You are on page 1of 11

Khorais Road Project - Riyadh

Saudi Diyar Consultants

HVAC System
Air Handling Unit
Project :
Date : Ambient Temp, °F:

a- General :

1- Unit No :
2- Location :
3- Served area :
4- Serial Number :
5- Model Number :
6- Type :
7- Voltage :
8- Amperage :
WATER
9- Inlet Temperature , ° F:
10- Outlet Temperature, ° F :
11- Inlet Pressure, psi :
12- Outlet pressure, psi :
Design Actual
13- Water flow, gpm :
AIR
14- Leaving air temperature db/wb, ° F : /
15- Entering air temperature db/wb, ° F : /
Design Actual
16- Airflow, cfm :
Electric Heater
17- Heater , Kw :
18- Stages :
19- Reheat, Kw :
20- Stages :
21- Motor RPM :
Design Actual
22- Supply air, cfm
23- Return air, cfm
24- Fresh air, cfm

NOTES :
Name Signature

05/07/2018
General 1
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

b- Check List :

1 - Unit installed on concrete pad with 2" thick coark ok not ok


2 - Unit is installed on anti vibration mounts ok not ok
3 - Alignment and Levelling good bad
4 - Condensate drain pipe directed to nearest floor drain ok not ok
5 - Condensate drain pipe shall have a P-Trap found not found
6 - Chilled water pipes installation good bad
7 - Chilled water pipes insulation good bad
8 - FDI installation on main ChW return pipe found not found
9 - Pipes identifications ok not ok
### - Valves tagging ok not ok
11 - Pressure gauges installation found not found
### - Thermometer installation found not found
### - Automatic air vent installation found not found
### - 2-way valve installation found not found
### - Strainer installation found not found
### - General cleaning ok not ok
### - Smoke detector installation found not found
### - Differential pressure on AHU's filter found not found
### - Differential pressure on AHU's fan found not found
### - Ducts installations good bad
### - Ducts insulation good bad
### - Ducts identification ok not ok
### - Canvas installation at main supply and return ducts found not found
### - Fresh air duct installation good bad
### - Volume damper installation at FA duct with filter found not found
### - Clading or wrapping for Ch. W pipes found not found

NOTES :

Name Signature Date

05/07/2018
Checklist 2
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

c- Electrical Checklist

AHU is connected to MCC panel No. :


Voltage :
Amperage :

1 - Control panel installation good bad


2 - Indication lamps found not found
3 - Phase failure unit protection found not found
4 - Overload protection found not found
5 - Wires are tightly connected good bad

c- Control Checklist

AHU is connected to DDC panel No. :


Thermostat setting:

Min, ° F Max, ° F
occupied
not occupied
RH %

1 - 2-way valve connection to DDC panel ok not ok


2 - Smoke detector connection to DDC panel ok not ok
3 - Filter differential switch connection to DDC panel ok not ok
4 - Fan differential switch connection to DDC panel ok not ok
5 - Thermostat installation and connection to DDC ok not ok
6 - Humidistat installation and connection to DDC ok not ok
7 - Outside air temperature sensor installation ok not ok
8 - Outside air humidity sensor ok not ok
9 - Heater and reheat stages connection to DDC panel ok not ok
### - Sequence of operation programming ok not ok
11 - Interlocking with fire alarm system ok not ok

NOTES :

Name Signature Date

05/07/2018
Electrical&Control 3
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Main Supply Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

05/07/2018
Supply 4
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/07/2018
Supply 5
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Main Return Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

05/07/2018
Return 6
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/07/2018
Return 7
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Fresh Air Duct Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

05/07/2018
Fresh air 8
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/07/2018
Fresh air 9
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Served Area: Location:


Length, ft Av. FPM 0.0 SCFM 0.0 Design CFM
Area factor Reading No. 1 ACFM 0.0 Actual CFM
Type Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

Measured data, FPM

NOTES :

Name Signature Date

05/07/2018
Air Outlet 10
19:46:48
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

05/07/2018
Air Outlet 11
19:46:48