A1 PRIOR TO POURING CONCRETE DURING EXTREMELY COLD

WEATHER, IT IS ADVISABLE TO RE-CALCULATE THE CONCRETE


! PRESSURES AND TIE LOADS TO ENSURE THE EQUIPMENT IS
NOT OVERLOADED AND REDUCE THE RISK OF FAILURE.

COLUMN FORMWORK NOTES

18 Ply 400 18 Ply 18 Ply 450 18 Ply 18 Ply 18 Ply


700
Framax Universal Waling 0.90m ! CRANE HOOK
4 No. in height
Super Plate 15.0 MAXIMUM HOISTING WEIGHT 10 kN (1000 kg)
4 No. in height

! CLAMPS IN HEIGHT

400

450

350
Framax Stop End Tie
4 No. in height UPRIGHT PANEL CONNECTIONS
100x75 Timber Beams 900mm AND 1350mm - 2 CLAMPS
3300mm - 3 CLAMPS
SIDEWAY PANEL CONNECTIONS
Doka Panel 300mm AND 450mm - 1 CLAMP
Strut 340
600mm AND 900mm - 2 CLAMPS
1350mm - 2 CLAMPS
OUTSIDE CORNERS - STATIC AND HINGED
900mm AND 1350mm - 4 CLAMPS
3300mm - 10 CLAMPS

Plan - 400x400 Plan - 450x450 Plan - 700x350 Area in


Scale 1:33 Scale 1:33 Scale 1:33 Abeyance
Framax quick-acting clamp RU Framax stop-end tie Super plate 15.0 Framax multi function clamp Framax wedge clamp
Article Number 588153 Article Number 588143 Article Number 581966 Article Number 588169 Article Number 588152

Note:
All Timber to be Grade C16 or better
Ply to be 17.5mm Pourform or better Detail: Doka Express Anchor
(for fixing panel struts & table struts into slabs)

Minimum required concrete strength on first

FRAMAX Lifting details Fmax = 17.0 kN


If this is not possible due to panel
configuration, lifting hooks to be For further information please read the fitting
Framax lifting hook placed over one of the welded-on instructions leaflet for Doka express anchors !
must always be attached plates. Refer to Framax lifting hook
over a panel joint Operating Instructions. (These are
issued to site with all lifting hooks.)
F
Doka express anchor
(Re-useable item)

Doka coil 16mm


(Lost item)

Bore hole size for express anchor:

2700 Panel
16mm dia
140mm(min) - 150mm(max) depth
Doka Panel
Strut 340
1550

Assembly
575

Doka Express
Anchor & Coil Rev Name Date Description
(See Detail)

2595 Pour Height


! Preliminary Drawing - NOT FOR CONSTRUCTION
Typical Section 1st Floor to Roof
Scale 1:33
Working Drawing - ISSUED FOR CONSTRUCTION

18 Ply
115 Timber

300 Panel

Multi Function Clamp

2595 Pour Height


25, Cecil Road, Wealdstone,
Harrow, Middlesex
HA3 5QY
Telephone 020 8424 7999 info@toureenmangan.co.uk
Note:
1150

Access to pour by mobile towers Fax 020 8424 7998 www.toureenmangan.co.uk


2965 Pour Height
927

Client
3300 Panel

Jarvis
Sop End Tie Centres

Doka Panel
3415 Pour Height

2700 Panel

Strut 340
3300 Panel

1550
662

Doka Panel Project


Strut 340
Wood House
1550

3415 Pour Height


Assembly Hemel Hampstead
990

Doka Express
575

Assembly Title
Anchor & Coil
(See Detail) Doka Framax Panels To Columns
Typical
575

Doka Express
361

Anchor & Coil


(See Detail) Typical Section GF Typical Section GF
Scale 1:33 (Alternative Panel Heights) Drawn By Checked By
Scale 1:33 AP

Typical Section GF Full Height Section - To Level 03 Date


14-06-2017
Scale
As shown @ A1
(Greater than 3.3m High) Scale 1:50
Scale 1:33 Drawing No.
TCL563-01 Sht 1 of 1