ACI Convention Spring 2016 Milwaukee

ACI 562 Concrete Repair Code, Applicability & Use

External Post-tensioned
Reinforcement Repair
a Design Example Using ACI 562

Village Lofts Condominiums


Steel Corbel Added to (E) Concrete Column
for External Post-tensioned Reinforcement

Gene R. Stevens, Principal, P.E., S.E., M. ASCE


J. R. Harris & Company
Project: 4 condominium buildings
Designed circa 2002 & Constructed circa 2004
Lofts
3 Stories

Slab

Condominiums - 3 Stories of Wood Framed Construction atop


a Concrete Podium Slab over the Garage
Litigation on Faulty Construction – 2010 found
Design Error in Podium Slab Beams
Litigation
$damages: lesser
of the demand-
capacity ratio of
the original or the Slab
current
building Code
Garage

Drafting Error - Transposed Bar Sizes in the Beam Schedule Garage Entry
#9 to #6 for the bottom bars in the center span of some podium slab beams
ACI 562 “Standard” using Mandatory Language

ACI 562-13 – Code Requirements for


Evaluation, Repair, and Rehabilitation of
Concrete Buildings
ACI 562-16 - Code Requirements for
Assessment, Repair, and Rehabilitation of
Existing Concrete Structures to be printed in
May or June 2016
Using lesser of the demand-capacity ratio of the
original or current Code: Commentary in 562-13
(1.3C) but Code in 562-16 (1.3.2)
ACI 562-16 Defines Assessment etc.

1 Assessment 3

Investigate the structure 2 Report: Findings,


Conclusions, and
Evaluate Data Recommendations

Systematically collect
Structural data:
deterioration, damage, Process of determining and judging
geometry, material structural adequacy of the structure
strengths, and history for its intended use – tests, analysis,
determining demands and capacities
Investigation: Systematic collection of Structural
Data - Concrete Strength & Buildings
562-13 & 16, Sect.
6.2.5:
1.Ballast on roof
2.Drifting snow on
roof
3.Mechanical Eq. &
Conc. pads
4.12 in. thick not
14 in. center slab
5.Surveyed slab
elevations show
FND movement
Evaluate data to judge structural adequacy
Computer Analysis – SAP & SAFE - CSI
28-4 36-4
Typ.

Podium Beam Flr. & Roof Trusses

Ctr. of Corr.

Plan of Podium Slab


3D View from SCI, Safe Model – Bldg. B

Podium Beam Ctr. of Corr.

Int. Col.

Ext. Wall

Roof Frames @ this end


Our 2010 assessment reports findings, conclusions, and
recommendations same as if based on ACI 562-16

ASCE 7-10: U = 1.2D + 1.6L + 0.5S


2012 - Litigation Case settles leaving the HOA
(not our client) with $4 M to resolve their issues.
Base estimate was about $10 to $12 M to return the
buildings to the original building Code.

Podium Beam

Ext. Wall

Int. Col.
We propose to the HOA using ACI 562-13 as our
criteria for the repairs, but need Bldg. Dept.’s approval

Asked building Podium Beam


officials if we
could use the Plumbing Issues
new ACI 562-13
criteria for
design of the
repairs
Int. Col.
What is a Generally Accepted Standard?
Harp Points. (5) ½ φ P.T. Cables E.S.

Podium Beam

Plan of Village Lofts P.T. Repairs of Podium slab beam

1. Recognition by National Groups – ACI/ANSI compliant


2. Acceptance by Professional Organizations – ACI/TAC
3. Acceptance by Local Jurisdictional Authorities
4. Validation through successful use on projects
Section of Podium slab beam w/ external P. T.

Podium Beam Corridor Loads ≈ harp points

High point at col.

Int. Col.

Six beams with 10 years in service prior to repairs


NOT necessarily a demonstration of statically acceptable past
performance - previous loads are not well established - 562-16, section
4.1.6C & 4.5.1C. Rcn > D + 0.5RLL or 1.1D + 0.6RLL (nonlinear analysis)
Rcn < 1.1D + 0.75RLL + 0.2S with nonlinear analysis
Repair design using the current building Code
562-13, Sect. 5.2 & 6.2.5: U = 1.2D + 1.6L + 0.5S
 S – snow loads with drifting per ASCE 7-10 & IBC 09

562-13, Sect. 6.3 Concrete strength per original concrete tests

562-13, Section 5.5 & 7.9 - external reinforcement systems

Podium slab

High point of P.T. at cols. Podium Beam


ACI 562-13, Section 5.5 for repairs with
unprotected external reinforcement Eq. 5.5.1

Uex ≥ 1.2D + 0.5L + Ak + 0.2S (5.5.1) - strength without P.T.


Used Ak = 0.0
Check unprotected external P.T. reinforcement
ACI 562-16 sections on repairs with external reinforcement in
Chap. 5 have just been completed – FRP not P. T.
Evaluation of extraordinary
events:
• analytical procedures
typically examine collapse
mechanisms
• Unified Facilities Criteria
(UFC 4-023-03), Design of
Buildings to Resist
Progressive Collapse
• simple progressive collapse
mechanisms
• nonlinear models

No fireproofing required – Sect. 5.5.3. w/ φ = 1.0 (bending).


Eq. 5.5.3 – 1.2D + 0.5L + 0.2S during a fire
We added fireproofing wrap at one beam based on judgment.
ACI 562-13, Section 5.2.4 – 1.2 load factor at
P.T. anchorage zone
P.T. End Anchorage And Sealants
Basic ACI 562-16 sections:

1. 4.5.2 – assessment
criteria for faulty
construction & repair
using the current code
2. 5.2.5 – anchor load
factor of 1.2
3. 5.5 – load combos for
external reinforcement
4. 6.2 & 6.3 –
investigation &
evaluation
5. 7.9 – Performance
under fire.
Savings on Repairs to the wood framing and
concrete was about $ 9 M using the provisions of
ACI 562-16 ≡ lesser of original or current code

Corridor Loads ≈ harp points


“Precedent” defined as something done or said that
may serve as an example or rule to authorize or justify
a subsequent act of the same kind (Webster).
Award in Litigations
Pikes Peak Regional
Building Department

considered ACI 562-13


(two cases).

Sets precedent.
Harp Points for P.T. cables

Project basis Building Department approval(3) to use ACI 562-13:


1. Greenwood Village [for the Village Lofts Condominiums]
2. Pikes Peak Regional Building Department [2 litigation cases – 250 units]
Design of Repairs for Faulty Construction –
ACI 562 Applicable for the design of External P.T.
Reinforcement(4)
ACI 562 - Consensus
Standard(1):
• approved using
accredited
procedures of
American National
Standards Institute
(ANSI)
• complies with ACI(2)
requirements to
safeguard the public Profile of P.T. cables
Legal Issue – Is ACI 562 Applicable to Determine
Monetary Damages ($) for Faulty Construction?
• ACI 562-16 - source
document for assessment &
repair of existing concrete
structures
• Section 4.5 of ACI 562-16
addresses faulty construction
specifically
• Precedent to use ACI 562
to determine monetary
obligations
• Approval to use ACI 562
by Building Official helps
Tensioning External Reinforcement
P. T. End Anchorage
Thank You

Questions

See Concrete International


Starting Feb. 2016 and through 2017
for
Existing Concrete Structures
Learning Lessons and Advancing Solutions