Cost Heading Amount (NRs)

A. Remuneration 310,000.00
B. Out-of-Pocket Experiences (Fixed Expences) 105,000.00
C. Reimbursable Cost 35,000.00
Sub total (A+B+C) 450,000.00
D. Provisional Sum (costs to Cover the necessary tests to be undertaken as
specified in ToR)
Estimated cost 100,000.00
Overhead @10% of estimated cost (for handing/ managing activities under the
Provisional Sum)
Sub total (D) 100,000.00
Total (A+B+C+D) 550,000.00
VAT @ 13% of total 71,500.00
Grand Total in NRs 621,500.00
SN Position Name Input/Month Rate (NRs) Amount (NRs)

Professional Staf
1 Team Leader (Bridge/Structural Engineer) Mr. Ram Babu Mahatto 2.75 50,000.00 137,500.00
2 Geotechnical Engineer Mr. Ambar Bahadur Thapa 0.5 40,000.00 20,000.00
3 Hydrologist Mr. Gopal Niure 1.5 25,000.00 37,500.00
5 Sociologist Mr. Pratap Chhatkulle 1 20,000.00 20,000.00
6 Bridge Design Engineer Mr. Laxman Babu Sedhai 1 30,000.00 30,000.00
7 Sub Engineer/Senior Surveyor Mr. Yogesh Shrestha 2 20,000.00 40,000.00
Sub-Total for Professional Staf 285,000.00
Local Staf
11 Supervisors (2 nos.) TBN 5 5,000.00 25,000.00
Sub-Total for Local Staf 25,000.00
Grand Total 310,000.00
S.N. Description Input Rate Amount
1 Communication LS 5,000.00
2
Drafting, reproduction of reports (including IEE revew committee metting expences) LS 20,000.00
3 Equipment: Soil Testing Equipment, survey equipment, computers, etc. 50,000.00
4 Software 10,000.00
5 Office Rental/Running LS 20,000.00
Total 105,000.00
No. Description Unit Quantity Unit Rate Total Amount
1 Air Flights Trip
2 Subsistence Allowance Day
3 Ground/Local Transportation LS 20,000.00 20,000.00
4 Miscellaneous Travel Expences LS 15,000.00 15,000.00
Total 35,000.00