Managing Successful Projects with PRINCE2 2009

1. Introduction

1.1 The purpose of this manual

Describe PRINCE2 method

Source of reference on PRINCE2

1.2 The importance of projects

Need to balance

Maintain business as usual

Business change

Projects introduce change

1.3 What makes projects different?

Project

Temporary organization

Deliver business products

According to agreed Business Case

Characteristics

Introduce change

Have defined start and end

Are cross-functional

Are unique

Are more risky

1.4 Why have a project management method?

Project management

Planning

Delegating

Monitoring

Control

Motivation

Achieve project objectives


Meet performance targets

Time

Cost

Quality

Scope

Benefits

Risks

1.5 Introducing PRINCE2

1.5.1 What does a Project Manager do?

Plans activities

Delegates work

Monitors progress against plan

Exerts control

1.5.2 What is it we wish to control?

Costs

Timescales

Quality

Scope

Risk

Benefits

1.5.3 Structure of PRINCE2

Principles

Themes

Processes

Tailoring

1.6 Related OGC guidance

Best-practice guides

P3O

Gateway

M_o_R
ITIL

PfM

MSP

Best-practice models

P3M3

P2MM

1.6.1 What PRINCE2 does not provide

Specialist aspects

Detailed techniques

Leadership capability

1.7 Benefits of PRINCE2

Embodies best practice and governance

Applies to any project

Is widely recognized and understood

Has defined project responsibilities

Accountability

Delegation

Authority

Communication

Clarifies what project will deliver

Why

When

By whom

For whom

Meets different management needs

Is based on management by exception

Focuses on Business Case

Defines economical structure of reports

Ensures stakeholders are represented


Promotes learning and improvement

Promotes consistency of work

Facilitates assurance and assessment

Has expert support

ATOs

ACOs

2. Principles

2.1 Continued business justification

Is required to start project

Remains valid throughout project

Is approved

Is documented in Business Case

Drives decision-making processes

Aligned to business objectives

2.2 Learn from experience

Seek lessons

Record lessons

Act upon lessons

When starting project

As project progresses

As project closes

2.3 Defined roles and responsibilities

Within an organization structure

Engages stakeholders

Business sponsors

Users

Suppliers

2.4 Manage by stages

Provide control points

Plan
Delegate

Monitor

Control

End stage is a decision point

Planning horizons

High-level Project Plan

Detailed Stage Plan

Minimum of two stages

2.5 Manage by exception

Define project responsibilities

Directing

Managing

Delivering

Delegate authority one level to the next

Set tolerances against six objectives

Time

Cost

Quality

Scope

Risk

Benefit

Refer exceptions to next management layer

2.6 Focus on products

Defines and agrees products

Particularly quality requirements

Defines scope

Use Product Descriptions

Purpose

Composition
Derivation

Format

Quality criteria

Quality method

Avoid major risks

Acceptance disputes

Rework

Scope creep

User dissatisfaction

Underestimation of acceptance activities

2.7 Tailor to suit the project environment

Ensure project management method suits project environment

Ensure project controls suit project

Scale

Complexity

Importance

Capability

Risk

Explain tailoring in Project Initiation Documentation

3. Introduction to PRINCE2 themes

3.1 What are the themes?

Describe aspects of project management

Must be addressed continually

Describe specific PRINCE2 treatment

Business Case

Organization

Quality

Plans

Risk

Change
Progress

3.2 Applying the themes

Tailor themes to project

Scale

Nature

Complexity

Formal/informal

Detailed/concise

4. Business Case

4.1 Purpose

Judge whether project is (and remains)

Desirable

Viable

Achievable

4.2 Business Case defined

4.2.1 What is a Business Case?

Tests project viability

Is the investment still worthwhile?

Is continually updated

Costs

Risks

Benefits

4.2.2 Outputs, outcomes and benefits

Output

Project's specialist product

Outcome

Result of using project's outputs

Benefit

Measurable improvement resulting from outcome


4.2.3 Types of Business Case

Depends on project

Compulsory

Not-for-profit

Evolving

Customer/supplier

Multi-organization

Depends on measure

Return on investment

Non-financial benefits

4.3 The PRINCE2 approach to the Business Case

Business case is developed, maintained, verified and confirmed

4.3.1 Developing the Business Case

Executive is responsible

May be delegated

Is derived from:

Outline Business Case

Project mandate

Developed by Starting up a Project

Detailed Business Case

Outline Business Case

Project Plan

Risk Register

Developed by Initiating a Project

4.3.2 Verifying and maintaining the Business Case

Is continually reviewed

End of Starting up a Project

End of Initiating a Project

Part of impact assessment

Issues
Risks

With Exception Plan

End of each stage

During final stage

Part of benefits review

4.3.3 Confirming the benefits

Identify benefits

Select objective measures

Collect baseline measures

Define Benefits Review Plan

4.3.4 The contents of a Business Case

4.3.4.1 Reasons

Explain why project is required

Are aligned to corporate objectives and strategy

Are defined in project mandate

4.3.4.2 Business options

Do nothing

Do minimum

Do something

4.3.4.3 Expected benefits

Are aligned to corporate objectives and strategy

Are mapped from outputs and outcomes

Are quantified (with tolerance)

Are measurable

Are assigned

4.3.4.4 Expected dis-benefits

Are negative outcomes

Are consequences of activity

4.3.4.5 Timescale
Period for incurring costs

Period for cost/benefits analysis

When benefits are accrued

Earliest/latest start date

Earliest/latest completion date

4.3.4.6 Costs

Are derived from Project Plan

Include operations and maintenance costs

Include funding arrangements

4.3.4.7 Investment appraisal

Compares costs with benefits

Covers project costs

Covers operations and maintenance costs

Investment appraisal techniques:

Through-life costs

Net benefits

Return on investment (ROI)

Payback period

Discounted cash flow

Net present value

Sensitivity analysis

4.3.4.8 Major risks

May reduce or enhance

Benefits

Costs

Summary of aggregated risks

Included in summary risk profile

Include project and business risks

4.4 Responsibilities

Corporate/programme management
Provide project mandate

Define Business Case standards

Hold Senior User(s) to account for realizing post-project benefits

Responsible for Benefits Review Plan (post-project)

Executive

Responsible for Business Case

Responsible for Benefits Review Plan

Oversee development of Business Case

Senior User(s)

Specify benefits

Specify project outcomes

Ensure products deliver outcomes

Ensure benefits are realized

Provide benefits statement at benefits reviews

Senior Supplier(s)

Responsible for supplier Business Case

Confirm products are within costs and viable

Project Manager

Prepare Business Case for Executive

Conduct impact analysis of issues/risks

Update Business Case at end of stages

Report project performance at closure

Project Assurance (business assurance)

Help develop Business Case

Verify and monitor Business Case

Ensure project fits programme/corporate strategy

Monitor project finance

Reassess value-for-money solution

Monitor impact of changes on business/Business Case


Review impact assessment of changes on Business Case and Project Plan

Verify and monitor Benefits Review Plan

Project Support

Baseline and place under configuration management

Advise Project Manager of changes that affect Business Case

5. Organization

5.1 Purpose

Define and establish the project's structure

Accountability

Responsibilities

5.2 Organization defined

5.2.1 Project

Is temporary organization

Delivers products according to Business Case

Needs to be flexible

Requires broad base of skills

5.2.2 Programme

Is temporary flexible organization

Coordinates, directs, oversees

Implements projects and activities to deliver outcomes and benefits

Has longer life than project

5.2.3 Corporate organization

Project exists within organization

Either functional or project-focused

5.2.4 Roles and jobs

PRINCE2 defines roles and responsibilities not jobs

Roles can be shared or combined

Responsibilities must always be allocated

5.2.5 Three project interests

Business
User

Supplier

5.3 The PRINCE2 approach to organization

5.3.1 Levels of organization

Corporate/programme management

Sits outside the project management team

Commission project

Identify Executive

Define project-level tolerances

Directing

Project Board

Approves major plans and resources

Authorizes stage exceptions

Approves completion of each stage

Authorizes start of next stage

Communicates with stakeholders

Managing

Project Manager

Responsible for day-to-day management

Ensures project produces products

Time

Cost

Quality

Scope

Risk

Benefits

Delivering

Team members

Deliver products
Quality

Timescale

Cost

5.3.2 The project management team

5.3.2.1 Project management team structure

Is temporary

Manages project to conclusion

Allows communication to decision-making forums

Is backed up by role descriptions

Responsibilities

Goals

Limits of authority

Relationships

Skills

Knowledge

Experience

Executive and Senior User roles can be combined

Project Manager and Executive roles cannot be shared

Project Manager and Project Board accountability cannot be delegated

5.3.2.2 Project Board

Includes Executive, Senior User(s) and Senior Supplier(s)

Is accountable for project success/failure

Provides unified direction

Delegates effectively

Facilitates integration with corporate/external organizations

Provides resources

Authorizes funds

Ensures effective decision making

Supports Project Manager

Ensures effective communication


Project team

External stakeholders

Has four key characteristics

Authority

Credibility

Ability to delegate

Availability

5.3.2.3 Project Assurance

Is Project Board role

Monitors all aspects of the project's performance and products

Is independent of Project Manager

5.3.2.4 Change Authority

Is Project Board responsibility

Can delegate at initiation stage

Agrees scale of change severity ratings

5.3.2.5 Size of the Project Board

Is agreed by Executive

Is tailored to project

Should be as small as possible

5.3.2.6 Project Manager

Single focus for day-to-day management

Runs project on behalf of Project Board

Normally from customer

Manages Team Managers and Project Support

Liaises with Project Assurance and Project Board

5.3.2.7 Team Manager

Ensures production of products

Reports to Project Manager

Takes direction from Project Manager


May be assigned to Project Manager or separate person

Is allocated Work Packages

5.3.2.8 Project Support

Is responsibility of Project Manager

Provides administrative services and guidance

Project management tools

Configuration management

Provides specialist functions

Planning

Risk management

Is separate from Project Assurance

5.3.2.9 Dealing with changes to the project management team

Have clearly defined team structure

Have comprehensive role descriptions

Use management stages to review roles

Use End Stage Reports and Stage Plans

5.3.3 Working with the project team

5.3.3.1 Balancing the project, team and individual

People are crucial to success

Know different personality types

Know how different personality types work together

5.3.3.2 Training needs for project teams

Project processes and standards

Configuration management procedures

Quality methods

Progress reporting

Introduction to project and its goals

Project roles

PRINCE2 processes and terminology

Specialist training
5.3.3.3 Part-time teams

Have more absences and diversions

Project Manager negotiates availability/greater tolerance

5.3.4 Working with the corporate organization

5.3.4.1 Line management/functional management

Project Board can be more closely involved

Lead

Direct

Prioritize work

Resolve issues

Project Manager sets up clear project controls

Project Manager agrees project controls with Project Board

5.3.4.2 Centre of excellence

Defines standards

Processes

Templates

Tools

Provides skills and training

Provides independent assurance functions

5.3.5 Working with stakeholders

5.3.5.1 Types of stakeholders

Support/oppose project

Gain/lose from project

See project as threat/enhancement

Become active supporters or blockers

5.3.5.2 Stakeholder engagement

Identify and communicate effectively

OGC's MSP six-step procedure:

Identify stakeholders (Who?)


Create and analyse stakeholder profiles (What?)

Define stakeholder engagement strategy (How?)

Plan engagements (When?)

Engage stakeholders (Do)

Measure effectiveness (Results)

5.3.5.3 The Communication Management Strategy

Describes means and frequency of communication

To internal and external parties

Establishes bi-directional communication flows

Is documented by Project Manager

Is reviewed at each stage boundary

Helps corporate/programme management retain control

5.4 Responsibilities

Corporate/programme management

Appoint Executive

Appoint (possibly) Project Manager

Provide information to project

Executive

Appoint Project Manager

Confirm project management team appointments

Approve Communication Management Strategy

Senior User

Provide user resources

Define and verify user requirements and expectations

Senior Supplier

Provide supplier resources

Project Manager

Prepare Communication Management Strategy

Review and update Communication Management Strategy

Design, review and update project management team structure


Prepare role descriptions

Team Manager

Manage project team members

Advise on project team members

Advise on stakeholder engagement

Project Assurance

Advise on selection of project team members

Advise on stakeholder engagement

Ensure Communication Management Strategy is appropriate

Ensure communication activities take place

Project Support

Provide administrative support for project management team

6. Quality

6.1 Purpose

Define and implement means to

Create products

Verify products are fit for purpose

6.2 Quality defined

6.2.1 Quality

Product's ability to meet its requirements

6.2.2 Scope

Is sum total of products

Is defined by

Product breakdown structure

Product Descriptions

6.2.3 Quality management and quality management systems

Quality management: activities that direct and control quality approach

Quality management system: quality standards, procedures and responsibilities

6.2.4 Quality planning


Define products

Define quality criteria and methods

Define quality responsibilities

6.2.5 Quality control

Fulfil quality requirements

Eliminate causes of unsatisfactory performance

6.2.6 Quality assurance

Independent of project management team

Ensures project direction and management are adequate

Ensures project complies with standards and policies

Is responsibility of corporate/programme organization

Checks planning and control processes are in place

Establishes and maintains quality management system

Reviews project to assess whether quality requirements will be met

6.3 The PRINCE2 approach to quality

6.3.1 Quality planning

Provide secure basis for:

Project Board agreement

Communicating

Control

6.3.1.1 The customer's quality expectations

Statement of quality expected from project product

Defined in Starting up a Project

Included in Project Product Description

Cover key quality requirements

Cover quality standards and processes

Cover quality measurements

Often expressed in broad terms

Are reviewed at end of each stage

6.3.1.2 Acceptance criteria


Prioritized list of measurable definitions

Ease of use

Ease of support

Ease of maintenance

Appearance

Major functions

Development costs

Running costs

Capacity

Availability

Reliability

Security

Accuracy

Performance

Agreed during Starting up a Project

Documented in Project Product Description

Reviewed at end of each stage

Only changed with Project Board approval

6.3.1.3 The Project Product Description

Created in Starting up a Project

May be refined during Initiating a Project

Subject to change control

Checked at stage boundaries

Includes:

Product purpose

Product composition

Customer's quality expectations

Acceptance criteria, method and responsibilities

Project-level quality tolerances


Is included in Project Brief

Helps select project approach

6.3.1.4 The Quality Management Strategy

Is prepared during Initiating a Project

Is approved by Project Board

Describes how quality management systems apply to project

Confirms quality standards,procedures, techniques and tools

Outlines quality assurance arrangements

Defines quality responsibilities

Includes approach to Project Assurance

Is maintained throughout project

6.3.1.5 Product Descriptions

Created for all products

State product purpose

Who

Why

What

Define quality

Criteria

Tolerances

Methods

Skills

Responsibilities

Producer

Reviewer

Approver

6.3.1.6 The Quality Register

Is diary of quality events

Is created during Initiating a Project

Is maintained throughout project


Provides audit and assurance information

6.3.2 Quality control

6.3.2.1 Quality methods

In-process methods

Appraisal methods

Testing

Quality inspection

PRINCE2 quality review technique

Objectives

Assess product (usually documents) against criteria

Involve interested parties in checking product quality

Promote wider acceptance of product

Confirm product is complete

Baseline product for change control

Review team roles

Chair

Presenter

Reviewer

Administrator

Review preparation

Make administrative arrangements (chair/administrator)

Check product is ready (chair)

Confirm availability of reviewers (chair)

Distribute copies of product and Product Description (presenter)

Review product against quality criteria (reviewers)

Submit question list to chair and presenter (reviewers)

Annotate product errors and return to presenter (reviewers)

Produce question list (chair) and send to presenter

Review meeting agenda


Personal introductions (chair)

Product introduction (presenter)

Major/global questions (chair)

Product talk-through (presenter)

Read back actions (administrator)

Determine review result (chair)

Complete

Conditionally complete

Incomplete

Close review (chair)

Inform interested parties of result (chair)

Review follow-up

Coordinate actions (presenter)

Sign off actions (reviewers)

Sign off product (chair)

Communicate quality review outcome (administrator)

Store quality records (administrator)

Request product approval (presenter)

Side-benefits

Stakeholder engagement

Leadership

Team building

Developing individuals

Quality documentation

Quality culture

6.3.2.2 Quality records

Provide assurance

Products are complete

Products meet quality criteria

Agreed processes were observed


Approval authorities and stakeholders are satisfied

Audits were conducted and reported

Include references to quality inspection documentation

Detail defect statistics

Detail corrective actions

Include quality-related reports

6.3.2.3 Approval records

Not specified by PRINCE2

Depend on level of formality

Depend on customer/supplier relationship

Depend on quality management system

6.3.2.4 Acceptance records

Are kept for audit and/or contractual purposes

Confirm ultimate approval of product

6.4 Responsibilities

Corporate/programme management

Provide details of quality management system

Provide quality assurance

Executive

Approve Project Product Description

Approve Quality Management Strategy

Confirm acceptance of project product

Senior User

Provide customer's quality expectations and acceptance criteria

Approve Project Product Description

Approve Quality Management Strategy

Approve Product Descriptions

Provide resources for user quality activities and product approval

Provide acceptance of project product


Senior Supplier

Approve Project Product Description

Approve Quality Management Strategy

Approve quality methods, techniques and tools

Provide resources for supplier quality activities

Approve Product Descriptions for specialist products

Project Manager

Document customer's quality expectations and acceptance criteria

Prepare Project Product Description (with users)

Prepare Quality Management Strategy

Prepare and maintain Product Descriptions

Ensure Team Managers implement quality controls

Product Descriptions

Work Packages

Team Manager

Produce products consistent with Product Descriptions

Manage quality controls for products

Assemble quality records

Advise Project Manager of product quality status

Project Assurance

Advise Project Manager on Quality Management Strategy

Assist Project Board and Project Manager by reviewing Product Descriptions

Advise Project Manager on quality reviewers/approvers

Assure Project Board on Quality Management Strategy

Project Support

Provide administrative support for quality controls

Maintain Quality Register and quality records

Help Team Managers and members apply quality processes

7. Plans

7.1 Purpose
Facilitate communication and control

Define means of delivering the products

7.2 Plans defined

7.2.1 What is a plan?

A document

Describes how, when and by whom targets will be achieved

Products

Timescales

Costs

Quality

Benefits

Backbone of the management information system

Kept aligned with Business Case

7.2.2 What is planning?

Is process of making and maintaining plan

Is vital to project success

Predicts project result

Scope

Quality

Risk

Timescale

Cost

Benefits

7.2.3 Three Levels of plan

Project Plan

Stage Plans

Team Plans

7.2.4 The Project Plan

States how project's targets will be achieved


Provides Business Case with costs and timescales

Identifies major control points

Used by Project Board to monitor progress

Should align with corporate/programme management's plan

7.2.5 Stage Plans

Required for each management stage

Provides basis for day-to-day control

Produced near end of stage

7.2.6 Team Plans

Produced by Team Managers

Facilitate execution of Work Package

Are optional

7.2.7 Exception Plans

Show actions required to recover from tolerance deviation

Replaces plan in exception

Are not produced for Work Packages

7.3 The PRINCE2 approach to plans

7.3.1 Philosophy

Use product-based planning

Identify products first

Then identify activities, dependencies and resources

For all levels of plan

7.3.2 Prerequisites for planning - design the plan

Audience

Presentation and layout

Planning tools

Estimating methods

Levels of plan

Monitoring methods

7.3.3 Define and analyse the products


Use product-based planning

Identifies products and interdependencies

Removes ambiguity over expectations

Involves users in specifying product requirements

Improves communication

Clarifies scope boundary

Identifies external but necessary products

Prepares way for Work Packages

Gains agreement on production, review and approval responsibilities

7.3.3.1 Write the Project Product Description

Is written by Project Manager with Senior User and Executive

Must be as complete as possible

7.3.3.2 Create the product breakdown structure

Break plan down until appropriate detail is reached

Involve team of people

Identify products through structured brainstorming

Reach consensus on breakdown structure

Identify external products required

Decide whether to include different product states

Use different shapes/styles/colours for products

7.3.3.3 Write the Product Descriptions

Are required for all products

Are written as soon as possible

Are baselined when plan is baselined

Are written with experts and end-users

Can be reused for other projects

Can be substituted by detailed requirements specification

7.3.3.4 Create the product flow diagram

Defines product development sequence


Identifies dependencies

Is created by Project/Team Manager with stakeholders

Can be created in parallel with product breakdown structure

Needs very few symbols

Can have starting point from which all entry points are attached

7.3.4 Identify activities and dependencies

7.3.4.1 Activities

Required to create or change each product

Identified by

Making list of activities

Creating work breakdown structure

Include activities for

Management

Quality checking

Specialist product

7.3.4.2 Dependencies

Identify internal dependencies

Identify external dependencies

Delivery of product from another project

Purchase order

Decision from programme management

7.3.5 Prepare estimates

Identify type resource required

Estimate effort for each activity by resource type

Challenge estimates

Estimating techniques

Top-down

Bottom-up

Comparative

Parametric
Single-point

Three-point

7.3.6 Prepare the schedule

7.3.6.1 Define activity schedule

7.3.6.2 Assess resource availability

7.3.6.3 Assign resources

7.3.6.4 Level resource usage

7.3.6.5 Agree control points

7.3.6.6 Define milestones

7.3.6.7 Calculate total resource requirements and costs

7.3.6.8 Present the schedule

Presentation formats

Gantt charts

Critical path diagram

Spreadsheets

Product checklist

7.3.7 Analyse the risks

For resources

For activities

For planning information

Are entered in Risk Register

7.3.8 Document the plan

Consolidate costs, controls and text

Narrative needed to explain plan

Constraints

External dependencies

Assumptions

Monitoring and control

Risks
Risk responses

Consider summary diagrams for Project Board

7.4 Responsibilities

Corporate/programme management

Set project tolerances

Document project tolerances in project mandate

Approve Exception Plans for project-level tolerances

Provide planning standards

Executive

Approve Project Plan

Define stage tolerances

Approve Stage Plans

Approve Exception Plans for stage-level tolerances

Commit business resources to Stage Plans

Senior User

Ensure Project Plans and Stage Plans are consistent

Commit user resources to Stage Plans

Senior Supplier

Ensure Project Plans and Stage Plans are consistent

Commit supplier resources to Stage Plans

Project Manager

Design plans

Prepare Project Plan and Stage Plans

Decide how to apply management and technical stages

Instruct corrective action for Work Package-level tolerances

Prepare Exception Plan

Team Manager

Prepare Team Plans

Prepare schedules for Work Packages

Project Assurance
Monitor changes to Project Plan

Monitor stage and project progress

Project Support

Help compile Project Plans, Stage Plans and Team Plans

Contribute specialist expertise

Baseline, store and distribute Project Plans, Stage Plans and Team Plans

8. Risk

8.1 Purpose

Identify, assess and control uncertainty

Improve ability of project to succeed

8.2 Risk defined

8.2.1 What is a risk?

Uncertain event or set of events

Affect achievement of objectives

Threat or opportunity

8.2.2 What is at risk?

Project objectives

Time

Cost

Quality

Scope

Benefits

Risk

8.2.3 What is risk management?

Systematic application of procedures

Identify risks

That affect objectives

Described to ensure common understanding

Assess risks
Likelihood

Impact

Immediacy

Control risks

Identify risk responses

Assign risk owners

Execute, monitor and control responses

8.3 The PRINCE2 approach to risk

8.3.1 Management of Risk (M_o_R) principles

Understand project context

Involve stakeholders

Establish project objectives

Develop project risk management approach

Report on risks regularly

Define roles and responsibilities

Establish support structure and supportive culture

Monitor early warning indicators

Establish review cycle and look for continual improvement

8.3.2 Risk management in projects

Identify corporate or programme policies and processes

Organizational risk management policy

Communicates how risk management is implemented

Risk appetite

Risk tolerances

Escalation procedures

Roles and responsibilities

Organizational risk management process guide

Describes steps to implement risk management

Describes associated activities

Provides best-practice approach


8.3.3 Risk Management Strategy

Is developed before embarking on risk management activities

Describes how risk management is embedded in the project

Records risk tolerances

8.3.4 Risk Register

Captures and maintains risk information

Unique identifier

Who raised it

When it was raised

Category

Description

Probability, impact and expected value

Proximity

Response category

Response actions

Status

Risk Owner

Risk Actionee

Maintained by Project Support

8.3.5 Risk management procedure

8.3.5.1 Identify

Identify context

Understand project objectives

Formulate Risk Management Strategy

Is influenced by:

Customer's quality expectations

Number of organizations involved

Stakeholder needs

Project importance, complexity and scale


Assumptions

Organization's environment

Organization's approach to risk management

Project mandate, Project Brief and Project Product Description

Includes decisions on:

Risk management procedure

Tools and techniques

Records

Risk reporting

Timing of activities

Roles and responsibilities

Risk scales

Likelihood

Impact

Proximity

Risk categories

Risk response categories

Early warning indicators

Percentage of Work Packages (not) accomplished

Percentage of approvals (not) accomplished

Number of issues raised per week/month

Percentage of unresolved issues

Average number of days issues remain unresolved

Average number of defects

Adherence to budget

Adherence to schedule

Risk tolerances

Risk budget

Identify risks

Recognize threats and opportunities


Capture in Risk Register

Prepare early warning indicators

Understand stakeholders' view

Use risk identification techniques

Review lessons

Risk checklists

Risk prompt lists

Brainstorming

Risk breakdown structure

Express risks clearly

Cause

Event

Effect

8.3.5.2 Assess

Estimate

Assess risk probability and impact

Assess risk proximity

Assess how risk impact may change

Create summary risk profile

Use risk estimation techniques

Probability trees

Expected value

Pareto analysis

Probability impact grid

Evaluate

Assess net effect of threats and opportunities

Determine if level of risk is within tolerance

Use risk evaluation techniques

Risk models
Expected monetary value

8.3.5.3 Plan

Prepare threat responses

Avoid

Reduce

Fallback

Transfer

Share

Accept

Prepare opportunity responses

Exploit

Enhance

Share

Reject

Ensure response is proportional to the risk

Inherent risk

Exposure before any action is taken

Residual risk

Risk remaining after risk response has been applied

Secondary risk

Risks that may occur as a result of invoking a risk response

8.3.5.4 Implement

Action risk responses

Monitor effectiveness of risk responses

Take corrective action

Allocate clear roles and responsibilities

Risk owner

Responsible for management, monitoring and control

Risk actionee

Assigned to carry out risk response


8.3.5.5 Communicate

Checkpoint Reports

Highlight Reports

End Stage Reports

End Project Reports

Lessons Reports

8.3.6 Risk budget

Is included in project budget

To fund specific responses

Can be determined by use of expected monetary value

Define control mechanisms in Risk Management Strategy

8.4 Responsibilities

Corporate/programme management

Provide corporate risk management policy

Provide risk management process guide

Executive

Accountable for risk management

Ensure business risks are identified, assessed and controlled

Escalate risks to corporate/programme management

Senior User

Ensure user risks are identified, assessed and controlled

Senior Supplier

Ensure supplier risks are identified, assessed and controlled

Project Manager

Create Risk Management Strategy

Create and maintain Risk Register

Ensure risks are identified, assessed and controlled

Team Manager

Identify, assess and control risks


Project Assurance

Ensure risk management practices are in line with Risk Management Strategy

Project Support

Help Project Manager maintain Risk Register

9. Change

9.1 Purpose

Identify, assess and control potential and approved changes

9.2 Change defined

9.2.1 Issue and change control

Ensure issues and changes that affect project baselines

Identified

Assessed

Approved

Rejected

Deferred

9.2.2 Configuration management

Creation, maintenance and controlled change of configuration

Configuration items

Product component

Product

Release

Integrated with issue and change control

9.2.3 Issues

Any relevant, unplanned events

Require management action

9.2.4 Types of issue

Request for change

Off-specification

Problem/concern

9.3 The PRINCE2 approach to change


9.3.1 Establish controls

9.3.1.1 Configuration Management Strategy

Configuration management procedure

Issue and change control procedure

Tools and techniques

Records

Performance reporting

Timing of activities

Roles and responsibilities

Priority scale

Severity rating

Severity handling

Change Authority

Change budget

9.3.1.2 Configuration Item Records

Status

Version

Variant

Relationships between items

9.3.1.3 Product Status Account

Provides product information within defined limits

9.3.1.4 Daily Log

Problems/concerns handled informally

Required actions

Significant events

9.3.1.5 Issue Register

Captures and maintains information on formal issues

Is monitored by Project Manager regularly

9.3.1.6 Issue Report


Description

Impact assessment

Recommendation

For issues handled formally

9.3.2 Configuration management procedure

Planning

Decide level of configuration management

Identification

Identify configuration items

Allocate unique identifier

Record product attributes

Control

Approve and baseline products

Make authorized changes only

Store and retrieve project information

Ensure security of configuration items

Distribute copies of configuration items

Archive project documentation

Status accounting

Product Status Account

Current and historical data for each product

Verification and audit

Compare actual product status against authorized state

Also check configuration management procedure

Occur at end of each stage

Occur at end of project

9.3.3 Issue and change control procedure

9.3.3.1 Capture

Determine issue type

Determine severity and priority


Add to Issue Register or Daily Log

Create Issue Report for formal issues

9.3.3.2 Examine

Assess impact on project

Performance targets

Business Case

Risk profile

Primary stakeholders

Check severity and priority

Update Issue Register and Issue Report

9.3.3.3 Propose

Identify options

Evaluate options

Recommend options

Update Issue Register and Issue Report

9.3.3.4 Decide

Escalate issues to Project Board/Change Authority (if beyond authority)

Approve/reject/defer recommended option

Update Issue Register and Issue Report

9.3.3.5 Implement

Take corrective action

Update Issue Register and Issue Report

9.4 Responsibilities

Corporate/programme management

Provide corporate/programme strategy

Change control

Issue resolution

Configuration management

Executive
Determine Change Authority

Determine change budget

Set severity ratings

Set priority ratings

Advise Project Manager

Make decisions on escalated issues

Continued business justification

Senior User

Advise Project Manager

Make decisions on escalated issues

Safeguarding benefits

Senior Supplier

Advise Project Manager

Make decisions on escalated issues

Safeguarding complete solution

Project Manager

Manage configuration management procedure

Manage issue and change control procedure

Create and maintain Issue Register

Implement corrective actions

Team Manager

Implement corrective actions

Project Assurance

Advise on examining and resolving issues

Project Support

Maintain Configuration Item Records

Produce Product Status Accounts

Help Project Manager maintain Issue Register

10. Progress

10.1 Purpose
Monitor and compare actual achievements against those planned

Forecast project objectives and project viability

Control any unacceptable deviations

10.2 Progress defined

10.2.1 What is progress?

Measure of achievement of plan objectives

At project, stage or Work Package level

10.2.2 What are progress controls?

Allow project management team to:

Monitor progress

Compare achievement with plan

Review plans and options against future situations

Detect problems

Identify risks

Initiate corrective action

Authorize further work

10.2.3 Exceptions and tolerances

Exceptions are forecast deviations beyond agreed tolerances

Tolerances are permissible deviations above or below plan targets

Time

Cost

Quality

Scope

Benefit

Risk

10.3 The PRINCE2 approach to progress

10.3.1 Delegating authority

10.3.1.1 The four levels of management

Corporate/programme management
Project Board

Project Manager

Team Manager

10.3.1.2 Project Board controls

Authorizations

Progress updates

Exceptions and changes

10.3.1.3 Project Manager controls

Authorizations

Progress updates

Exceptions and changes

10.3.2 Use of management stages for control

Management stages are partitions of project

Provide review and decision points

Ensure key decisions are made prior to detailed work being implemented

Clarify impact of external influences

Delegate authority to Project Manager on stage-by-stage basis

10.3.2.1 Number of stages

Depends on project factors

Scale

Risk

Timing of key decision points

Balancing

How far ahead to plan

Where key decision points are needed

The amount of risk

Too many versus too few

Confidence in the Project Manager

Initiation stage and at least one management stage

10.3.2.2 Length of stages


Depends on project factors

Planning horizon

Technical stages

Programme activities

Level of risk

10.3.2.3 Technical stages

Cover design, build and implementation

Use specialist skills

10.3.3 Event-driven and time-driven controls

Event driven

When specific event occurs

Time driven

At predefined periodic intervals

Highlight Report

Checkpoint Report

10.3.3.1 Baselines for progress control

Project Plan

Stage Plans

Exception Plan

Work Packages

10.3.3.2 Reviewing progress

Daily Log

Issue Register

Product Status Account

Quality Register

Risk Register

10.3.3.3 Capturing and reporting lessons

Lessons Log

Lessons Report
10.3.3.4 Reporting progress

Checkpoint Report

Highlight Report

End Stage Report

End Project Report

10.3.4 Raising exceptions

Work Package-level exceptions

Team Manager raised an issue

Stage-level exceptions

Project Manager produces an Issue Report and Exception Report

Project-level exceptions

Project Board no longer has authority

May ask Project Manager to produce Exception Report

10.4 Responsibilities

Corporate/programme management

Provide project tolerances

Document project tolerances in project mandate

Make decisions on Exception Plans for project-level tolerances

Executive

Provide stage tolerances

Ensure progress is consistent from business perspective

Make decisions on Exception Plans for stage-level tolerances

Recommend action on project exceptions

Senior User

Ensure progress is consistent from user perspective

Senior Supplier

Ensure progress is consistent from supplier perspective

Project Manager

Authorize Work Packages

Monitor progress against Stage Plans


Produce reports

Highlight Reports

End Stage Reports

Lessons Reports

End Project Report

Produce Exception Reports for stage-level tolerances

Maintain registers and logs

Team Manager

Agree Work Packages with Project Manager

Inform Project Support of completed quality activities

Produce Checkpoint Reports

Notify Project Manager of Work Package deviations

Project Assurance

Verify Business Case against external events and project progress

Verify changes to Project Plan

Confirm stage and project progress against tolerances

Project Support

Assist with reports

Contribute specialist tool expertise

Number, record, store, and distribute Issue Reports and Exception Reports

Help Project Manager maintain Issue Register and Risk Register

Maintain Quality Register for Project Manager

11. Introduction to processes

11.1 The PRINCE2 processes

Are structured activities

Turn defined inputs into defined outputs

11.2 The PRINCE2 journey

11.2.1 Pre-project

Trigger is the project mandate


Verify project is worthwhile and viable

Produce and review Project Brief

Decide whether to initiate project

11.2.2 Initiation stage

Plan in detail

Obtain funding

Establish strategies and controls

Develop Business Case and Benefits Review Plan

Produce Project Initiation Documentation

11.2.3 Subsequent delivery stages

Project Manager has day-to-day control

Assigns work

Ensures products meet specifications

Gains approval

Ensures progress is in line with plan

Ensures performance targets are within tolerances

Maintains records

Daily Log

Lessons Log

Issue Register

Risk Register

Quality Register

Configuration Item Records

Produces Highlight Reports

Updates Business Case

Plans next management stage

Assign work

Monitor progress

Take corrective action

11.2.4 Final delivery stage


Transition products into operational use

Archive documentation

Assess project performance against plan

Release project resources

Plan post-project benefits reviews

11.3 The PRINCE2 process model

Starting up a Project

Directing a Project

Initiating a Project

Controlling a Stage

Managing Product Delivery

Managing a Stage Boundary

Closing a Project

12. Starting up a Project

12.1 Purpose

Ensure prerequisites for initiation are in place

Answer question: do we have a viable and worthwhile project?

12.2 Objective

Project has business justification

Authorities exist

Project scope is defined

Project approach is selected

Individuals are appointed

Work of initiation is planned

Time is not wasted initiating inappropriate projects

12.3 Context

Triggered by the project mandate

Refined into the Project Brief

Includes outline Business Case


Enables Project Board to decide whether to initiate project

12.4 Activities

12.4.1 Appoint the Executive and the Project Manager

Review Project Mandate and check understanding

Corporate or programme appoint the Executive

Executive to appoint Project Manager

Create Daily Log

12.4.2 Capture previous lessons

Create Lessons Log

Review related Lessons Reports

Review lessons from corporate or programme

Consult others with previous experience

Record lessons identified in Lessons Log

12.4.3 Design and appoint the project management team

Review Lessons Log

Design project management team role descriptions

Create project management team

Appoint the project management team

Add any risks to the Daily Log

Project Manager - P

12.4.4 Prepare the outline Business Case

Executive to draft Outline Business Case

Project Manager create Project Product Description

Review risk and update the outline Business Case

12.4.5 Select the project approach and assemble the Project Brief

Evaluate possible delivery solutions

Select project approach

Assemble the Project Brief

12.4.6 Plan the initiation stage

Decide on controls for initiation stage


Create initiation Stage Plan

Review risks for impact of initiation Stage Plan

Add any new risks to Daily Log

Request authorization to initiate project

13. Directing a Project

13.1 Purpose

Enable Project Board to be accountable for project success

Make key decisions

Exercise overall control

Delegate day-to-day management to Project Manager

13.2 Objective

Authority to initiate project

Authority to deliver products

Direction and control throughout project

Project remains viable

Corporate or programme management interface to project

Authority to close project

Plans for post-project benefits are managed and reviewed

13.3 Context

Starts on completion of Starting up a Project

Project Board activities

Manages by exception

Monitors via reports

Controls through small number of decision points

Assuring continued business justification

13.4 Activities

13.4.1 Authorize initiation

Review and approve Project Brief

Review and approve Project Product


Verify outline Business Case

Review and approve Initiation Stage Plan

Inform stakeholders

Authorize Project Manager to proceed with initiation stage

13.4.2 Authorize the project

Review and approve Project Initiation Documentation

Review and approve Benefits Review Plan

Notify corporate or programme management

Authorize Project Manager

To deliver the project,or

Close the project prematurely

13.4.3 Authorize a Stage or Exception Plan

Review and approve End Stage Report

Review Stage Plan or Exception Plan

Make decision

Communicate status to corporate or programme management

13.4.4 Give ad hoc direction

Respond to informal requests for advice

Respond to escalated Issue Report

Respond to Exception Report

Respond Highlight Report

Respond to corporate or programme advice and decisions

13.4.5 Authorize project closure

Review original and current Project Initiation Documentation

Review and approve End Project Report

Review and gain approval for (updated) Benefits Review Plan

Confirm (updated) Business Case

Review and issue project closure notification

14. Initiating a Project

14.1 Purpose
Establish solid foundation for the project

Understand work required to deliver products

14.2 Objective

Ensure understanding of:

Reasons, benefits and risks

Scope and products

How products will be delivered and costs

Who will be involved in decision making

How quality will be achieved

How baselines will be established and controlled

How risks, issues and changes will be identified, assessed and controlled

How progress will be monitored and controlled

Who need what Information and when

How project management method will be tailored

14.3 Context

Determine whether project is aligned with corporate/programme objectives

Avoid committing significant resources without full understanding

14.4 Activities

14.4.1 Prepare the Risk Management Strategy

Review Project Brief

Seek lessons

Review Daily Log

Define the Risk Management Strategy

Consult Project Assurance

Create and populate Risk Register

Seek Project Board approval

14.4.2 Prepare the Configuration Management Strategy

Review Project Brief

Seek lessons
Review Risk Register and Daily Log

Define the Configuration Management Strategy

Consult Project Assurance

Create initial Configuration Item Records

Create Issue Register

Update Risk Register, Issue Register and Daily Log

Seek project Board Approval

14.4.3 Prepare the Quality Management Strategy

Review Project Product Description

Review Project Brief

Seek lessons

Review Risk Register and Issue Register

Define the Quality Management Strategy

Consult Project Assurance

Create Quality Register

Project Manager - A

Project Assurance - R

Project Support - P

Update Risk Register, Issue Register and Daily Log

Seek project Board Approval

14.4.4 Prepare the Communication Management Strategy

Review Project Brief

Seek lessons

Review Risk Register and Issue Register

Identify and consult stakeholders

Establish information needs with other strategies

Define the Communication Management Strategy

Consult Project Assurance

Update Risk Register, Issue Register and Daily Log

Seek project Board Approval


14.4.5 Set up the project controls

Review Project Brief

Review strategies

Seek lessons

Review Risk Register and Issue Register

Confirm and document management stages

Allocate levels of decision making

Update project management team structure and role descriptions

Confirm project tolerances

Summarize project controls

Consult Project Assurance

Update Risk Register, Issue Register and Daily Log

Seek project Board Approval

14.4.6 Create the Project Plan

Review Project Brief

Seek lessons

Review Risk Register and Issue Register

Create Project Plan

Follow the planning procedure

Update Project Product Description

Create Configuration Item Records

Consult Project Assurance

Update Risk Register, Issue Register and Daily Log

Seek project Board Approval

14.4.7 Refine the Business Case

Review Project Brief

Seek lessons

Create detailed Business Case

Create Benefits Review Plan


Consult Project Assurance

Update Risk Register, Issue Register and Daily Log

Seek project Board Approval

14.4.8 Assemble the Project Initiation Documentation

Extract information from Project Brief

Project definition

Project approach

Include or reference

Project management team structure

Role descriptions

Detailed Business Case

Quality Management Strategy

Configuration Management Strategy

Risk Management Strategy

Communication Management Strategy

Project Plan

Project controls

Summarize tailoring of PRINCE2

Assemble Project Initiation Documentation

Cross-check all information

Consult Project Assurance

Prepare for next stage

Triggers Managing a stage Boundary

Request authority to deliver the project

15. Controlling a Stage

15.1 Purpose

Assign and monitor work

Deal with issues

Report progress to Project Board

Take corrective action to remain within tolerance


15.2 Objective

Focus attention on product delivery

Control risks and issues

Keep Business Case under review

Deliver products within quality standards, cost, effort and time

Focus project management team on delivery within tolerances

15.3 Context

Day-to-day management of the stage

Work Packages used to define and control work

Towards end of stage

Triggers Managing a Stage Boundary

Towards end of project

Triggers Closing a Project

15.4 Activities

Work Packages

15.4.1 Authorize a Work Package

Examine Stage Plan

Examine Project Initiation Documentation

Define each Work Package

Review Work Package with Team Manager

Review Team Plan

Update Stage Plan

Update Configuration Item Records

Update Quality Register

Update Risk Register

Update Issue Register

15.4.2 Review Work Package status

Review Checkpoint Report

Update Risk Register


Update Issue Register

Update Stage Plan

15.4.3 Receive completed Work Packages

Ensure Team Manager has completed Work Package

Check Quality Register

Ensure each product is approved

Confirm Configuration Item Records have beed updated

Update Stage Plan

Monitoring and reporting

15.4.4 Review the stage status

Review progress for stage

Decide whether actions are required

Revise Risk Register and Issue Register

Update Stage Plan

Phased handover?

Request Product Status Account

Ensure products approved

Hand over products

Consider whether to review lessons

End of current stage?

Prepare for next stage

End of final stage?

Prepare to close project

15.4.5 Report highlights

Assemble information

Checkpoint Reports

Risk Register

Issue Register

Quality Register

Lessons Log
Product Status Account

Revisions to Stage Plan

Assemble list of corrective actions

Review Highlight Report (previous period)

Produce Highlight Report (current period)

Distribute Highlight Report

Issues

15.4.6 Capture and examine issues and risks

Informal issues

Deal with them

Update Daily Log

Formal issues

Update Issue Register

Create Issue Report

Report status

Risks

Update Risk Register

Report status

Review Stage Status before

Taking corrective action

Seeking advise from the Project Board

Escalating an issue or risk

15.4.7 Escalate issues and risks

Examine Stage Plan

Examine Project Plan

Determine options for recovery

Assess impact of options

Create Exception Report

15.4.8 Take corrective action


Collect information about deviation

Identify ways of dealing with deviation

Trigger corrective action

Via authorizing a Work Package

Update Configuration Item Records

Update Issue Report

Update Issue Register or Daily Log

Update Risk Register

Update Stage Plan

16. Managing Product Delivery

16.1 Purpose

Control link between Project Manager and Team Manager

Place formal requirements on project work

Accepting

Executing

Delivering

16.2 Objective

Work on products is authorized and agreed

Team Managers understand objectives

Products

Effort

Cost

Timescales

Products meet expectations and within tolerance

Project Manager receives progress information

Accurate

At agreed frequency

16.3 Context

Team Manager ensures products are delivered

Accepts Work Packages


Maintains interfaces

Creates Team Plan

Adheres to development methods

Adheres to quality methods

Obtains approval

16.4 Activities

16.4.1 Accept a Work Package

Review Work Package

Produce Team Plan

Review risks and raise any new ones risk

Agree to deliver Work Package

16.4.2 Execute a Work Package

Manage development of products

Raise new issues, risks or lessons

Obtain approvals

Review and report on status

16.4.3 Deliver a Work Package

Review Quality Register

Review approval records

Update Team Plan

Deliver completed products

According to Work Package

Notify Project Manager

17. Managing a Stage Boundary

17.1 Purpose

Enable Project Board to be provided with information

Review success of current stage

Approve next Stage Plan

Review updated Project Plan


Confirm continued business justification

Confirm acceptability of risks

17.2 Objective

Assure Project Board products are completed and approved

Prepare Stage Plan for next stage

Review and update Project Initiation Documentation

Business Case

Project Plan

Project approach and strategies

Project management team structure and roles

Assess project viability and risk exposure

Record helpful lessons

Request authorization to start next stage

17.3 Context

Executed towards end of each stage

Also implemented in exception situations

17.4 Activities

17.4.1 Plan the next stage

Review and update Project Initiation Documentation

Produce Stage Plan for next stage

Create/update Configuration Item Records

UpdateIssue Register and Risk Register

Update Quality Register

17.4.2 Update the Project Plan

Check current Stage Plan is up to date

Revise Project Plan

Update Issue Register and Risk Register

17.4.3 Update the Business Case

Review risk appetite, risk capacity and Risk Register

Update Benefits Review Plan


Examine and review

Benefits Review Plan

Results of reviews undertaken

Need to reviews in the next stage

Approved changes

Project risk profile and key risks

Issue Register

Project Plan

Time

Costs

Project environment

Revise Business Case

Update Risk Register and Issue Register

17.4.4 Report stage end

Prepare End Stage Report

Create Lessons Report

Identify follow-on action recommendation (if phased handover)

Seek approval of Exception Plan or Stage Plan

Review Communication Management Strategy

Send copies of End Stage Report

Send copies of Lessons Report

17.4.5 Produce an Exception Plan

Update Issue Register

Review and update Project Initiation Documentation

Produce Exception Plan

Create/update Configuration Item Records

Update Issue Register and Risk Register

Update Quality Register

18. Closing a Project


18.1 Purpose

Fixed point

Conform acceptance of project product

Recognize objectives have been achieved

OR project has has nothing more to contribute

18.2 Objective

Verify user acceptance of products

Ensure host site can support products

Review project performance against baselines

Benefits

Assess benefits

Update benefits forecast

Plan review of unrealized benefits

Address open issues and risks with follow-on action recommendations

18.3 Context

A clear end

More successful than slow drift into use

Ensure unachieved objectives are identified

Transfers ownership

Planned as part of last stage

May be triggered by premature closure

18.4 Activities

18.4.1 Prepare planned closure

Update Project Plan

Request Product Status Account

Confirm Project Product delivered

Seek approval to give notice that resources can be released

18.4.2 Prepare premature closure

Update Issue Register

Update Project Plan


Request Product Status Account

Agree means for recovering products

Seek approval to give notice that resources can be released early

18.4.3 Hand over products

Prepare follow-on action recommendations

Update Benefits Review Plan

Hand over products

18.4.4 Evaluate the project

Review original Project Initiation Documentation

Review current Project Initiation Documentation

Prepare End Project Report

Prepare Lessons Report

18.4.5 Recommend project closure

Identify who needs to be advised

Close records

Close Issue Register

Close Risk Register

Close Quality Register

Close Daily Log

Close Lessons Log

Archive project information

Prepare draft project closure notification

19. Tailoring PRINCE2 to the project environment

19.1 What is tailoring?

Appropriate use of PRINCE2 on project

Adapt themes

Incorporate terms and language

Revise management Product Descriptions

Revise role descriptions


Adjust processes

Done by project management team

What is embedding?

Adoption of PRINCE2 across an organization

Process responsibilities

Scaling rules

Standards

Training and development

Integration with business processes

Tools

Process assurance

Done by the organization

19.2 General approach to tailoring

19.2.1 Applying the principles

Are universal

Are not tailored

19.2.2 Adapting the themes

Incorporate environmental and project factors

Risk Management Strategy

Quality Management Strategy

Configuration Management Strategy

Communication Management Strategy

19.2.3 Applying the organization's terms and language

Substitute terms in project documentation to improve understanding

19.2.4 Adapting the management products

Modify Product Descriptions/provide template

Purpose and quality criteria remain clear

19.2.5 Adapting the roles

Match individuals' capability and authority to project roles

19.2.6 Adapting the processes


All process activities must be done

Responsibilities for activities may change

References to management products may change

19.3 Examples of tailoring PRINCE2

Projects in programme environment

Project scale

Commercial customer/supplier environment

Multi-organization projects

Project type

Sector differences

Project management Bodies of Knowledge

19.4 Projects in a programme environment

Programme is temporary organization structure

Implements related project and activities

Delivers outcomes and benefits relating to strategic objectives

Can span several years

Helps transform organizations

19.4.1 Themes

19.4.1.1 Business Case

Programme defines project standards

Project Business Case is aggregated into programme Business Case

Budget

Benefits

Contributions to programme blueprint

Programme management team manages benefits

Project Benefits Review Plan

Programme benefits realization plan

19.4.1.2 Organization

Programme board
Senior Responsible Owner

Ensures programme meets objectives

Ensures programme delivers benefits

Confirm project Executive appointments

Programme manager

Oversees day-to-day management and delivery

Business change manager(s)

Oversees benefits definition and management

Ensures project capabilities are adopted by organization

Representatives of corporate functions

Lead supplier

Project Executives

Integrated programme and project management teams

Have clear responsibilities and accountabilities

Avoid duplication

Have efficient reports and reviews

19.4.1.3 Quality

Programme Quality Management Strategy

Defines project's Quality Management Strategy

Quality assurance and control at programme level

19.4.1.4 Plans

Programme monitoring and control strategy

Describes project planning standards

Programme may provide dedicated planners

Identify inter-project dependencies

19.4.1.5 Risk

Programme Risk Management Strategy

Defines project's Risk Management Strategy

Risk categories

Risk scales
Probability

Impact

Proximity

Risk evaluation techniques

Project-level risk tolerance

Escalation procedures

19.4.1.6 Change

Programme information management strategy

Defines project's Configuration Management Strategy

Defines project interfaces

Programme issue resolution strategy

Defines project's change control procedure

Defines escalation procedures

19.4.1.7 Progress

Programme monitoring and control strategy

Influences project reviews and reports

Influences project management standards

Defines project tolerances

Influences management stages

19.4.2 Processes

Programme could undertake most of Starting up a Project

Appoint Executive and Project Manager

Review previous lessons

Design and appoint programme management team

Prepare Project Brief

19.4.3 Management products

Common names for project and programme

Use different prefixes and templates

Are maintained locally/centrally


19.5 Project scale

Is relative to organization

Is related to project size

Is related to project context

19.5.1 Simple project

19.5.1.1 Themes

Organization

Consolidate roles and functions

Executive and Senior User

Project Board and Project Assurance

Project Manager and Team Manager

Project Manager and Project Support

Business Case

Business justification is needed

Plans

Product Descriptions

Product checklist

Quality

Understand levels of quality

Risk

Risk analysis

Risk responses

Communicate risk by Checkpoint and Highlight Reports

Change

Version control standards

Secure work storage

Progress

Some form of control and reporting

19.5.1.2 Processes

Remain relevant
Starting up a Project can be less formal

Starting up a Project and Initiating a Project can be combined

19.5.1.3 Management products

Project Board reports could be oral

Reports could be email

Project Initiation Documentation could be set of presentation slides

Documents could include more than one management product

19.6 Commercial customer/supplier environment

Has two sets of:

Reasons for project

Management systems

Governance structures

Corporate cultures

19.6.1 Themes

19.6.1.1 Business Case

Customer Business Case

Benefits

Internal costs

External costs

Project risks

Operational risks

Supplier Business Case

Sales objective

Account plan objectives

Sales territory objectives

Market sector objectives

19.6.1.2 Organization

Key role decisions

Senior Supplier
Project Manager

Project Board

Maintain business justification

Adhere to governance rules

19.6.1.3 Quality

Is defined by Quality Management Strategy

19.6.1.4 Plans

Align payments to each management stage

Have break-points in contracts

Customer decides how to manage procurement activities

Team Plan may be private to supplier

Project Manager uses Checkpoint Report to maintain Stage Plan

19.6.1.5 Risk

Have more than one Risk Register

Have joint Risk Register

19.6.1.6 Change

Align change control procedure

Align change budget

19.6.1.7 Progress

Align reviewing and reporting to governance requirements

Frequency

Format

Formality

19.6.2 Processes

Supplier pre-contract activities

Starting up a Project

Initiating a Project

Assess viability of sale

Assess costs and prices

Align business approval processes


19.6.3 Management products

Project Initiation Documentation

See Also: Contract

Work Package

See Also: Contract

Contract

See Also: Project Initiation Documentation, Work Package

19.7 Multi-organization projects

Similar guidance to customer/supplier environment

Examples

Joint ventures

Collaborative research

Inter-departmental projects

Inter-governmental projects

Inter-agency projects

Alliance contracting

Bidding consortium

Partnerships

19.8 Project type

19.8.1 Lifecycle models

Align management stages to development lifecycle

Design

Build

Test

Transition

Use tolerances to match development focus

Integrate specialist roles into project management team structure

Use PRINCE2 for project management products

Use specialist method to define management products


Purpose

Format

Composition

Quality criteria

Link Managing Product Delivery to specialist product development processes

19.8.2 The evolving project

Evolving Business Case

Enables organization to make balanced investment commitment

Assesses impact of requested changes

19.8.3 The feasibility project

Has one Project Plan

Has one Business Case

Has one set of risks

Has one product - recommendation

19.9 Sector differences

19.9.1 Senior Responsible Owner

Has overall responsibility for project/programme

Is not PRINCE2 role

In programme context

Project Executive reports to the programme SRO

In project context

Project SRO undertakes the project Executive role

19.9.2 OGC Gateway Review

Examines project at key decision points

Provides assurance on project progress

Is best practice

UK central government

Health sector

Local government

Defence
Delivers peer review

Can align with PRINCE2

Review 1: Business justification

Reviews 2 and 3: Delivery strategy and investment decision

Review 4: Readiness for service

19.10 Project management Bodies of Knowledge

Describe project management competencies and techniques

Leadership

Negotiation

Interpersonal skills

Are non-prescriptive

Can be referred to in isolation

Are targeted at Project Managers

Appendix A: Product Description outlines

A.1 Benefits Review Plan

A.1.1 Purpose

Define how and when benefits are measured

Define post-project benefits reviews during Closing a Project

A.1.2 Composition

Benefits to be measured

Who is accountable for benefits

How to measure benefits

Resources needed

Baseline measures

How product performance will be reviewed

A.1.3 Derivation

Business Case

Project Product Description

Programme benefits realization plan


Corporate performance monitoring function

A.1.4 Format and presentation

Document

Spreadsheet

Presentation slides

Project management tool

A.1.5 Quality criteria

Covers benefits in Business Case

Confirms benefits are measurable

Records baseline measures

Describes timing for measurement

Identifies skills/individuals required

Confirms effort and cost is realistic

Measures and reviews dis-benefits

A.2 Business Case

A.2.1 Purpose

Document justification for product

Costs

Development

Implementation

Incremental operations and maintenance

Benefits

Risks

A.2.2 Composition

Executive summary

Reasons

Business options

Expected benefits

Expected dis-benefits

Timescale
Costs

Investment appraisal

Major risks

A.2.3 Derivation

Project mandate and Project Brief - reasons

Project Plan - costs and timescales

Senior User(s) - expected benefits

Executive - value for money

Risk Register

Issue Register

A.2.4 Format and presentation

Document

Spreadsheet

Presentation slides

Project management tool

A.2.5 Quality criteria

Is consistent with corporate/programme management strategy

Aligns Project Plan and Business Case

Identifies and justifies Benefits

Clarifies how benefits will be realized

Defines successful outcome

Describes preferred business option

Describes preferred sourcing option

Describes funding

Includes financial and non-financial criteria

Includes operations and maintenance costs and risks

Conforms to organizational accounting standards

States major risks and responses

A.3 Checkpoint Report


A.3.1 Purpose

Report Work Package status

A.3.2 Composition

Date

Period

Follow-ups

This reporting period:

Products being developed

Products completed

Quality management activities

Lessons identified

Next reporting period:

Products being developed

Products to be completed

Quality management activities

Work Package tolerance status

Issues and risks

A.3.3 Derivation

Work Package

Team Plan and actuals

Previous Checkpoint Report

A.3.4 Format and presentation

Oral report to Project Manager

Presentation at progress review

Document/email to Project Manager

Project management tool

A.3.5 Quality criteria

Produced at required frequency

Has timely, useful, objective and accurate information

Covers every product in Work Package


Includes update on unresolved issues

A.4 Communication Management Strategy

A.4.1 Purpose

Describe communication means and frequency

Covers internal and external communication

Facilitate stakeholder engagement

Establishes bi-directional flow of information

A.4.2 Composition

Introduction

Purpose

Objectives

Scope

Responsibilities

Communication procedure

Tools and techniques

Records

Reporting

Timing of activities

Roles and responsibilities

Stakeholder analysis

Identification

Current relationship

Desired relationship

Interfaces

Key messages

Information needs

From project

To project

Provider and recipient


Means of communication

Format

A.4.3 Derivation

Corporate communications policies

Programme's information management strategy

Project Initiation Documentation

Project management team structure

Risk Management Strategy

Quality Management Strategy

Configuration Management Strategy

Workshops/discussions with stakeholders

Stakeholder analysis

A.4.4 Format and presentation

Stand-alone product

Section of Project Initiation Documentation

Document

Spreadsheet

Mindmap

Project management tool

A.4.5 Quality criteria

Identifies and consults all stakeholders

Obtains stakeholder agreement

Content

Frequency

Method

Considers common communication standard

Allows for time, effort and resources in Stage Plans

Has appropriate formality and frequency of communication

Describes reporting structure between project and programme

Incorporates corporate communications facilities


A.5 Configuration Item Record

A.5.1 Purpose

Provide information record

History

Status

Version

Variant

Relationships

A.5.2 Composition

Project identifier

Item identifier

Current version

Item title

Date of last status change

Owner

Location

Copy-holders

Item type

Item attributes

Stage

Users

Status

Product state

Variant

Producer

Date allocated

Source

Relationship with other items

Cross-references
A.5.3 Derivation

Configuration Management Strategy

Product breakdown structure

Stage Plan and Work Package

Quality Register

Issue Register

Risk Register

A.5.4 Format and presentation

Document

Spreadsheet

Database

Project management tool

A.5.5 Quality criteria

Reflects product status

Is in secure location

Version numbers match products

Shows version histories

Is defined and updated

A.6 Configuration Management Strategy

A.6.1 Purpose

To identify:

How and where products will be stored

Storage and retrieval security arrangements

How versions and variants will be identified

How changes will be controlled

Responsibility for configuration management

A.6.2 Composition

Introduction

Purpose

Objectives
Scope

Responsibilities

Configuration management procedure

Issue and change control procedure

Tools and techniques

Records

Reporting

Issue Report

Product Status Account

Timing of activities

Roles and responsibilities

Scales for priority and severity

A.6.3 Derivation

Customer's quality expectations

Corporate configuration management system

Programme Quality Management Strategy

User's quality management system

Supplier's quality management system

Needs of products and environment

Project management team structure

Workshops and discussions

A.6.4 Format and presentation

Stand-alone product

Section of Project Initiation Documentation

Project management tool

A.6.5 Quality criteria

Clarifies responsibilities

Defines key identifier for products

Clarifies version control


Provides Project Manager with product information

Considers corporate/programme management strategy

Has efficient retrieval system

Has necessary project files

Audits

Historical records

Lessons

Is appropriate for size and nature of project

Has appropriate resources

Considers requirements of operational group

A.7 Daily Log

A.7.1 Purpose

Record:

Informal issues

Required actions

Significant events not caught elsewhere

Acts as project diary for Project Manager

A.7.2 Composition

Date of entry

Problem/action/event/comment

Person responsible

Target date

Results

A.7.3 Derivation

Entries made by Project/Team Manager

Thoughts, conversations, observations

A.7.4 Format and presentation

Document

Spreadsheet

Desk diary
Log book

Electronic diary/calendar/task lists

Project management tool

A.7.5 Quality criteria

Understandable entries

Filled in date, person responsible and target date

Suitable access rights

A.8 End Project Report

A.8.1 Purpose

Review project performance against Project Initiation Documentation

Pass on lessons

Pass on details of unfinished work

A.8.2 Composition

Project Manager's report

Review of Business Case

Benefits achieved

Residual benefits expected

Net benefits expected

Deviations

Review of project objectives

Targets and tolerances

Time

Cost

Quality

Scope

Benefits

Risk

Strategies and controls

Review of team performance


Review of products

Quality records

Approval records

Off-specifications

Project product handover

Follow-on action recommendations

Lessons Report

A.8.3 Derivation

Project Initiation Documentation

Business Case

Project Plan

Benefits Review Plan

Issue Register

Quality Register

Risk Register

Lessons Report

End Stage Reports

Exception Reports

A.8.4 Format and presentation

Presentation to Project Board

Document/email to Project Board

Project Management Tool

A.8.5 Quality criteria

Describes abnormal situations

Closes issues/recommends follow-on action

Accompanied by useful documentation or evidence

Confirmed by Project Assurance

A.9 End Stage Report

A.9.1 Purpose

Summarize progress and project situation to date


Provides information for Project Board to decide what to do next

A.9.2 Composition

Project Manager's report

Review of Business Case

Benefits achieved

Residual benefits expected

Net benefits expected

Deviations

Aggregated risk exposure

Review of project objectives

Targets and tolerances

Time

Cost

Quality

Scope

Benefits

Risk

Strategies and controls

Review of stage objectives

Review of team performance

Review of products

Quality records

Approval records

Off-specifications

Phased handover

Follow-on action recommendations

Lessons report

Issues and risks

Forecast
Time

Cost

Quality

Scope

Benefits

Risk

A.9.3 Derivation

Current Stage Plan and actuals

Project Plan

Benefits Review Plan

Risk Register

Quality Register

Issue Register

Exception Report

Lessons Report

Work Packages

Updated Business Case

A.9.4 Format and presentation

Presentation to Project Board

Document/email to Project Board

Project Management Tool

A.9.5 Quality criteria

Shows stage performance against plan

Describes abnormal situations

Confirmed by Project Assurance

A.10 Exception Report

A.10.1 Purpose

Inform Project Board of forecast exception

A.10.2 Composition

Exception title
Cause of exception

Consequences of deviation

Project

Corporate/programme management

Options

Recommendation

Lessons

A.10.3 Derivation

Current plan and actuals

Issue Register

Risk Register

Quality Register

Highlight/Checkpoint Reports

Project Board advice

A.10.4 Format and presentation

Issue raised at progress review

Document/email

Project management tool

A.10.5 Quality criteria

Shows status of time and cost performance

States reasons for deviation

Analyses exception

Describes impact

Considers implications for Business Case

Analyses options

Is timely and appropriate

A.11 Highlight Report

A.11.1 Purpose

Provide Project Board with stage status summary


A.11.2 Composition

Date

Period

Status summary

This reporting period:

Work Packages

Products completed

Products planned

Corrective actions

Next reporting period:

Work Packages

Products to be completed

Corrective actions

Project and stage tolerance status

Requests for change

Key issues and risks

Lessons Report

A.11.3 Derivation

Project Initiation Documentation

Checkpoint Reports

Issue Register

Quality Register

Risk Register

Stage Plan and actuals

Communication Management Strategy

A.11.4 Format and presentation

Presentation to Project Board

Document/email to Project Board

Project Management Tool

A.11.5 Quality criteria


Has right level and frequency of progress reporting

Is provided at required frequency

Is timely, useful, accurate and objective

Highlights potential problems

A.12 Issue Register

A.12.1 Purpose

Capture information on formally managed issues

A.12.2 Composition

Issue identifier

Issue type

Request for change

Off-specification

Problem/concern

Date raised

Raised by

Issue Report author

Issue description

Priority

Severity

Status

Closure date

A.12.3 Derivation

Configuration Management Strategy

New issues raised

New information on existing issues

A.12.4 Format and presentation

Document

Spreadsheet

Database
Stand-alone register

Carry forward in progress review minutes

Project management tool

Integrated project register

Risks

Actions

Decisions

Issues

Assumptions

Lessons

A.12.5 Quality criteria

Indicates action status

Uniquely identifies issues

Defines update process

Transfers risks to Risk Register

Has controlled access

Is kept in safe place

A.13 Issue Report

A.13.1 Purpose

Describes formal issue

Request for change

Off-specification

Problem/concern

A.13.2 Composition

Issue identifier

Issue type

Request for change

Off-specification

Problem/concern

Date raised
Raised by

Issue Report author

Issue description

Impact analysis

Recommendation

Priority

Severity

Decision

Accept

Reject

Defer

Grant concession

Approved by

Decision date

Closure date

A.13.3 Derivation

Configuration Management Strategy

Highlight Report

Checkpoint Report

End Stage Report

Stage Plan

Users and supplier teams

Quality controls

Observation and experience of processes

Quality Register

Risk Register

Lessons Log

Completed Work Packages

A.13.4 Format and presentation


Document

Spreadsheet

Database

Project management tool

A.13.5 Quality criteria

States issues clearly

Has detailed impact analysis

Considers all implications

Examines effect on tolerances

Registers issues correctly

Describes decisions accurately

A.14 Lessons Log

A.14.1 Purpose

Records lessons

Apply to this project

Apply to future projects

A.14.2 Composition

Lesson type

Project

Corporate/programme

Project and corporate/programme

Lesson detail

Event

Effect

Causes/trigger

Early warning indicators

Recommendations

Risk

Data logged

Logged by
Priority

A.14.3 Derivation

Lessons Reports

Project mandate/Project Brief

Daily Log

Issue Register

Quality Register

Risk Register

Checkpoint Reports

Highlight Reports

Completed Work Packages

Stage Plans with actuals

Observation and experience of processes

A.14.4 Format and presentation

Document

Spreadsheet

Database

Stand-alone log

Carry forward in progress review meetings

Project management tool

Integrated project register

Risks

Actions

Decisions

Issues

Assumptions

Lessons

A.14.5 Quality criteria

Indicates action status


Uniquely identifies lessons

Defines update process

Has controlled access

Is kept in safe place

A.15 Lessons Report

A.15.1 Purpose

Pass on lessons

Embed lessons in way of working

A.15.2 Composition

Executive summary

Scope

Review:

What went well

What went badly

Recommendations

Project management method

Specialist methods

Project strategies

Project controls

Abnormal events

Review of useful measurements

Effort required to create products

Effectiveness of Quality Management Strategy

Issues and risks

Additional details for significant lessons

Event

Effect

Causes/trigger

Early warning indicators

Recommendations
Risk

A.15.3 Derivation

Project Initiation Documentation

Lessons Log

Quality Register

Issue Register

Risk Register

Quality records

Communication Management Strategy

A.15.4 Format and presentation

Oral report to Project Board

Presentation at progress review

Document/email to Project Board

Project management tool

A.15.5 Quality criteria

Examines every management control

Provides statistics

Estimates versus actuals

Success of quality controls

Reviews unexpected risks

Recommends actions

Confirmed by Project Assurance

A.16 Plan

A.16.1 Purpose

Show how and when objectives are achieved

A.16.2 Composition

Plan description

Plan prerequisites

External dependencies
Planning assumptions

Lessons incorporated

Monitoring and control

Budgets

Tolerances

Product Descriptions

Schedule

Gantt/bar chart

Product breakdown structure

Product flow diagram

Activity network

Table of resource requirements

Table of specific resources

A.16.3 Derivation

Project Brief

Quality Management Strategy

Risk Management Strategy

Communication Management Strategy

Configuration Management Strategy

Resource availability

Registers and logs

A.16.4 Format and presentation

Stand-alone product

Section of Project Initiation Documentation

Document

Spreadsheet

Presentation slides

Mindmap

Project management tool

A.16.5 Quality criteria


Is achievable

Bases estimates on resources and/or historical data

Has appropriate level of detail

Conforms to corporate/programme standards

Incorporates lessons from previous projects

Incorporates legal requirements

Covers management and control activities

Supports project strategies

Quality Management Strategy

Configuration Management Strategy

Risk Management Strategy

Communication Management Strategy

Supports project approach

Supports management controls

A.17 Product Description

A.17.1 Purpose

Understand product

Nature

Purpose

Function

Appearance

Define users

Identify information/supply sources

Identify quality required

Identify activities

Produce

Review

Approve

Define people/skills required


A.17.2 Composition

Identifier

Project name

Item name

Version number

Title

Purpose

Composition

Derivation

Format and presentation

Development skills required

Quality criteria

Quality tolerance

Quality method

Quality skills required

Quality responsibilities

A.17.3 Derivation

Product breakdown structure

End-users

Quality Management Strategy

Configuration Management Strategy

A.17.4 Format and presentation

Document

Presentation slides

Mindmap

Project management tool

A.17.5 Quality criteria

Has clear and consistent purpose

Has sufficient level of detail

Is concise
Identifies responsibility for product development

Has consistent quality criteria

Verifies product meets quality criteria

Defines requirements of Senior User(s)

Confirms product requirements are achievable

A.18 Product Status Account

A.18.1 Purpose

Provide status information

Within defined limits

Entire project

Particular stage

Particular area

History of specific product

A.18.2 Composition

Report scope

Date produced

Product status

Product identifier and title

Version

Status and date of status change

Product state

Owner

Copy-holders

Location

Users

Producer and allocated date

Planned and actual baseline date

Product Description

Product
Planned date for next baseline

List of related items

List of related issues and risks

A.18.3 Derivation

Configuration Item Records

Stage Plan

A.18.4 Format and presentation

Document

Spreadsheet

Database report

Project management tool output

A.18.5 Quality criteria

Details and dates match Stage Plan

Product name is consistent

Product breakdown structure

Configuration Item Record

A.19 Project Brief

A.19.1 Purpose

Provide full and firm foundation for initiation

A.19.2 Composition

Project definition

Background

Objectives

Time

Cost

Quality

Scope

Benefits

Risk

Desired outcomes
Scope and exclusions

Constraints and assumptions

Tolerances

Users and interested parties

Interfaces

Outline Business Case

Project Product Description

Project approach

Project management team structure

Role descriptions

References

A.19.3 Derivation

Project mandate

Programme management

Discussions

Corporate management

Project Board

Users

Operations and maintenance organization

Suppliers

Lessons Log

A.19.4 Format and presentation

Document

Presentation slides

Project management tool

A.19.5 Quality criteria

Is brief

Reflects project mandate

Reflects requirements of business and users


Considers range of project approaches

Off-the-shelf

Contracted out

Developed in-house

Designed from new

Modified product

Maximizes chance of project success

Is consistent with corporate social responsibility directive

Has SMART objectives

Specific

Measurable

Achievable

Realistic

Time-bound

A.20 Project Initiation Documentation

A.20.1 Purpose

Define project

Give direction and scope

Form contract between Project Manager and Project Board

Ensure project has sound basis

Assess progress, issues and viability

Provide single reference source

A.20.2 Composition

Project definition

Background

Objectives and outcomes

Scope and exclusions

Constraints and assumptions

Users and interested parties

Interfaces
Project approach

Business Case

Project management team structure

Role descriptions

Quality Management Strategy

Configuration Management Strategy

Risk Management Strategy

Communication Management Strategy

Project Plan

Project controls

Tailoring of PRINCE2

A.20.3 Derivation

Project Brief

Discussions

User

Business

Supplier

A.20.4 Format and presentation

Single document

Index for collection of documents

Document with cross-references to other documents

Project management tool

A.20.5 Quality criteria

Correctly represents project

Shows viable project

Has complete project management team structure

Names

Titles

Role descriptions
Lines of authority

Shows control and reporting regime

Project Board

Project Manager

Team Managers

Delegated assurance requirements

Is consistent with corporate social responsibility directive

A.21 Project Product Description

A.21.1 Purpose

Gain agreement on project scope and requirements

Define customer's quality expectations

Define acceptance criteria

Define acceptance method and responsibilities

A.21.2 Composition

Title

Purpose

Composition

Derivation

Existing products

Design specifications

Feasibility report

Project mandate

Development skills required

Customer's quality expectations

Acceptance criteria

Project-level quality tolerances

Acceptance method

Acceptance responsibilities

A.21.3 Derivation

Project mandate
Discussions with Senior User and Executive

Request for proposal

A.21.4 Format and presentation

Document

Presentation slides

Mindmap

Project management tool

A.21.5 Quality criteria

Has clear purpose

Defines project scope

Addresses stakeholder requirements

Defines acceptability of products

Measurable criteria

Realistic and consistent criteria

Proven criteria

Describes quality expectations

Characteristics of key requirements

Customer's quality management system

Customer/staff satisfaction

A.22 Quality Management Strategy

A.22.1 Purpose

Define quality techniques and standards

Define responsibilities

A.22.2 Composition

Introduction

Purpose

Objectives

Scope

Responsibilities
Quality management procedure

Tools and techniques

Records

Quality Register

Reporting

Timing of activities

Roles and responsibilities

A.22.3 Derivation

Project Board

Project Brief

Project management team structure

Project Product Description

Organizational standards

Supplier and customer quality management systems

Configuration management requirements

Change control requirements

Corporate/programme strategies

Workshops and discussions

A.22.4 Format and presentation

Stand-alone document

Section of Project Initiation Documentation

Project management tool

A.22.5 Quality criteria

Defines how customer's expectations will be met

Defines responsibilities independent of project and Project Manager

Conforms to supplier's and customer's management systems

Conforms to corporate/programme quality policy

Has appropriate approaches

A.23 Quality Register

A.23.1 Purpose
Issue unique identifier for each quality activity

Point to product quality records

Summarize quality activities

A.23.2 Composition

Quality identifier

Product identifier

Product title

Method

Roles and responsibilities

Dates

Result

Quality records

A.23.3 Derivation

Quality Management Strategy

Stage Plan

Quality activities

A.23.4 Format and presentation

Document

Spreadsheet

Database

Stand-alone register

Carry forward in progress review minutes

Project management tool

Integrated register

Risks

Actions

Decisions

Issues

Assumptions
Lessons

A.23.5 Quality criteria

Ensures quality activities are entered

Allocates responsibility

Describes and assigns actions

Has controlled access

Is kept in safe place

Assigns appropriate levels of control

A.24 Risk Management Strategy

A.24.1 Purpose

Describe risk management techniques and standards

Describe responsibilities

A.24.2 Composition

Introduction

Purpose

Objectives

Scope

Responsibilities

Risk management procedure

Tools and techniques

Records

Risk Register

Reporting

Timing of activities

Roles and responsibilities

Scales

Probability

Impact

Proximity

Risk categories
Risk response categories

Early warning indicators

Risk tolerance

Risk budget

A.24.3 Derivation

Project Brief

Business Case

Corporate/programme management

A.24.4 Format and presentation

Stand-alone document

Section of Project Initiation Documentation

Project management tool

A.24.5 Quality criteria

Defines clear responsibilities

Documents risk management procedure

Defines scales, expected value and proximity

Defines risk reporting requirements

A.25 Risk Register

A.25.1 Purpose

Capture and maintain information on identified risks

A.25.2 Composition

Risk identifier

Risk author

Date registered

Risk category

Risk description

Cause

Event

Effect
Probability, impact and expected value

Inherent

Residual

Proximity

Risk response categories

Threats

Avoid

Reduce

Fallback

Transfer

Accept

Share

Opportunities

Enhance

Exploit

Reject

Share

Risk response

Risk status

Risk owner

Risk actionee

A.25.3 Derivation

Risk Management Strategy

New risks

Project Brief

Work Packages

Daily Log/Issue Register

A.25.4 Format and presentation

Document

Spreadsheet
Database

Stand-alone register

Carry forward in progress review minutes

Integrated project register

Risks

Actions

Decisions

Issues

Assumptions

Lessons

A.25.5 Quality criteria

Indicates action status

Uniquely identifies risks

Has controlled access

Is kept in safe place

A.26 Work Package

A.26.1 Purpose

Pass responsibility for work to Team Manager/member

A.26.2 Composition

Date

Team Manager/person authorized

Work Package description

Techniques, processes and procedures

Development interfaces

Operations and maintenance interfaces

Configuration management requirements

Joint agreements

Tolerances

Constraints
Reporting arrangements

Problem handling and escalation

Extracts/references

Stage Plan

Product Descriptions

Approval method

A.26.3 Derivation

Existing commercial agreements

Quality Management Strategy

Configuration Management Strategy

Stage Plan

A.26.4 Format and presentation

Document

Conversation between Project Manager and Team Manager

Project management tool

A.26.5 Quality criteria

Is clearly defined and understood

Has Product Description for each product

Identifies quality criteria

Has agreed standards

Defines interfaces

Has agreement on constraints

Has defined reporting arrangements

Appendix B: Governance

Governance of project management principles

Outside scope of PRINCE2

Board has overall responsibility

Partially addressed by PRINCE2

Defined roles, responsibilities and performance criteria

Project is aligned to corporate strategy


Effective delegation of authorization bodies

Independent scrutiny by corporate/programme management

Culture of improvement and open reporting

Fully addressed by PRINCE2

Disciplined governance arrangements

Projects have approved plan with authorization points

Business Case is supported by relevant information

Defined criteria for reporting project status and escalations

Project stakeholders are engaged

Appendix C: Roles and responsibilities

C.1 Project Board

C.1.1 General responsibilities

During start-up and initiation

Confirm project tolerances

Approve Project Brief

Approve Stage Plan for initiation

Authorize project initiation

Decide whether to use Change Authority

Set severity ratings

Set priority ratings

Approve supplier contract

Approve Project Initiation Documentation

Authorize project start

During project

Set stage tolerances

Approve Stage Plans

Authorize management stages

Approve Product Descriptions

Approve stage-level Exception Plans


Communicate with stakeholders

Provide overall guidance and direction

Advise Project Manager

Ensure risks are tracked and managed

Approve changes

Make decisions on escalated issues

Approve completed products

At end of project

Provide assurance

Product delivery

Acceptance criteria

Confirm acceptance of project product

Approve End Project Report

Pass on issues, lessons and risks

Distribute follow-on action recommendations and Lessons Reports

Transfer responsibility of Benefits Review Plan

Authorize project closure

Send project closure notification to corporate/programme management

C.1.2 Competencies

Have authority to make decisions

Approve plans

Authorize deviations

Allocate resources

Represent stakeholders

Business

User

Supplier

Stay with project

Decision making

Delegation
Leadership

Negotiation

Conflict resolution

C.2 Executive

C.2.1 Responsibilities

Design and appoint project management team

Oversee Project Brief and Business Case

Secure project funding

Approve supplier contracts

Hold Senior Supplier and Senior User to account

Transfer responsibility for post-project benefits reviews

Monitor and control project progress

Escalate project-level issues and risks

Ensure risks are identified, assessed and controlled

Make decisions on escalated issues

Organize and chair Project Board reviews

Ensure overall business assurance

C.3 Senior User

C.3.1 Responsibilities

Provide customer's quality expectations

Define acceptance criteria

Specify desired outcome

Ensure products deliver desired outcomes

Ensure benefits are realized

Provide statement of actual versus forecast benefits

Resolve user requirements and priority conflicts

Make user resources available

Make decisions on escalated issues

Advise user management on project matters


Maintain business performance stability

Provide user view on follow-on action recommendations

Undertake user Project Assurance

C.4 Senior Supplier

C.4.1 Responsibilities

Confirm viability of project approach

Ensure proposals are realistic

Advise on design, development and acceptance methods

Make supplier resources available

Make decisions on escalated issues

Resolve supplier requirements and priority conflicts

Brief management on supplier aspects

Ensure quality procedures are used correctly

Undertake supplier Project Assurance

C.5 Project Manager

C.5.1 Responsibilities

Prepare baseline management products

Project Brief

Project Product Description

Benefits Review Plan

Project Initiation Documentation

Stage/Exception Plans and Product Descriptions

Work Packages

Prepare reports

Highlight Reports

Issue Reports

End Stage Reports

Lessons Reports

Exception Reports

End Project Report


Maintain records

Issue Register

Risk Register

Daily Log

Lessons Log

Liaise with corporate/programme management

Liaise with external suppliers/account managers

Lead and motivate project management team

Establish behavioural expectations

Manage information flows

Manage production of products

Establish and manage project procedures

Risk management

Issue and change control

Configuration management

Communication

Establish and manage project controls

Authorize Work Packages

Advise Project Board of deviations

Perform Team Manager role

Perform Project Support role

Implement Configuration Management Strategy

Ensure project personnel comply with Configuration Management Strategy

Schedule configuration audits

C.5.2 Competencies

Planning

Time management

People management

Problem solving
Attention to detail

Communication

Negotiation

Conflict management

C.6 Team Manager

C.6.1 Responsibilities

Prepare Team Plan

Agree Team Plan with Project Manager

Produce Checkpoint Reports

Plan, monitor and manage team's work

Progress

Resources

Corrective actions

Advise Project Manager

Issues and risks

Deviations

Corrective action

Pass completed products to Project Manager

Liaise with Project Assurance and Project Support

Ensure quality activities are performed correctly

Ensure entries are made in Quality Register

Manage specific issues and risks

Assist Project Manager examine issues and risks

Ensure issues are reported in Issue Register

C.6.2 Competencies

Planning

Time management

People management

Problem solving

Attention to detail
Communication

Negotiation

Conflict management

C.7 Project Assurance

C.7.1 Responsibilities

Ensure that:

Stakeholder liaison is maintained

Risks are controlled

Right people are involved

Product Descriptions

Quality inspection

Staff are trained quality methods

Quality methods are followed

Quality control follow-up actions are dealt with

Acceptable solution is developed

Project scope is not changing unnoticed

Communications are working

Applicable standards are used

Specialist needs are observed

Business assurance responsibilities

Assist Project Manager

Business Case

Benefits Review Plan

Advise on project management team

Advise on Risk Management Strategy

Review Business Case

Verify Business Case

Check project is aligned to corporate/programme strategy

Review project finance


Verify solution is value for money

Check project is viable

Assess risk is within tolerance

Authorize supplier payments

Assess issue/risk impact on Business Case

Constrain excesses

Inform project management team of changes

Monitor progress against tolerances

User assurance responsibilities

Advise on stakeholder engagement

Advise on Communication Management Strategy

Ensure user needs are clear

Ensure solution meets user needs

Advise on impact of changes

Monitor risks to user

Ensure quality control procedures meet user needs

Ensure user liaison is working

Supplier assurance responsibilities

Review Product Descriptions

Advise on Quality Management Strategy

Advise on Configuration Management Strategy

Advise on development strategy, design and methods

Ensure supplier and operating standards are met

Advise on impact of changes

Monitor risks

Ensure quality control procedures are used correctly

C.7.2 Competencies

Represent stakeholders

Credibility

Specialist knowledge
Stay with project

Diplomacy

Thoroughness

Attention to detail

Communication

C.8 Change Authority

C.8.1 Responsibilities

Approve/reject changes and off-specifications

Refer exceptions to Project Board

C.8.2 Competencies

Represent business, user and supplier stakeholders

Credibility

Specialist knowledge

Decision making

Planning

Attention to detail

Problem solving

C.9 Project Support

C.9.1 Responsibilities

Set up and maintain project files

Establish document control procedures

Collect actuals data and forecasts

Update plans

Administer/assist quality review process

Administer/assist Project Board meetings

Help compile reports

Contribute expertise in specialist tools and techniques

Maintain records

Quality Register
Configuration Item Records

Registers/logs

Administer configuration management procedure

Administer products

Receipt

Identification

Versions

Storage

Issue

Provide information on product status

Archive product copies

Secure product master copies

Maintain record of copies issued

Notify holders of changes to copies

Record and distribute Issue Reports

Conduct configuration audits

C.9.2 Competencies

Administration and organization

Knowledge of specialist tools and techniques

Knowledge of corporate/programme standards

Appendix D: Product-based planning example

D.1 Scenario

Annual conference

D.2 Example of a Project Product Description

Purpose

Organize annual conference

Composition

Venue

Attendees

Speakers
Publicity

Handouts

Logistics

Derivation

Selected subject matter

Mailing list

Previous lessons and materials

Agreed date

Development skills required

Conference management

Marketing

Public relations

Customer's quality expectations

Networking forum

Expert speakers

Interactive conference

Central location

Acceptance criteria and project-level quality tolerances

Cost

Attendance

Interactive presentations

Approved speakers

Repeat attendance

Location

Acceptance method

Editorial board

Independent assurance

End Project Report

Acceptance responsibilities
Senior User

Executive

D.3 Examples of a product breakdown structure

Hierarchy chart

Mindmap

Indented list

D.4 Example of a Product Description

Identifier

Conference/4.1/version 1.0

Title

Mail-shot

Purpose

Advertise conference

Composition

Mailing envelope

Outline letter

Leaflet

Booking form

Response envelope

Derivation

Mailing list

Agreed programme

Booking arrangements

Venue

Format and presentation

A4 letter

A5 leaflet and booking form

C5 mailing envelope

Development skills required

Marketing
Design

Copywriting

Quality responsibilities

Producer - event management company

Reviewers - marketing team, Conference Project Manager

Approver - membership secretary

Quality criteria

Adheres to corporate identity standards

Reflects agreed details

No spelling/grammatical errors

A4 letter

Quality tolerance

Quality method

PRINCE2 quality review

Inspection

Quality skills required

Marketing team

Conference Project Manager

Proof reader

Appendix E: Health check

E.1 Starting up a Project

Have project management team roles been allocated?

Do Project Board members have authority, availability and credibility?

Are project's stakeholders represented by Project Board?

Do roles descriptions exist?

Have appointed people confirmed acceptance?

Has Daily Log been set up?

Has Lessons Log been set up?

Have previous lessons been identified/applied?


Have lessons been sought from similar projects?

Has Project Brief been produced?

Is there an outline Business Case?

Has Project Product Description been produced?

Has project approach been decided?

Is there a Stage Plan for initiation?

E.2 Directing a Project

Authorize initiation

Has Project Brief been approved?

Has initiation Stage Plan been approved?

Have corporate pr programme management been informed?

Authorize project

Has Project Initiation Documentation been approved?

Have corporate pr programme management been informed?

Authorize Stage/Exception Plan

Has End Stage Report been reviewed?

Has overall project viability been assessed?

Has Stage Plan (or Exception Plan) been reviewed?

Have corporate pr programme management been informed?

Give ad hoc direction

Has Project Board responded to Project Manager's requests?

Has Project Board responded to reports?

Has Project Board responded to external influences?

Have corporate pr programme management been informed?

Authorize project closure

Has handover and acceptance been confirmed?

Has End Project Report been approved?

Has Lessons Report been reviewed?

Has the Business Case been confirmed?

Has updated Benefits Review Plan been approved?


Has project closure notification been issued?

E.3 Initiating a Project

Have previous lessons been identified/applied?

Has Risk Management Strategy been defined and documented?

Has Risk Register been set up?

Has Configuration Management Strategy been defined and documented?

Have Configuration Item Records been set up?

Has Issue Register been set up?

Has Quality Management Strategy been defined and documented?

Has Quality Register been set up?

Has Communication Management Strategy been defined and documented?

Have project controls been established?

Has Project Plan been created?

Has project management team structure been updated?

Have any new role descriptions been been accepted?

Has detailed Business Case been created?

Has Benefits Review Plan been created?

Has Project Initiation Documentation been assembled?

E.4 Controlling a Stage

Have Work Packages been issued?

Have Team Plans been agreed?

Have products been produced?

Have Configuration Item Records been created/updated?

Has Quality Register been maintained?

Were products handed over for phased delivery?

Has Risk Register been maintained?

Has Issue Register been maintained?

Has Stage Plan been updated with actuals and forecasts?

Has Daily Log been maintained?


Have Checkpoint Reports been received?

Was progress against tolerances checked?

Were exceptions escalated to Project Board?

Were corrective actions logged, implemented and tracked?

Was Business Case checked for ongoing viability?

Were Highlight Reports created and issued?

Do Issue Reports exist for all formal issues?

Do Exception Reports exist for all exceptions?

Has Lessons Log been updated?

E.5 Managing Product Delivery

Did Work Package and Product Description contain sufficient information?

Has Team Plan been created?

Has Team Plan been updated with actuals and forecasts?

Was progress against tolerances checked?

Were exceptions escalated to Project Manager?

Were Checkpoint Reports issued?

Was Project Manager notified of issues and risks?

Do approval records exist for completed products?

Has Project Support been notified of updates?

Configuration Item Records

Quality Register

Has Project Manager been notified of product delivery?

E.6 Managing a Stage Boundary

Have completed products been approved?

Has Product Status Account been created?

Were any outstanding issued been documented as follow-on action recommendations?

Has Lessons Log been reviewed and updated?

Has Lessons Report been created?

Has Stage Plan been updated with actuals?

Has Risk Management Strategy been reviewed and updated?


Has Risk Register been reviewed and updated?

Has Configuration Management Strategy been reviewed and updated?

Have Configuration Item Records been reviewed and updated?

Has Issue Register been reviewed and updated?

Has Quality Management Strategy been reviewed and updated?

Has Quality Register been reviewed and updated?

Has Communication Management Strategy been reviewed and updated?

Have project controls been reviewed and updated?

Has Project Plan been reviewed and updated?

Has project management team structure been reviewed and updated?

Have any new roles descriptions been accepted?

Has Business Case been reviewed and updated?

Has Benefits Review Plan been reviewed and updated?

Has Project Initiation Documentation been reviewed and updated?

Has End Stage Report been produced?

Has End Stage Report been issued to Project Board?

Next Stage

Has Stage Plan for next stage been created?

Have Product Descriptions been created?

Has Project Board been requested to authorize next stage?

Exception

Has Exception Plan been created?

Have Product Descriptions been created?

Has Project Board been requested to authorize Exception Plan?

E.7 Closing a Project

Have all products been completed and approved?

Has Product Status Account been created?

Are all outstanding issues documented as follow-on action recommendations?

Is there an acceptance record for handover?


Does acceptance record include operational and maintenance acceptance?

Has Lessons Log been reviewed and Lesson Report created?

Has Project Plan been updated with actuals?

Has Business Case been updated with actuals?

Has Benefits Review Plan been updated with actuals?

Has End Project Report been produced?

Has End Project Report been issued to Project Board?

Has draft closure notification been created for Project Board?

Have all registers and logs been closed?

Has all project documentation been archived?