0.00000
C0C04002_Supply & install
Leyte-Abuyog- OD Type ACPDB/MTS
5532071 V0207 Capilian 000608160665975 88187NEMENGINEERstandframe_VIS KG 41 41.0000 41 0.00000 9210510 0.0000 0.00000
C2I00060_Supply & install
Leyte-Abuyog- MCB/ECB in NEMA 3R -
5532071 V0207 Capilian 000608160665975 88187EPC ENGINEER100A_VIS SET 1 1.0000 1 0.00000 9210510 0.0000 0.00000

C0C01001_Excavation,
Leyte-Abuyog- backfilling & compaction works
5532071 V0207 Capilian 000608160665975 88187HPP ENGINEERfor other civil works_VIS cu.m. 5 5.0000 1 0.00000 9210510 0.0000 0.00000
C0B01001_As-built
Leyte-Abuyog- documentation (end to end)
5532071 V0207 Capilian 000608160665975 88187LFV ENGINEERservices._VIS SITE 1 1.0000 1 0.00000 9210510 0.0000 0.00000

30.8
Unit Price* Start Date End Date PP Type Customer SCustomer SPP Status Sub Projec Project Na Current Ha AP ID PP PreparePP Creatio PP ApprovePP ApprovePP ApprovePP ApprovePR Plan Rate

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%
0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%
0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%
0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%

0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase731513 Dalton Terr 2017-03-08 16:24:55 100%
Project No. DU Numbe DU Name HW Contra Customer ITEM COD Category* PP Line Description UOM* huawei Actual BSPT PO Qty Actual Field Qty Product PO AmountService Pro
C0G00002_Supply & install
Antenna Support
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187GXY ENGINEERStructures_VIS KG 419 789.5400 0.00000 9210510
C2I00002_Standard
Penetration Test
Service(SPT needed by
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187NVX ENGINEERSmart)_VIS SITE 1 1.0000 1 0.00000 9210510
C0E01001_Supply & install
all electrical accessories for
Service Entrance
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187HQHENGINEERPedestal_VIS SET 1 1.0000 1 0.00000 9210510

C0C02013_Service Entrance
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187NLN ENGINEERPedestal Works _VIS LOT 1 1.0000 1 0.00000 9210510
C0C01006_Rebar works
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187JFE ENGINEER_VIS KG 5631.86 6649.3200 6530.77 0.00000 9210510

C2I00092_Supply & install


Grounding Bus bar (16 holes
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187PEU ENGINEER- Equipment pad)_VIS SET 1 1.0000 1 0.00000 9210510
C2I00088_Supply & install
50mm² bare copper wire.
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEER(underground ring)_VIS M 37 70.0000 80 0.00000 9210510
C2I00005_Perimeter fence
CHB wall, column & footing
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187GEL ENGINEERworks_VIS M 41 41.0000 41 0.00000 9210510
C0C04001_Supply & install
600mm width outdoor cable
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187KDF ENGINEERtray._VIS M 10 10.0000 10 0.00000 9210510
C0C01009_Concreting
works for other civil
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187FRP ENGINEERworks_VIS cu.m. 4.2500 4.2500 4.25 0.00000 9210510

5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187EWBENGINEERC0C01007_Form works_VIS M*M 76.14 78.6400 79.05 0.00000 9210510
C0B01004_Delivery services
for other materials from
Huawei Warehouse to Site
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187KYR ENGINEER_VIS SITE 1 1.0000 1 0.00000 9210510
C0B01001_As-built
documentation (end to end)
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187LFV ENGINEERservices._VIS SITE 1 1.0000 1 0.00000 9210510
C0C02002_Supply, level &
compaction of imported
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187JXQ ENGINEERsoil._VIS cu.m. 52 64.6200 56.32 0.00000 9210510
C0F01007_Supply & install
300 x 300 x 400mm
Grounding Test Pit /
handhole complete with steel
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187KFT ENGINEERplate cover with handle._VIS SET 1 1.0000 1 0.00000 9210510
C2I00083_Supply & install
Copper lightning arrester
(25mm Ø x 3m) with
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEERaccessories._VIS SET 1 1.0000 1 0.00000 9210510
C0E01014_Supply & install
perimeter light and all
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187GEX ENGINEERaccessories._VIS SET 2 2.0000 2 0.00000 9210510
C0C01008_Concreting
works for Tower
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187ELE ENGINEERFoundations_VIS cu.m. 47.9000 47.9000 46.51 0.00000 9210510
C0C01003_Excavation
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187NQX ENGINEERworks for Soil_VIS cu.m. 134.4 159.0140 148.11 0.00000 9210510

C2I00105_Install roofing
system (Sun shelter supply
by Huawei) amd accessories
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187JFM ENGINEERfor Out Door equipment _VIS SITE 1 1.0000 1 0.00000 9210510
C2I00062_Supply & install
exposed (above ground)
power cables:- 2-50mm2
THHN & 1-14mm2, in 40mm
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEERØ IMC Pipe._VIS M 6 6.0000 6 0.00000 9210510
C2I00006_Perimeter fence
barbed wire works (SMART
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187JDJ ENGINEERSpec.)_VIS M 41 41.0000 41 0.00000 9210510
C0C04002_Supply & install
OD Type ACPDB/MTS
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187NEMENGINEERstandframe_VIS KG 41 41.0000 41 0.00000 9210510
C0C02011_Supply & install
Steel Gate 3m width with all
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187QNGENGINEERaccessories_VIS SET 1 1.0000 1 0.00000 9210510
C0C01005_Lean
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187ECB ENGINEERconcrete_VIS cu.m. 3.7000 3.7000 3.44 0.00000 9210510

C2I00101_Supply & install of


sun shelter lighting 20watts
ESL, sucket, 2-3.5 mmsq
duplex wire power cable in
PVC flexible conduit (10 m)
and complete
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187LYR ENGINEERaccessories._VIS SET 1 1.0000 1 0.00000 9210510
C2I00099_Supply & install
power cables (Ob light):- 2-
3.5mm2 THHN & 1-3.5mm2,
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEERin 15mm Ø IMC Pipe._VIS M 55.0000 55.0000 55 0.00000 9210510
C2I00095_Supply & install
Grounding Bus bar (32
holes, 340mm x 100mm x
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187GPV ENGINEER6mm)_VIS SET 3 3.0000 3 0.00000 9210510

C2I00091_Supply & install


500mm x 500mm x 500mm
Grounding Test Pit /
handhole complete with steel
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187NMWENGINEERplate cover with handle._VIS SET 1 1.0000 1 0.00000 9210510
C2I00086_Supply & install
50mm² insulated copper wire
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEER(color green)_VIS M 51 95.0000 100 0.00000 9210510
C2I00004_Supply, level &
compaction of 100mm thick
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187PWCENGINEERgravel _VIS M*M 101 104.0000 101 0.00000 9210510
C0E01013_Install Outdoor
electrical accessories (supply
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187KGC ENGINEERby Huawei)_VIS LOT 1 1.0000 1 0.00000 9210510
C0E01002_Supply & install
KWH meter and panel c/w
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187GER ENGINEERsecurity grill_VIS SET 1 1.0000 1 0.00000 9210510
C0D01005_GF Tower
erection works (≤ 40 m 3
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEERLegged SST Tower)_VIS LOT 1 1.0000 1 0.00000 9210510
C0E01016_Install
Obstruction Light (Twin
lights) with Photocell (Supply
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187MQRENGINEERby Huawei)._VIS SET 1 1.0000 1 0.00000 9210510
C0C01004_Backing filling
work & compaction works for
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187PQD ENGINEERtower foundation_VIS cu.m. 91.14 105.8420 101.51 0.00000 9210510

C0B01003_Delivery services
for tower & related materials
from Huawei Warehouse to
site (GF) (Total weight below
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187KDA ENGINEERor equal 20 TON)_VIS SITE 1 1.0000 1 0.00000 9210510
C2I00103_Supply and install
photo cell (adaptable to
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187LGQ ENGINEERperimeter light) _VIS SET 1 1.0000 1 0.00000 9210510
C2I00090_Supply & install
16mm Ø. X 3m copper clad
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEERground rod._VIS PCS 5 9.0000 9 0.00000 9210510
C2I00089_Supply & install
50mm2 bare copper wire in
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEER20mm Ø PVC pipe. _VIS M 43 10.0000 80 0.00000 9210510

C2I00074_Supply & install


underground power cables
(Perimeter Light):- 2-3.5mm2
THHN & 1-3.5mm2, in 10mm
Ø PVC Pipe, concrete
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEERencased._VIS M 30 30.0000 42 0.00000 9210510
C0C01001_Excavation,
backfilling & compaction
works for other civil
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187HPP ENGINEERworks_VIS cu.m. 5 5.0000 5 0.00000 9210510
C0B01002_Mobilization,
preliminaries &
Demobilization services for
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187ECQ ENGINEERGF Site_VIS SITE 1 1.0000 1 0.00000 9210510
C3S00017_75mm Thick
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187PDY ENGINEERConcrete Apron Slab_VIS M*M 4.5000 4.5000 4.5 0.00000 9210510
C2I00102_Supply and install
pad lock with 3 keys (yale) -
2 sets 20mm and 1 set
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187QFV ENGINEER40mm pad lock_VIS SET 6.0000 1.0000 1 0.00000 9210510

C2I00063_Supply & install


underground power cables:-
2-50mm2 THHN & 1-14mm2,
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 ENGINEERin 40mm Ø PVC Pipe._VIS M 6.0000 6.0000 8 0.00000 9210510
C2I00060_Supply & install
MCB/ECB in NEMA 3R -
5532071 V0208 Leyte-Mahaplag-Cuatro de Agosto 000608160665975 88187EPC ENGINEER100A_VIS SET 1 1.0000 1 0.00000 9210510
Remain Qt Remain AmUnit Price* Start Date End Date PP Type Customer SCustomer SPP Status Sub Projec Project Na Current Ha AP ID PP PreparePP Creatio PP ApprovePP ApprovePP ApprovePP ApprovePR Plan Rate

0.0000 0.00000 0 2017-04-102017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase765208 Dalton Terr 2017-04-07 09:51:42 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%
0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%
0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%
0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%

0.0000 0.00000 0 2017-03-132017-04-28Normal PR APPROVE 480830F SMART 2G FTK Phase732069 Dalton Terr 2017-03-09 10:37:45 100%
Project No. DU Numbe DU Name HW Contra Customer ITEM COD Category* PP Line Description UOM* HUAWEI Actual PO Qty Actual Qty Product

ENGINEERING_SERVICE.SI
00060816 C2I00090_Supply & install 16mm Ø. X 3m copper clad
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO PCS 5 9.0000 9
011825 ground rod._VIS
NSTRUCTION

ENGINEERING_SERVICE.SI C2I00062_Supply & install exposed (above ground)


00060816
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO power cables:- 2-50mm2 THHN & 1-14mm2, in 40mm M 6 8.0000 6
011825
NSTRUCTION Ø IMC Pipe._VIS

ENGINEERING_SERVICE.SI
00060816 88187KD C0C04001_Supply & install 600mm width outdoor
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO M 10 10.0000 10
011825 F cable tray._VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187QN C0C02011_Supply & install Steel Gate 3m width with
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 G all accessories_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187EC
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO C0C01005_Lean concrete_VIS cu.m. 4.9 4.9000 4.9
011825 B
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187NQ
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO C0C01003_Excavation works for Soil_VIS cu.m. 159 219.9600 162.73
011825 X
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187PD
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO C3S00017_75mm Thick Concrete Apron Slab_VIS M*M 4.5 4.5000 4.5
011825 Y
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187PE C2I00092_Supply & install Grounding Bus bar (16
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 U holes - Equipment pad)_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI C2I00074_Supply & install underground power cables


00060816
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO (Perimeter Light):- 2-3.5mm2 THHN & 1-3.5mm2, in M 35 45.0000 48
011825
NSTRUCTION 10mm Ø PVC Pipe, concrete encased._VIS

ENGINEERING_SERVICE.SI
00060816 88187EP C2I00060_Supply & install MCB/ECB in NEMA 3R -
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 C 100A_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187NV C2I00002_Standard Penetration Test Service(SPT
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SITE 1 1.0000 1
011825 X needed by Smart)_VIS
NSTRUCTION
ENGINEERING_SERVICE.SI
00060816 88187NE C0C04002_Supply & install OD Type ACPDB/MTS
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO KG 41 41.0000 41
011825 M standframe_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187LG C2I00103_Supply and install photo cell (adaptable to
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 Q perimeter light) _VIS
NSTRUCTION

ENGINEERING_SERVICE.SI C2I00099_Supply & install power cables (Ob light):- 2-


00060816
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO 3.5mm2 THHN & 1-3.5mm2, in 15mm Ø IMC M 55 65.0000 55
011825
NSTRUCTION Pipe._VIS

ENGINEERING_SERVICE.SI
00060816 88187PW C2I00004_Supply, level & compaction of 100mm thick
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO M*M 143 143.0000 143
011825 C gravel _VIS
NSTRUCTION

ENGINEERING_SERVICE.SI C0F01007_Supply & install 300 x 300 x 400mm


00060816 88187KF
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO Grounding Test Pit / handhole complete with steel plate SET 1 1.0000 1
011825 T
NSTRUCTION cover with handle._VIS

ENGINEERING_SERVICE.SI
00060816 88187MQ C0E01016_Install Obstruction Light (Twin lights) with
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 R Photocell (Supply by Huawei)._VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187KG C0E01013_Install Outdoor electrical accessories
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO LOT 1 1.0000 1
011825 C (supply by Huawei)_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 C2I00086_Supply & install 50mm² insulated copper
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO M 95 120.0000 100
011825 wire (color green)_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 C2I00006_Perimeter fence barbed wire works (SMART
5532071 V0205 Leyte-Capoocan-Culasian 665975 88187JDJ TE_CIVIL_WORKS.SITE_CO M 48 159.0000 48
011825 Spec.)_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 C0D01005_GF Tower erection works (≤ 40 m 3 Legged
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO LOT 1 1.0000 1
011825 SST Tower)_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187FR
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO C0C01009_Concreting works for other civil works_VIS cu.m. 4.85 17.1500 4.85
011825 P
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 C2I00089_Supply & install 50mm2 bare copper wire in
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO M 10 12.0000 10
011825 20mm Ø PVC pipe. _VIS
NSTRUCTION
ENGINEERING_SERVICE.SI
00060816 88187JX C0C02002_Supply, level & compaction of imported
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO cu.m. 71.5 123.2900 76.97
011825 Q soil._VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187EW
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO C0C01007_Form works_VIS M*M 82.3 211.3500 80.01
011825 B
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187KY C0B01004_Delivery services for other materials from
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SITE 1 1.0000 1
011825 R Huawei Warehouse to Site _VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 C2I00083_Supply & install Copper lightning arrester
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 (25mm Ø x 3m) with accessories._VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187GE C0E01014_Supply & install perimeter light and all
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 2 2.0000 2
011825 X accessories._VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187GE C0E01002_Supply & install KWH meter and panel c/w
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 R security grill_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187HQ C0E01001_Supply & install all electrical accessories
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 H for Service Entrance Pedestal_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187EL C0C01008_Concreting works for Tower
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO cu.m. 51.9500 51.9500 51.95
011825 E Foundations_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816
5532071 V0205 Leyte-Capoocan-Culasian 665975 88187JFE TE_CIVIL_WORKS.SITE_CO C0C01006_Rebar works _VIS KG 6683.14 8025.6700 6988.1
011825
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187EC C0B01002_Mobilization, preliminaries & Demobilization
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SITE 1 1.0000 1
011825 Q services for GF Site_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI C2I00091_Supply & install 500mm x 500mm x 500mm


00060816 88187NM
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO Grounding Test Pit / handhole complete with steel plate SET 1 1.0000 1
011825 W
NSTRUCTION cover with handle._VIS
ENGINEERING_SERVICE.SI
00060816 C2I00088_Supply & install 50mm² bare copper wire.
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO M 70 90.0000 70
011825 (underground ring)_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187GE C2I00005_Perimeter fence CHB wall, column & footing
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO M 48 159.0000 48
011825 L works_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187PQ C0C01004_Backing filling work & compaction works for
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO cu.m. 106 123.2000 112.19
011825 D tower foundation_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187HP C0C01001_Excavation, backfilling & compaction works
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO cu.m. 5 33.9100 5
011825 P for other civil works_VIS
NSTRUCTION

C2I00101_Supply & install of sun shelter lighting


ENGINEERING_SERVICE.SI
00060816 20watts ESL, sucket, 2-3.5 mmsq duplex wire power
5532071 V0205 Leyte-Capoocan-Culasian 665975 88187LYR TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 cable in PVC flexible conduit (10 m) and complete
NSTRUCTION
accessories._VIS

ENGINEERING_SERVICE.SI
00060816 88187GP C2I00095_Supply & install Grounding Bus bar (32
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 3 3.0000 3
011825 V holes, 340mm x 100mm x 6mm)_VIS
NSTRUCTION

ENGINEERING_SERVICE.SI C2I00063_Supply & install underground power cables:-


00060816
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO 2-50mm2 THHN & 1-14mm2, in 40mm Ø PVC M 6 8.0000 10
011825
NSTRUCTION Pipe._VIS

ENGINEERING_SERVICE.SI
00060816 C0B01001_As-built documentation (end to end)
5532071 V0205 Leyte-Capoocan-Culasian 665975 88187LFV TE_CIVIL_WORKS.SITE_CO SITE 1 1.0000 1
011825 services._VIS
NSTRUCTION

ENGINEERING_SERVICE.SI
00060816 88187NL
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO C0C02013_Service Entrance Pedestal Works _VIS LOT 1 1.0000 1
011825 N
NSTRUCTION

ENGINEERING_SERVICE.SI C0B01003_Delivery services for tower & related


00060816 88187KD
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO materials from Huawei Warehouse to site (GF) (Total SITE 1 1.0000 1
011825 A
NSTRUCTION weight below or equal 20 TON)_VIS
ENGINEERING_SERVICE.SI C2I00105_Install roofing system (Sun shelter supply by
00060816 88187JF
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO Huawei) amd accessories for Out Door equipment SITE 1 1.0000 1
011825 M
NSTRUCTION _VIS

ENGINEERING_SERVICE.SI
00060816 88187QF C2I00102_Supply and install pad lock with 3 keys
5532071 V0205 Leyte-Capoocan-Culasian 665975 TE_CIVIL_WORKS.SITE_CO SET 1 1.0000 1
011825 V (yale) - 2 sets 20mm and 1 set 40mm pad lock_VIS
NSTRUCTION
PO AmountService ProRemain Qt Remain AmUnit Price* Start Date End Date PP Type Customer SCustomer SPP Status Sub Projec Project Na Current Ha AP ID PP PreparePP Creatio PP ApprovePP ApprovePP ApprovePP ApprovePR Plan Rate
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,

Dalton
SMART 2017-04-
2017-04- 2017-04- Normal APPROV Terrible
0.00000 9210510 0.0000 0.00000 0 480830F 2G FTK 755332 03 100%
07 28 PR Plan ED 84069154
Phase 2 15:23:24
,
PR Plan Rate
Engineeri iBuy PR Huawei Technologies Phils. DU iBuy PR HW ACTUAL BSPT PO Line Signed
ng Name No. Inc.-2016-2018-
Tender name Number DU Name Start Date End Date Line No. Item Code Commodity SubGroup PR Line Description QTY Qty Actual Field Qty EBB Qty Back Date
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C0F01007_Supply & install 300 x
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI 300 x 400mm Grounding Test Pit /
2G FTK 10611442 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-12- 2018-12- 88187KF NG_SERVIC SITE_CIVIL_WO handhole complete with steel plate
Phase 2 7635 Inc.-2016-2018-
Region V0173 Lacson 31 31 1 T E RKS cover with handle._VIS 1 2 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO C0B01001_As-built documentation
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 1 88187LFV E RKS (end to end) services._VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0B01002_Mobilization,
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187EC NG_SERVIC SITE_CIVIL_WO preliminaries & Demobilization
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 2 Q E RKS services for GF Site_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187NQ NG_SERVIC SITE_CIVIL_WO C0C01003_Excavation works for
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 3 X E RKS Soil_VIS 152.06 206.98 155.25 183.872 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0C01001_Excavation, backfilling &
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187HP NG_SERVIC SITE_CIVIL_WO compaction works for other civil
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 4 P E RKS works_VIS 5 33.91 5 11.616 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0C01004_Backing filling work &
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187PQ NG_SERVIC SITE_CIVIL_WO compaction works for tower
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 5 D E RKS foundation_VIS 88.69 154.11 94.53 161.6072125 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187EC NG_SERVIC SITE_CIVIL_WO
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 6 B E RKS C0C01005_Lean concrete_VIS 4.61 6.27 4.7 4.7045 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 7 88187JFE E RKS C0C01006_Rebar works _VIS 6526.3 8025.67 7640.74 6,612.16 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187EW NG_SERVIC SITE_CIVIL_WO
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 8 B E RKS C0C01007_Form works_VIS 75.7 211.35 69.81 63.874 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187EL NG_SERVIC SITE_CIVIL_WO C0C01008_Concreting works for
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 9 E E RKS Tower Foundations_VIS 59.18 79.07 59.24 59.458375 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187FR NG_SERVIC SITE_CIVIL_WO C0C01009_Concreting works for
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 10 P E RKS other civil works_VIS 4.25 17.15 4.25 4.322875 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0C02011_Supply & install Steel
2G FTK 10611367 Procurement Project-VIS 27th St. 2017-09- 2018-09- 88187QN NG_SERVIC SITE_CIVIL_WO Gate 3m width with all
Phase 2 0573 Region V0173 Lacson 30 30 11 G E RKS accessories_VIS 1 1 1 1 YES
Huawei Technologies Phils.
Inc.-2016-2018-
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187NL NG_SERVIC SITE_CIVIL_WO C0C02013_Service Entrance
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 12 N E RKS Pedestal Works _VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187KD NG_SERVIC SITE_CIVIL_WO C0C04001_Supply & install 600mm
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 13 F E RKS width outdoor cable tray._VIS 10 10 10 10 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187NE NG_SERVIC SITE_CIVIL_WO C0C04002_Supply & install OD
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 14 M E RKS Type ACPDB/MTS standframe_VIS 41 41 41 41 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0D01005_GF Tower erection
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO works (≤ 40 m 3 Legged SST
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 15 E RKS Tower)_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0E01001_Supply & install all
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187HQ NG_SERVIC SITE_CIVIL_WO electrical accessories for Service
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 16 H E RKS Entrance Pedestal_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0E01002_Supply & install KWH
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187GE NG_SERVIC SITE_CIVIL_WO meter and panel c/w security
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 17 R E RKS grill_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187KG NG_SERVIC SITE_CIVIL_WO C0E01013_Install Outdoor electrical
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 18 C E RKS accessories (supply by Huawei)_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0E01014_Supply & install
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187GE NG_SERVIC SITE_CIVIL_WO perimeter light and all
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 19 X E RKS accessories._VIS 2 2 2 2 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0E01016_Install Obstruction Light
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187MQ NG_SERVIC SITE_CIVIL_WO (Twin lights) with Photocell (Supply
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 20 R E RKS by Huawei)._VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C0F01007_Supply & install 500 x
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI 500 x 400mm Grounding Test Pit /
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187KF NG_SERVIC SITE_CIVIL_WO handhole complete with steel plate
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 21 T E RKS cover with handle._VIS 0 0 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00002_Standard Penetration
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187NV NG_SERVIC SITE_CIVIL_WO Test Service(SPT needed by
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 22 X E RKS Smart)_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00004_Supply, level &
2G FTK 10611367 Procurement Project-VIS 27th St. 2017-09- 2018-09- 88187PW NG_SERVIC SITE_CIVIL_WO compaction of 100mm thick gravel
Phase 2 0573 Region V0173 Lacson 30 30 23 C E RKS _VIS 101 143 114 118.82 YES
Huawei Technologies Phils.
Inc.-2016-2018-
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187GE NG_SERVIC SITE_CIVIL_WO C2I00005_Perimeter fence CHB
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 24 L E RKS wall, column & footing works_VIS 41 48 44 44 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO C2I00006_Perimeter fence barbed
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 25 88187JDJ E RKS wire works (SMART Spec.)_VIS 41 48 44 44 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187JX NG_SERVIC SITE_CIVIL_WO C0C02002_Supply, level &
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 26 Q E RKS compaction of imported soil._VIS 52 64.62 52 96.123 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187EP NG_SERVIC SITE_CIVIL_WO C2I00060_Supply & install
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 27 C E RKS MCB/ECB in NEMA 3R - 100A_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C2I00062_Supply & install exposed
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI (above ground) power cables:- 2-
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO 50mm2 THHN & 1-14mm2, in 40mm
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 28 E RKS Ø IMC Pipe._VIS 6 6 6 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C2I00063_Supply & install
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI underground power cables:- 2-
2G FTK 10611367 Procurement Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO 50mm2 THHN & 1-14mm2, in 40mm
Phase 2 0573 Region V0173 Lacson 30 30 29 E RKS Ø PVC Pipe._VIS 6 6 10 YES
Huawei Technologies Phils.
Inc.-2016-2018-
SITE_CIVIL_WORKS- C2I00074_Supply & install
Philippines Y2016~Y2018 FTK underground power cables
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI (Perimeter Light):- 2-3.5mm2 THHN
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO & 1-3.5mm2, in 10mm Ø PVC Pipe,
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 30 E RKS concrete encased._VIS 30 30 49 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00083_Supply & install Copper
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO lightning arrester (25mm Ø x 3m)
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 31 E RKS with accessories._VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00086_Supply & install 50mm²
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO insulated copper wire (color
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 32 E RKS green)_VIS 51 95 100 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00088_Supply & install 50mm²
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO bare copper wire. (underground
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 33 E RKS ring)_VIS 37 70 78 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00089_Supply & install 50mm2
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO bare copper wire in 20mm Ø PVC
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 34 E RKS pipe. _VIS 10 10 10 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Procurement Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO C2I00090_Supply & install 16mm Ø.
Phase 2 0573 Region V0173 Lacson 30 30 35 E RKS X 3m copper clad ground rod._VIS 5 9 9 9 YES
Huawei Technologies Phils.
Inc.-2016-2018-
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C2I00091_Supply & install 500mm x
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI 500mm x 500mm Grounding Test Pit
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187NM NG_SERVIC SITE_CIVIL_WO / handhole complete with steel plate
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 36 W E RKS cover with handle._VIS 1 2 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00092_Supply & install
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187PE NG_SERVIC SITE_CIVIL_WO Grounding Bus bar (16 holes -
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 37 U E RKS Equipment pad)_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00095_Supply & install
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187GP NG_SERVIC SITE_CIVIL_WO Grounding Bus bar (32 holes,
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 38 V E RKS 340mm x 100mm x 6mm)_VIS 3 3 3 3 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C2I00099_Supply & install power
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI cables (Ob light):- 2-3.5mm2 THHN
2G FTK 10611367 Procurement Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO & 1-3.5mm2, in 15mm Ø IMC
Phase 2 0573 Huawei
Region Technologies Phils. V0173 Lacson 30 30 39 E RKS Pipe._VIS 55 55 55 55 YES
Inc.-2016-2018-
SITE_CIVIL_WORKS- C2I00101_Supply & install of sun
Philippines Y2016~Y2018 FTK shelter lighting 20watts ESL, sucket,
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI 2-3.5 mmsq duplex wire power cable
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- NG_SERVIC SITE_CIVIL_WO in PVC flexible conduit (10 m) and
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 40 88187LYR E RKS complete accessories._VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C2I00102_Supply and install pad
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI lock with 3 keys (yale) - 2 sets
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187QF NG_SERVIC SITE_CIVIL_WO 20mm and 1 set 40mm pad
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 41 V E RKS lock_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187PD NG_SERVIC SITE_CIVIL_WO C3S00017_75mm Thick Concrete
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 42 Y E RKS Apron Slab_VIS 4.5 4.5 4.5 4.5 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C2I00103_Supply and install photo
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187LG NG_SERVIC SITE_CIVIL_WO cell (adaptable to perimeter light)
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 43 Q E RKS _VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C2I00105_Install roofing system
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI (Sun shelter supply by Huawei) amd
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187JF NG_SERVIC SITE_CIVIL_WO accessories for Out Door equipment
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 44 M E RKS _VIS 1 1 1 1 YES
SITE_CIVIL_WORKS- C0B01003_Delivery services for
Philippines Y2016~Y2018 FTK tower & related materials from
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI Huawei Warehouse to site (GF)
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187KD NG_SERVIC SITE_CIVIL_WO (Total weight below or equal 20
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 45 A E RKS TON)_VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI C0B01004_Delivery services for
2G FTK 10611367 Huawei Technologies
Procurement Phils.
Project-VIS 27th St. 2017-09- 2018-09- 88187KY NG_SERVIC SITE_CIVIL_WO other materials from Huawei
Phase 2 0573 Inc.-2016-2018-
Region V0173 Lacson 30 30 46 R E RKS Warehouse to Site _VIS 1 1 1 1 YES
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI
2G FTK 10611367 Procurement Project-VIS 27th St. 2017-09- 2018-09- 88187HX NG_SERVIC SITE_CIVIL_WO C0B01006_Sea Freight services for
Phase 2 0573 Region V0173 Lacson 30 30 47 X E RKS SSLZ/VIS/Mindanao_VIS 1 1 1 1 YES
Huawei Technologies Phils.
Inc.-2016-2018-
SITE_CIVIL_WORKS-
Philippines Y2016~Y2018 FTK C2I00001_Delivery services for
SMART (SA & CW) Frame-Frame Bacolod - ENGINEERI shelter and all neccessary
2G FTK 10611367 Procurement Project-VIS 27th St. 2017-09- 2018-09- 88187EU NG_SERVIC SITE_CIVIL_WO accessories from Huawei warehouse
Phase 2 0573 Region V0173 Lacson 30 30 48 Y E RKS to site._VIS 1 1 1 1 YES
Customer Customer
Site Site
Number Name

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson
Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson
Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson
Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson

Bacolod -
27th St.
V0173 Lacson
Bacolod -
27th St.
V0173 Lacson
Site Name : Bacold 27th St Lacson

Code Description L W D Volume

C0C0100
Excavation works for soil_VIS 10.4 10.4 1.7 183.872
3

Code Description L W D Volume


Excavation, backfilling &
C0C0100
compaction works for other civil 2.2 2.2 1.2 11.616
1
works_VIS

Code Description L W D Volume


C0C0100 Backfilling work & compaction
10.4 10.4 1.6 173.056
4 works for tower foundation_VIS
Less :
Footing (Tower) 9.4 9.4 0.6 53.016
Lean Concrete 9.4 9.4 0.05 4.418
Tower Pedestals - 3 1 1 1 3
ODU Footing (2) 1.2 1.2 0.2 0.576
ODU Column /Pedestal (2) 0.275 0.275 1.2 0.1815
ODU Column /Pedestal (2)-
0.275 0.275 1 0.15125
Embedded at Mat Fdn
Climbing/Cable Ladder Fdn 0.2 1.3 1 0.26
Total Deductions 61.60275
Net Volume 111.45325
Plus : Compaction 50.1539625
Total Backfilling 161.6072125

Code Description L W D Volume

C0C0100
Lean Concrete_VIS 9.7 9.7 0.05 4.7045
5

Code Description L W D Area


C0C0100
Form Works_VIS
7
Footing 9.4 9.4 0.6 22.56
Pedestal-Tower 1 1 1.9 22.8
ODU Column /Pedestal (2) 0.275 0.275 1.2 2.64
ODU Column /Pedestal (2)-
0.275 0.275 1.9
Embedded at Mat Fdn 4.18
Climbing/Cable Ladder Fdn 0.2 1.3 1.9 0.494
ODU Beams/Slab 4 4 0.35 11.2
Total Form Works 63.874

Code Description L W D Volume


C0C0100 Concreting Works for Tower
8 Foundation_VIS
Mat Footing 9.4 9.4 0.6 53.016
Tower Pedestal 1 1 1.9 5.7
ODU Column /Pedestal (2) 0.275 0.275 1.9 0.287375
Climbing/Cable Ladder Fdn 0.2 1.3 1.75 0.455
Total Concrete Works 59.458375

Code Description L W D Volume


C0C0100 Concreting Works for other civil
9 works _VIS
ODU Column /Pedestal (2) 0.275 0.275 1.5 0.226875
ODU Footing (2) 1.2 1.2 0.2 0.576
ODU Beams 16 0.35 0.2 1.12
ODU Slab 4 4 0.15 2.4
Total Concrete Works-Other Civil Works 4.322875

Code Description L W H Area


Supply, level & compaction of
C2I00004 12 14.4 10.5 138.6
100mm thick gravel _VIS
Less :
ODU Pad 4 4 16
Tower Pedestal 1 1 3
Climbing/Cable Ladder Pedestal 0.2 1.3 0.78
Total Deduction 19.78
Total Area for Gravel Bedding 118.82

Code Description L W H Volume


Perimeter fence CHB wall, column
C2I00005
& footing works _VIS
Left 10.4
Right 10
Front 14.4
Rear 12
Total Length 46.8
Less : 3m Gate 3
Total Length 43.8
say 44

Code Description L W H Volume


Perimeter fence barbed wire works
C2I00006
(SMART Spec.) _VIS
Left 10.4
Right 10
Front 14.4
Rear 12
Total Length 46.8
Less : 3m Gate 3
Total Length 43.8
say 44

Code Description L W D Volume


C0C0200 Supply, level & compaction of
12 14.4 0.5 68.97
2 imported fill _VIS
Less :
ODU Pad 4 4 0.5 8
Tower Pedestal 1 1 0.5 0.5
Climbing/Cable Ladder Pedestal 0.2 1.3 0.5 0.13
Total Deduction 8.63
Loose Volume 60.34
Plus : 45% Compaction 27.153
Compacted Volume 96.123

Code Description L W D Total

Supply & install underground power


cables:- 2-50mm2 THHN & 1-
C2I00063
14mm2, in 40mm Ø PVC
Pipe._VIS
From Service Entrace to ACPDB 5
Up 2.5 7.5

Code Description L W D Total


Supply & install underground power
cables:- 2-50mm2 THHN & 1-
C2I00063
14mm2, in 40mm Ø PVC
Pipe._VIS
From Service Entrace to ACPDB 5
Remarks

.50m allowance on both sites

Remarks

.50m allowance on both sites

Remarks

.50m allowance on both sites

Remarks
With .30m allowance on all sides
based on plan for protection of
footing forms.

Remarks

Remarks
Remarks

Remarks

Remarks

Remarks

Remarks
Remarks

Remarks
Site Name : BACOLOD 27TH ST LACSON

FOUNDATION DETAILS:

Mat Footing Rebars

Top and Bottom Bars


a = (t -concrete cover exposed to earth (75mm))/2 + .10
b =L or W - concrete cover exposed to earth (75mm)

L total =2a + b

Thickness Length Width Concrete Cover a b

0.6 9.4 9.4 0.075 0.325 9.25

No of Rebars 31.33333 say 32 pcs one-way,


128 pcs top & bottom
Mat Footing
128 9.9 3.853 4,882.52

Bar Chair

L =0.2*2 + .4*2 +.25


L 1.45

Spacing @ 1.5m both ways

No of pcs =9.4/1.5
No of pcs 6.266667 say 7
No of pcs = 14

Bar Chair No of Pcs Length Unit Weight Weight


14 1.45 3.853 78.22
Tower Pedestal Rebars

Tower Pedestal Rebars

L = H - concrete cover + 1.0


L = 2.5 - 0.075-.050 + 1.0
L 3.375

Ties 12mm @ 150mm


H = H - t + 1.0 (bend)
H =2.5-.6+1
H 2.9

No of Ties/Pedestal =2.9 / 0.150


19.33333
say 21 pcs /pedestal
No of Ties for 3 Pedestals = 21 * 3
No of Ties for 3 Pedestals = 63

Tower Pedestal Ties No of Pcs Length Unit Weight Weight


63 2.9 0.89 162.60
Ltotal Rebar Size

9.9 25mm @ 300mm


L =D-.15+1
L =1.9-.15+1
L 2.75

Vertical Bars

Vertical Bars No of Pcs Length Unit Weight Weight


12mm dia 10 2.75 0.889 24.45

No. of pcs =1.9-0.15


1.75
No. of pcs 11.66667
13pcs

L =(1.3-.075*2 +.20-.075*2) * 2
2.4

Ties No of Pcs Length Unit Weight Weight


12mm dia 13 2.4 0.889 27.74

Total Weight 52.18


ODU

L =D-.15+1
L =1.9-.15+1
L 2.75

L =1.2-0.075*2 +.20
L 1.25

FOOTING

Footing No of Pcs Length Unit Weight Weight


12mm dia 20 1.25 0.888 22.20

Total Weight Footing 22.20


VERTICAL BARS

H @ Fdn =H-.05*2 + 0.2 (bend)


=2.5-.05*2 + 0.2 (bend)
H @ Fdn 2.6

H @ Isolated =H-.05*2 + 0.2 (bend)


=1.7-.05*2 + 0.2 (bend)
H @ Isolated 1.8

Vertical Bars No of Pcs Length Unit Weight Weight


16mm dia @ FDN 8 2.6 1.578 32.82
16mm dia @ Isolated 8 1.8 1.578 22.72
55.55

TIES
@ FDN L = (0.275 - 0.075*2) * 4 +.1
No of Ties L 0.8
1@50mm 2
5@100m 10
rest @ 200mm 6
No of Ties 18

TIES
@ Isolated L = (0.275 - 0.075*2) * 4 +.1
No of Ties L 0.8
1@50mm 2
5@100m 10
rest @ 200mm 0
No of Ties 12

Ties No of Pcs Length Unit Weight Weight


10mm dia @ Fdn 36 0.8 0.616 17.74
10mm dia @ Isolated 24 0.8 0.616 11.83
29.57

Total Weight Column 85.11


RC BEAM

L =4-.05*2 + (.350/2+.2)
L 4.275

Vertical Bars No of Pcs Length Unit Weight Weight


16mm dia ( T & B ) 16 4.275 1.578 107.94

TIES
L = 2*(.350 -.05*2) + 2*(.20-.05*2) +.1
No of Ties L 0.8
1@50mm 2
5@100m 10 H 1.1
rest @ 200mm 13 H 3.45
No of Ties / Beam 25 2.35
Total No of Ties 100 11.75

Ties No of Pcs Length Unit Weight Weight


10mm dia 100 0.8 0.616 49.28

Total Weight -RC Beam 157.22


Slab Rebars No of Pcs Length Unit Weight Weight
12mm dia @ 200mm 0.888
100 4.15 368.52
OC T & B

Total Weight -Slab 368.52

Summary
Footing 22.20
Column 85.11
RC Beams 157.22
Slab 368.52
Total Weight 633.05
1.2m
Item No. Description Rebar Size Length Unit Weight Qty
1 Mat Footing 25mm 9.9 3.853 128
2 Bar Chair 25mm 1.45 3.853 14
3 Tower Pedestal
Vertical Bars 20mm 3.375 2.47 96
Ties 12mm 0.89

Cable Ladder Fdn


ODU

Total Weight
Tie Wires
Total Weight Rebars
including tie wires
Weight
4,882.52
78.22

800.28
162.60

52.18
633.05

6,608.85
3.30

6,612.16