You are on page 1of 3
7 =) A Conporcio TRANSMANTARO E.Qutub Minar ‘SUPERVISION DE LA FABRICACION DE LAS TORRES METALICAS DE LA LINEA DE TRANSMISION MANTARO - MARCONA - SOCABAYA - MONTALVO A 500 kV _ REVISION DETALLADA. “Approval Document No.7 PROYECTO PE-MAMO-00009.2001, ALCANCE: SCOPE 2 FECHA: — Mayo 29 de 2015 REVISOR: INGENIERO JORGE VILLATE C. JObject: Towers Manufacturing Inspection: Prototype Stubs Towers A, AA, B, C and D altitude 2000-3000msnm Place: Skipper Limited factories in Jangalpur and Uluberia, Howrah India Start ime: 11:00am End time: 12:00m attendees: By: SKIPPER LIMITED By: PDLISA-Consorcio Qutub Minar Somnath Bhattacharjee: _In-Charge Drawing Jorge Vilate Castile: Inspector Report prepared by: JVC Complementary documents Drawings: Annex 1 and 2 We performed the seventh meeting about the inspection process required for the fabrication of the transmission line Mantaro - Montalvo, manufacture to be made by the company Skipper Limited., Project to be developed by the| lcompany PROYECTOS DE INFRAESTRUCTURA DEL PERU SAC which is part of ISA S.A. E.S.P. Group ang| Jwith the participation asa company — supervisor Consorcio. Qutub Minar. JAfter reviewed the prototype, made comments of the inconsistencies found and subsequent made corrections to| the BOM, structural drawings and shop drawings by Skipper. Proceed to the approval of the prototype, structural Jdrawings, shop drawings and bill of materials of the Stubs Towers A, AA, B, C and D for altitude 2000 - 3000 Imsnm, these documents are the basis for mass production of the structure, Note: This does not absolve Skipper Limited contractual responsibilty for delivery of the towers, according to as| stipulated in the contract. Sign in evidence: _Sormety Prot nlaye» Somnath Bhattacharjee Jorge Villate Castillo In-Charge Drawing Skipper Inspector ISA-Consorcio Qutub Minar so 4 con TRANSMANTARO \sorcio AiQutub Minar ‘SUPERVISION DE LA FABRICACION DE LAS TORRES METALICAS DE LA LINEA DE TRANSMISION MANTARO - MARCONA - SOCABAYA - MONTALVO A 500 KV _ REVISION DETALLADA “Approval Document No.7 ANNEX 1 STRUCTURAL DRAWINGS 1 PE-MANO.00004-L-R2.KA#2z7_STUB_A2000 2 PE-MAMO.00004-L-R2-KAAA77_STUB_AAZ000 3 PE:MAMO.00004-L-R1-KB527_STUB_82000 4 PE:MAMO-00004-L-R1-KC575_STUB_C2000 5 PE-MAMO-00004-L-R2-KD626_STUB_D2000 semen 99h airnleee 7 Pagina 2 des a ee 7 isa 4 Congorcio cut TRANSMANTARO ub Minar ‘SUPERVISION DE LA FABRICACION DE LAS TORRES METALICAS DE LA LINEA DE TRANSMISION MANTARO - MARCONA - SOCABAYA - MONTALVO A 500 kV_ REVISION DETALLADA, ‘Approval Document No.7 JANNEX 2 BoM ‘SUPERUISZ/ALT(2-3AISTUB-O1 ‘SUPERUIS2/ALT(2-3ANISTUB-O1 ‘SUPERUIS2/ALT(2-3)/B/STUB-01 ‘SUPERUIS2/ALT(2-3)ICISTUB-O1 SUPERUIS2/ALT(2-3)DISTUB-O1 (koucnra)

You might also like