MANUALI 1 PRODHIMI I MATERIALEVE TE NDERTIMIT

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Shp pl 8%
Nr.analize

Emertimi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta

Totali
T/km

Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1.21/p Prodhim llaç gelqere 1:3 m3

Sp + p op 3.36 125 420

Shtese mbi page 65% leke 420 0.650 273

Betonjere 250 liter op 0.9 174 156.6

Gelqere e shuar op 339 7.87 2669

Uje kg 200 0.40 80

Rere liter 1.03 736 758

Shuma: m3 693 156.6 3507 4356 348 436 5140

Tirane 2018 Denisa Shaba


MANUALI 1 PRODHIMI I MATERIALEVE TE NDERTIMIT

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Shp pl 8%
Nr.analize

Emertimi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta

Totali
T/km

Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1.41/p Prodhim elemente b/a te m3


parapregatitura me brinje 41-
50cm
Sp + p op 7.56 185 1399

Sigurime shoqerore 16.7% leke 1399 0.167 234

Beton C-16/20 m2 1.122 20 22 1.02 5294 5400

Kallep inventari kg 4 140 560

Gozhde kg 0.02 90 2

Solar op 0.75 87 65

Vinc Op 1.2 53 63.6

Vibrator m3 0.6 53 31.8

Shuma: 1632 22 95.4 6027 7777 622 778 9177

Tirane 2018 Denisa Shaba


MANUALI 2 ANALIZA TEKNIKE PER PUNIMET E NDERTIMIT TE NDERTESAVE
PUNIME DHEU

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Shp pl 8%
Emertimi
Nr.kodi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta
T*km

Totali
Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

2.25 Germim dheu themele e plinta m3


me b>2m,ekskavator me goma
0.25m3,shkarkimi ne toke
op 0.067 2810 188
Ekskavator me kove 0.25m3

leke 188 188 15 19 222


Shuma:

Tirane 2018 Denisa Shaba


MANUALI 2 ANALIZA TEKNIKE PER PUNIMET E NDERTIMIT TE NDERTESAVE
PUNIME DHEU

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Shp pl 8%
Emertimi
Nr.kodi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta
T*km

Totali
Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

2.25 Mure me tulla shamot h~4m m3

op 24.5 185 4533


Sp + p

Sigurime shoqerore 16.7% leke 4533 0.167 757

Transport T*km 4.1 21 86

Tulla shamot cope 196 112 21952

Pluhur shamot m3 0.14 2200 308

Skele inventari m2 1.5 130 195

5289 86 22455 27831 2226 2783 32840


Shuma:

Tirane 2018 Denisa Shaba


MANUALI 3 ANALIZA TEKNIKE PER PUNIMET E RRUGEVE,KULLIM-UJITJE DHE HIDROCENTRALEVE

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Shp pl 8%
Nr.analize

Emertimi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta

Totali
T/km

Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

3.245 Struktura monolite betoni C m3


25/30
op 12.8 185 2368
Sp + p
Sigurime shoqerore 16.7% leke 2368 0.167 395 0.65 650 423

Betonjere 500 liter op 1.64 53 87

Vibrator thellesie kg 378 8.7 3289

Cimento 42.5R m3 0.74 835 618

Rere e e lare m3 0.43 1546 665

Uje liter 200 0.4 80

Kallepe m2 5.4 457 2468

2763 7119 10392 831 1039 12263


Shuma:

Tirane 2018 Denisa Shaba


MANUALI 3 ANALIZA TEKNIKE PER PUNIMET E RRUGEVE,KULLIM-UJITJE DHE HIDROCENTRALEVE

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Shp pl 8%
Nr.analize

Emertimi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta
T*km

Totali
Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

3.326 Mur mbajtes e themele me gur m3


te thate

op 5.8 185 1073


Sp + p

Sigurime shoqerore 16.7% leke 1073 0.167 179

Gur kave mozaik m3 1.1 1000 1100

Shuma: 1252 1100 2352 188 235 2776

Tirane 2018 Denisa Shaba


MANUALI 4 ANALIZA TEKNIKE PER PUNIMET DHE INSTALIMET TEKNOLOGJIKE

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Nr.analizeS

Shp pl 8%
Emertimi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta

Totali
T/km

Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

4.5 Shkalle metalike me ton 1


llamarine te riguar
op 34 185 6290
Sp + p
Shtese mbi paga 16.7% leke 6290 0.167 1050

Transport T*km 5 20 100

Elektrosaldatrice op 6.6 110 726

Autovinc op 1.6 3100 4960

Konstruksion i gatshem ton 1 104783 104783

Elektroda kg 2.7 180 486

7340.4 105269 118395.005 9472 11840 139706


Shuma:

Tirane 2018 Denisa Shaba


MANUALI 4 ANALIZA TEKNIKE PER PUNIMET DHE INSTALIMET TEKNOLOGJIKE

PUNTORI TRANSPORT MAKINERI MATERIAL

Fitim 10%
Shp pl 8%
Nr.analize

Emertimi

Shuma
Cmimi

Cmimi

Cmimi

Cmimi
Njesia

Vlefta

Vlefta

Vlefta

Vlefta
T*km

Totali
Sasia
op

op
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

4.131/1.5 F.V.ne toke kabllo Cu fuqie m 1


÷1000V, me izolim gome e
mbulese plastmasi, te armuar,
2x10mm2
op 0.4 185 74
Sp + p

Shtese mbi paga 16.7% leke 74 0.167 12

Kabell m 1.01 300 303

Te ndryshme leke 0.014 303 4.2

Shuma: 86 307.2 393.6 31.488 39.36 464

Tirane 2018 Denisa Shaba