Asset Description
Workshop AN Section
Workshop UTW
Workshop
Workshop
Workshop CAN
Workshop Workshop
Workshop Miscelleneous
Workshop Miscelleneous
Workshop Miscelleneous
Workshop Utlities Plant
Workshop NP Plant
Workshop NP Plant
Craf
Craf
Craf
Craf
Craf
Craf
Craf
Craf
Craf
Craf
Craf
Wheel Loader Model TCM
1 Garage NP Plant WL#03 835
2 Garage Craf CR304 13 Ton Coles Crane
Revival of 30 Ton Crane (Ex-Fatima). Mechanical job 90% compl Corrective May - June
JO placed - Job in progress for Denting / painting & cabin glass inCorrective Apr / May
Ovrehauling of (02 NO’s) PSV’s of Boiler drum line B HNO3 planCorrective Mar
Pressure Testing of (06 NO’s) Hydrogen pipe of HNO3 plant Preventive Mar
Pressure Testing of Demin water services Hose Pipes of HNO3 Preventive Mar
Pressure testing of (12 NO’s) Hose Pipes of ammonia filling statPreventive Mar
Manufacturing/Rectification of Seat Plug & cage of PIC2007-B Cost Saving / Local ManufactMar
control valve (UTY) (Cost Saving: 0.78 Million)
Repairing the cracks of crystallizer section shaf by welding & Cost Saving / Local ManufactMar
machining
Manufacturing of seat & plug for LCV 129 auto valve of Cost Saving / Local ManufactMar
ammonia plant
Manufacturing of (8 NO’s) bushes for HNO3 plant Cost Saving / Local ManufactMar
Manufacturing of blind flanges for mothballing of CO2 plant Cost Saving / Local ManufactMar
pipe lines.
Repaint the bounded area lines for the mandatory PPE’S in the Safety Initiative Mar
Overhauling of
1. Refurbishment of auto valve body of 40-436 by welding and Cost Saving / Local ManufactDec
machining(NP)
2. Manufacturing of S.S shaf for tube well 07 stage pump (UTY) Cost Saving / Local ManufactDec
3. Manufacturing of shaf sleeve for 108-J (NH3) Cost Saving / Local ManufactDec
Rigging support for Cooling Water Return Line at NP Plant. (Dec-17) Support job Dec
Erected scaffolding inside New Cooling Rower Cell # 2 and cell #3 for
fitting of fills. (Dec-Jan17) Support job Dec-Jan
Erected scaffoldings inside and outside of Balcke Cooing Tower for
Civil Repair. (4-Jan- April) Support job Jan~April
Rigging, scaffolding and insulation of LS Line Project. (4-Jan-18 to
Mar) Support job Jan~Mar
Rigging, scaffolding and insulation support shifing of LCO2 Plant.
(22-Jan-24-Apr) Support job Jan~April
Unloading / loading of Rental Gas Generators. (Feb – 18) Support job Feb
Rigging, scaffolding and Rescue support for internal repair of 102-E
Stripper at ammonia Plant. (Mar-Apr) Support job Mar~April
Rear Gear with Exil Removal for Gear Teeth Welding/ Repairing Dec-17
Main Hoist Brake & Lowering Stystem Repairing, Engine Tuning, Annual Load Test. Jan-18
Clutch System Repairing, Engine Tuning, Brake System Rerpairing, Fan Belt & Coolant Hose Feb-18
Preventive Maintenance, Oil^& Oil Filter, Fuel Filter, Air Filter Replacement, Batteries PM Mar-18
90% 6
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100% 20 3 480
100% 22 2 352
100% 1.5 7 74
100% 22 2 176
100% 24 3 576
100% 22 1 176
100% 52 2 832
100% 22 2 176
100% 96 2 1536
100% 4 1 32
100% 3 2 48
100% 4 1 30
100% 22 2 176
100% 40 2 640
100% 18 3 448
100% 22 2 176
100% 15 4 504
100% 6 2 96
100% 24 2 384
100% 22 2 176
100% 6 2 96
100% 6 4 192
100% 22 3 528
100% 22 2 176
100% 8 2 128
100% 1 5 40
80% 22 3 528
Complete 2 1 16
Complete 22 2
Complete 3 3 72
Complete 6 3 155
Complete 2 2 32
IN Progress 22 3 528
Complete 2 1 16
Complete 22 2 176
IN Progress 22 3 528
IN Progress 22 2 352
Plan 10 2 160
70% 12 3 288
Plan 1 5 30
Plan 4 2 64
Plan 4 2 64
Plan 5 2 96
Plan 8 2 128
Plan 4 3 72
Plan 8 2 128
Plan 20 2 320
Plan 30 1 240
Plan 6 2 96
Man Days/monthours / da No. of monavailable man-hours
Craf 19 22 8 7 23408
Garage 9 22 8 7 11088
Workshop 19 22 8 7 23408