Approval Form etfNo : Date :19 une 2017 Subject Notice to Proceed Budget For Paoting Handa, Cut & Fil Sand & Gravel Repair Cansten & Cover Drainage Purpose Need tobe repakes Scope of Work: Painting (Handrail at Parking Area, Portable Stair at GTC Shelter) “cut Fil at Pig uncer “Perbakan Cansteen & Cover Concrete Drainage Saciground As instruction President Dector a it vit ume 1th, 2017, Actual Condition Need tobe Repair budget Rp 12.078.000,00 Wa. ‘Gardening at South GTC Shaker | Te [em ‘Sabra Famting andra at Parking Area, Portable Sai a GTC hater a [water Paint Zink Cromate Nippon Pant @ See mer Coat) ap 220.00000 cs | wp 1.320,00000 [Paint top Costng Yotew Cor @ SERRE | ap 185 000,0, ‘cs | ap 480.00, 00 1 3 [inna Cobra tam © 1 Ap 77.0000, Bas [A 800,00 fue 25° Rp 2.500,00 noes [A 125 ,00,00 1 [lea 7 FROODOOT Tee LEO] Tai ap 373,000.00 [coc ati Cancer 11 [Materia 4 [eravel baw See] ca SO. asf 00 00000 ; 2 [sad Pasir) cn 125,000.00, ama [Ap 500,00, 00 2 loom 7 TESTO TEs TST] Toa ip 73250.000.00 Ferbitan Canteen Cover Concrete Draroge T [Pc cement © 50 a 70.0 W0zak [Ro 700.000,50 2 [Sand Pas) AD 72.000 23 | ip 2750.00.00 3 [ites mm ae Rp 75:00) 2 | 350.00,00- [kay Kaos ap 75:00, Sees | 375 00,00 ‘5 Jes! Geton damm AD 30.000 2g | Ro aca am i THOTT Ts — Taal cm [Total wR] itachments Terlampr Foto coststimate Proposed By Reviewed by “Reproved by ame ‘ancy WSR Name Tara katrn Name Tis MarbendTawanto Postion IMicpzonpratendent Poston: Fiance Manager Postion Vie President ier senate [senature signature name cep Saefuin Postion (OB Manager senate rece ‘Approved Che [Name Tze un Hee ame WS Boek Poston: Internal Ava Manager [Postion President Drector |arecd/Disagreed Sienature Name Sala anwar signature Position GM persion senature t oor For Painting Hara, Cit Flan & Gravel Rep Canten Cover Drage tai COST ESTIMATE (Painting Handrail, Cut & Fill Sand & Gravel Repair Cansteen & Cover Drainage) Proyek Lokasi 15 Juni 2017 Scope of Work ‘Grand Total (IDR) 32,078,000 Prepare by: Facility & Pipeline Supervisor; ‘Antoni Gultom PHOTO SITE VISIT BOD 4th/June/2017 Now No.2 Handrail Area Parking 1 > Repainting Handrail Area Parking 2 > Repainting INO. [Gravel Area Pig Launcher 1 > Additional Sand and Gravel [Gravel Area Pig Launcher 2 |_> Additional Sand and Gravel No.5 No.6 [Gravel Area 63 |-> Additional Sand and Gravel No.7 [Barier of Cover Drainage area Hitec 1 |-> Repair [Barier of Cover Drainage area Hitec 2 > Repair

You might also like