SCHEDULE PLANT

DISCOVERY HOTEL & CONVENTION ANCOL PROJECT


PT. HAMANROKO

Dez.17 Jän.18 Feb.18 Mär.18 Apr.18 Mai.18


No Description Remarks
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

A MECHANICAL WORK SHOP


DRAWING &
APPROVAL
1 SHOP DRAWING FOR APPROVAL AND

EQUIPMENT ORDER HR TO SKEMANUSA AND DISCOVERY MATERIAL ORDER MATERIAL ON SITE


- Fire Pump

HR TO SKEMANUSA AND DISCOVERY MATERIAL ORDER MATERIAL ON SITE


- Hot Water Pump

HR TO SKEMANUSA AND DISCOVERY MATERIAL ORDER MATERIAL ON SITE


- Clean Water Pump

HR TO SKEMANUSA AND DISCOVERY MATERIAL ORDER MATERIAL ON SITE


- Chiller Pipe

2 FIRE, HOT, CLEAN, CHILLER (INSTALL PUMP AND PIPING)

(SETTING) CONTINUE SUPPORT FOR PIPE INSTALL


FABRICATION
- SUPPORTING INSTALL

CLEAN AND HOT PIPE INSTALL CONTINUE TEST PUMP & PIPE CONTINUE PAINTING, TIDY UP PUMP & PIPE
- HOT AND CLEAN WATER PIPE INSTALL `

FIRE FIGHTING INSTALL INSTALL FIRE PUMP CONTINUE TEST PUMP & PIPE CONTINUE PAINTING, TIDY UP PUMP & PIPE
- FIRE PUMP PIPE

CHW PIPE INSTALL & INSULATION CONTINUE TEST PUMP & PIPE CONTINUE PAINTING, TIDY UP PUMP & PIPE
- CHILLER PIPE INSTALL

SETTING
- SETTING
CONNECT TO EXISTING

- CONNECTING TO EXISTING CHECKLIST


- CHECKLIST

- TEST AND RUNNING


TEST & RUNNING

3 HVAC
SUPPORT INSTALL TO APRIL
- SUPPORTING INSTALL IN ELECTRICAL ROOM AND TRENCH

SETTING
INSTALL AC SPLIT
- INSTALL AC SPLIT IN ELECTRICAL ROOM CHECKLIST

INSTALL EXHAUST FAN


- INSTALL EXHAUST FAN IN MAINHOLE TRENCH
TEST & RUNNING
PIPE INSTALL & INSULATION CONTINUE TEST PUMP & PIPE CONTINUE PAINTING, TIDY UP PUMP & PIPE
- MAIN LINE PIPE IN WING RISER
SHOP
DRAWING &
B ELECTRICAL ROOM APPROVAL

1 SHOP DRAWING FOR APP HR TO SKEMANUSA AND DISCOVERY MATERIAL ORDER MATERIAL ON SITE SETTING TRAVO
- TRAVO 2000KVA WIRING TRAVO CONNECT TO MVMSB
WIRING CABLE FROM
2 SHOP DRAWING FOR APP HR TO SKEMANUSA AND DISCOVERY v MATERIAL ORDER MATERIAL ON SITE SETTING MVMSB JUNCTION BOX TO EXISTING
WIRING MVMSB CONNECT TO LVMSB
- PANEL MVMSB 20KV

3 SHOP DRAWING FOR APP HR TO SKEMANUSA AND DISCOVERY MATERIAL ORDER MATERIAL ON SITE SETTING LVMSB
- PANEL LVMSB WIRING LVMSB CONNECT TO JUNCTION BOX
4 SHOP DRAWING FOR APP HR TO SKEMANUSA AND DISCOVERY MATERIAL ORDER MATERIAL ON SITE SETTING CAP. BANK CONNECT TO EXISTING

- CAPASITOR BANK WIRING CAP.BANK CONNECT TO LVMSB CHECKLIST NEW


CONNECTING
5 SHOP DRAWING FOR APP

- CABLE LADDER AND TRAY CHECK NEW PANEL

6 CIVIL WORK FINISH TEST & RUNNING


PIPING & WIRING &
INSTALL LIGHTING
7 LIGHTING INSTALLATION PIPING & WIRING MEGGER TEST

PIPING & WIRING


8 POWER SOCKET OUTLET PIPING & WIRING MEGGER TEST

9 POWER A.C PIPING & WIRING PIPING & WIRING


MEGGER TEST
10 CABLE LADDER & TRAY INSTALL CABLE LADDER INSTALL

C TRENCH AREA

HR TO SKEMANUSA AND DISCOVERY


1 - SHOP DRAWING FOR APP

MATERIAL ON SITE
2 - SUPPORTING INSTALL INSTALL SUPPORT

3 - PIPE WIRING LIGHTING


PIPING WIRING LIGHTING
INSTALL LIGHTING
4 - INSTALL LIGHTING

DISMANTLE EXISTING TIDY UP CABLE EXISTING


5 - DISMANTLE EXISTING CABLE LADDER & TRAY

INSTALL LADDER & TRAY


6 - INSTALL CABLE LADDER & TRAY
SCHEDULE WING BUILD INSTALLATION - DISCOVERY & CONVENTION HOTEL ANCOL PROJECT

EAST WING
Description DEC'17 JAN'18 FEB'18
No 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8
115 215 315 515 615 219 319 519 221 321 227 102 202 302 502 104 204 304 504 604 306 506 606 706 108 608 708 110 210 310 212 312 512 612 114 614 116 216 316 516
NUMBER ROOM Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture
217 317 517 223 323 225 602 702 802 704 106 206 208 308 508 510 610 112 214 314 514 218 318 518
1 Electrical

1,1 Check Grouping the existing wiring,Piping


and Wiring New Installation

1,2 Install box with MCB & hangger,Tighting


for termination of panel

1,3 Termination FCU, key taq and testing

2 Plumbing

2,1 Dismantle the Existing Installation for


Hot Water,Waste Water,Sewage and
Water Supply

2,2 Install the new Installation for Hot Water,


Waste Water,Sewage and Water Supply

2,4 Installation Isolation Pipe

2,5 Testing

3 VAC

3,1 Demolish Ducting,FCU,Exhaust Fan,Diffuser,


CHW pipe and Drain.

3,2 Pabrication ducting

3,2 Reinstall New Installation for Ducting,FCU,


Diffuser,CHW pipe, Drain and testing
WEST WING
Description FEB'18 MAR'18 APR'18
No 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5
220 320 222 322 224 341 531 627 721 803 629 723 805 233 345 235 347 537 633 237 239 541 637 241 543 641 245 547 247 549 255 230 335 532 628 336 534 630 724 234
NUMBER ROOM Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture Close Ceiling & Install fixture
226 228 229 231 343 533 535 631 725 349 539 635 639 243 545 249 251 253 722 804 232 337 536 632
1 Electrical

1,1 Check Grouping the existing wiring,Piping


and Wiring New Installation

1,2 Install box with MCB & hangger,Tighting


for termination of panel

1,3 Termination FCU, key taq and testing

2 Plumbing

2,1 Dismantle the Existing Installation for


Hot Water,Waste Water,Sewage and
Water Supply

2,2 Install the new Installation for Hot Water,


Waste Water,Sewage and Water Supply

2,4 Installation Isolation Pipe

2,5 Testing

3 VAC

3,1 Demolish Ducting,FCU,Exhaust Fan,Diffuser,


CHW pipe and Drain.

3,2 Pabrication ducting

3,2 Reinstall New Installation for Ducting,FCU,


Diffuser,CHW pipe, Drain and testing
WEST WING SOUTH WING
Description APR'18 MAY'18
No 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
NUMBER ROOM
726 236 338 538 634
Close Ceiling & Install fixture
636 240 340 542 638
Close Ceiling & Install fixture
640 244 344 546 246
Close Ceiling & Install fixture
250 252 254 256 325 Close Ceiling & Install fixture
327 523 619 711 329
Close Ceiling & Install fixture
331 527 623 715 333
Close Ceiling & Install fixture
719 324 520 616 710
Close Ceiling & Install fixture
712 328 524 620 714
Close Ceiling & Install fixture
238 339 540 242 342 544 346 248 348 521 617 709 525 621 713 529 625 717 326 522 618 330 526 622
1 Electrical

1,1 Check Grouping the existing wiring,Piping


and Wiring New Installation

1,2 Install box with MCB & hangger,Tighting


for termination of panel

1,3 Termination FCU, key taq and testing

2 Plumbing

2,1 Dismantle the Existing Installation for


Hot Water,Waste Water,Sewage and
Water Supply

2,2 Install the new Installation for Hot Water,


Waste Water,Sewage and Water Supply

2,4 Installation Isolation Pipe

2,5 Testing

3 VAC

3,1 Demolish Ducting,FCU,Exhaust Fan,Diffuser,


CHW pipe and Drain.

3,2 Pabrication ducting

3,2 Reinstall New Installation for Ducting,FCU,


Diffuser,CHW pipe, Drain and testing
SOUTH WING NORTH WING
Description JUNE'18
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
NUMBER ROOM 716 332 528 624 718 Close Ceiling & Install fixture 720 350 550 642 727 Close Ceiling & Install fixture 728 352 552 644 729 Close Ceiling & Install fixture 730 354 554 646 731 Close Ceiling & Install fixture
334 530 626 351 551 643 353 553 645 355 555 647 732
1 Electrical

1,1 Check Grouping the existing wiring,Piping


and Wiring New Installation

1,2 Install box with MCB & hangger,Tighting


for termination of panel

1,3 Termination FCU, key taq and testing

2 Plumbing

2,1 Dismantle the Existing Installation for


Hot Water,Waste Water,Sewage and
Water Supply

2,2 Install the new Installation for Hot Water,


Waste Water,Sewage and Water Supply

2,4 Installation Isolation Pipe

2,5 Testing

3 VAC

3,1 Demolish Ducting,FCU,Exhaust Fan,Diffuser,


CHW pipe and Drain.

3,2 Pabrication ducting

3,2 Reinstall New Installation for Ducting,FCU,


Diffuser,CHW pipe, Drain and testing