LEGEND:
Chainage
Datum :
Proposed ROW
Superelevation
Existing Shoulder
Proposed Median
OGL 20m LEFT
OGL 20m RIGHT
Existing Carriageway
Proposed Carriageway
1
1
OW
+
HORIZONTAL SCHEMATIC
P
PROW
58+000 672.094 674.156 673.120 679.821 679.821
+0
0
OW
0
58+010 672.179 674.235 673.556 679.841 679.841
HYDERABAD
TS
58+020
57
672.363 674.229 673.560 679.854 679.854 63
+9
Ls=115.00
58+030
.8
672.559 674.162 673.087 679.860 679.860 86 MA
58+040 672.401 674.125 673.236 679.859 679.859
Structure
TC
H
58+050 672.479 674.146 673.402 679.851 679.851 LIN
58+060 672.819 674.165 673.954 679.835 679.835
E
58+070 672.534 674.273 673.950 679.813 679.813 58+
SC
58+080 672.649 674.076 674.245 679.784 679.784
078
P.R
.88
6
G=-0.665%
58+090 672.802 673.985 674.460 679.747 679.747
58+
OW
2
2
REV
58+120
OW
DATE
58+150 674.211 673.790 674.439 679.399 679.399
R0 JAN 2018
58+160 674.457 673.897 674.411 679.332 679.332
L=68m
L=68m
58+170 674.689 674.222 674.521 679.266 679.266
G=-0.665%
G=-0.665%
R=400.00
Lc=174.59
LHS=5.00%
RHS=5.00%
58+180 674.893 674.438 674.665 679.199 679.199
58+190 674.774 674.553 675.030 679.133 679.133
58+200 674.708 674.134 675.316 679.067 679.067 58+200
58+210 675.278 674.926 675.665 679.013 679.013
58+220 675.434 675.717 675.994 678.970 678.970
P.ROW
FIRST SUBMISSION
58+230 675.359 676.297 676.326 678.940 678.940
58+240 675.278 676.427 676.609 678.922 678.922
P.ROW
3
3
K=81.136
K=81.136
58+280 675.939 676.892 677.189 678.974 678.974
L=150.000m
L=150.000m
58+290 676.054 677.358 677.206 679.018 679.018
DESCRIPTION OF REVISIONS
58+300 676.183 677.872 677.268 679.074 679.074
58+310 676.444 678.254 677.464 679.142 679.142
Ls=115.00
58+320 676.609 678.534 677.683 679.223 679.223
58+300
58+330 676.863 678.804 678.219 679.316 679.316
58+340 677.123 679.067 678.504 679.422 679.422
58+350 677.389 679.298 678.760 679.538 679.538
P.ROW
BY
SM
58+360 677.657 679.551 678.337 679.656 679.656 8
368.47
L=38m
L=38m
58+370 677.942 679.860 678.605 679.775 679.775 ST 58+
G=1.184%
G=1.184%
P.ROW
CLIENT:
58+390 678.484 680.582 679.949 680.010 680.010
4
4
NHAI
58+490 679.760 681.493 680.449 680.844 680.844
58+500 679.803 681.451 680.402 680.893 680.893
P.ROW
PIU/HYDERABAD
58+510 679.912 681.415 680.355 680.936 680.936
58+520 679.947 681.369 680.471 680.973 680.973
58+500
58+530 679.982 681.304 680.570 681.003 681.003
Ch.=58538.629
58+540 680.017 681.310 680.665 681.028 681.028 L=681.771
RHS=2.50%
5
5
K=-160.987
K=-160.987
L=310.000m
L=310.000m
CONSULTANT:
58+560 680.073 681.352 680.920 681.058 681.058
58+570 680.043 681.274 680.672 681.064 681.064
58+580
F DBAC
680.084 681.169 680.544 681.063 681.063
Straight L=405.24
INFRA
Making Infrastructure Happen
58+640 680.234 680.233 680.438 680.930 680.930
58+650 680.202 680.236 680.355 680.886 680.886
58+660 680.189 680.253 680.291 680.835 680.835
58+670 680.142 680.249 680.395 680.779 680.779
Lalbagh Road
6
6
58+700
58+720 680.020 680.158 680.378 680.425 680.425
58+730 679.944 680.061 680.239 680.351 680.351
Scale:
P.ROW
Checked by:
Approved By:
V 1:200
H 1:2000
P.ROW
DSC
ALA
E
58+830
7
7
SC 58+848.721
58+850
DRG NO.:
LHS=5.00%
P.ROW
58+900
58+900 678.947 679.232 678.740 679.090 679.090
58+910 678.860 679.166 678.816 679.016 679.016 CS 58+9
58+920
07.851
678.784 679.093 678.739 678.942 678.942
58+930 678.711 679.009 678.141 678.868 678.868
58+940 678.642 678.934 677.950 678.793 678.793
58+950 678.571 678.827 678.146 678.719 678.719
Ls=75.00
MANNEGUDA
G=-0.742%
59+0
58+980 678.641 678.528 678.293 678.497 678.497
0
FIPL/HD/(R&B)PPP/ TAED-213/ RD 12 EXG/P&P
FINAL FEASIBILITY REPORT
P.RO
590+ 0
58+990 678.521 678.428 678.209 678.422 678.422
00
PLAN & PROFILE FROM KM 58+000 TO KM 59+000
W
ST 5
8+98
2
59+000
.8
678.323 678.335 678.351 678.348 678.348
Bharatmala Pariyojana on Hybrid Annuity Mode.
R0
MAT
REV.
L=618m
L=618m
P.RO
G=-0.742%
G=-0.742%
CH L 51
INE
W
SHEET
(ORR-Appa Junction) (Design Ch: Km 14+000/ Existing km.14+000) to Manneguda
45 Of 47
Consultancy Services for Feasibility Study of Four Laning of NH-163 from Hyderabad
F
E
B
A
H
D
C
Size: A2