LARSEN & TOUBRO LIMITED

ECC Division - EDRC

PROJECT: Infotech Tower at Powai DOCUMENT NO DATE

O4129-C-IT 3/25/2018
DESIGNED CHECKED SHEET

TITLE: BOQ Prelims AGVD YEN OF

Input data

Grade of Concrete = M 30

Grade of Steel = Fe 415

Riser ( R) = 150 mm

Tread( T) = 275 mm

Lower landing slab span = 0m

upper landing slab span = 1.2 m

projected area of steps = 3.3 m

Depth of waist slab = 175 mm

Cover = 30 mm

Over all Slab depth = 175 mm

Diameter of main bars = 12 mm

Diamater of distribution bars = 10 mm

Calculations:

√ R2 +T 2 = 313 mm

Effective Span = 3.9 mm

Effective depth = 145 mm

Xumax/d = 0.48

Loads on going

Self weight of waist slab @ 25X175X313/275 = 4.98 KN/m2

Self weight of steps @25X150/2 = 1.88 KN/m2

Live load = 3 KN/m2

Floor finish = 1.00 KN/m2

Sum = 10.86 KN/m2

Factored load = 16.29 KN/m2


Loads on landing

Self weight of waist slab @ 25X175 = 4.375 KN/m2


LARSEN & TOUBRO LIMITED
ECC Division - EDRC

PROJECT: Infotech Tower at Powai DOCUMENT NO DATE

O4129-C-IT 3/25/2018
DESIGNED CHECKED SHEET

TITLE: BOQ Prelims AGVD YEN OF

Finishes = 1 KN/m2

Live load = 3 KN/m2

Sum = 8.375 KN/m2

Factored load = 12.56 KN/m2

A B
0 3.3 0.6
Design Moment

Lower landing = 0m

Upper landing = 0.6 m

Reaction RA = 31.59 KN

RB = 29.70 KN

Bending moment at mid span = 29.95 KN-m

Mu/Bd2 = 1.425

Limiting Mu/Bd2 = 4.139

Pt = 0 %

Area of steel Ast = 607 mm2

Spacing of 12mm dia bars = 186 mm

Maximum spacing = 435 mm or 450 mm

Therefore provide Y12 @ 180mm C/C

Distribution bars

Ast required = 210 mm2

Spacing of 10mm dia bars = 374 mm

Maximum spacing = 725 mm or 450 mm

Therefore provide Y10 @ 370mm C/C as distribution steel

Check for deflection

L/d = 26.90