EQUIPMENT LAYUP

Preservation program
works for outages from one
month to several years

W
hen Araucaria Power alcanti de Albuquerque (Fig 1) told hydropower, and when reservoirs are
Station successfully com- the editors that OEM recommenda- full, thermal generating plants may
pleted acceptance tests tions were strictly followed during be in layup for months. To learn more
in September 2002, no this process. about the country’s energy sector,
one thought the facility would spend Proof of the program’s success was visit www.psimedia.info/handbooks.
the next four years in layup and, that recommissioning and commer- html and click on the “2010 Brazil
in the process, become a center of cial operation were achieved in only Energy Handbook” at the upper right
excellence for equipment preserva- seven weeks following the long out- corner of your screen.
tion that would earn plant personnel age, and plant availability is consis-
the respect of combined-cycle owner/ tently above 98%, except for a forced Program overview
operators worldwide. outage caused by a short circuit in
The 484-MW, 2 × 1, 501FD2-pow- the steam turbine’s generator stator Albuquerque described plant preser-
ered facility was built in southern in early 2008. vation as a combination of protecting
Brazil, near Curitiba, the capital of Recently, the plant O&M team equipment against degradation—
Parana state, by a con- such as is caused by cor-
sortium consisting of El rosion, erosion, sunlight
Paso Corp, Copel, and effects, etc—and main-
Petrobras. El Paso is the taining its operability
gas producer known to through periodic opera-
most readers, Copel is tion and/or testing.
the state-owned electric To achieve these goals,
and telecommunications long-term preservation
firm known officially as programs were devel-
Companhia Paranaense oped for the gas turbine/
de Energia, and Petro- generators (GTG), heat-
bras is the semi-priva- recovery steam genera-
tized oil giant controlled tors (HRSG), steam tur-
by the Brazilian govern- bine/generator (STG),
ment and known formal- and balance-of-plant
ly as Petroleo Brasileiro (BOP) systems.
SA. El Paso later sold its The foundation for
60% share in the facil- this effort was the experi-
ity to Copel, which now ence Copel personnel had
owns 80% and operates gained at other plants,
the plant; Petrobras holds assistance from NAES
the remaining shares and 1. Marcos Freitas, operations supervisor; Fernando Albuquerque, Corp (sidebar), and, as
manages the gas supply operations manager; and Jean Ferreira, operations shift leader (l mentioned earlier, docu-
and electric sales. to r), are members of the team that developed the long-term pres- mentation from OEMs
The hold-up in com- ervation program for Araucaria and service providers.
mercial operation had Regarding the HRSGs
to do with contractual terms in the reviewed and improved the long-term specifically, some of the lessons
power purchase agreement that were program to enable faster installation learned and best practices described
not consistent with the intent of Bra- and removal of preservation systems, in the “HRSG Users Handbook,” com-
zilian laws. thereby enabling their deployment piled by Robert C Swanekamp, PE, of
Over the four-year layup, Araucar- for shutdowns of one month or more the HRSG User’s Group, were incor-
ia’s O&M team developed and imple- in duration when economical and porated into the Araucaria plan.
mented a comprehensive equipment consistent with grid requirements. Key features of the program
preservation program for the outdoor In a typical year, the plant operates included the following:
plant. Operations Shift Leader Jean at or near base load in winter and as n Maintain relative humidity (RH)
Carlos Nunes Ferreira, Operations needed during the “hydro season.” on the gas side of the HRSGs, and
Supervisor Marcos de Freitas, and Note that more than 80% of Bra- in the ST low-pressure (LP) sec-
Operations Manager Fernando Cav- zil’s electricity needs are met by tion, at less than 40%. Fig 2, from

92 COMBINED CYCLE JOURNAL, First Quarter 2010


EQUIPMENT LAYUP
120
Weight increase, milligrams/square decimeter call for first draining the (1) water
side of the boiler, including super-
100 heater, evaporator, and economizer
panels; (2) HP and LP steam piping,
(3) kettle boilers, and (4) the water
80 side of the fuel gas heater.
Step two: Backfill those sections
with nitrogen and pressurize the
60
inert atmosphere to about 7 psig.
Finally, check the concentration of
40 oxygen in the inert atmosphere quar-
terly, bleeding and filling with fresh
nitrogen as necessary. Albuquer-
20 que mentioned the desire to reduce
nitrogen pressure to decrease its
0 consumption. Copel is investigating
0 20 40 60 80 100 the installation of more sensitive
Relative humidity, % pressure gages for this use during
2. Relationship between corrosion layups, as well as the advantages of a
rate and the moisture content of air 3. Dual-pressure HRSGs produce nitrogen generator.
shows the importance of maintaining steam at 1465 psig/977F and 81 A plastic curtain closes off the air
relative humidity below about 40% inlet to the gas turbine (Fig 4). Ini-
psig/507F
tially, a curtain also was installed
a maintenance guide supplied by at the stack entrance to isolate the
STG manufacturer Alstom Power, HRSG but that has been replaced
shows corrosion products are pro- by a duct balloon, which is easier
duced at an exponential rate when to deploy (Figs 5, 6). Dehumidifiers
RH exceeds about 60%. installed outside the HRSG (origi-
n Analyze and maintain cooling- nally portable and installed inside)
water chemistry on a regular basis condition the space from the turbine
according guidelines provided by inlet to the stack balloon to 40% RH.
the tower supplier and GE Water Space temperature and humidity are
& Process Technologies. monitored via the DCS and alarms
n Protect exposed surfaces by paint- sound when limits are exceeded.
ing in accordance with recom- 4. Curtains prevent air from entering Such improvements have reduced
mendations from Lactec, a local the gas turbines’ compressors dramatically the manpower require-
technology institute and formerly ments and time needed to install
part of Copel. motors and generators on “auto- and break-down the preservation
n Perform tests and inspections matic” when the equipment is not system. Specifically, the total effort
according to long-term shutdown in service and check heater perfor- now takes 25% or less time than was
procedures provided by the manu- mance quarterly. required originally, making the sys-
facturers and conduct preventive, tem viable for outages of about one
predictive, and corrective main- HRSGs, steam systems month and longer.
tenance as recommended in the To illustrate: The plastic curtain
plant maintenance manual. The Each of the plant’s two dual-pressure at the HRSG outlet took four people
foregoing activities must comply HRSGs (Fig 3) has a kettle boiler 16 hours to install, including erec-
with environmental, safety, and incorporated in the LP section. Its tion of the scaffolding required, and
health regulations and are facili- purpose is produce steam four people 12 hours to remove it.
tated by use of Copel’s computer- while removing heat from Two people can deploy the duct bal-
based O&M operations manage- compressor discharge air loon in about an hour, and take it
ment system. used for rotor cooling. Arau- Stack out of the stack with the same level
n Keep all space heaters for electric caria’s dry layup procedures of effort. Also, it originally took four

Stack balloon

Plastic curtain
Heat-recovery
Compressor Turbine steam generator
Gas-turbine
air inlet

Dehumidifier Humidity Corrosion


indicator test coupon
5. Curtain and stack balloon prevent outside air from entering the gas turbine
and the gas side of the HRSG. When the preservation system was first
installed, there was a curtain between the HRSG and the stack and portable 6. Duct balloon is simple to install
dehumidifiers were located inside the boiler casing. The arrangement shown is through manhole accessible from
the optimum solution catwalk
COMBINED CYCLE JOURNAL, First Quarter 2010 93
EQUIPMENT LAYUP

Process air Dry air

Wet air
Air heater

Reactivation air

Drive motor
7, 8. Dehumidifier located outside the HRSG casing (left) works as illustrated at right

man-days to install electric heaters n Turning-gear motors. installed outside the LP section (Fig
and dehumidifiers inside the HRSG n Control oil pumps. 9) and arranged as shown in Fig 10
and another three to remove them. n Evaporative-cooler pumps (every to eliminate the need for installing/
Both steps are avoided by use the other day). removing plastic curtains and the
permanently installed dehumidifier n Compressor washing systems scaffolding needed to accommodate
described in Figs 7 and 8. (monthly). their installation and removal.
Today the major effort in preserva- n Igniters (command test). ST auxiliaries operated or tested
tion system implementation is instal- The plant’s valve test schedule weekly:
lation of the plastic curtain in the GT called for periodic testing or opera- n Main lube-oil (LO) pump.
inlet, a task that takes two people tion of these flow-control devices: n DC emergency LO pump.
about six hours to complete. Removal n LO-cooler temperature control n LO vapor extractor.
takes two people four hours. valve. n Turning-gear motor.
HRSG and main-steam system n Main-gas-line vent valve. n Control oil pump.
fluid handling equipment operated or n Stages A, B, and C gas control n LO purifier pump.
tested periodically are the following: valves (command). n Gland seal-steam condenser
n Water-level control valves for the n Pilot-gas control valve (com- exhausters.
HRSG drums. mand). n Jacking-oil pump.
n D e s u p e r h e a t e r s p r a y - w a t e r n Kettle-boiler air bypass valve.
valves. n Coolant-flow control valve for disk Condensate system
n Blowdown valves. cavities 2 and 3.
n HP and LP superheater drain n IGV command. The condensate system has two full-
valves. n LP and HP compressor bleed size pumps, preserved as follows with
n Fuel-gas heater valves. valves (command). motor and pump coupled throughout
n All HP and LP steam-system n Instrument-air valve (command). the layup period:
valves. n Pump pit maintained dry.
n Blowdown-system sump pumps. Steam turbine/generator n Pump shafts manually turned
twice monthly.
Gas turbine/generators The 164-MW Alstom ST is comprised n Bearing lube replaced semiannu-
of HP and LP turbines arranged on ally.
The preservation plan for the GTGs one shaft. HP superheated steam flows n Condensate piping from the pump
was based on the OEM’s recommen- through the former and into the lat- to the HRSGs was pressurized to
dations, which proactively guard ter, where it is supplemented by steam about 7 psig with nitrogen.
against corrosion. The inlet curtain from the HRSG’s LP superheater. n Suction and discharge piping was
and stack balloon described in the The condenser hotwell was drained drained monthly.
HRSG section are the first line of in accordance with the OEM’s recom- Valves operated or tested as part
defense against corrosion. In addition, mendations and the ST LP section of the preservation program were the
compressor bleed valves, manholes, originally was separated from the following:
inspection doors and other openings condenser with a plastic curtain like n Condenser makeup control valve.
were sealed to prevent atmospheric that used in the GT inlet. Reason for n Condenser rejects control valve.
air from entering the dehumidified the curtain here was that the circu- n Condensate minimum-flow control
engine. Any leakage through seals, lating water system had to remain in valve.
walls, roof, doors of the GTC enclo- service to prevent wood members in n HP and LP steam-bypass desuper-
sure were repaired to prevent con- the six-cell mechanical-draft cooling heater spray-water control valves.
tamination by outside air. tower from drying out. n Spray-water control valve for HP
The following equipment was test- Heaters and dehumidifier were steam serving steam seals.
ed or operated weekly, according to installed at the ST exhaust to keep n Steam-jet air-ejector hogging and
the test schedule developed for Arau- the moisture level below 40% RH. Air holding valves.
caria, except where noted: temperature and humidity inside the n Spray-water valve in condenser
n Main lube-oil (LO) pumps. turbine were monitored continuously. neck.
n DC emergency LO pumps. As was done for the HRSG, a n Fuel-gas-heater temperature con-
n LO vapor extractors. ST dehumidifier was permanently trol valves.
94 COMBINED CYCLE JOURNAL, First Quarter 2010
EQUIPMENT LAYUP

Condenser
Steam-turbine Cooling
exhaust water

Hotwell

Dehumidifier
Humidity indicator Corrosion
test coupon
9, 10. Steam turbine has a separate dehumidifier (left) which is located external to the unit (right)

n Backpressure control valve for Auxiliary systems according to the Plant Maintenance
STG seal water to the STG vacu- Program.
um-breaker valve. Fuel gas system piping was Steam and water analysis sys-
drained, vented, and pressurized tem remained in service with a con-
Boiler feedwater system with nitrogen. Valves were tested tinuous flow of demineralized water.
periodically. Demineralized water system
Two full-size feedwater pumps are Instrument and service air sys- was operated quarterly to produce
provided with each HRSG. Each pump tems remained in service during the boiler-quality water and maintain
transfers water from the LP section to layup. Use of the redundant com- the normal level in the demin tank.
the HP section and is equipped with pressors and dryers was alternated All functions of all equipment in the
an auxiliary LO pump. according to the Plant Equipment two parallel trains were tested and
The boiler-feed pumps were drained Test Schedule. verified—including demin-water pro-
and suction, discharge, and recircu- Closed cooling-water (CCW) duction, rinse quality, regeneration,
lation valves opened. This allowed system also remained in service and backwash, etc.
nitrogen in the HRSG steam/water the use of redundant equipment The circulating water system
circuit to inert the BFPs and connect- alternated. serves the surface condenser and
ing piping as well. Pump shafts were Condensate/feedwater chemi- CCW plate heat exchangers and pro-
manually rotated quarterly as recom- cal control system (amine and oxy- vides quench water to the HRSGs’
mended by Sulzer, the pump OEM. gen scavenger for condensate and blowdown systems. Operation of the
The BFP auxiliary LO pumps also phosphate for feedwater) was out of 3 × 50% pumps was alternated to
were exercised quarterly. service and inspected and maintained assure one pump was on at all times
to keep the cooling tower’s wood
members wet and to provide blow-
NAES forms company in Brazil down for the wastewater system
clearwell. Operation of the six tower
NAES Corp, Issaquah, Wash, recent- to establishing NAES Servicos. fans also was alternated weekly.
ly formalized its presence in Brazil by Activities included participation in The raw water system remained
launching NAES Servicos de Opera- the development and implementa- in service to supply water to the GT
cao e Manutencao Eletrica Ltda, with tion of Araucaria Power Station’s evap coolers. Filter feed pumps and
headquarters in Rio de Janeiro state. long-term preservation program. the filter backwash pump were run
The company sees a bright future for Operations Manager Fernando quarterly.
Brazil, the world’s fifth most popu- Albuquerque said NAES advi- The wastewater system, includ-
lous nation and 10th largest electric- sors, who were onsite to assist ing the sewage treatment system,
ity market. in the development of O&M pro- operated continuously. The waste
NAES Corp is not new to inter- grams before plant commission- neutralization tank was operated
national markets. It began working ing, remained after the facility was quarterly (in concert with the demin
outside the US in the mid 1990s, placed in layup to share their pres- water system), sump pumps and
following the lead of powerplant ervation experience. Albuquerque the oil/water separator whenever it
developers chasing promising recalled their significant contribu- rained.
opportunities in Latin America and tions in the areas of valve and motor Chemical feed system remained
the Caribbean. At one point, NAES care and testing that were the first in service and chemistry was moni-
had as many contracts in those steps towards a more comprehen- tored daily.
markets as it had at home. Today sive preservation program. Plant DCS and major equipment
the company provides O&M services NAES remains involved with the control systems were kept in service
for generating plants in Canada, Araucaria project to this day, advis- and exercised as recommended by
Mexico, and Colombia, and recently ing Copel on gas-turbine matters. the manufacturers.
signed an agreement to operate and NAES has deep experience in 501F The plant auxiliary electric sys-
maintain one Brazilian project as it technology, having operated and tems, backfed from the grid, remained
actively pursues others. maintained more than two dozen of in service. The emergency diesel/gen-
NAES was working in Brazil prior these engines. erator also was maintained ready to
enter service when required. ccj