BILL OF MATERIALS

Project : Proposed Gas Station

Location :

Owner :

Description Quantity Unit Cost Amount

A. CANOPY / PUMP SHADE:

 Footing & Column:


Cement 25 bags 260.00 6,500.00
Sand 1.5 cu.m. 900.00 1,350.00
Gravel ¾”ø 2.5 cu.m. 1,200.00 3,000.00
16mmø def. bars 10 pcs. 360.00 3,600.00
20mmø def. bars 12 pcs. 480.00 5,760.00
10mmø def. bars 10 pcs. 165.00 1,650.00
#16 G.I wires 6-kls. 90.00 540.00
₱ 22,400.00

 Canopy / Roofing:
3”x3”x1/4” angle bars 14 pcs. 1,800.00 25,200.00
2x2x1/4 angle bars 20 pcs. 1,200.00 24,000.00
2”x4”x1.5mm c-purlins 11 pcs. 690.00 7,590.00
Ribb type color roof 36 sq.m. 600.00 21,600.00
G.I. painted gutter x 2.40 12 pcs. 430.00 5,160.00
Welding rod 2 box 2,600.00 5,200.00
Red oxide primer 4 gals 575.00 5,300.00
Rib type color roof ( fascia ) 25 sq.m. 600.00 15,000.00
Rivets 2 box 500.00 1,000.00
Teck Screw 400 pcs. 2.75 1,000.00
₱ 108,050.00
 Pump Island:
Cement 16 bags 260.00 4,160.00
Sand 5 cu.m 900.00 450.00
Gravel ¾ 1 cu.m 1,250.00 1,200.00
6” thk.conc. hollow blocks 40 pcs. 10.00 400.00
10 mmø def. bars 20 pcs. 165.00 3,300.00
#16 G.I. tiw wires 4 kls. 90.00 360.00
₱ 9,840.00
 Ceiling Works:
Spandrell 36 sq.m. 600.00 21,600.00
Metal Furring x 5.00 m. 40 pcs. 140.00 5,600.00
Rivets 10 box 500.00 5,000.00
₱ 32,200.00
 Electrical Works:
Lump Sum ( Mtl’s Only ) ---------- ----------- ₱ 25,000.00

 Painting Works:

Lump Sum ( mtl’s only ) ---------- ------------ ₱ 35,000.00

 Ground Concreting: ( 1,125 sq.m. )


Cement 50 bags 260.00 13,0000.00
Sand 36 cu.m. 900.00 31,400.00
Gravel ¾”ø 18 cu.m. 1,200.00 21,600.00
10 mmø def.bars 22 pcs. 165.00 3,630.00
#16 G.I tie wires 1 rolls 1,800.00 1800.00
₱ 71,403.00

Total materials cost = ₱ 303,893.00


Labor cost 45% = ₱ 137,052
Total cost = ₱ 440,645.00
Miscellaneous 10% = ₱ 44,065.00
Project total cost = ₱ 484,701.00