Eje Longitud (m) Altura (m) Area (m2) Descuentos (m2) Limpieza (m2)

(A,C) (1,6) 3.43 6.50 22.30 - 22.30


(C,D) (1,5) 2.97 5.37 15.95 - 15.95
1 (A,D) 6.40 0.90 5.76 2 * V1+P1 = 3.50 -
2 (B,B') 1.30 0.90 1.17 P2 = 0.80 -
3 (B',D) 2.27 0.90 2.04 -
5 (B,D) 3.17 0.90 2.85 P4 + V3 = 1.20 -
6 (A,B) 3.63 0.90 3.27 -
A (1,6) 5.70 0.90 5.13 -
B (1,2) 2.37 0.90 2.13 -
B (5,6) 0.73 0.90 0.66 V2 = 0.50 -
B' (2,5) 1.80 0.90 1.62 P3 = 0.70 -
D (1,5) 4.17 0.90 3.75 -
38.24
Excavaciones VF (0,40 * 0,30) (m3) Solados e=0,05 cm A= 0,40 (m2) Bloque de sobrecimiento (ml)
- - -
0.77 2.56 6.40
0.16 0.52 1.30
0.27 0.908 2.27
0.38 1.268 3.17
0.44 1.452 3.63
0.68 2.28 5.70
0.28 0.948 2.37
0.09 0.292 0.73
0.22 0.72 1.80
0.50 1.668 4.17
3.78 12.62 31.54
Mamposteria ordinaria (m2)
-
2.26
0.37
2.04
1.65
3.27
5.13
2.13
0.16
0.92
3.75
21.69