06 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

02.06.01 TRABAJOS PRELIMINARES

02.06.01.01 TRAZO Y REPLANTEO DE OBRA m2


02.06.01.02 EXPLANACION EN MATERIAL SUELTO m3
02.06.01.03 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.02 CAMARA DE REJAS

02.06.02.01 MOVIMIENTO DE TIERRAS

02.06.02.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.02.01.02 REFINE Y COMP. DE TERRENO m2
02.06.02.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.02.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.02.02 OBRAS DE CONCRETO SIMPLE

02.06.02.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.02.02.02 CONCRETO F'C = 140 KG/CM2 - DADO DE CONCRETO m3
02.06.02.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.02.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.02.02.05 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.02.03 OBRAS DE CONCRETO ARMADO

02.06.02.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg


02.06.02.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.02.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.02.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.02.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.02.03.06 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - LOSA DE TECHO kg
02.06.02.03.07 ENCOFRADO Y DESENCOFRADO - LOSA DE TECHO m2
02.06.02.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE TECHO m3
02.06.02.03.09 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.02.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.02.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.02.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.02.05 PINTURA

02.06.02.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.02.06 CARPINTERIA METALICA

02.06.02.06.01 SUM. E INST. DE REJA METALICA CON FoLo 1/4" INC. PINTURA ANTICORROSIVA EPOXICA - CAMARA DE und
REJAS
02.06.02.07 VARIOS

02.06.02.07.01 COLOCACION DE TUB. DE VENTILACION EN LOSA DE OPERACION (PVC DN = 2") - CAMARA DE REJAS m
02.06.02.07.02 JUNTA DE DILATACION CON ASFALTO e = 1" m
02.06.03 DESARENADOR

02.06.03.01 MOVIMIENTO DE TIERRAS

02.06.03.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.03.01.02 REFINE Y COMP. DE TERRENO m2
02.06.03.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.03.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.03.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.03.02 OBRAS DE CONCRETO SIMPLE

02.06.03.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.03.02.02 CONCRETO F'C = 140 KG/CM2 - DADO DE CONCRETO m3
02.06.03.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.03.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.03.02.05 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.03.03 OBRAS DE CONCRETO ARMADO

02.06.03.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg


02.06.03.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.03.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.03.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.03.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.03.03.06 TAPA DE CONCRETO PRE FABRICADO und
02.06.03.03.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.03.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.03.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.03.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.03.05 PINTURA

02.06.03.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.03.06 EQUIPAMIENTO HIDRAULICO - DESARENADOR

02.06.03.06.01 SUMINISTRO E INST. DE EQUIPAMIENTO HIDRAULICO DE DESARENADOR und


02.06.03.07 VARIOS

02.06.03.07.01 JUNTA DE DILATACION CON ASFALTO e = 1" m


02.06.03.07.02 SUM. E INST.DE COMPUERTA TIPO TARJETA PL PVC E=2" x 0.45 x 0.60 und
02.06.03.07.03 SUM. E INST.DE VERTEDERO TIPO SUTRO PL PVC E=1" x 0.45 x 0.50 und
02.06.04 CAMARA DISTRIBUCION DE CAUDALES (CDC)

02.06.04.01 MOVIMIENTO DE TIERRAS

02.06.04.01.01 EXCAVACION MANUAL m3


02.06.04.01.02 REFINE Y COMP. DE TERRENO m2
02.06.04.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.04.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.04.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.04.02 OBRAS DE CONCRETO SIMPLE

02.06.04.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.04.02.02 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.04.02.03 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.04.02.04 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.04.03 OBRAS DE CONCRETO ARMADO

02.06.04.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg


02.06.04.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.04.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.04.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.04.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.04.03.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.04.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.04.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.04.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.04.05 PINTURA

02.06.04.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.04.06 VARIOS

02.06.04.06.01 SUM. E INST.DE VERTEDERO TRIANGULAR PL PVC E=1" x 0.50 x 0.20 und
02.06.04.06.02 SUM. E INST. BRIDA ROMPE AGUA DE ACERO PARA SOLDAR DN = 160 MM und
02.06.05 TANQUES IMHOFF

02.06.05.01 MOVIMIENTO DE TIERRAS

02.06.05.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.05.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2
02.06.05.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.05.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.05.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.05.02 OBRAS DE CONCRETO SIMPLE

02.06.05.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.05.02.02 CONCRETO F'C = 175 KG/CM2 - DADOS DE CONCRETO m3
02.06.05.02.03 ENCOFRADO Y DESENCOFRADO - DADOS DE CONCRETO m2
02.06.05.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.05.02.05 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.05.02.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.05.03 OBRAS DE CONCRETO ARMADO

02.06.05.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg


02.06.05.03.02 ENCOFRADO Y DESENCOFRADO EN PISO m2
02.06.05.03.03 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.05.03.04 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.05.03.05 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.05.03.06 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.05.03.07 TAPA DE CONCRETO PRE FABRICADO und
02.06.05.03.08 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.05.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.05.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.05.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.05.05 PINTURA

02.06.05.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.05.06 CARPINTERIA DE MADERA

02.06.05.06.01 SUM. E INST.DE BAFLE DE MADERA 2" 1.20m x 0.80 m und


02.06.05.07 EQUIPAMIENTO HIDRAULICO

02.06.05.07.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - TANQUE IMHOFF und


02.06.05.08 OTROS

02.06.05.08.01 JUNTA DE CONSTRUCCION CON WATER STOP m


02.06.05.08.02 JUNTA DE DILATACION CON ASFALTO e = 1" m
02.06.06 FILTRO BIOLOGICO

02.06.06.01 MOVIMIENTO DE TIERRAS

02.06.06.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.06.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2
02.06.06.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.06.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.06.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.06.02 OBRAS DE CONCRETO SIMPLE

02.06.06.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.06.02.02 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.06.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.06.02.04 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.06.03 OBRAS DE CONCRETO ARMADO

02.06.06.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg


02.06.06.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.06.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.06.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.06.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.06.03.06 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGUETAS PRE FABRICADAS kg
02.06.06.03.07 ENCOFRADO Y DESENCOFRADO CARAVISTA - VIGUETAS PRE FABRICADAS m2
02.06.06.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - VIGUETAS PRE FABRICADAS m3
02.06.06.03.09 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.06.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.06.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.06.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.06.04.03 SELLOS PARA VIGUETAS MORTERO 1:3 m3
02.06.06.05 PINTURA

02.06.06.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.06.06 CARPINTERIA METALICA

02.06.06.06.01 SUM. E INST. SOPORTE METALICO DE TUBERIAS DE DISTRIBUCION und


02.06.06.07 MATERIAL DE SOPORTE Y MEDIO FILTRANTE

02.06.06.07.01 SUM. E INST. MATERIAL DE SOPORTE DE FILTROS - GRAVA P/FILTRO m3


02.06.06.08 OTROS

02.06.06.08.01 JUNTA DE CONSTRUCCION CON WATER STOP m


02.06.06.08.02 JUNTA DE DILATACION CON ASFALTO e = 1" m
02.06.06.08.03 SUM. E INST. DE TUBERIA PERFORADA PVC ISO 1452 DN=110 MM C-10 m
02.06.07 SEDIMENTADORES

02.06.07.01 MOVIMIENTO DE TIERRAS

02.06.07.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.07.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2
02.06.07.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.07.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.07.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.07.02 OBRAS DE CONCRETO SIMPLE

02.06.07.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.07.02.02 CONCRETO F'C = 140 KG/CM2 - DADOS DE APOYO m3
02.06.07.02.03 MORTERO CEMENTO ARENA 1:3 - FALSO FONDO CANAL RECOLECCION m3
02.06.07.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.07.02.05 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.07.02.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.07.03 OBRAS DE CONCRETO ARMADO

02.06.07.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg


02.06.07.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.07.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.07.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.07.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.07.03.06 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGAS kg
02.06.07.03.07 ENCOFRADO Y DESENCOFRADO - VIGAS m2
02.06.07.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - VIGAS m3
02.06.07.03.09 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - CANAL DE RECOLECCION kg
02.06.07.03.10 ENCOFRADO Y DESENCOFRADO - CANAL DE RECOLECCION m2
02.06.07.03.11 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - CANAL DE RECOLECCION m3
02.06.07.03.12 TAPA DE CONCRETO PRE FABRICADO und
02.06.07.03.13 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.07.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.07.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.07.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.07.05 PINTURA

02.06.07.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.07.06 EQUIPAMIENTO HIDRAULICO

02.06.07.06.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - SEDIMENTADOR und


02.06.07.07 OTROS

02.06.07.07.01 JUNTA DE CONSTRUCCION CON WATER STOP m


02.06.07.07.02 JUNTA DE DILATACION CON ASFALTO e = 1" m
02.06.08 LECHOS DE SECADO

02.06.08.01 MOVIMIENTO DE TIERRAS

02.06.08.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.08.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2
02.06.08.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.08.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.08.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.08.02 OBRAS DE CONCRETO SIMPLE

02.06.08.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.08.02.02 CONCRETO F'C = 140 KG/CM2 - DADOS DE APOYO m3
02.06.08.02.03 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.08.02.04 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.08.02.05 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.08.03 OBRAS DE CONCRETO ARMADO

02.06.08.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg


02.06.08.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.08.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.08.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.08.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.08.03.06 ACERO Fy = 4200 KG/CM2 EN COLUMNAS kg
02.06.08.03.07 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2
02.06.08.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - COLUMNAS m3
02.06.08.03.09 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGAS kg
02.06.08.03.10 ENCOFRADO Y DESENCOFRADO - VIGAS m2
02.06.08.03.11 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - VIGAS m3
02.06.08.03.12 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - LOSA SALPICADOR kg
02.06.08.03.13 ENCOFRADO Y DESENCOFRADO - LOSA SALPICADOR m2
02.06.08.03.14 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA SALPICADOR m3
02.06.08.03.15 ACERO Fy = 4200 kg/cm2 - DADO DE APOYO kg
02.06.08.03.16 ENCOFRADO Y DESENCOFRADO - DADO DE APOYO m2
02.06.08.03.17 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - DADO DE APOYO m3
02.06.08.03.18 ACERO Fy = 4200 kg/cm2 EN TAPAS DE CANAL CENTRAL kg
02.06.08.03.19 ENCOFRADO Y DESENCOFRADO - TAPAS DE CANAL CENTRAL m2
02.06.08.03.20 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - TAPAS DE CANAL CENTRAL m3
02.06.08.03.21 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.08.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.08.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.08.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.08.05 PINTURA

02.06.08.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.08.05.02 PINTURA C/LATEX VINILICO - COLUMNAS m2
02.06.08.06 EQUIPAMIENTO HIDRAULICO

02.06.08.06.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - LECHOS DE SECADO TIPO 1 und


02.06.08.06.02 SUM. E INST. EQUIPAMIENTO HIDRAULICO - LECHOS DE SECADO TIPO 2 und
02.06.08.06.03 SUM. E INST. EQUIPAMIENTO HIDRAULICO - LECHOS DE ARENA und
02.06.08.07 COBERTURA LIGERA

02.06.08.07.01 FABRICACION DE CARTELAS METALICAS PL e=3/16" PARA RETICULADO DE MADERA m2


02.06.08.07.02 RETICULADO DE MADERA - INSTALACION DE BRIDAS DE MADERA SUPERIOR E INFERIOR 3" x 6" m
02.06.08.07.03 RETICULADO DE MADERA - INSTALACION DE BRIDAS DE MADERA SUPERIOR E INFERIOR 3" x 4" m
02.06.08.07.04 SUM. E INST. DE COBERTURA LIGERA (INC. ACCS.) m2
02.06.08.08 SUMINISTRO E INSTALACION DE MATERIAL FILTRANTE

02.06.08.08.01 SUM. E INST. DE MATERIAL GRANULAR - GRAVA 1" LECHOS DE SECADO m3


02.06.08.08.02 SUM. E INST. DE MATERIAL GRANULAR - GRAVA 1/4" LECHOS DE SECADO m3
02.06.08.08.03 SUM. E INST. DE MATERIAL FINO - ARENA GRUESA - LECHOS DE SECADO m3
02.06.08.08.04 SUM. E INST. DE LADRILLOS (ACOMODADOS) - LECHOS DE SECADO m2
02.06.08.09 OTROS

02.06.08.09.01 JUNTA DE DILATACION CON ASFALTO e = 1" m


02.06.09 CAMARA DE CONTACTO DE CLORO

02.06.09.01 MOVIMIENTO DE TIERRAS

02.06.09.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.09.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2
02.06.09.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.09.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2
02.06.09.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.09.02 OBRAS DE CONCRETO SIMPLE

02.06.09.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.09.02.02 CONCRETO F'C = 175 KG/CM2 - VEREDA m2
02.06.09.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2
02.06.09.02.04 CONCRETO F'C = 175 KG/CM2 - DADOS DE APOYO m3
02.06.09.02.05 ENCOFRADO Y DESENCOFRADO CARAVISTA EN DADOS DE APOYO m2
02.06.09.02.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.09.03 OBRAS DE CONCRETO ARMADO

02.06.09.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE FONDO kg


02.06.09.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.09.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.09.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.09.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.09.03.06 CONCRETO F'C = 175 KG/CM2 - LOSA DE PISO m3
02.06.09.03.07 ENCOFRADO Y DESENCOFRADO - LOSA DE PISO m2
02.06.09.03.08 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
02.06.09.03.09 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.09.04 REVOQUES ENLUCIDOS Y MOLDURAS
02.06.09.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
02.06.09.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.09.05 PINTURA

02.06.09.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.09.05.02 PINTADO DE ESTRUCTURA METALICA m2
02.06.09.06 EQUIPAMIENTO HIDRAULICO

02.06.09.06.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - CAMARA DE CONTACTO DE CLORO und


02.06.09.06.02 SUM. E INST. DE TANQUE DE AGUA POLIETILENO V = 250 L (INC. ACCS) und
02.06.09.07 CARPINTERIA METALICA

02.06.09.07.01 FABRICACION DE PLANCHA METALICA DE ANCLAJE PL e=6mm x 0.25m x 0.25m - ANCLAJE DE COLUMNAS EN und
CASETA
02.06.09.07.02 SUM. E INST. DE PERFIL METALICO TUB. CUADRADO 4" x e=4mm - COLUMNAS EN CASETA m
02.06.09.07.03 MALLA METALICA DE PROTECCION C/ALAMBRE GALV N.10 X COCADAS DE 2 x 2 CM. - CASETA m2
02.06.09.07.04 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO C/MALLA DE ALAMBRE GALVANIZADO - CASETA m2
02.06.09.07.05 SUM. E INST. DE COBERTURA LIGERA - CALAMINON - CASETA m2
02.06.09.07.06 CUMBRERA ESTANDAR PARA CALAMINON T - CASETA m
02.06.09.07.07 FABRICACION DE PLANCHA METALICA DE ANCLAJE PL e=6mm x 4" x 4" - SOPORTE REJILLA METALICA und
02.06.09.07.08 SUM. E INST. DE PERFIL METALICO TUB. CUADRADO 3" x e=4mm - SOPORTE REJILLA METALICA m
02.06.09.07.09 SUM. E INST. DE PERFIL METALICO TIPO "T" 1" x 1" x 1/8" - SOPORTE REJILLA METALICA m
02.06.09.08 OTROS

02.06.09.08.01 JUNTA DE CONSTRUCCION CON WATER STOP m


02.06.09.08.02 JUNTA DE DILATACION CON ASFALTO e = 1" m
02.06.09.08.03 SUM. E INST. DE COBERTURA DE POLICARBONATO m2
02.06.10 CAJAS DE PASO Y DE SALIDA

02.06.10.01 MOVIMIENTO DE TIERRAS

02.06.10.01.01 EXCAVACION MANUAL m3


02.06.10.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2
02.06.10.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.10.01.04 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.10.02 OBRAS DE CONCRETO SIMPLE

02.06.10.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2


02.06.10.03 OBRAS DE CONCRETO ARMADO

02.06.10.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE FONDO kg


02.06.10.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3
02.06.10.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg
02.06.10.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2
02.06.10.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3
02.06.10.03.06 TAPA DE CONCRETO PRE FABRICADO und
02.06.10.03.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.10.04 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.10.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2


02.06.10.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2
02.06.10.05 PINTURA

02.06.10.05.01 PINTADO C/ESMALTE (2 MANOS) m2


02.06.11 RED DE DISTRIBUCION INTERNA DE A.R.

02.06.11.01 TRABAJOS PRELIMINARES

02.06.11.01.01 TRAZO Y REPLANTEO PARA INSTALACION DE TUBERIAS m


02.06.11.02 MOVIMIENTO DE TIERRAS

02.06.11.02.01 EXC ZANJA C/MAQ. P/TUB. Prof=1.50 m m


02.06.11.02.02 EXC ZANJA C/MAQ.C/ENTIBADO P/TUB. Hp = 5.50 m. m
02.06.11.02.03 REFINE Y NIV. DE FONDO DE ZANJA m
02.06.11.02.04 CAMA DE APOYO e=0.10m m
02.06.11.02.05 PRIMER RELLENO DE ZANJA m
02.06.11.02.06 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 0.90 m. m
02.06.11.02.07 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 4.90 m. m
02.06.11.02.08 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.11.03 TUBERIAS

02.06.11.03.01 SUM TUB PVC UF ISO 4435 DN=160 mm. S-2 m


02.06.11.03.02 SUM TUB PVC UF ISO 4435 DN=200mm S-2 m
02.06.11.03.03 SUM TUB PVC UF ISO 4435 DN=250mm S-2 m
02.06.11.03.04 SUMINISTRO DE TUBERIA DE ACERO SCH-40 ASTM A-53 DN = 6" m
02.06.11.03.05 INST TUB PVC UF m
02.06.11.03.06 INSTALACION DE TUBERIA ACERO SCH-40 m
02.06.11.03.07 DADO DE EMPALME A BUZON FC=140 KG/CM2 und
02.06.11.04 PRUEBAS HIDRAULICAS

02.06.11.04.01 PRUEBA DE NIVELACION m


02.06.11.04.02 PRUEBA HIDRAULICA A ZANJA ABIERTA P/TUB. m
02.06.11.04.03 PRUEBA HIDRAULICA C/RELLENO COMPACTADO TUB. m
02.06.12 POZO PERCOLADOR

02.06.12.01 MOVIMIENTO DE TIERRAS

02.06.12.01.01 EXCAVACION MANUAL m3


02.06.12.01.02 RELLENO CON MATERIAL PROPIO m3
02.06.12.01.03 ACARREO DE MATERIAL EXCEDENTE m3
02.06.12.01.04 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.12.02 OBRAS DE CONCRETO ARMADO

02.06.12.02.01 ACERO Fy = 4200 kg/cm2 EN CIMIENTO kg


02.06.12.02.02 ENCOFRADO Y DESENCOFRADO EN CIMIENTO m2
02.06.12.02.03 CONCRETO F'C = 210 KG/CM2 CON CEM. TIPO-V - CIMIENTO m3
02.06.12.02.04 ACERO Fy = 4200 kg/cm2 EN LOSA SUPERIOR kg
02.06.12.02.05 ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR m2
02.06.12.02.06 CONCRETO F'C = 210 KG/CM2 CON CEM. TIPO-V - LOSA SUPERIOR m3
02.06.12.02.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.12.03 ARQUITECTURA

02.06.12.03.01 MURO DE LADRILO DE CABEZA KK und


02.06.12.03.02 GRAVA DE 2 1/2" m2
02.06.13 CERCO PERIMETRICO

02.06.13.01 MOVIMIENTO DE TIERRAS

02.06.13.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3


02.06.13.01.02 REFINE Y COMP. DE TERRENO m2
02.06.13.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3
02.06.13.01.04 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3
02.06.13.02 CONCRETO SIMPLE

02.06.13.02.01 CONCRETO F'C=140 KG/CM2 + 30% P.G. PARA CIMIENTOS CORRIDOS m3


02.06.13.02.02 CONCRETO F'C=175 KG/CM2 + 25% P.M. PARA SOBRECIMIENTOS m3
02.06.13.02.03 ENCOFRADO Y DESENCOFRADO - SOBRECIMIENTOS m2
02.06.13.02.04 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.13.03 CONCRETO ARMADO
02.06.13.03.01 CONCRETO COLUMNAS F'C = 210 KG/CM2 m3
02.06.13.03.02 ACERO Fy = 4200 KG/CM2 EN COLUMNAS kg
02.06.13.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2
02.06.13.03.04 CONCRETOF'C=210 KG/CM2 - VIGAS m3
02.06.13.03.05 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGAS kg
02.06.13.03.06 ENCOFRADO Y DESENCOFRADO - VIGAS m2
02.06.13.03.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
02.06.13.04 MUROS Y TABIQUES

02.06.13.04.01 MURO DE LADRILLO K.K. MEZCLA C:A 1:5 TIPO IV P.TARRAJ. DE SOGA m2
02.06.13.05 REVOQUES ENLUCIDOS Y MOLDURAS

02.06.13.05.01 TARRAJEO DE SOBRECIMIENTOS M=1:4, E=1.5 cm. m2


02.06.13.05.02 TARRAJEO EN COLUMNAS M=1:4, E=1.5 cm. m2
02.06.13.05.03 TARRAJEO EN VIGAS M=1:4, E=1.5 cm. m2
02.06.13.06 CARPINTERIA METALICA

02.06.13.06.01 SUMINISTRO E INSTALACION DE PUERTA METALICA C/PL. LAC. (ACANALADA) 1.40 m. x 2.10 m. INC PINTURA und
02.06.13.06.02 CERRADURA PARA PUERTA METALICA und
02.06.13.07 PINTURA

02.06.13.07.01 PINTADO C/ESMALTE (2 MANOS) - CONTRAZOCALOS m2


02.06.13.07.02 PINTADO EN COLUMNAS Y VIGAS DE CERCO PERIMETRICO C/LATEX VINILICO m2
02.07 PLAN DE MITIGACIÓN AMBIENTAL Y PLAN DE MONITOREO ARQUEOLÓGICO

02.07.01 MITIGACION AMBIENTAL

02.07.01.01 MEDIDAS DE MANEJO AMBIENTAL

02.07.01.01.01 RIEGO DE ÁREAS DE TRABAJO glb


02.07.01.01.02 RETIRO Y REPOSICIÓN DE COBERTURA VEGETAL. glb
02.07.01.01.03 MANTENIMIENTO OPORTUNO Y PROGRAMADO DE EQUIPOS Y MAQUINARIAS. glb
02.07.01.01.04 ADQUISICIÓN DE ACCESORIOS PARA MITIGACIÓN AMBIENTAL DE AIRE Y RUIDO glb
02.07.01.02 PROGRAMA DE MANEJO DE RESIDUOS SOLIDOS

02.07.01.02.01 ADQUISICIÓN DE CONTENEDORES PARA ALMACENAMIENTO DE RRSS und


02.07.01.02.02 TRANSPORTE Y DISPOSICIÓN FINAL DE RESIDUOS DE CONSTRUCCIÓN glb
02.07.01.02.03 ALQUILER DE BAÑOS PORTÁTILES PARA PERSONAL DE OBRA mes
02.07.01.03 MONITOREOS AMBIENTALES

02.07.01.03.01 MONITOREO AGUA pto


02.07.01.03.02 MONITOREO AIRE pto
02.07.01.03.03 MONITOREO RUIDO pto
02.07.01.03.04 MONITOREO VIBRACIÓN pto
02.07.01.04 PLAN DE CONTINGENCIA

02.07.01.04.01 ADQUISICIÓN DE EQUIPOS E INSUMOS PARA MEDIDAS DE CONTINGENCIA glb


02.07.01.04.02 CAPACITACIÓN DEL PERSONAL DE TRABAJO EN TEMAS DE IDENTIFICACIÓN, MANEJO Y USO DE glb
MATERIALES PELIGROSOS Y SU RESPUESTA ANTE LA OCURRENCIA DE UN DERRAME
02.07.01.05 MEDIDAS DE CIERRE DE OBRAS

02.07.01.05.01 DESMONTAJE DE INSTALACIONES glb


02.07.01.05.02 USOS POTENCIALES DEL ÁREA DESPUÉS DE SU CIERRE glb
02.07.01.06 PLAN DE PARTICIPACION CIUDADANA

02.07.01.06.01 TALLER DE CHARLA INFORMATIVA DE IMPACTOS AMBIENTALES Y EDUCACIÓN AMBIENTAL glb


02.07.01.06.02 TALLER DE EDUCACIÓN SANITARIA glb
02.07.02 MONITOREO ARQUEOLOGICO

02.07.02.01 EJECUCION DEL PLAN DE MONITOREO ARQUEOLOGICO und


03 PROGRAMA DE CAPACITACION
03.01 EDUCACION SANITARIA
03.01.01 TALLER PRACTICAS SALUDABLES DE HIGIENE und
03.01.02 TALLER DISPOSICION SANITARIA DE EXCRETAS Y AGUAS RESIDUALES und
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
01.01 TRABAJOS GENERALES
01.01.01 CARTEL OBRA DE L=5.00M x A=3.20M und 1.00 3.00
01.01.02 INST. CAMPAMENTO DE OBRA m2 1.00 600.00
01.01.03 OFICINA DE RESIDENTE DE OBRA mes 1.00 6.00
01.01.04 ALQUILER DE BAÑOS PORTÁTILES PARA PERSONAL DE OBRA mes 1.00 6.00
01.01.05 SUMINISTRO DE ENERGIA ELECTRICA PROVISIONAL und 1.00 1.00
01.01.06 SUMINISTRO DE AGUA PARA LA OBRA und 1.00 1.00
01.01.07 FLETE TERRESTRE LIMA - OROYA ton 1.00 175.50
01.01.08 PRUEBA DE ANALISIS GRANULOMETRICO und 1.00 3.00
01.01.09 PRUEBA DE ANALISIS QUIMICO DE SUELOS und 1.00 2.00
01.01.10 PRUEBA DE PROCTOR EN SUELOS und 1.00 15.00
01.01.11 PRUEBA DE DENSIDAD CAMPO und 1.00 382.00
01.01.12 PRUEBA DE COMPRESIÓN DE PROBETAS DE CONCRETO und 1.00 40.00
01.01.13 ENSAYO DE MEZCLAS DE CONCRETO und 1.00 5.00
01.02 TRABAJOS PRELIMINARES
01.02.01 MOVILIZACION Y DESMOVILIZACION DE MAQUINAS und 1.00 1.00
01.02.02 CALICATAS IDENTIFICACION DE INTERFERENCIAS und 1.00 80.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509
AREA 1.00 1.00

Err:509 Err:509 Err:509


AREA 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1 MURO 4.00 4.00 1.00
VOLUMEN 1 LOSA 1.00 1.00 1.00
VOLUMEN 1 TAPA 1.00 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
VOLUMEN CAMARA HUMEDA 1.00 1.00 1.90
VOLUMEN DENTELLON 1 1.00 1.00 0.15
VOLUMEN DENTELLON 2 1.00 1.00 0.20
VOLUMEN CAJA DE VALVULA 1.00 1.00 0.85
VOLUMEN DE ALETAS 1.00 1.00
VOLUMEN PARA INSTALACION DE TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.90
CAJA DE VALVULAS 1.00 1.00 0.85
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN EN REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 1.90
AREA CAJA DE VALVULAS 1.00 1.00 0.85
AREA ALETAS 1.00 1.00 2.25
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


AREA DE LOSA DE SELLADO 1.00 1.00
AREA DE CONCRETO DE SELLADO 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
ACERO LONGITUDINAL - CAJA VALVULAS 1.00 2.00 0.60
ACERO TRANSVERSAL - CAJA VALVULAS 1.00 2.00 0.71
ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 5.00 1.95
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 5.00 1.95

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.80
CAMARA HUMEDA 1.00 2.00 1.80
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS 1.00 2.00 0.80


CAJA DE VALVULAS 1.00 2.00 0.70

Err:509 Err:509 Err:509


VOLUMEN 1 EN DENTELLON 1.00 1.00 0.15
VOLUMEN 2 EN DENTELLON 1.00 1.00 0.20
VOLUMEN EN CAMARA HUMEDA 1.00 1.00 1.85
VOLUMEN EN CAJA DE VALVULA 1.00 1.00 0.85

Err:509 Err:509 Err:509


ACERO HORIZONTAL - CAJA VALVULAS 1.00 4.00 3.06
ACERO VERTICAL - CAJA VALVULAS 1.00 12.00 0.63
ACERO HORIZONTAL - CAMARA HUMEDA 1.00 5.00 7.06
ACERO VERTICAL - CAMARA HUMEDA-1 1.00 7.00 1.26
ACERO VERTICAL - CAMARA HUMEDA-2 1.00 7.00 1.73
ACERO VERTICAL - CAMARA HUMEDA-3 1.00 5.00 1.34
ACERO VERTICAL - CAMARA HUMEDA-4 1.00 5.00 1.59
ACERO HORIZONTAL - ALETAS 2.00 6.00 2.48
ACERO VERTICAL - ALETAS 2.00 9.00 1.53

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 1.00 2.00 1.80
CAMARA HUMEDA EXTERNO 1.00 2.00 1.80
CAMARA HUMEDA INTERNO 1.00 2.00 1.50
CAMARA HUMEDA INTERNO 1.00 2.00 1.50
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS EXTERNO 1.00 2.00 0.80


CAJA DE VALVULAS EXTERNO 1.00 2.00 0.70
CAJA DE VALVULAS INTERNO 1.00 2.00 0.60
CAJA DE VALVULAS INTERNO 1.00 2.00 0.50
ALETAS 1 2.00 2.00 2.25
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 1.00 2.00 1.80
VOLUMEN 2 CAMARA HUMEDA 1.00 2.00 1.50
VOLUMEN 1 CAJA DE VALVULA 1.00 2.00 0.80
VOLUMEN 2 CAJA DE VALVULA 1.00 2.00 0.50
VULUMEN ALETAS 1.00 2.00 2.25
VOLUMEN PESTAÑAS DE ALETAS 1.00 1.00

Err:509 Err:509 Err:509


ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 5.00
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 5.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.50

Err:509 Err:509 Err:509


VOLUMEN CAMARA HUMEDA 1.00 1.00 1.80
VOLUMEN CAJA AREA TAPA METALICA 1.00 1.00 0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAJA DE CAP. 1 1.00 2.00 1.80
CAJA DE CAP. 2 1.00 2.00 1.80
CAJA DE CAP. 3 1.00 2.00 1.50
CAJA DE CAP. 4 1.00 2.00 1.50
CAJA DE CAP. 5 1.00 1.00 1.50
TAPA DE CAP. 1.00 1.00 1.50
CAJA DE VAL. 1 1.00 2.00 0.80
CAJA DE VAL. 2 1.00 2.00 0.70
CAJA DE VAL. 3 1.00 2.00 0.60
CAJA DE VAL. 4 1.00 2.00 0.50
CAJA DE VAL. 5 1.00 1.00 0.60
ALETAS 1 2.00 2.00 2.25
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNA 1.00 2.00 1.50
CAMARA HUMEDA INTERNA 1.00 2.00 1.50
CAMARA HUMEDA INTERNA 1.00 1.00 1.80
CAMARA HUMEDA EXTERNA 1.00 1.00 1.80
ALETAS INTERNAS 1.00 2.00 2.25
ALETAS INTERNAS 1.00 1.00 0.15
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.80
CAMARA HUMEDA 1.00 1.00 1.80
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70
CAJA DE VALVULAS 1.00 2.00 0.60
CAJA DE VALVULAS 1.00 2.00 0.50
CAJA DE VALVULAS 1.00 1.00 0.60
ALETAS EXTERNAS 1.00 2.00 2.25
ALETAS EXTERNAS 1.00 1.00 0.15
TAPA 1.00 1.00 1.50

Err:509 Err:509
Err:509 Err:509 Err:509
CAJA DE CAPTACION 1.00 2.00 1.80
CAJA DE CAPTACION 1.00 2.00 1.80
TAPA DE CAPTACION 1.00 1.00 1.80
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70
ALETAS 2.00 1.00 2.25
ALETAS 1.00 1.00

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 2.00 0.65
CAJA DE VALVULAS 1.00 2.00 0.65
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 1.00

Err:509 Err:509 Err:509


TAPA METALICA 1.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 3" - SALIDA LINEA DE CONDUCION

DESCRIPCION DIAMET. CANT.

CANASTILLA DE BRONCE BB 110.00 1 und 1.00


NIPLE DE F°G° RR C/BRA, L=0.65m 90.00 1 und 1.00
VALVULA COMPUERTA HDF BB 90.00 1 und 1.00
NIPLE ACERO SHC-40 BB, L=0.10 90.00 1 und 1.00
UNION TIPO DRESSER 90.00 2 und 2.00
MACROMEDIDOR DE CAUDAL 90.00 1 und 1.00
NIPLE ACERO SHC-40 BB, L=0.30m 90.00 1 und 1.00
ADAPTADOR BRIDA CAMPANA HDF 90.00 1 und 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACCESORIOS DE 4" - SALIDA LIMPIA Y REBOCE

DESCRIPCION DIAMET. CANT.

CONO DE REBOCE PVC 110.00 1 und 1.00


ADAPTADOR F°G° C/R 110.00 2 und 2.00
NIPLE F°G° RR, L=0.20m 4" 1 und 1.00
UNION F°G° RR 4" 1 und 1.00
NIPLE F°G° C/BRA, L=0.15m 4" 1 und 1.00
NIPLE PVC, L=0.05m 110.00 1 und 1.00
CODO HDF-BB 90° 110.00 1 und 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.70

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.50
CAMARA HUMEDA 1.00 2.00 1.50
CAMARA HUMEDA 1.00 1.00 1.50

Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TRAZO 1.00 2.00 14.11

Err:509 Err:509 Err:509


VOLUMEN 1.00 2.00

Err:509 Err:509 Err:509


AREA 1.00 2.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 2.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
TRAZO 1.00 1.00 24.00

Err:509 Err:509
Err:509 Err:509 Err:509
EXCAVACION DE DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509 Err:509


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509 Err:509


AREA CAD 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509
Err:509 Err:509 Err:509
PUERTA METALICA 1.00

Err:509 Err:509 Err:509


MALLA GALVANIZADA 1.00 1.00 22.77

Err:509 Err:509 Err:509


POSTES 9.00

Err:509 Err:509 Err:509


ALAMBRE Y CONCERTINA 1.00 1.00 24.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
AREA 1.00 1.00

Err:509 Err:509 Err:509


AREA 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1 MURO 1.00 2.00 0.60
VOLUMEN 2 MURO 1.00 2.00 0.40
VOLUMEN 1 LOSA 1.00 1.00 0.60
VOLUMEN 1 TAPA 1.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
VOLUMEN CAMARA HUMEDA 1.00 1.00 1.10
VOLUMEN DENTELLON 1 1.00 1.00 0.15
VOLUMEN DENTELLON 2 1.00 1.00 0.20
VOLUMEN CAJA DE VALVULA 1.00 1.00 1.05
VOLUMEN DE ALETAS 1.00 1.00
VOLUMEN PARA INSTALACION DE TUBERIA DE REBOCE 1.00 1.00 10.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.10
CAJA DE VALVULAS 1.00 1.00 1.05
TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN EN REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

AREA CAMARA HUMEDA 1.00 1.00 1.10


AREA CAJA DE VALVULAS 1.00 1.00 1.05
AREA ALETAS 1.00 1.00 1.10

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


AREA DE LOSA DE SELLADO 1.00 1.00
AREA DE CONCRETO DE SELLADO 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
ACERO LONGITUDINAL - CAJA VALVULAS 1.00 2.00 0.60
ACERO TRANSVERSAL - CAJA VALVULAS 1.00 2.00 0.71
ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 3.00 1.34
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 3.00 1.34
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.20
CAMARA HUMEDA 1.00 2.00 1.20
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70

Err:509 Err:509 Err:509


VOLUMEN 1 EN DENTELLON 1.00 1.00 0.15
VOLUMEN 2 EN DENTELLON 1.00 1.00 0.20
VOLUMEN EN CAMARA HUMEDA 1.00 1.00 1.05
VOLUMEN EN CAJA DE VALVULA 1.00 1.00 1.05

Err:509 Err:509 Err:509


ACERO HORIZONTAL - CAJA VALVULAS 1.00 4.00 3.06
ACERO VERTICAL - CAJA VALVULAS 1.00 12.00 0.63
ACERO HORIZONTAL - CAMARA HUMEDA 1.00 5.00 4.64
ACERO VERTICAL - CAMARA HUMEDA-1 1.00 5.00 1.26
ACERO VERTICAL - CAMARA HUMEDA-2 1.00 5.00 1.73
ACERO VERTICAL - CAMARA HUMEDA-3 1.00 3.00 1.34
ACERO VERTICAL - CAMARA HUMEDA-4 1.00 3.00 1.59
ACERO HORIZONTAL - ALETAS 2.00 6.00 2.03
ACERO VERTICAL - ALETAS 2.00 7.00 1.53

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 1.00 2.00 1.20
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA EXTERNO 1.00 2.00 1.20


CAMARA HUMEDA INTERNO 1.00 2.00 0.90
CAMARA HUMEDA INTERNO 1.00 2.00 0.90
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.80
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.70
CAJA DE VALVULAS INTERNO 1.00 2.00 0.60
CAJA DE VALVULAS INTERNO 1.00 2.00 0.50
ALETAS 1 2.00 2.00 1.83
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 1.00 2.00 1.00
VOLUMEN 2 CAMARA HUMEDA 1.00 2.00 0.70
VOLUMEN 1 CAJA DE VALVULA 1.00 2.00 1.00
VOLUMEN 2 CAJA DE VALVULA 1.00 2.00 0.40
VULUMEN ALETAS 1.00 2.00 1.10
VOLUMEN PESTAÑAS DE ALETAS 1.00 1.00

Err:509 Err:509 Err:509


ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 3.00 1.54
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 3.00 1.54

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 0.90
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN CAMARA HUMEDA 1.00 1.00 1.00
VOLUMEN CAJA AREA TAPA METALICA 1.00 1.00 0.60

Err:509 Err:509 Err:509


CAJA DE CAP. 1 1.00 2.00 1.20
CAJA DE CAP. 2 1.00 2.00 1.20
CAJA DE CAP. 3 1.00 2.00 0.90
CAJA DE CAP. 4 1.00 2.00 0.90
CAJA DE CAP. 5 1.00 1.00 0.90
TAPA DE CAP. 1.00 1.00 0.90
CAJA DE VAL. 1 1.00 2.00 0.80
CAJA DE VAL. 2 1.00 2.00 0.70
CAJA DE VAL. 3 1.00 2.00 0.60
CAJA DE VAL. 4 1.00 2.00 0.50
CAJA DE VAL. 5 1.00 1.00 0.60
ALETAS 1 2.00 2.00 1.83
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNA 1.00 2.00 0.90
CAMARA HUMEDA INTERNA 1.00 2.00 0.90
CAMARA HUMEDA INTERNA 1.00 1.00 1.20
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA EXTERNA 1.00 1.00 1.20


ALETAS INTERNAS 1.00 2.00 1.83
ALETAS INTERNAS 1.00 1.00 0.15

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.20
CAMARA HUMEDA 1.00 1.00 1.20
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70
CAJA DE VALVULAS 1.00 2.00 0.60
CAJA DE VALVULAS 1.00 2.00 0.50
CAJA DE VALVULAS 1.00 1.00 0.60
ALETAS EXTERNAS 1.00 2.00 1.83
ALETAS EXTERNAS 1.00 1.00 0.15
TAPA 1.00 1.00 0.90

Err:509 Err:509
Err:509 Err:509 Err:509
CAJA DE CAPTACION 1.00 2.00 1.20
CAJA DE CAPTACION 1.00 2.00 1.20
TAPA DE CAPTACION 1.00 1.00 1.20
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70
ALETAS 2.00 1.00 1.83
ALETAS 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 2.00 0.65
CAJA DE VALVULAS 1.00 2.00 0.65

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 1.00

Err:509 Err:509 Err:509


TAPA METALICA 1.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 1" - SALIDA LINEA DE CONDUCION

DESCRIPCION DIAMET. CANT.

CANASTILLA DE BRONCE 1" 1 und 1.00


NIPLE DE F°G° RR C/BRA, L=0.65m 1" 1 und 1.00
VALVULA COMPUERTA BRONCE 1" 1 und 1.00
NIPLE F°G° RR, 0.10m 1" 1 und 1.00
UNION UNIVERSAL F°G° 1" 2 und 2.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

MEDIDOR VOLUMETRICO DE BRONCE 1" 1 und 1.00


NIPLE F°G° RR, L=0.30m 1" 1 und 1.00
ADAPTADOR F°G° 1" 1 und 1.00

ACCESORIOS DE 2" - SALIDA LIMPIA Y REBOCE

DESCRIPCION DIAMET. CANT.

CONO DE REBOCE PVC 63 mm 1 und 1.00


ADAPTADOR F°G° C/R 2" 2 und 2.00
NIPLE F°G° RR, L=0.20m 2" 1 und 1.00
UNION F°G° RR 2" 1 und 1.00
NIPLE F°G° C/BRA, L=0.15m 2" 1 und 1.00
NIPLE PVC, L=0.05m 63 mm 1 und 1.00
CODO PVC-UF 90° 63 mm 1 und 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.70

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 0.90
CAMARA HUMEDA 1.00 2.00 0.90
CAMARA HUMEDA 1.00 1.00 0.90
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509
TRAZO 1.00 1.00 16.94
TRAZO 1.00 1.00 18.96

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


AREA 1.00 1.00
AREA 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TRAZO 1.00 1.00 20.00

Err:509 Err:509
Err:509 Err:509 Err:509
EXCAVACION DE DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509 Err:509


DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509 Err:509


AREA CAD 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509
Err:509 Err:509 Err:509
PUERTA METALICA 1.00

Err:509 Err:509 Err:509


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

MALLA GALVANIZADA 1.00 1.00 18.77

Err:509 Err:509 Err:509


POSTES 9.00

Err:509 Err:509 Err:509


ALAMBRE Y CONCERTINA 1.00 1.00 20.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
AREA 1.00 1.00

Err:509 Err:509 Err:509


AREA 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1 MURO 4.00 4.00 1.00
VOLUMEN 1 LOSA 1.00 1.00 1.00
VOLUMEN 1 TAPA 1.00 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VOLUMEN CAMARA HUMEDA 1.00 1.00 1.30


VOLUMEN DENTELLON 1 1.00 1.00 0.15
VOLUMEN DENTELLON 2 1.00 1.00 0.20
VOLUMEN CAJA DE VALVULA 1.00 1.00 0.85
VOLUMEN DE ALETAS 1.00 1.00
VOLUMEN PARA INSTALACION DE TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.30
CAJA DE VALVULAS 1.00 1.00 0.85
TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN EN REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 1.30
AREA CAJA DE VALVULAS 1.00 1.00 0.85
AREA ALETAS 1.00 1.00 1.41

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


AREA DE LOSA DE SELLADO 1.00 1.00
AREA DE CONCRETO DE SELLADO 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACERO LONGITUDINAL - CAJA VALVULAS 1.00 2.00 0.60


ACERO TRANSVERSAL - CAJA VALVULAS 1.00 2.00 0.71
ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 3.00 1.34
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 3.00 1.34

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.20
CAMARA HUMEDA 1.00 2.00 1.20
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70

Err:509 Err:509 Err:509


VOLUMEN 1 EN DENTELLON 1.00 1.00 0.15
VOLUMEN 2 EN DENTELLON 1.00 1.00 0.20
VOLUMEN EN CAMARA HUMEDA 1.00 1.00 1.25
VOLUMEN EN CAJA DE VALVULA 1.00 1.00 0.85

Err:509 Err:509 Err:509


ACERO HORIZONTAL - CAJA VALVULAS 1.00 4.00 3.06
ACERO VERTICAL - CAJA VALVULAS 1.00 12.00 0.63
ACERO HORIZONTAL - CAMARA HUMEDA 1.00 5.00 4.67
ACERO VERTICAL - CAMARA HUMEDA-1 1.00 5.00 1.26
ACERO VERTICAL - CAMARA HUMEDA-2 1.00 5.00 1.73
ACERO VERTICAL - CAMARA HUMEDA-3 1.00 3.00 1.34
ACERO VERTICAL - CAMARA HUMEDA-4 1.00 3.00 1.59
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACERO HORIZONTAL - ALETAS 2.00 6.00 1.57


ACERO VERTICAL - ALETAS 2.00 5.00 1.53

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 1.00 2.00 1.20
CAMARA HUMEDA EXTERNO 1.00 2.00 1.20
CAMARA HUMEDA INTERNO 1.00 2.00 0.90
CAMARA HUMEDA INTERNO 1.00 2.00 0.90
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.80
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.70
CAJA DE VALVULAS INTERNO 1.00 2.00 0.60
CAJA DE VALVULAS INTERNO 1.00 2.00 0.50
ALETAS 1 2.00 2.00 1.41
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 1.00 2.00 1.20
VOLUMEN 2 CAMARA HUMEDA 1.00 2.00 0.90
VOLUMEN 1 CAJA DE VALVULA 1.00 2.00 0.80
VOLUMEN 2 CAJA DE VALVULA 1.00 2.00 0.50
VULUMEN ALETAS 1.00 2.00 1.41
VOLUMEN PESTAÑAS DE ALETAS 1.00 1.00

Err:509 Err:509 Err:509


ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 5.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 5.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 0.90

Err:509 Err:509 Err:509


VOLUMEN CAMARA HUMEDA 1.00 1.00 1.20
VOLUMEN CAJA AREA TAPA METALICA 1.00 1.00 0.60

Err:509 Err:509 Err:509


CAJA DE CAP. 1 1.00 2.00 1.20
CAJA DE CAP. 2 1.00 2.00 1.20
CAJA DE CAP. 3 1.00 2.00 0.90
CAJA DE CAP. 4 1.00 2.00 0.90
CAJA DE CAP. 5 1.00 1.00 0.90
TAPA DE CAP. 1.00 1.00 0.90
CAJA DE VAL. 1 1.00 2.00 0.80
CAJA DE VAL. 2 1.00 2.00 0.70
CAJA DE VAL. 3 1.00 2.00 0.60
CAJA DE VAL. 4 1.00 2.00 0.50
CAJA DE VAL. 5 1.00 1.00 0.60
ALETAS 1 2.00 2.00 1.41
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA INTERNA 1.00 2.00 0.90
CAMARA HUMEDA INTERNA 1.00 2.00 0.90
CAMARA HUMEDA INTERNA 1.00 1.00 1.20
CAMARA HUMEDA EXTERNA 1.00 1.00 1.20
ALETAS INTERNAS 1.00 2.00 1.41
ALETAS INTERNAS 1.00 1.00 0.15

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.20
CAMARA HUMEDA 1.00 1.00 1.20
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70
CAJA DE VALVULAS 1.00 2.00 0.60
CAJA DE VALVULAS 1.00 2.00 0.50
CAJA DE VALVULAS 1.00 1.00 0.60
ALETAS EXTERNAS 1.00 2.00 1.41
ALETAS EXTERNAS 1.00 1.00 0.15
TAPA 1.00 1.00 0.90

Err:509 Err:509
Err:509 Err:509 Err:509
CAJA DE CAPTACION 1.00 2.00 1.20
CAJA DE CAPTACION 1.00 2.00 1.20
TAPA DE CAPTACION 1.00 1.00 1.20
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS 1.00 2.00 0.80


CAJA DE VALVULAS 1.00 2.00 0.70
ALETAS 2.00 1.00 1.41
ALETAS 1.00 1.00

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 2.00 0.65
CAJA DE VALVULAS 1.00 2.00 0.65

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 1.00

Err:509 Err:509 Err:509


TAPA METALICA 1.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 1" - SALIDA LINEA DE CONDUCION

DESCRIPCION DIAMET. CANT.

CANASTILLA DE BRONCE 1" 1 und 1.00


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

NIPLE DE F°G° RR C/BRA, L=0.65m 1" 1 und 1.00


VALVULA COMPUERTA BRONCE 1" 1 und 1.00
NIPLE F°G° RR, 0.10m 1" 1 und 1.00
UNION UNIVERSAL F°G° 1" 2 und 2.00
MEDIDOR VOLUMETRICO DE BRONCE 1" 1 und 1.00
NIPLE F°G° RR, L=0.30m 1" 1 und 1.00
ADAPTADOR F°G° 1" 1 und 1.00

ACCESORIOS DE 2" - SALIDA LIMPIA Y REBOCE

DESCRIPCION DIAMET. CANT. CANT.

CONO DE REBOCE PVC 63 mm 1 und 1.00


ADAPTADOR F°G° C/R 2" 2 und 2.00
NIPLE F°G° RR, L=0.20m 2" 1 und 1.00
UNION F°G° RR 2" 1 und 1.00
NIPLE F°G° C/BRA, L=0.15m 2" 1 und 1.00
NIPLE PVC, L=0.05m 63 mm 1 und 1.00
CODO PVC-UF 90° 63 mm 1 und 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.70
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 0.90
CAMARA HUMEDA 1.00 2.00 0.90
CAMARA HUMEDA 1.00 1.00 0.90

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
TRAZO 1.00 1.00 15.00

Err:509 Err:509
Err:509 Err:509 Err:509
EXCAVACION DE DADO DE ANCLAJE 1.00 7.00 0.40

Err:509 Err:509 Err:509


DADO DE ANCLAJE 1.00 7.00 0.40

Err:509 Err:509 Err:509


AREA CAD 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


DADO DE ANCLAJE 1.00 7.00 0.40

Err:509 Err:509
Err:509 Err:509 Err:509
PUERTA METALICA 1.00

Err:509 Err:509 Err:509


MALLA GALVANIZADA 1.00 1.00 13.77

Err:509 Err:509 Err:509


POSTES 7.00

Err:509 Err:509 Err:509


ALAMBRE Y CONCERTINA 1.00 1.00 15.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
AREA 1.00 1.00

Err:509 Err:509 Err:509


AREA 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN 1 MURO 4.00 4.00 1.00
VOLUMEN 1 LOSA 1.00 1.00 1.00
VOLUMEN 1 TAPA 1.00 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
VOLUMEN CAMARA HUMEDA 1.00 1.00 2.70
VOLUMEN DENTELLON 1 1.00 1.00 0.15
VOLUMEN DENTELLON 2 1.00 1.00 0.20
VOLUMEN CAJA DE VALVULA 1.00 1.00 0.95
VOLUMEN DE ALETAS 1.00 1.00
VOLUMEN PARA INSTALACION DE TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 2.70
CAJA DE VALVULAS 1.00 1.00 0.95
TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VOLUMEN 1.00 1.00


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN EN REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 2.70
AREA CAJA DE VALVULAS 1.00 1.00 0.95
AREA ALETAS 1.00 1.00 2.25

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


AREA DE LOSA DE SELLADO 1.00 1.00
AREA DE CONCRETO DE SELLADO 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
ACERO LONGITUDINAL - CAJA VALVULAS 1.00 2.00 0.60
ACERO TRANSVERSAL - CAJA VALVULAS 1.00 2.00 0.71
ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 7.00 2.77
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 7.00 2.77

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 2.60
CAMARA HUMEDA 1.00 2.00 2.60
CAJA DE VALVULAS 1.00 2.00 0.90
CAJA DE VALVULAS 1.00 2.00 0.70

Err:509 Err:509 Err:509


VOLUMEN 1 EN DENTELLON 1.00 1.00 0.15
VOLUMEN 2 EN DENTELLON 1.00 1.00 0.20
VOLUMEN EN CAMARA HUMEDA 1.00 1.00 2.65
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VOLUMEN EN CAJA DE VALVULA 1.00 1.00 0.95

Err:509 Err:509 Err:509


ACERO HORIZONTAL - CAJA VALVULAS 1.00 4.00 3.06
ACERO VERTICAL - CAJA VALVULAS 1.00 12.00 0.63
ACERO HORIZONTAL - CAMARA HUMEDA 1.00 5.00 10.26
ACERO VERTICAL - CAMARA HUMEDA-1 1.00 10.00 1.34
ACERO VERTICAL - CAMARA HUMEDA-2 1.00 10.00 1.75
ACERO VERTICAL - CAMARA HUMEDA-3 1.00 8.00 1.34
ACERO VERTICAL - CAMARA HUMEDA-4 1.00 8.00 1.61
ACERO HORIZONTAL - ALETAS 2.00 6.00 2.48
ACERO VERTICAL - ALETAS 2.00 9.00 1.55

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 1.00 2.00 2.60
CAMARA HUMEDA EXTERNO 1.00 2.00 2.60
CAMARA HUMEDA INTERNO 1.00 2.00 2.30
CAMARA HUMEDA INTERNO 1.00 2.00 2.30
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.90
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.70
CAJA DE VALVULAS INTERNO 1.00 2.00 0.70
CAJA DE VALVULAS INTERNO 1.00 2.00 0.50
ALETAS 1 2.00 2.00 2.25
ALETAS 2 2.00 1.00 0.15
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 1.00 2.00 2.60
VOLUMEN 2 CAMARA HUMEDA 1.00 2.00 2.30
VOLUMEN 1 CAJA DE VALVULA 1.00 2.00 0.90
VOLUMEN 2 CAJA DE VALVULA 1.00 2.00 0.50
VULUMEN ALETAS 1.00 2.00 2.25
VOLUMEN PESTAÑAS DE ALETAS 1.00 1.00

Err:509 Err:509 Err:509


ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 8.00
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 8.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 2.30

Err:509 Err:509 Err:509


VOLUMEN CAMARA HUMEDA 1.00 1.00 2.60
VOLUMEN CAJA AREA TAPA METALICA 1.00 1.00 0.60

Err:509 Err:509 Err:509


CAJA DE CAP. 1 1.00 2.00 2.60
CAJA DE CAP. 2 1.00 2.00 2.60
CAJA DE CAP. 3 1.00 2.00 2.30
CAJA DE CAP. 4 1.00 2.00 2.30
CAJA DE CAP. 5 1.00 1.00 2.30
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TAPA DE CAP. 1.00 1.00 2.30


CAJA DE VAL. 1 1.00 2.00 0.90
CAJA DE VAL. 2 1.00 2.00 0.70
CAJA DE VAL. 3 1.00 2.00 0.70
CAJA DE VAL. 4 1.00 2.00 0.50
CAJA DE VAL. 5 1.00 1.00 0.70
ALETAS 1 2.00 2.00 2.25
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNA 1.00 2.00 2.30
CAMARA HUMEDA INTERNA 1.00 2.00 2.30
CAMARA HUMEDA INTERNA 1.00 1.00 2.60
CAMARA HUMEDA EXTERNA 1.00 1.00 2.60
ALETAS INTERNAS 1.00 2.00 2.25
ALETAS INTERNAS 1.00 1.00 0.15

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 2.60
CAMARA HUMEDA 1.00 1.00 2.60
CAJA DE VALVULAS 1.00 2.00 0.90
CAJA DE VALVULAS 1.00 2.00 0.70
CAJA DE VALVULAS 1.00 2.00 0.70
CAJA DE VALVULAS 1.00 2.00 0.50
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS 1.00 1.00 0.70


ALETAS EXTERNAS 1.00 2.00 2.25
ALETAS EXTERNAS 1.00 1.00 0.15
TAPA 1.00 1.00 2.30

Err:509 Err:509
Err:509 Err:509 Err:509
CAJA DE CAPTACION 1.00 2.00 2.60
CAJA DE CAPTACION 1.00 2.00 2.60
TAPA DE CAPTACION 1.00 1.00 2.60
CAJA DE VALVULAS 1.00 2.00 0.90
CAJA DE VALVULAS 1.00 2.00 0.70
ALETAS 2.00 1.00 2.25
ALETAS 1.00 1.00

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 2.00 0.65
CAJA DE VALVULAS 1.00 2.00 0.75

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 1.00

Err:509 Err:509 Err:509


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TAPA METALICA 1.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 4" - SALIDA LINEA DE CONDUCION

DESCRIPCION DIAMET. CANT.

CANASTILLA DE BRONCE BB 110 mm 1 und 1.00


NIPLE DE F°G° RR C/BRA, L=0.65m 110 mm 1 und 1.00
VALVULA COMPUERTA HDF BB 110 mm 1 und 1.00
NIPLE ACERO SHC-40 BB, L=0.10m 110 mm 1 und 1.00
UNION TIPO DRESSER 110 mm 2 und 2.00
MACROMEDIDOR DE CAUDAL 110 mm 1 und 1.00
NIPLE ACERO SHC-40 BB, L=0.30m 110 mm 1 und 1.00
ADAPTADOR BRIDA CAMPANA HDF 110 mm 1 und 1.00

ACCESORIOS DE 6" - SALIDA LIMPIA Y REBOCE

DESCRIPCION DIAMET. CANT.

CONO DE REBOCE PVC 160 mm 1 und 1.00


ADAPTADOR F°G° C/R 160 mm 2 und 2.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

NIPLE F°G° RR, L=0.20m 6" 1 und 1.00


UNION F°G° RR 6" 1 und 1.00
NIPLE F°G° C/BRA, L=0.15m 6" 1 und 1.00
NIPLE PVC, L=0.05m 160 mm 1 und 1.00
CODO HDF-BB 90° 160 mm 1 und 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.70

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 2.30
CAMARA HUMEDA 1.00 2.00 2.30
CAMARA HUMEDA 1.00 1.00 2.30

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
TRAZO 1.00 1.00 18.00

Err:509 Err:509
Err:509 Err:509 Err:509
EXCAVACION DE DADO DE ANCLAJE 1.00 6.00 0.40
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


DADO DE ANCLAJE 1.00 6.00 0.40

Err:509 Err:509 Err:509


AREA CAD 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
DADO DE ANCLAJE 1.00 6.00 0.40

Err:509 Err:509
Err:509 Err:509 Err:509
MALLA GALVANIZADA 1.00 1.00 18.00

Err:509 Err:509 Err:509


POSTES 6.00

Err:509 Err:509 Err:509


ALAMBRE Y CONCERTINA 1.00 1.00 18.00

Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
AREA 1.00 1.00

Err:509 Err:509 Err:509


AREA 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1 MURO 4.00 4.00 1.00
VOLUMEN 1 LOSA 1.00 1.00 1.00
VOLUMEN 1 TAPA 1.00 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
VOLUMEN CAMARA HUMEDA 1.00 1.00 1.50
VOLUMEN DENTELLON 1 1.00 1.00 0.15
VOLUMEN DENTELLON 2 1.00 1.00 0.20
VOLUMEN CAJA DE VALVULA 1.00 1.00 0.85
VOLUMEN DE ALETAS 1.00 1.00
VOLUMEN PARA INSTALACION DE TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.50
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS 1.00 1.00 0.85


TUBERIA DE REBOCE 1.00 1.00 10.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00
VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN EN REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 1.50
AREA CAJA DE VALVULAS 1.00 1.00 0.85
AREA ALETAS 1.00 1.00 1.55
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


AREA DE LOSA DE SELLADO 1.00 1.00
AREA DE CONCRETO DE SELLADO 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
ACERO LONGITUDINAL - CAJA VALVULAS 1.00 2.00 0.60
ACERO TRANSVERSAL - CAJA VALVULAS 1.00 2.00 0.71
ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 4.00 1.56
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 4.00 1.56

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.40
CAMARA HUMEDA 1.00 2.00 1.40
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS 1.00 2.00 0.80


CAJA DE VALVULAS 1.00 2.00 0.70

Err:509 Err:509 Err:509


VOLUMEN 1 EN DENTELLON 1.00 1.00 0.15
VOLUMEN 2 EN DENTELLON 1.00 1.00 0.20
VOLUMEN EN CAMARA HUMEDA 1.00 1.00 1.45
VOLUMEN EN CAJA DE VALVULA 1.00 1.00 0.85

Err:509 Err:509 Err:509


ACERO HORIZONTAL - CAJA VALVULAS 1.00 4.00 3.06
ACERO VERTICAL - CAJA VALVULAS 1.00 12.00 0.63
ACERO HORIZONTAL - CAMARA HUMEDA 1.00 5.00 5.54
ACERO VERTICAL - CAMARA HUMEDA-1 1.00 6.00 1.26
ACERO VERTICAL - CAMARA HUMEDA-2 1.00 6.00 1.76
ACERO VERTICAL - CAMARA HUMEDA-3 1.00 4.00 1.34
ACERO VERTICAL - CAMARA HUMEDA-4 1.00 4.00 1.59
ACERO HORIZONTAL - ALETAS 2.00 6.00 1.77
ACERO VERTICAL - ALETAS 2.00 6.00 1.53

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 1.00 2.00 1.40
CAMARA HUMEDA EXTERNO 1.00 2.00 1.40
CAMARA HUMEDA INTERNO 1.00 2.00 1.10
CAMARA HUMEDA INTERNO 1.00 2.00 1.10
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS EXTERNO 1.00 2.00 0.80


CAJA DE VALVULAS EXTERNO 1.00 2.00 0.70
CAJA DE VALVULAS INTERNO 1.00 2.00 0.60
CAJA DE VALVULAS INTERNO 1.00 2.00 0.50
ALETAS 1 2.00 2.00 1.55
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 1.00 2.00 1.40
VOLUMEN 2 CAMARA HUMEDA 1.00 2.00 1.10
VOLUMEN 1 CAJA DE VALVULA 1.00 2.00 0.80
VOLUMEN 2 CAJA DE VALVULA 1.00 2.00 0.50
VULUMEN ALETAS 1.00 2.00 1.55
VOLUMEN PESTAÑAS DE ALETAS 1.00 1.00

Err:509 Err:509 Err:509


ACERO LONGITUDINAL - CAMARA HUMEDA 1.00 4.00
ACERO TRANSVERSAL - CAMARA HUMEDA 1.00 4.00

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.10

Err:509 Err:509 Err:509


VOLUMEN CAMARA HUMEDA 1.00 1.00 1.40
VOLUMEN CAJA AREA TAPA METALICA 1.00 1.00 0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAJA DE CAP. 1 1.00 2.00 1.40
CAJA DE CAP. 2 1.00 2.00 1.40
CAJA DE CAP. 3 1.00 2.00 1.10
CAJA DE CAP. 4 1.00 2.00 1.10
CAJA DE CAP. 5 1.00 1.00 1.10
TAPA DE CAP. 1.00 1.00 1.10
CAJA DE VAL. 1 1.00 2.00 0.80
CAJA DE VAL. 2 1.00 2.00 0.70
CAJA DE VAL. 3 1.00 2.00 0.60
CAJA DE VAL. 4 1.00 2.00 0.50
CAJA DE VAL. 5 1.00 1.00 0.60
ALETAS 1 2.00 2.00 1.55
ALETAS 2 2.00 1.00 0.15

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNA 1.00 2.00 1.10
CAMARA HUMEDA INTERNA 1.00 2.00 1.10
CAMARA HUMEDA INTERNA 1.00 1.00 1.40
CAMARA HUMEDA EXTERNA 1.00 1.00 1.40
ALETAS INTERNAS 1.00 2.00 1.55
ALETAS INTERNAS 1.00 1.00 0.15
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.40
CAMARA HUMEDA 1.00 1.00 1.40
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70
CAJA DE VALVULAS 1.00 2.00 0.60
CAJA DE VALVULAS 1.00 2.00 0.50
CAJA DE VALVULAS 1.00 1.00 0.60
ALETAS EXTERNAS 1.00 2.00 1.55
ALETAS EXTERNAS 1.00 1.00 0.15
TAPA 1.00 1.00 1.10

Err:509 Err:509
Err:509 Err:509 Err:509
CAJA DE CAPTACION 1.00 2.00 1.40
CAJA DE CAPTACION 1.00 2.00 1.40
TAPA DE CAPTACION 1.00 1.00 1.40
CAJA DE VALVULAS 1.00 2.00 0.80
CAJA DE VALVULAS 1.00 2.00 0.70
ALETAS 2.00 1.00 1.55
ALETAS 1.00 1.00

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 2.00 0.65
CAJA DE VALVULAS 1.00 2.00 0.65
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 1.00

Err:509 Err:509 Err:509


TAPA METALICA 1.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 1 1/2" - SALIDA LINEA DE CONDUCION

DESCRIPCION DIAMET. CANT.

CANASTILLA DE BRONCE 1 1/2" 1 und 1.00


NIPLE DE F°G° RR C/BRA, L=0.65m 1 1/2" 1 und 1.00
VALVULA COMPUERTA BRONCE 1 1/2" 1 und 1.00
NIPLE F°G° RR, L=0.10m 1 1/2" 1 und 1.00
UNION UNIVERSAL F°G° 1 1/2" 2 und 2.00
MEDIDOR VOLUMETRICO DE BRONCE 1 1/2" 1 und 1.00
NIPLE F°G° RR, L=0.10m 1 1/2" 1 und 1.00
ADAPTADOR F°G° 1 1/2" 1 und 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACCESORIOS DE 3" - SALIDA LIMPIA Y REBOCE

DESCRIPCION DIAMET. CANT.

CONO DE REBOCE PVC 90 mm 1 und 1.00


ADAPTADOR F°G° C/R 3" 2 und 2.00
NIPLE F°G° RR, L=0.10m 3" 1 und 1.00
UNION F°G° RR 3" 1 und 1.00
NIPLE F°G° C/BRA, L=0.15m 3" 1 und 1.00
NIPLE PVC, L=0.05m 90 mm 1 und 1.00
CODO PVC-UF 90° 90 mm 1 und 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.70

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.10
CAMARA HUMEDA 1.00 2.00 1.10
CAMARA HUMEDA 1.00 1.00 1.10

Err:509 Err:509
Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


TRAZO 1.00 1.00 24.00

Err:509 Err:509
Err:509 Err:509 Err:509
EXCAVACION DE DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509 Err:509


DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509 Err:509


AREA CAD 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
EXCAVACION DE DADO DE ANCLAJE 1.00 9.00 0.40

Err:509 Err:509
Err:509 Err:509 Err:509
PUERTA METALICA 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


MALLA GALVANIZADA 1.00 1.00 22.77

Err:509 Err:509 Err:509


POSTES 9.00

Err:509 Err:509 Err:509


ALAMBRE Y CONCERTINA 1.00 1.00 24.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA DE REUNION 1.00 1.00 2.52

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 2.52

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA DE REUNION 1.00 1.00 1.60
CAJA DE VALVULA 1.00 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 1.60
CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


CAMARA DE VALVULA 1.00 1.00 0.15
SALIDA DE REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 1.50
AREA CAJA DE VALVULAS 1.00 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 7.00 1.43


LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 7.00 1.43
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 7.00 0.73
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 6.00 0.93

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.60
CAMARA HUMEDA 1.00 2.00 1.60
CAJA DE VALVULAS 1.00 2.00 1.00
CAJA DE VALVULAS 1.00 2.00 0.80

Err:509 Err:509 Err:509


VOLUMEN EN CAMARA HUMEDA 1.00 1.00 1.60
VOLUMEN EN CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) AZUL 1.00 7.00 1.33
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) AZUL 1.00 6.30 1.43
MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) VERDE 1.00 7.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) VERDE 1.00 6.40 1.43
MUROS ACERO TRANSVERSAL CAMARA HUMEDA (2) 2.00 7.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (2) 2.00 6.00 1.43
GANCHOS 2.00 6.00 0.20
MUROS ACERO TRANSVERSAL CAMARA SECA (1) 1.00 5.87 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (1) 1.00 6.20 0.73
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

MUROS ACERO TRANSVERSAL CAMARA SECA (2) 1.00 5.87 0.78


MUROS ACERO LONGITUDINAL CAMARA SECA (2) 1.00 6.20 0.73
MUROS ACERO TRANSVERSAL CAMARA SECA (3) 2.00 7.67 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (3) 2.00 6.67 0.93

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 1.00 2.00 1.50
CAMARA HUMEDA EXTERNO 1.00 2.00 1.50
CAMARA HUMEDA INTERNO 1.00 2.00 1.20
CAMARA HUMEDA INTERNO 1.00 2.00 1.20
CAJA DE VALVULAS EXTERNO 1.00 2.00 1.00
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.80
CAJA DE VALVULAS INTERNO 1.00 2.00 0.80
CAJA DE VALVULAS INTERNO 1.00 2.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 1.00 2.00 1.50
VOLUMEN 2 CAMARA HUMEDA 1.00 2.00 1.20
VOLUMEN 1 CAJA DE VALVULA 1.00 2.00 1.00
VOLUMEN 2 CAJA DE VALVULA 1.00 2.00 0.60

Err:509 Err:509 Err:509


LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 4.00 1.43
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 7.00 0.90
GANCHO TECHO 2.00 3.40 0.22
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 3.00 0.45


LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 1.80 0.75
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 2.00 0.60
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 5.00 0.20

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.20
CAMARA HUMEDA 4.00 1.00 1.50
CAMARA HUMEDA - TAPA 4.00 1.00
CAMARA HUMEDA - TAPA 4.00 1.00
CAJA DE VALVULAS 1.00 1.00 0.20
CAJA DE VALVULAS 2.00 1.00 1.00
CAJA DE VALVULAS 2.00 1.00 0.80
CAJA DE VALVULAS 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.50
CAMARA HUMEDA 1.00 1.00 0.60
CAMARA HUMEDA 2.00 1.00 0.60
CAMARA HUMEDA 2.00 1.00 0.40
CAJA DE VALVULAS 1.00 1.00 0.30
CAJA DE VALVULAS 1.00 1.00 0.80
CAJA DE VALVULAS 2.00 1.00 0.60
CAJA DE VALVULAS
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.20
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.20
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.20
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.20
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80


CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 1.00 0.60
CAJA DE VALVULAS 1.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 2.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 3" - INGRESO DE CAPTACION N°1

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA BRIDADA Ø 90mm 1.00 1.00


CODO HDF BB 90° Ø 90mm 2.00 2.00
NIPLE ACERO SCH-40 BB L=0.40m Ø 90mm 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

NIPLE ACERO SCH-40 BB Ll=0.60M Ø 90mm 1.00 1.00


ADAPTADOR BRIDA CAMPANA HDF Ø 90mm 1.00 1.00

ACCESORIOS DE 1" - INGRESO DE CAPTACION N°2

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA Ø1° 1.00 1.00


CODO 90° F°G° Ø1° 2.00 2.00
NIPLE F°G° RR L=0.40m Ø1° 1.00 1.00
NIPLE F°G° RR L=0.60m Ø1° 1.00 1.00
ADAPTADOR F°G° C/R Ø1° 1.00 1.00

ACCESORIOS DE 4" - SALIDA

DESCRIPCION DIAMET. CANT.

CANASTILLA D HFD BB Ø 110mm 1.00 1.00


NIPLE DE ACERO SCH - 40 BB C/BRA L=0.50m Ø 110mm 1.00 1.00
NIPLE DE ACERO SCH - 40 L=0.15m Ø 110mm 1.00 1.00
NIPLE DE ACERO SCH - 40 L=0.50m Ø 110mm 1.00 1.00
VALVULA COMPUERTA HDF BB Ø 110mm 1.00 1.00
UNION TIPO DRESSER Ø 110mm 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 110mm 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACCESORIOS DE 4" (LIMPIA Y REBOSE)

DESCRIPCION DIAMET. CANT.


Ø 110mm 1.00 1.00
CONO DE REBOSE PVC Ø4" 2.00 2.00
ADAPTADOR F°G° C/R Ø4" 1.00 1.00
NIPLE PVC L=0.35m Ø4" 1.00 1.00
UNION F°G° RR Ø4" 1.00 1.00
NIPLE F°G° RR C/BRA L=0.15m Ø4" 1.00 1.00
TUBERI PVC - UF Ø 110mm VAR 1.00
CODO PVC - UF 90° Ø 110mm 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.80

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.20
CAMARA HUMEDA 4.00 1.00 1.20
CAMARA HUMEDA 1.00 1.00 1.20

Err:509 Err:509
Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 2.52

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 2.52

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA DE REUNION 1.00 1.00 1.60
CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 1.60
CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


CAMARA DE VALVULA 1.00 1.00 0.15
SALIDA DE REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 1.50
AREA CAJA DE VALVULAS 1.00 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509
Err:509 Err:509 Err:509
LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 7.00 1.43
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 7.00 1.43
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 7.00 0.73
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 6.00 0.93

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.60
CAMARA HUMEDA 1.00 2.00 1.60
CAJA DE VALVULAS 1.00 2.00 1.00
CAJA DE VALVULAS 1.00 2.00 0.80

Err:509 Err:509 Err:509


VOLUMEN EN CAMARA HUMEDA 1.00 1.00 1.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VOLUMEN EN CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) AZUL 1.00 7.00 1.33
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) AZUL 1.00 6.30 1.43
MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) VERDE 1.00 7.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) VERDE 1.00 6.40 1.43
MUROS ACERO TRANSVERSAL CAMARA HUMEDA (2) 2.00 7.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (2) 2.00 6.00 1.43
GANCHOS 2.00 6.00 0.20
MUROS ACERO TRANSVERSAL CAMARA SECA (1) 1.00 5.87 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (1) 1.00 6.20 0.73
MUROS ACERO TRANSVERSAL CAMARA SECA (2) 1.00 5.87 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (2) 1.00 6.20 0.73
MUROS ACERO TRANSVERSAL CAMARA SECA (3) 2.00 7.67 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (3) 2.00 6.67 0.93

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 1.00 2.00 1.50
CAMARA HUMEDA EXTERNO 1.00 2.00 1.50
CAMARA HUMEDA INTERNO 1.00 2.00 1.20
CAMARA HUMEDA INTERNO 1.00 2.00 1.20
CAJA DE VALVULAS EXTERNO 1.00 2.00 1.00
CAJA DE VALVULAS EXTERNO 1.00 2.00 0.80
CAJA DE VALVULAS INTERNO 1.00 2.00 0.80
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS INTERNO 1.00 2.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 1.00 2.00 1.50
VOLUMEN 2 CAMARA HUMEDA 1.00 2.00 1.20
VOLUMEN 1 CAJA DE VALVULA 1.00 2.00 1.00
VOLUMEN 2 CAJA DE VALVULA 1.00 2.00 0.60

Err:509 Err:509 Err:509


LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 4.00 1.43
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 7.00 0.90
GANCHO TECHO 2.00 3.40 0.22
LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 3.00 0.45
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 1.80 0.75
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 2.00 0.60
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 5.00 0.20

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.20
CAMARA HUMEDA 4.00 1.00 1.50
CAMARA HUMEDA - TAPA 4.00 1.00
CAMARA HUMEDA - TAPA 4.00 1.00
CAJA DE VALVULAS 1.00 1.00 0.20
CAJA DE VALVULAS 2.00 1.00 1.00
CAJA DE VALVULAS 2.00 1.00 0.80
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.50
CAMARA HUMEDA 1.00 1.00 0.60
CAMARA HUMEDA 2.00 1.00 0.60
CAMARA HUMEDA 2.00 1.00 0.40
CAJA DE VALVULAS 1.00 1.00 0.30
CAJA DE VALVULAS 1.00 1.00 0.80
CAJA DE VALVULAS 2.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.20
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.20
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60


CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.20
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.20
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 1.50
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 1.00 0.60
CAJA DE VALVULAS 1.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 2.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 3" - INGRESO DE CAPTACION N°1

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA BRIDADA Ø 90mm 1.00 1.00


CODO HDF BB 90° Ø 90mm 2.00 2.00
NIPLE ACERO SCH-40 BB L=0.40m Ø 90mm 1.00 1.00
NIPLE ACERO SCH-40 BB Ll=0.60M Ø 90mm 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 90mm 1.00 1.00

ACCESORIOS DE 1" - INGRESO DE CAPTACION N°2

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA Ø1° 1.00 1.00


CODO 90° F°G° Ø1° 2.00 2.00
NIPLE F°G° RR L=0.40m Ø1° 1.00 1.00
NIPLE F°G° RR L=0.60m Ø1° 1.00 1.00
ADAPTADOR F°G° C/R Ø1° 1.00 1.00

ACCESORIOS DE 4" - SALIDA


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

DESCRIPCION DIAMET. CANT.

CANASTILLA D HFD BB Ø 110mm 1.00 1.00


NIPLE DE ACERO SCH - 40 BB C/BRA L=0.50m Ø 110mm 1.00 1.00
NIPLE DE ACERO SCH - 40 L=0.15m Ø 110mm 1.00 1.00
NIPLE DE ACERO SCH - 40 L=0.50m Ø 110mm 1.00 1.00
VALVULA COMPUERTA HDF BB Ø 110mm 1.00 1.00
UNION TIPO DRESSER Ø 110mm 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 110mm 1.00 1.00

ACCESORIOS DE 4" (LIMPIA Y REBOSE)

DESCRIPCION DIAMET. CANT.


Ø 110mm 1.00 1.00
CONO DE REBOSE PVC Ø4" 2.00 2.00
ADAPTADOR F°G° C/R Ø4" 1.00 1.00
NIPLE PVC L=0.35m Ø4" 1.00 1.00
UNION F°G° RR Ø4" 1.00 1.00
NIPLE F°G° RR C/BRA L=0.15m Ø4" 1.00 1.00
TUBERI PVC - UF Ø 110mm VAR 1.00
CODO PVC - UF 90° Ø 110mm 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

JUNTA 1.00 1.00 0.80

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.20
CAMARA HUMEDA 4.00 1.00 1.20
CAMARA HUMEDA 1.00 1.00 1.20

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA DE REUNION 1.00 1.00 3.21

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 3.21

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA DE REUNION 1.00 1.00 2.20
CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 2.20
CAJA DE VALVULA 1.00 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA DE VALVULA 1.00 1.00 0.15
SALIDA DE REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 2.20
AREA CAJA DE VALVULAS 1.00 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509
Err:509 Err:509 Err:509
LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 10.00 2.03
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 9.00 2.23
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 7.00 0.73
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 6.00 0.93
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 2.10
CAMARA HUMEDA 1.00 2.00 2.20
CAJA DE VALVULAS 1.00 2.00 1.00
CAJA DE VALVULAS 1.00 2.00 0.80

Err:509 Err:509 Err:509


VOLUMEN EN CAMARA HUMEDA 1.00 1.00 2.10
VOLUMEN EN CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) AZUL 1.00 10.00 1.33
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) AZUL 1.00 6.30 2.23
MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) VERDE 1.00 10.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) VERDE 1.00 6.40 2.23
MUROS ACERO TRANSVERSAL CAMARA HUMEDA (2) 2.00 9.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (2) 2.00 6.00 2.03
GANCHOS 2.00 6.00 0.20
MUROS ACERO TRANSVERSAL CAMARA SECA (1) 1.00 5.87 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (1) 1.00 6.20 0.73
MUROS ACERO TRANSVERSAL CAMARA SECA (2) 1.00 5.87 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (2) 1.00 6.20 0.73
MUROS ACERO TRANSVERSAL CAMARA SECA (3) 2.00 7.67 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (3) 2.00 6.67 0.93
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 2.00 1.00 2.10
CAMARA HUMEDA EXTERNO 2.00 1.00 2.10
CAMARA HUMEDA INTERNO 2.00 1.00 1.80
CAMARA HUMEDA INTERNO 2.00 1.00 1.80
CAJA DE VALVULAS EXTERNO 2.00 1.00 1.00
CAJA DE VALVULAS EXTERNO 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO 2.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 2.00 1.00 2.10
VOLUMEN 2 CAMARA HUMEDA 2.00 1.00 1.80
VOLUMEN 1 CAJA DE VALVULA 2.00 1.00 1.00
VOLUMEN 2 CAJA DE VALVULA 2.00 1.00 0.60

Err:509 Err:509 Err:509


LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 7.00 2.23
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 10.00 1.50
GANCHO TECHO 2.00 3.40 0.22
LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 3.00 0.85
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 3.40 0.75
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 2.00 0.60
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 5.00 0.20
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.80
CAMARA HUMEDA 4.00 1.00 2.10
CAMARA HUMEDA - TAPA 4.00 1.00
CAMARA HUMEDA - TAPA 4.00 1.00
CAJA DE VALVULAS 1.00 1.00 0.20
CAJA DE VALVULAS 2.00 1.00 1.00
CAJA DE VALVULAS 2.00 1.00 0.80
CAJA DE VALVULAS 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 2.10
CAMARA HUMEDA 1.00 1.00 0.60
CAMARA HUMEDA 2.00 1.00 0.60
CAMARA HUMEDA 2.00 1.00 0.40
CAJA DE VALVULAS 1.00 1.00 0.30
CAJA DE VALVULAS 1.00 1.00 0.80
CAJA DE VALVULAS 2.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.80
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.80
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60


CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 2.10
CAMARA HUMEDA TECHO 1.00 1.00 2.10
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.80
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.80
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 2.10
CAMARA HUMEDA TECHO 1.00 1.00 2.10
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA TECHO 1.00 1.00 0.60


CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 2.10
CAMARA HUMEDA TECHO 1.00 1.00 2.10
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 1.00 0.60
CAJA DE VALVULAS 1.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 2.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 4" - INGRESO DE CAMARA DE REUNION N°02

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA BRIDADA Ø 4" 1.00 1.00


CODO HDF BB 90° Ø 4" 2.00 2.00
NIPLE ACERO SCH-40 BB L=0.40m Ø 4" 1.00 1.00
NIPLE ACERO SCH-40 BB Ll=0.60M Ø 4" 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 4" 1.00 1.00

ACCESORIOS DE 4" - INGRESO DE CAPTACION N°4


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA BRIDADA Ø 4" 1.00 1.00


CODO HDF BB 90° Ø 4" 2.00 2.00
NIPLE F°G° BB L=0.40m Ø 4" 1.00 1.00
NIPLE F°G° BB L=0.60m Ø 4" 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 4" 1.00 1.00

ACCESORIOS DE 6" - SALIDA

DESCRIPCION DIAMET. CANT.

CANASTILLA DE HFD BB Ø 6" 1.00 1.00


NIPLE DE ACERO SCH - 40 BB C/BRA L=0.50m Ø 6" 1.00 1.00
NIPLE DE ACERO SCH - 40 L=0.15m Ø 6" 1.00 1.00
NIPLE DE ACERO SCH - 40 L=0.50m Ø 6" 1.00 1.00
VALVULA COMPUERTA HDF BB Ø 6" 1.00 1.00
UNION TIPO DRESSER Ø 6" 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 6" 1.00 1.00

ACCESORIOS DE 6" - (LIMPIA Y REBOSE)

DESCRIPCION DIAMET. CANT.


Ø 160mm 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CONO DE REBOSE PVC Ø 6" 2.00 2.00


ADAPTADOR F°G° C/R Ø 6" 1.00 1.00
NIPLE PVC L=0.35m Ø 6" 1.00 1.00
UNION F°G° RR Ø 6" 1.00 1.00
NIPLE F°G° RR C/BRA L=0.15m Ø 6" 1.00 1.00
TUBERI PVC - UF Ø 160mm VAR 1.00
CODO PVC - UF 90° Ø 160mm 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.80

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.80
CAMARA HUMEDA 4.00 1.00 1.80
CAMARA HUMEDA 1.00 1.00 1.80

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA DE REUNION 1.00 1.00 2.91

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 2.91
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA DE REUNION 1.00 1.00 1.90
CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


CAMARA DE REUNION 1.00 1.00 1.90
CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


CAMARA DE VALVULA 1.00 1.00 0.15
SALIDA DE REBOCE 1.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00

Err:509 Err:509 Err:509


VOLUMEN

Err:509 Err:509
Err:509 Err:509 Err:509
AREA CAMARA HUMEDA 1.00 1.00 1.90
AREA CAJA DE VALVULAS 1.00 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


VOLUMEN 1.00 1.00 0.30

Err:509 Err:509
Err:509 Err:509 Err:509
LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 8.00 1.73
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 8.00 1.73
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 7.00 0.73
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 6.00 0.93

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 2.00 1.90
CAMARA HUMEDA 1.00 2.00 1.80
CAJA DE VALVULAS 1.00 2.00 1.00
CAJA DE VALVULAS 1.00 2.00 0.80

Err:509 Err:509 Err:509


VOLUMEN EN CAMARA HUMEDA 1.00 1.00 1.90
VOLUMEN EN CAJA DE VALVULA 1.00 1.00 1.00

Err:509 Err:509 Err:509


MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) AZUL 1.00 8.00 1.33
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) AZUL 1.00 6.30 1.73
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

MUROS ACERO TRANSVERSAL CAMARA HUMEDA (1) VERDE 1.00 8.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (1) VERDE 1.00 6.40 1.73
MUROS ACERO TRANSVERSAL CAMARA HUMEDA (2) 2.00 8.00 1.35
MUROS ACERO LONGITUDINAL CAMARA HUMEDA (2) 2.00 6.00 1.73
GANCHOS 2.00 6.00 0.20
MUROS ACERO TRANSVERSAL CAMARA SECA (1) 1.00 5.87 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (1) 1.00 6.20 0.73
MUROS ACERO TRANSVERSAL CAMARA SECA (2) 1.00 5.87 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (2) 1.00 6.20 0.73
MUROS ACERO TRANSVERSAL CAMARA SECA (3) 2.00 7.67 0.78
MUROS ACERO LONGITUDINAL CAMARA SECA (3) 2.00 6.67 0.93

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERNO 2.00 1.00 1.80
CAMARA HUMEDA EXTERNO 2.00 1.00 1.80
CAMARA HUMEDA INTERNO 2.00 1.00 1.50
CAMARA HUMEDA INTERNO 2.00 1.00 1.50
CAJA DE VALVULAS EXTERNO 2.00 1.00 1.00
CAJA DE VALVULAS EXTERNO 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO 2.00 1.00 0.60

Err:509 Err:509 Err:509


VOLUMEN 1 CAMARA HUMEDA 2.00 1.00 1.80
VOLUMEN 2 CAMARA HUMEDA 2.00 1.00 1.50
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VOLUMEN 1 CAJA DE VALVULA 2.00 1.00 1.00


VOLUMEN 2 CAJA DE VALVULA 2.00 1.00 0.60

Err:509 Err:509 Err:509


LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 6.00 1.73
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 8.00 1.20
GANCHO TECHO 2.00 3.40 0.22
LOSA DE FONDO ACERO TRANSVERSAL CAMARA HUMEDA 1.00 3.00 0.60
LOSA DE FONDO ACERO LONGITUDINAL CAMARA HUMEDA 1.00 2.40 0.75
LOSA DE FONDO ACERO TRANSVERSAL CAMARA SECA 1.00 2.33 0.60
LOSA DE FONDO ACERO LONGITUDINAL CAMARA SECA 1.00 5.00 0.20

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.50
CAMARA HUMEDA 4.00 1.00 1.80
CAMARA HUMEDA - TAPA 4.00 1.00
CAMARA HUMEDA - TAPA 4.00 1.00
CAJA DE VALVULAS 1.00 1.00 0.20
CAJA DE VALVULAS 2.00 1.00 1.00
CAJA DE VALVULAS 2.00 1.00 0.80
CAJA DE VALVULAS 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.80
CAMARA HUMEDA 1.00 1.00 0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA 2.00 1.00 0.60


CAMARA HUMEDA 2.00 1.00 0.40
CAJA DE VALVULAS 1.00 1.00 0.30
CAJA DE VALVULAS 1.00 1.00 0.80
CAJA DE VALVULAS 2.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.50
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.50
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.80
CAMARA HUMEDA TECHO 1.00 1.00 1.80
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA INTERNO BASE 1.00 1.00 1.50
CAMARA HUMEDA INTERNO PAREDES 4.00 1.00
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 1.50
CAMARA HUMEDA INTERNO CIELO RAZO 1.00 1.00 -0.60
CAMARA HUMEDA INTERNO PAREDES DE TAPA 4.00 1.00 0.60

Err:509 Err:509 Err:509


CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.80
CAMARA HUMEDA TECHO 1.00 1.00 1.80
CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA HUMEDA EXTERIOR PAREDES 4.00 1.00 1.80
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA TECHO 1.00 1.00 1.80


CAMARA HUMEDA TECHO 1.00 1.00 0.60
CAJA DE VALVULAS INTERNO BASE 1.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS INTERNO PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS INTERNO PAREDES DE TAPA 4.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR PAREDES 2.00 1.00 0.60
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.30
CAJA DE VALVULAS EXTERIOR TECHO 1.00 1.00 0.80
CAJA DE VALVULAS EXTERIOR TECHO 2.00 1.00 0.60

Err:509 Err:509 Err:509


CAJA DE CAPTACIÓN 1.00 1.00 0.60
CAJA DE VALVULAS 1.00 1.00 0.60

Err:509 Err:509
Err:509 Err:509 Err:509
TAPA METALICA 2.00

Err:509 Err:509
Err:509 Err:509 Err:509

ACCESORIOS DE 4" - INGRESO DE CAMARA DE REUNION N°03


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA BRIDADA Ø 6" 1.00 1.00


CODO HDF BB 90° Ø 6" 2.00 2.00
NIPLE ACERO SCH-40 BB L=0.40m Ø 6" 1.00 1.00
NIPLE ACERO SCH-40 BB Ll=0.60M Ø 6" 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 6" 1.00 1.00

ACCESORIOS DE 6" - INGRESO DE CAPTACION N°5

DESCRIPCION DIAMET. CANT.

VALVULA FLOTADORA BRIDADA Ø 63mm 1.00 1.00


CODO HDF BB 90° Ø 2" 2.00 2.00
NIPLE F°G° BB L=0.40m Ø 2" 1.00 1.00
NIPLE F°G° BB L=0.60m Ø 2" 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 2" 1.00 1.00

ACCESORIOS DE 2" - SALIDA

DESCRIPCION DIAMET. CANT.

CANASTILLA DE HFD BB Ø 6" 1.00 1.00


NIPLE DE ACERO SCH - 40 BB C/BRA L=0.50m Ø 6" 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

NIPLE DE ACERO SCH - 40 L=0.15m Ø 6" 1.00 1.00


NIPLE DE ACERO SCH - 40 L=0.50m Ø 6" 1.00 1.00
VALVULA COMPUERTA HDF BB Ø 6" 1.00 1.00
UNION TIPO DRESSER Ø 6" 1.00 1.00
ADAPTADOR BRIDA CAMPANA HDF Ø 6" 1.00 1.00

ACCESORIOS DE 6" - (LIMPIA Y REBOSE)

DESCRIPCION DIAMET. CANT.


Ø 160mm 1.00 1.00
CONO DE REBOSE PVC Ø 6" 2.00 2.00
ADAPTADOR F°G° C/R Ø 6" 1.00 1.00
NIPLE PVC L=0.35m Ø 6" 1.00 1.00
UNION F°G° RR Ø 6" 1.00 1.00
NIPLE F°G° RR C/BRA L=0.15m Ø 6" 1.00 1.00
TUBERI PVC - UF Ø 160mm VAR 1.00
CODO PVC - UF 90° Ø 160mm 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
JUNTA 1.00 1.00 0.80

Err:509 Err:509 Err:509


CAMARA HUMEDA 1.00 1.00 1.50
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA HUMEDA 4.00 1.00 1.50


CAMARA HUMEDA 1.00 1.00 1.50

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Captacion N°1 - reservorio 1.00 1.00 5,953.47
Captacion N°2 - LC 1.00 1.00 5.79
Captacion N°3 - LC 1.00 1.00 4.57
Captacion N°4 - LC 1.00 1.00 2.57
Captacion N°5 - LC 1.00 1.00 21.35

Err:509 Err:509
Err:509 Err:509 Err:509
TRAMO 0+000 - 0+550 EN TERRENO NORMAL 1.00 1.00 266.75
TRAMO 0+790 - 2+380 EN TERRENO NORMAL 1.00 1.00 789.50
TRAMO 2+630 - 3+350 EN TERRENO NORMAL 1.00 1.00 346.48
TRAMO 3+500 - 3+710 EN TERRENO NORMAL 1.00 1.00 105.00
TRAMO 4+010 - 4+920 EN TERRENO NORMAL 1.00 1.00 455.00
TRAMO 5+090 - 5+956.71 EN TERRENO NORMAL 1.00 1.00 431.91
Captacion N°2 - LC 1.00 1.00 1.50
Captacion N°3 - LC 1.00 1.00 2.29
Captacion N°4 - LC 1.00 1.00 1.29
Captacion N°5 - LC 1.00 1.00 10.68
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+550 EN TERRENO NORMAL 1.00 1.00 266.75
TRAMO 0+790 - 2+380 EN TERRENO NORMAL 1.00 1.00 789.50
TRAMO 2+630 - 3+350 EN TERRENO NORMAL 1.00 1.00 346.48
TRAMO 3+500 - 3+710 EN TERRENO NORMAL 1.00 1.00 105.00
TRAMO 4+010 - 4+920 EN TERRENO NORMAL 1.00 1.00 455.00
TRAMO 5+090 - 5+956.71 EN TERRENO NORMAL 1.00 1.00 431.91
Captacion N°2 - LC 1.00 1.00 1.50
Captacion N°3 - LC 1.00 1.00 2.29
Captacion N°4 - LC 1.00 1.00 1.29
Captacion N°5 - LC 1.00 1.00 10.68

Err:509 Err:509 Err:509


TRAMO 0+550 - 0+790 EN TERRENO SEMI ROCOSO 1.00 1.00 240.00
TRAMO 3+710 - 4+010 EN TERRENO SEMI ROCOSO 1.00 1.00 300.00

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+550 EN TERRENO NORMAL 1.00 1.00 266.75
TRAMO 0+790 - 2+380 EN TERRENO NORMAL 1.00 1.00 789.50
TRAMO 2+630 - 3+350 EN TERRENO NORMAL 1.00 1.00 346.48
TRAMO 3+500 - 3+710 EN TERRENO NORMAL 1.00 1.00 105.00
TRAMO 4+010 - 4+920 EN TERRENO NORMAL 1.00 1.00 455.00
TRAMO 5+090 - 5+956.71 EN TERRENO NORMAL 1.00 1.00 431.91
Captacion N°2 - LC 1.00 1.00 1.50
Captacion N°3 - LC 1.00 1.00 2.29
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Captacion N°4 - LC 1.00 1.00 1.29


Captacion N°5 - LC 1.00 1.00 10.68

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+550 EN TERRENO NORMAL 1.00 1.00 533.50
TRAMO 0+550 - 0+790 EN TERRENO SEMI ROCOSO 1.00 1.00 240.00
TRAMO 0+790 - 2+380 EN TERRENO NORMAL 1.00 1.00 1,579.00
TRAMO 2+630 - 3+350 EN TERRENO NORMAL 1.00 1.00 692.95
TRAMO 3+500 - 3+710 EN TERRENO NORMAL 1.00 1.00 210.00
TRAMO 3+710 - 4+010 EN TERRENO SEMI ROCOSO 1.00 1.00 300.00
TRAMO 4+010 - 4+920 EN TERRENO NORMAL 1.00 1.00 910.00
TRAMO 5+090 - 5+956.71 EN TERRENO NORMAL 1.00 1.00 863.81
Captacion N°2 - LC 1.00 1.00 2.99
Captacion N°3 - LC 1.00 1.00 4.57
Captacion N°4 - LC 1.00 1.00 2.57
Captacion N°5 - LC 1.00 1.00 21.35

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+550 EN TERRENO NORMAL 1.00 1.00 533.50
TRAMO 0+550 - 0+790 EN TERRENO SEMI ROCOSO 1.00 1.00 240.00
TRAMO 0+790 - 2+380 EN TERRENO NORMAL 1.00 1.00 1,579.00
TRAMO 2+630 - 3+350 EN TERRENO NORMAL 1.00 1.00 692.95
TRAMO 3+500 - 3+710 EN TERRENO NORMAL 1.00 1.00 210.00
TRAMO 3+710 - 4+010 EN TERRENO SEMI ROCOSO 1.00 1.00 300.00
TRAMO 4+010 - 4+920 EN TERRENO NORMAL 1.00 1.00 910.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TRAMO 5+090 - 5+956.71 EN TERRENO NORMAL 1.00 1.00 863.81


Captacion N°2 - LC 1.00 1.00 2.99
Captacion N°3 - LC 1.00 1.00 4.57
Captacion N°4 - LC 1.00 1.00 2.57
Captacion N°5 - LC 1.00 1.00 21.35

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+550 EN TERRENO NORMAL 1.00 1.00 533.50
TRAMO 0+550 - 0+790 EN TERRENO SEMI ROCOSO 1.00 1.00 240.00
TRAMO 0+790 - 2+380 EN TERRENO NORMAL 1.00 1.00 1,579.00
TRAMO 2+630 - 3+350 EN TERRENO NORMAL 1.00 1.00 692.95
TRAMO 3+500 - 3+710 EN TERRENO NORMAL 1.00 1.00 210.00
TRAMO 3+710 - 4+010 EN TERRENO SEMI ROCOSO 1.00 1.00 300.00
TRAMO 4+010 - 4+920 EN TERRENO NORMAL 1.00 1.00 910.00
TRAMO 5+090 - 5+956.71 EN TERRENO NORMAL 1.00 1.00 863.81
Captacion N°2 - LC 1.00 1.00 2.99
Captacion N°3 - LC 1.00 1.00 4.57
Captacion N°4 - LC 1.00 1.00 2.57
Captacion N°5 - LC 1.00 1.00 21.35

Err:509 Err:509
Err:509 Err:509 Err:509
TRAMO 0+000 - 0+226 1.00 1.00 226.20
TRAMO 0+256 - 0+382 1.00 1.00 126.04
TRAMO 0+407 - 1+831.58 1.00 1.00 1,425.90
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TRAMO 1+855.49 - 2+353.78 1.00 1.00 519.32


TRAMO 2+663.11 - 2+762.92 1.00 1.00 100.22
TRAMO 2+767.92 - 2+909.75 1.00 1.00 142.00
TRAMO 2+914.75 - 3+144.56 1.00 1.00 230.30
TRAMO 3+169.56 - 3+351.17 1.00 1.00 182.02
TRAMO3+503.03 - 5+040.81 1.00 1.00 1,541.83
TRAMO 5+070.87 - 5+650.19 1.00 1.00 583.39
TRAMO 5+665.10 - 5+932.30 1.00 1.00 269.01
TRAMO 0+003.5 - 0+005.79 CAPTACION N°2 - EMPLAME CON LC 1.00 1.00 2.29
TRAMO 0+000 - 0+004.56 CAPTACION N°3 - EMPLAME CON LC 1.00 1.00 4.56
TRAMO 0+000 - 0+002.57 CAPTACION N°4 - EMPLAME CON LC 1.00 1.00 2.57
TRAMO 0+000 - 0+021.34 CAPTACION N°5 - EMPLAME CON LC 1.00 1.00 21.34

Err:509 Err:509 Err:509


TRAMO 0+226 - 0+256 P.A. N°13 1.00 1.00 30.00
TRAMO 0+382 - 0+407 P.A. N°12 1.00 1.00 25.00
TRAMO 1+831.58 - 1+855.49 P.A. N°11 1.00 1.00 25.00
TRAMO 2+353.78 - 2+658.11 1.00 1.00 284.55
TRAMO 2+658.11 - 2+663.11 P.A. N°10 1.00 1.00 5.00
TRAMO 2+762.92 - 2+767.92 P.A. N°09 1.00 1.00 5.00
TRAMO 2+909.75 - 2+914.75 P.A. N°08 1.00 1.00 5.00
TRAMO 3+144.56 - 3+169.56 P.A. N°07 1.00 1.00 25.00
TRAMO 3+351.17 - 3+400.02 1.00 1.00 48.95
TRAMO 3+400.02 - 3+408.02 P.A.N°06 1.00 1.00 8.00
TRAMO 3+408.02 - 3+440.51 1.00 1.00 33.13
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TRAMO 3+440.51 - 3+465.45 P.A. N°05 1.00 1.00 25.00


TRAMO 3+465.45 - 3+503.03 1.00 1.00 37.63
TRAMO 5+040.81 - 5+070.87 P.A.N°04 1.00 1.00 30.00
TRAMO 5+650.19 - 5+665.10 P.A.N°03 1.00 1.00 15.00
TRAMO 5+932.30 - 5+937.57.57 P.A.N°01 1.00 1.00 5.00
TRAMO CAP N°2 - LC 1.00 1.00 3.50

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+226 1.00 1.00 226.20
TRAMO 0+256 - 0+382 1.00 1.00 126.04
TRAMO 0+407 - 1+831.58 1.00 1.00 1,425.90
TRAMO 1+855.49 - 2+353.78 1.00 1.00 519.32
TRAMO 2+663.11 - 2+762.92 1.00 1.00 100.22
TRAMO 2+767.92 - 2+909.75 1.00 1.00 142.00
TRAMO 2+914.75 - 3+144.56 1.00 1.00 230.30
TRAMO 3+169.56 - 3+351.17 1.00 1.00 182.02
TRAMO3+503.03 - 5+040.81 1.00 1.00 1,541.83
TRAMO 5+070.87 - 5+650.19 1.00 1.00 583.39
TRAMO 5+665.10 - 5+932.30 1.00 1.00 269.01
TRAMO 0+003.5 - 0+005.79 CAPTACION N°2 - EMPLAME CON LC 1.00 1.00 2.29
TRAMO 0+000 - 0+004.56 CAPTACION N°3 - EMPLAME CON LC 1.00 1.00 4.56
TRAMO 0+000 - 0+002.57 CAPTACION N°4 - EMPLAME CON LC 1.00 1.00 2.57
TRAMO 0+000 - 0+021.34 CAPTACION N°5 - EMPLAME CON LC 1.00 1.00 21.34

Err:509 Err:509 Err:509


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TRAMO 0+226 - 0+256 P.A. N°13 1.00 1.00 30.00


TRAMO 0+382 - 0+407 P.A. N°12 1.00 1.00 25.00
TRAMO 1+831.58 - 1+855.49 P.A. N°11 1.00 1.00 25.00
TRAMO 2+353.78 - 2+658.11 1.00 1.00 284.55
TRAMO 2+658.11 - 2+663.11 P.A. N°10 1.00 1.00 5.00
TRAMO 2+762.92 - 2+767.92 P.A. N°09 1.00 1.00 5.00
TRAMO 2+909.75 - 2+914.75 P.A. N°08 1.00 1.00 5.00
TRAMO 3+144.56 - 3+169.56 P.A. N°07 1.00 1.00 25.00
TRAMO 3+351.17 - 3+400.02 1.00 1.00 48.95
TRAMO 3+400.02 - 3+408.02 P.A.N°06 1.00 1.00 8.00
TRAMO 3+408.02 - 3+440.51 1.00 1.00 33.13
TRAMO 3+440.51 - 3+465.45 P.A. N°05 1.00 1.00 25.00
TRAMO 3+465.45 - 3+503.03 1.00 1.00 37.63
TRAMO 5+040.81 - 5+070.87 P.A.N°04 1.00 1.00 30.00
TRAMO 5+650.19 - 5+665.10 P.A.N°03 1.00 1.00 15.00
TRAMO 5+932.30 - 5+937.57.57 P.A.N°01 1.00 1.00 5.00
TRAMO CAP N°2 - LC 1.00 1.00 3.50

Err:509 Err:509
Err:509 Err:509 Err:509
2.00 1.00

Err:509 Err:509 Err:509


8.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


29.00 1.00

Err:509 Err:509 Err:509


2.00 1.00

Err:509 Err:509 Err:509


1° TRAMO DE ROCA 3.00 1.00
2° TRAMO DE ROCA 3.00 1.00
3° TRAMO DE ROCA 4.00 1.00

Err:509 Err:509 Err:509


PASE AEREO N°01 2.00 1.00
PASE AEREO N°02 2.00 1.00
PASE AEREO N°03 2.00 1.00
PASE AEREO N°04 2.00 1.00
PASE AEREO N°05 Y 06 2.00 1.00
PASE AEREO N°07 2.00 1.00
PASE AEREO N°08 2.00 1.00
PASE AEREO N°09 2.00 1.00
PASE AEREO N°10 2.00 1.00
PASE AEREO N°11 2.00 1.00
PASE AEREO N°12 2.00 1.00
PASE AEREO N°13 2.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


1.00 1.00

Err:509 Err:509 Err:509


4.00 1.00

Err:509 Err:509 Err:509


8.00 1.00

Err:509 Err:509 Err:509


3.00 1.00

Err:509 Err:509 Err:509


41.00 1.00

Err:509 Err:509 Err:509


50.00

Err:509 Err:509 Err:509


182.00 2.00

Err:509 Err:509 Err:509


1° TRAMO DE ROCA 2.00 1.00
2° TRAMO DE ROCA 2.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

3° TRAMO DE ROCA 3.00 1.00


Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA PARA VALVULA DE AIRE 21.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE VALVULA DE AIRE DN=50mm 21.00 1.00

Err:509 Err:509 Err:509


CAMARA PARA VALVULA DE PURGA 22.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE VALVULA DE PURGA DN=160mm 22.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA ROMPE PRESION 3.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION 3.00 1.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PASE AEREO TIPO II L=20M 2.00 1.00 30.00


PASE AEREO TIPO III L=15M 3.00 1.00 25.00
PASE AEREO TIPO IV L=10M 2.00 1.00 20.00
PASE AEREO TIPO VI L=3.5MM 6.00 1.00 4.00

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
EXCAVACION MANUAL EN ZAPATA IZQUIERDA 2.00 1.00
EXCAVACION MANUAL EN ZAPATA DERECHA 2.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE IZQUIERDO 2.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE DERECHO 2.00 1.00
PASE AEREO TIPO III L=15M
EXCAVACION MANUAL EN ZAPATA IZQUIERDA 3.00 1.00
EXCAVACION MANUAL EN ZAPATA DERECHA 3.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE IZQUIERDO 3.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE DERECHO 3.00 1.00
PASE AEREO TIPO IV L=10M
EXCAVACION MANUAL EN ZAPATA IZQUIERDA 2.00 1.00
EXCAVACION MANUAL EN ZAPATA DERECHA 2.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE IZQUIERDO 2.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE DERECHO 2.00 1.00
PASE AEREO TIPO VI L=3.5MM
EXCAVACION MANUAL PARA DADO IZQUIERDA 6.00 1.00
EXCAVACION MANUAL PARA DADO DERECHA 6.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
RELLENO CON MATERIAL PROPIO IZQUIERDA 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHA 2.00 1.00
RELLENO CON MATERIAL PROPIO IZQUIERDO 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHO 2.00 1.00
PASE AEREO TIPO III L=15M
RELLENO CON MATERIAL PROPIO IZQUIERDA 3.00 1.00
RELLENO CON MATERIAL PROPIO DERECHA 3.00 1.00
RELLENO CON MATERIAL PROPIO IZQUIERDO 3.00 1.00
RELLENO CON MATERIAL PROPIO DERECHO 3.00 1.00
PASE AEREO TIPO IV L=10M
RELLENO CON MATERIAL PROPIO IZQUIERDA 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHA 2.00 1.00
RELLENO CON MATERIAL PROPIO IZQUIERDO 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHO 2.00 1.00
PASE AEREO TIPO VI L=3.5MM
RELLENO CON MATERIAL PROPIO DADO IZQUIERDA 6.00 1.00
RELLENO CON MATERIAL PROPIO DADO DERECHA 6.00 1.00

Err:509 Err:509 Err:509


1.00 1.00
Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PASE AEREO TIPO II L=20M


ZAPATA 2.00 2.00 1.60

PASE AEREO TIPO III L=15M


ZAPATA 2.00 3.00 1.40

PASE AEREO TIPO IV L=10M


ZAPATA 2.00 2.00 1.40

PASE AEREO TIPO VI L=3.5MM


ZAPATA 2.00 6.00 0.40

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
CAMARA DE ANCLAJE 2.00 2.00 1.20

PASE AEREO TIPO III L=15M


CAMARA DE ANCLAJE 2.00 3.00 1.10

PASE AEREO TIPO IV L=10M


CAMARA DE ANCLAJE 2.00 2.00 1.10

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
CAMARA DE ANCLAJE 2.00 2.00 1.20
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PASE AEREO TIPO III L=15M


CAMARA DE ANCLAJE 2.00 3.00 1.10

PASE AEREO TIPO IV L=10M


CAMARA DE ANCLAJE 2.00 2.00 1.10

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 2.00 2.00 1.60
PASE AEREO TIPO III L=15M 2.00 3.00 1.40
PASE AEREO TIPO IV L=10M 2.00 2.00 1.40
PASE AEREO TIPO VI L=3.5MM 2.00 6.00 0.40

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 16.00 4.00 1.52
PASE AEREO TIPO III L=15M 14.00 6.00 1.32
PASE AEREO TIPO IV L=10M 14.00 4.00 1.32
PASE AEREO TIPO VI L=3.5MM
ACERO PRINCIPAL DE COLUMNA 4.00 12.00 0.96
ACERO DE ESTRIBO PARA COLUMNA 4.00 12.00 1.24

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 4.00 2.00 0.25
PASE AEREO TIPO III L=15M 4.00 3.00 0.25
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PASE AEREO TIPO IV L=10M 4.00 2.00 0.25

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
ACERO PRINCIPAL DE COLUMNA 6.00 8.00 4.59
ACERO DE ESTRIBO PARA COLUMNA 26.00 8.00 0.98
PASE AEREO TIPO III L=15M
ACERO PRINCIPAL DE COLUMNA 6.00 12.00 3.79
ACERO DE ESTRIBO PARA COLUMNA 22.00 12.00 0.98
PASE AEREO TIPO IV L=10M
ACERO PRINCIPAL DE COLUMNA 6.00 8.00 3.79
ACERO DE ESTRIBO PARA COLUMNA 22.00 8.00 0.98

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 2.00 8.00
COLUMNA LADO LATERAL 2.00 8.00
PASE AEREO TIPO III L=15M
COLUMNA LADO FROTAL 2.00 12.00
COLUMNA LADO LATERAL 2.00 12.00
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 2.00 8.00
COLUMNA LADO LATERAL 2.00 8.00
PASE AEREO TIPO VI L=3.5MM
LADOS 2.00 12.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 2.00 2.00 0.90
PASE AEREO TIPO III L=15M 2.00 3.00 0.90
PASE AEREO TIPO IV L=10M 2.00 2.00 0.90

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
ACERO PRINCIPAL DE VIGA 6.00 4.00 1.26
ACERO DE ESTRIBO PARA VIGA 7.00 4.00 1.08
PASE AEREO TIPO III L=15M
ACERO PRINCIPAL DE VIGA 6.00 6.00 1.26
ACERO DE ESTRIBO PARA VIGA 7.00 6.00 1.08
PASE AEREO TIPO IV L=10M
ACERO PRINCIPAL DE VIGA 6.00 4.00 1.26
ACERO DE ESTRIBO PARA VIGA 7.00 4.00 1.08

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 1.00 4.00 0.40
PASE AEREO TIPO III L=15M
VIGA LADO FRONTAL 2.00 6.00
VIGA LADO LATERAL 2.00 6.00 0.30
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VIGA BASE 1.00 6.00 0.40


PASE AEREO TIPO IV L=10M
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 1.00 4.00 0.40

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 2.00 8.00
COLUMNA LADO LATERAL 2.00 8.00
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 2.00 4.00 0.40
VIGA SUPERIOR 1.00 4.00 0.90
PASE AEREO TIPO III L=15M
COLUMNA LADO FROTAL 2.00 12.00
COLUMNA LADO LATERAL 2.00 12.00
VIGA LADO FRONTAL 2.00 6.00
VIGA LADO LATERAL 2.00 6.00 0.30
VIGA BASE 2.00 6.00 0.40
VIGA SUPERIOR 1.00 6.00 0.90
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 2.00 8.00
COLUMNA LADO LATERAL 2.00 8.00
VIGA LADO FRONTAL 2.00 4.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VIGA LADO LATERAL 2.00 4.00 0.30


VIGA BASE 2.00 4.00 0.40
VIGA SUPERIOR 1.00 4.00 0.90
PASE AEREO TIPO VI L=3.5MM
LADOS 2.00 12.00
LADO SUPERIOR 1.00 12.00 0.40

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 2.00 8.00
COLUMNA LADO LATERAL 2.00 8.00
PASE AEREO TIPO III L=15M
COLUMNA LADO FROTAL 2.00 12.00
COLUMNA LADO LATERAL 2.00 12.00
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 2.00 8.00
COLUMNA LADO LATERAL 2.00 8.00

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 1.00 4.00 0.40
VIGA SUPERIOR 2.00 4.00 0.90
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PASE AEREO TIPO III L=15M


VIGA LADO FRONTAL 2.00 6.00
VIGA LADO LATERAL 2.00 6.00 0.30
VIGA BASE 1.00 6.00 0.40
VIGA SUPERIOR 2.00 6.00 0.90
PASE AEREO TIPO IV L=10M
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 1.00 4.00 0.40
VIGA SUPERIOR 2.00 4.00 0.90

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 4.00 4.00
COLUMNA LADO LATERAL 4.00 4.00
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 1.00 4.00 0.40
VIGA SUPERIOR 1.00 4.00 0.90
PASE AEREO TIPO III L=15M
COLUMNA LADO FROTAL 4.00 6.00
COLUMNA LADO LATERAL 4.00 6.00
VIGA LADO FRONTAL 2.00 6.00
VIGA LADO LATERAL 2.00 6.00 0.30
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VIGA BASE 1.00 6.00 0.40


VIGA SUPERIOR 1.00 6.00 0.90
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 4.00 4.00
COLUMNA LADO LATERAL 4.00 4.00
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 1.00 4.00 0.40
VIGA SUPERIOR 1.00 4.00 0.90

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 2.00 2.00
PASE AEREO TIPO III L=15M 2.00 3.00
PASE AEREO TIPO IV L=10M 2.00 2.00

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 2.00 2.00
PASE AEREO TIPO III L=15M 2.00 3.00
PASE AEREO TIPO IV L=10M 2.00 2.00

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 2.00 2.00
PASE AEREO TIPO III L=15M 2.00 3.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PASE AEREO TIPO IV L=10M 2.00 2.00

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 1.00 2.00 32.95
PASE AEREO TIPO III L=15M 1.00 3.00 26.37
PASE AEREO TIPO IV L=10M 1.00 2.00 21.67

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 1.00 2.00 32.95
PASE AEREO TIPO III L=15M 1.00 3.00 26.37
PASE AEREO TIPO IV L=10M 1.00 2.00 21.67

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 6.00 2.00
PASE AEREO TIPO III L=15M 6.00 3.00
PASE AEREO TIPO IV L=10M 6.00 2.00

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
PENDOLA 1 1.00 2.00 1.50
PENDOLA 2 2.00 2.00 1.59
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PENDOLA 3 2.00 2.00 1.84


PENDOLA 4 2.00 2.00 2.28
PENDOLA 5 2.00 2.00 2.91
PASE AEREO TIPO III L=15M
PENDOLA 1 2.00 3.00 2.69
PENDOLA 2 2.00 3.00 2.02
PENDOLA 3 2.00 3.00 1.63
PENDOLA 4 1.00 3.00 1.50
PASE AEREO TIPO IV L=10M
PENDOLA 1 1.00 2.00 1.50
PENDOLA 2 2.00 2.00 1.77
PENDOLA 3 2.00 2.00 2.65

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
PENDOLA 1 1.00 2.00 1.50
PENDOLA 2 2.00 2.00 1.59
PENDOLA 3 2.00 2.00 1.84
PENDOLA 4 2.00 2.00 2.28
PENDOLA 5 2.00 2.00 2.91
PASE AEREO TIPO III L=15M
PENDOLA 1 2.00 3.00 2.69
PENDOLA 2 2.00 3.00 2.02
PENDOLA 3 2.00 3.00 1.63
PENDOLA 4 1.00 3.00 1.50
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PASE AEREO TIPO IV L=10M


PENDOLA 1 1.00 2.00 1.50
PENDOLA 2 2.00 2.00 1.77
PENDOLA 3 2.00 2.00 2.65

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 9.00 8.00
PASE AEREO TIPO III L=15M 7.00 12.00
PASE AEREO TIPO IV L=10M 5.00 8.00

Err:509 Err:509
Err:509 Err:509 Err:509
TUBERIA PVC UF ISO 1452 DN = 160 mm. S-10 1.00 1.00 5,376.99
TUBERÍA ACERO SCH-40 UNION BRIDADA DN=160mm 1.00 1.00 610.76

Err:509 Err:509 Err:509


TUBERIA PVC UF ISO 1452 DN = 160 mm. S-10 1.00 1.00 5,376.99
TUBERÍA ACERO SCH-40 UNION BRIDADA DN=160mm 1.00 1.00 610.76

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
Reemplazo de tuberias para conexión de reservorios. 1.00 1.00 38.94
Ingreso a reservorio de concreto 1.00 1.00 10.14
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Empalme a Linea de Aduccion 1.00 1.00 20.23

Err:509 Err:509
Err:509 Err:509 Err:509
Reemplazo de tuberias para conexión de reservorios. 1.00 1.00 38.94
Ingreso a reservorio de concreto 1.00 1.00 10.14
Empalme a Linea de Aduccion 1.00 1.00 20.23

Err:509 Err:509 Err:509


Reemplazo de tuberias para conexión de reservorios. 1.00 1.00 38.94
Ingreso a reservorio de concreto 1.00 1.00 10.14
Empalme a Linea de Aduccion 1.00 1.00 20.23

Err:509 Err:509 Err:509


Reemplazo de tuberias para conexión de reservorios. 1.00 1.00 38.94
Ingreso a reservorio de concreto 1.00 1.00 10.14
Empalme a Linea de Aduccion 1.00 1.00 20.23

Err:509 Err:509 Err:509


Reemplazo de tuberias para conexión de reservorios. 1.00 1.00 38.94
Ingreso a reservorio de concreto 1.00 1.00 10.14
Empalme a Linea de Aduccion 1.00 1.00 20.23

Err:509 Err:509 Err:509


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Reemplazo de tuberias para conexión de reservorios. 38.94


Ingreso a reservorio de concreto 10.14
Empalme a Linea de Aduccion 20.23

Err:509 Err:509
Err:509 Err:509 Err:509
Reemplazo de tuberias para conexión de reservorios. 1.00 1.00 38.94
Ingreso a reservorio de concreto 1.00 1.00 10.14
Empalme a Linea de Aduccion 1.00 1.00 20.23

Err:509 Err:509 Err:509


Reemplazo de tuberias para conexión de reservorios. 1.00 1.00 38.94
Ingreso a reservorio de concreto 1.00 1.00 10.14
Empalme a Linea de Aduccion 1.00 1.00 20.23

Err:509 Err:509
Err:509 Err:509 Err:509
Accesorios 5.00 1.00
Err:509 Err:509 Err:509
Accesorios 2.00 1.00
Err:509 Err:509 Err:509
Accesorios 2.00 1.00
Err:509 Err:509 Err:509
Accesorios 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


Accesorios 2.00 1.00
Err:509 Err:509 Err:509
Accesorios 3.00 1.00
Err:509 Err:509 Err:509
Accesorios 9.00 1.00
Err:509 Err:509 Err:509
Accesorios 6.00 1.00
Err:509 Err:509 Err:509
Accesorios 6.00 1.00
Err:509 Err:509 Err:509
Accesorios 6.00 1.00
Err:509 Err:509
Err:509 Err:509 Err:509
Equipos y accesorios 2.00 1.00
Err:509 Err:509 Err:509
Equipos y accesorios 1.00 1.00
Err:509 Err:509 Err:509
Equipos y accesorios 2.00 1.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Reservorio - Sector C 1.00 1.00 366.78


SECTOR A 1.00 1.00 796.70

Err:509 Err:509
Err:509 Err:509 Err:509
TRAMO 0+000 - 0+336.78 EN TERRENO NORMAL 1.00 1.00 222.98
TRAMO 0+000 - 0+090.22 EN TERRENO NORMAL 1.00 1.00 54.36
TRAMO 0+103.53 - 0+319.11 EN TERRENO NORMAL 1.00 1.00 54.36
TRAMO 0+337.77 - 0+509.07 EN TERRENO NORMAL 1.00 1.00 129.76
TRAMO 0+515.91 - 0+792.05 EN TERRENO NORMAL 1.00 1.00 103.21

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+336.78 EN TERRENO NORMAL 1.00 1.00 148.65
TRAMO 0+000 - 0+090.22 EN TERRENO NORMAL 1.00 1.00 36.24
TRAMO 0+103.53 - 0+319.11 EN TERRENO NORMAL 1.00 1.00 36.24
TRAMO 0+337.77 - 0+509.07 EN TERRENO NORMAL 1.00 1.00 86.50
TRAMO 0+515.91 - 0+792.05 EN TERRENO NORMAL 1.00 1.00 68.81

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+336.78 EN TERRENO NORMAL 1.00 1.00 336.78
TRAMO 0+000 - 0+090.22 EN TERRENO NORMAL 1.00 1.00 90.60
TRAMO 0+103.53 - 0+319.11 EN TERRENO NORMAL 1.00 1.00 90.60
TRAMO 0+337.77 - 0+509.07 EN TERRENO NORMAL 1.00 1.00 216.26
TRAMO 0+515.91 - 0+792.05 EN TERRENO NORMAL 1.00 1.00 172.02
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+336.78 EN TERRENO NORMAL 1.00 1.00 336.78
TRAMO 0+000 - 0+090.22 EN TERRENO NORMAL 1.00 1.00 90.60
TRAMO 0+103.53 - 0+319.11 EN TERRENO NORMAL 1.00 1.00 90.60
TRAMO 0+337.77 - 0+509.07 EN TERRENO NORMAL 1.00 1.00 216.26
TRAMO 0+515.91 - 0+792.05 EN TERRENO NORMAL 1.00 1.00 172.02

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+336.78 EN TERRENO NORMAL 1.00 1.00 336.78
TRAMO 0+000 - 0+090.22 EN TERRENO NORMAL 1.00 1.00 90.60
TRAMO 0+103.53 - 0+319.11 EN TERRENO NORMAL 1.00 1.00 90.60
TRAMO 0+337.77 - 0+509.07 EN TERRENO NORMAL 1.00 1.00 216.26
TRAMO 0+515.91 - 0+792.05 EN TERRENO NORMAL 1.00 1.00 172.02

Err:509 Err:509 Err:509


Eliminacion 1.00 1.00 906.26
Err:509 Err:509
Err:509 Err:509 Err:509
TRAMO 0+000 - 0+336.78 1.00 1.00 371.63
TRAMO 0+000 - 0+080.40 1.00 1.00 80.67
TRAMO 0+115.21 - 0+316.06 1.00 1.00 201.44
TRAMO 0+341.06 - 0+493.60 1.00 1.00 153.23
TRAMO 0+518.60 - 0+788.13 1.00 1.00 273.82
TRAMO 0+798.13 - EMPALME CON LA RED DE DISTRIBUCION 1.00 1.00 8.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


TRAMO 0+080.40 - 0+115.21 1.00 1.00 15.00
TRAMO 0+316.06 - 0+341.06 1.00 1.00 5.00
TRAMO 0+493.60 - 0+518.60 1.00 1.00 15.00
TRAMO 0+788.13 - 0+798.13 1.00 1.00 3.00

Err:509 Err:509 Err:509


TRAMO 0+000 - 0+336.78 1.00 1.00 371.63
TRAMO 0+000 - 0+080.40 1.00 1.00 80.67
TRAMO 0+115.21 - 0+316.06 1.00 1.00 201.44
TRAMO 0+341.06 - 0+493.60 1.00 1.00 153.23
TRAMO 0+518.60 - 0+788.13 1.00 1.00 273.82
TRAMO 0+798.13 - EMPALME CON LA RED DE DISTRIBUCION 1.00 1.00 8.00

Err:509 Err:509 Err:509


TRAMO 0+080.40 - 0+115.21 1.00 1.00 15.00
TRAMO 0+316.06 - 0+341.06 1.00 1.00 5.00
TRAMO 0+493.60 - 0+518.60 1.00 1.00 15.00
TRAMO 0+788.13 - 0+798.13 1.00 1.00 3.00

Err:509 Err:509
Err:509 Err:509 Err:509
2.00 1.00
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

2.00 1.00
Err:509 Err:509 Err:509
PASE AEREO N°14 2.00 1.00
PASE AEREO N°15 2.00 1.00
PASE AEREO N°16 2.00 1.00
PASE AEREO N°17 2.00 1.00

Err:509 Err:509 Err:509


2.00 11.00
Err:509 Err:509 Err:509
DADOS 4.00 1.00
Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA PARA VALVULA DE AIRE 6.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE VALVULA DE AIRE DN=50mm 6.00 1.00

Err:509 Err:509 Err:509


CAMARA PARA VALVULA DE PURGA 5.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE VALVULA DE PURGA DN=160mm 5.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CAMARA PARA VALVULA DE CONTROL 2.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE VALVULA DE CONTROL 2.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA ROMPE PRESION 2.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE ACCESORIOS EN CAMARA ROMPE PRESION 2.00 1.00

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 2.00 1.00 30.00
PASE AEREO TIPO IV L=10M 1.00 1.00 20.00
PASE AEREO TIPO V L=7MM 1.00 1.00 7.00

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
EXCAVACION MANUAL EN ZAPATA IZQUIERDA 2.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

EXCAVACION MANUAL EN ZAPATA DERECHA 2.00 1.00


EXCAVACION MANUAL EN CAMARA DE ANCLAJE IZQUIERDO 2.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE DERECHO 2.00 1.00
PASE AEREO TIPO IV L=10M
EXCAVACION MANUAL EN ZAPATA IZQUIERDA 2.00 1.00
EXCAVACION MANUAL EN ZAPATA DERECHA 2.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE IZQUIERDO 2.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE DERECHO 2.00 1.00
PASE AEREO TIPO V L=7MM
EXCAVACION MANUAL PARA DADO IZQUIERDA 1.00 1.00
EXCAVACION MANUAL PARA DADO DERECHA 1.00 1.00

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
RELLENO CON MATERIAL PROPIO IZQUIERDA 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHA 2.00 1.00
RELLENO CON MATERIAL PROPIO IZQUIERDO 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHO 2.00 1.00
PASE AEREO TIPO IV L=10M
RELLENO CON MATERIAL PROPIO IZQUIERDA 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHA 2.00 1.00
RELLENO CON MATERIAL PROPIO IZQUIERDO 2.00 1.00
RELLENO CON MATERIAL PROPIO DERECHO 2.00 1.00
PASE AEREO TIPO V L=7M
RELLENO CON MATERIAL PROPIO DADO IZQUIERDA 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

RELLENO CON MATERIAL PROPIO DADO DERECHA 1.00 1.00

Err:509 Err:509 Err:509


1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
ZAPATA 2.00 2.00 1.60

PASE AEREO TIPO IV L=10M


ZAPATA 2.00 1.00 1.40

PASE AEREO TIPO V L=7MM


ZAPATA 2.00 1.00 0.50

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
CAMARA DE ANCLAJE 2.00 2.00 1.20

PASE AEREO TIPO IV L=10M


CAMARA DE ANCLAJE 2.00 1.00 1.10

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

CAMARA DE ANCLAJE 2.00 2.00 1.20

PASE AEREO TIPO IV L=10M


CAMARA DE ANCLAJE 2.00 1.00 1.10

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 2.00 2.00 1.60
PASE AEREO TIPO IV L=10M 2.00 1.00 1.40
PASE AEREO TIPO VI L=7MM 2.00 1.00 0.50

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 16.00 2.00 1.52
PASE AEREO TIPO IV L=10M 14.00 2.00 1.32
PASE AEREO TIPO VI L=7MM
ACERO PRINCIPAL DE COLUMNA 4.00 6.00 1.24
ACERO DE ESTRIBO PARA COLUMNA 4.00 2.00 1.64

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 4.00 1.00 0.25
PASE AEREO TIPO IV L=10M 4.00 1.00 0.25

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
ACERO PRINCIPAL DE COLUMNA 8.00 6.00 4.59
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACERO DE ESTRIBO PARA COLUMNA 8.00 26.00 0.98


PASE AEREO TIPO IV L=10M
ACERO PRINCIPAL DE COLUMNA 4.00 6.00 3.79
ACERO DE ESTRIBO PARA COLUMNA 22.00 4.00 0.98

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 4.00 4.00
COLUMNA LADO LATERAL 4.00 4.00
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 2.00 4.00
COLUMNA LADO LATERAL 2.00 4.00
PASE AEREO TIPO VI L=7MM
LADOS 2.00 2.00

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 2.00 2.00 0.90
PASE AEREO TIPO IV L=10M 2.00 1.00 0.90

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
ACERO PRINCIPAL DE VIGA 2.00 6.00 1.26
ACERO DE ESTRIBO PARA VIGA 7.00 2.00 1.08
PASE AEREO TIPO IV L=10M
ACERO PRINCIPAL DE VIGA 2.00 3.00 1.26
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

ACERO DE ESTRIBO PARA VIGA 7.00 1.00 1.08

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
VIGA LADO FRONTAL 2.00 4.00
VIGA LADO LATERAL 2.00 4.00 0.30
VIGA BASE 2.00 2.00 0.40
PASE AEREO TIPO IV L=10M
VIGA LADO FRONTAL 2.00 2.00
VIGA LADO LATERAL 2.00 2.00 0.30
VIGA BASE 2.00 1.00 0.40

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 4.00 4.00
COLUMNA LADO LATERAL 4.00 4.00
VIGA LADO FRONTAL 4.00 2.00
VIGA LADO LATERAL 4.00 2.00 0.30
VIGA BASE 4.00 1.00 0.40
VIGA SUPERIOR 4.00 1.00 0.90
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 2.00 4.00
COLUMNA LADO LATERAL 2.00 4.00
VIGA LADO FRONTAL 2.00 2.00
VIGA LADO LATERAL 2.00 2.00 0.30
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VIGA BASE 2.00 1.00 0.40


VIGA SUPERIOR 2.00 1.00 0.90
PASE AEREO TIPO V L=7M
LADOS 2.00 2.00
LADO SUPERIOR 2.00 1.00 0.50

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 4.00 4.00
COLUMNA LADO LATERAL 4.00 4.00
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 4.00 4.00
COLUMNA LADO LATERAL 4.00 4.00
PASE AEREO TIPO VI L=7M
LADOS 4.00 2.00
LADO SUPERIOR 4.00 1.00 0.40

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
VIGA LADO FRONTAL 4.00 2.00
VIGA LADO LATERAL 4.00 2.00 0.30
VIGA BASE 4.00 1.00 0.40
VIGA SUPERIOR 4.00 1.00 0.90
PASE AEREO TIPO IV L=10M
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

VIGA LADO FRONTAL 2.00 2.00


VIGA LADO LATERAL 2.00 2.00 0.30
VIGA BASE 2.00 1.00 0.40
VIGA SUPERIOR 2.00 1.00 0.90

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
COLUMNA LADO FROTAL 4.00 4.00
COLUMNA LADO LATERAL 4.00 4.00
VIGA LADO FRONTAL 4.00 2.00
VIGA LADO LATERAL 4.00 2.00 0.30
VIGA BASE 4.00 1.00 0.40
VIGA SUPERIOR 4.00 1.00 0.90
PASE AEREO TIPO IV L=10M
COLUMNA LADO FROTAL 2.00 4.00
COLUMNA LADO LATERAL 2.00 4.00
VIGA LADO FRONTAL 2.00 2.00
VIGA LADO LATERAL 2.00 2.00 0.30
VIGA BASE 2.00 1.00 0.40
VIGA SUPERIOR 2.00 1.00 0.90
PASE AEREO TIPO VI L=7M
LADOS 2.00 2.00
LADO SUPERIOR 2.00 1.00 0.50
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 2.00 2.00
PASE AEREO TIPO IV L=10M 2.00 1.00

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 2.00 2.00
PASE AEREO TIPO IV L=10M 2.00 1.00

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 2.00 2.00
PASE AEREO TIPO IV L=10M 2.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M 1.00 2.00 32.95
PASE AEREO TIPO IV L=10M 1.00 1.00 21.67

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 1.00 2.00 32.95
PASE AEREO TIPO IV L=10M 1.00 1.00 21.67

Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 3.00 4.00
PASE AEREO TIPO IV L=10M 3.00 2.00

Err:509 Err:509
Err:509 Err:509 Err:509
PASE AEREO TIPO II L=20M
PENDOLA 1 1.00 2.00 1.50
PENDOLA 2 2.00 2.00 1.59
PENDOLA 3 2.00 2.00 1.84
PENDOLA 4 2.00 2.00 2.28
PENDOLA 5 2.00 2.00 2.91
PASE AEREO TIPO IV L=10M
PENDOLA 1 1.00 1.00 1.50
PENDOLA 2 2.00 1.00 1.77
PENDOLA 3 2.00 1.00 2.65

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M
PENDOLA 1 1.00 2.00 1.50
PENDOLA 2 2.00 2.00 1.59
PENDOLA 3 2.00 2.00 1.84
PENDOLA 4 2.00 2.00 2.28
PENDOLA 5 2.00 2.00 2.91
PASE AEREO TIPO IV L=10M
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PENDOLA 1 1.00 1.00 1.50


PENDOLA 2 2.00 1.00 1.77
PENDOLA 3 2.00 1.00 2.65

Err:509 Err:509 Err:509


PASE AEREO TIPO II L=20M 8.00 9.00
PASE AEREO TIPO IV L=10M 4.00 5.00

Err:509 Err:509
Err:509 Err:509 Err:509
TUBERIA PVC UF ISO 1452 DN = 160 mm. S-10 1.00 1.00 1,126.79

Err:509 Err:509 Err:509


TUBERIA PVC UF ISO 1452 DN = 160 mm. S-10 1.00 1.00 1,126.79

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL
Calle 01/Tramo 01 1.00 1.00 127.25
Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 01/ Tramo 06 1.00 1.00 145.59


Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509
Err:509 Err:509 Err:509
LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL
Calle 01/Tramo 01 1.00 1.00 127.25
Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 04/Tramo 01 1.00 1.00 108.12


Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 04/Tramo 05 1.00 1.00 151.26


Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 01/Tramo 04 1.00 1.00 99.17


Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509
Err:509 Err:509 Err:509
LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle02 /Tramo 01 1.00 1.00 127.97


Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=90mm EN TERR. NORMAL

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 04/Tramo 02 1.00 1.00 128.17


Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509
Err:509 Err:509 Err:509
CODO PVC-UF 45° DN=90 mm 7.00 1.00

Err:509 Err:509 Err:509


REDUCCION 160 x 90 mm 2.00 1.00

Err:509 Err:509 Err:509


TEE DN=90 mm 3.00 1.00

Err:509 Err:509 Err:509


Cruz DN=90 mm 2.00 1.00

Err:509 Err:509 Err:509


Cruz DN=160 x 90 mm 1.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


Union corrediza DN=90 mm 33.00 1.00

Err:509 Err:509 Err:509


TAPON PVC-UF DN=90 mm 2.00 1.00

Err:509 Err:509 Err:509


INSTALACION DE ACCESORIOS 186.00 1.00

Err:509 Err:509 Err:509


DADOS 66.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA PARA VALVULA DE AIRE Ø = 2" 7.00 1.00
CAMARA PARA VALVULA DE AIRE Ø = 3" 5.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO DE VALVULA DE AIRE Ø = 1/2" 7.00 1.00

Err:509 Err:509 Err:509


CAMARA PARA VALVULA DE PURGA DE Ø = 2" 4.00 1.00
CAMARA PARA VALVULA DE PURGA DE Ø = 3" 4.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE Ø = 2" 4.00 1.00

Err:509 Err:509 Err:509


CAMARA PARA VALVULA DE COTROL DN=90 mm 24.00 1.00

Err:509 Err:509 Err:509


SUM. E INST. DE VALVULA DE COTROL DN=90 MM 24.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
EMPALME 1.00 12.00 3.00

Err:509 Err:509 Err:509


CALLE PARALELO CARRETERA CENTRAL SECTOR A 1.00 1.00 108.63
1.00 1.00 94.76
1.00 1.00 99.38
1.00 1.00 151.26
CALLE PARALELO CARRETERA CENTRAL SECTOR B 1.00 1.00 123.71
1.00 1.00 54.79
1.00 1.00 128.17
1.00 1.00 108.12
CALLE PARALELO CARRETERA CENTRAL SECTOR C 1.00 1.00 129.03
1.00 1.00 100.87
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

1.00 1.00 138.41


1.00 1.00 76.15

Err:509 Err:509 Err:509


EMPALME 1.00 12.00 3.00

Err:509 Err:509 Err:509


CALLE PARALELO CARRETERA CENTRAL SECTOR A 1.00 1.00 108.63
1.00 1.00 94.76
1.00 1.00 99.38
1.00 1.00 151.26
CALLE PARALELO CARRETERA CENTRAL SECTOR B 1.00 1.00 123.71
1.00 1.00 54.79
1.00 1.00 128.17
1.00 1.00 108.12
CALLE PARALELO CARRETERA CENTRAL SECTOR C 1.00 1.00 129.03
1.00 1.00 100.87
1.00 1.00 138.41
1.00 1.00 76.15

Err:509 Err:509 Err:509


CALLE PARALELO CARRETERA CENTRAL SECTOR A 1.00 1.00 108.63
1.00 1.00 94.76
1.00 1.00 99.38
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

1.00 1.00 151.26


CALLE PARALELO CARRETERA CENTRAL SECTOR B 1.00 1.00 123.71
1.00 1.00 54.79
1.00 1.00 128.17
1.00 1.00 108.12
CALLE PARALELO CARRETERA CENTRAL SECTOR C 1.00 1.00 129.03
1.00 1.00 100.87
1.00 1.00 138.41
1.00 1.00 76.15

EMPALME 1.00 12.00 3.00

Err:509 Err:509
Err:509 Err:509 Err:509
TUB. PVC UF ISO 1452 90mm C-7.5

Calle 01/Tramo 01 1.00 1.00 127.25


Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 04/Tramo 01 1.00 1.00 108.12


Calle 04/Tramo 02 1.00 1.00 128.17
Calle 04/Tramo 03 1.00 1.00 54.79
Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509 Err:509

TUB. PVC UF ISO 1452 90mm C-7.5


Calle 01/Tramo 01 1.00 1.00 127.25
Calle 01/Tramo 02 1.00 1.00 143.96
Calle 01/Tramo 03 1.00 1.00 164.95
Calle 01/Tramo 04 1.00 1.00 99.17
Calle 01/Tramo 05 1.00 1.00 155.09
Calle 01/ Tramo 06 1.00 1.00 145.59
Calle02 /Tramo 01 1.00 1.00 127.97
Calle 03/Tramo 01 1.00 1.00 116.78
Calle 03/Tramo 02 1.00 1.00 127.98
Calle 04/Tramo 01 1.00 1.00 108.12
Calle 04/Tramo 02 1.00 1.00 128.17
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle 04/Tramo 03 1.00 1.00 54.79


Calle 04/Tramo 04 1.00 1.00 123.71
Calle 04/Tramo 05 1.00 1.00 151.26
Calle 04/Tramo 06 1.00 1.00 99.38
Calle 04/Tramo 07 1.00 1.00 94.76
Calle 04/Tramo 08 1.00 1.00 108.63

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509
LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL

Zona 01
Calle Lon 03/Tramo 01 1.00 1.00 69.95
Calle Lon 03/Tramo 02 1.00 1.00 57.67
Calle Lon 2.5/ Tramos 01 1.00 1.00 128.39
Calle Lon 2.5/ Tramos 02 1.00 1.00 47.25
Calle Trans 01/Tramo 01 1.00 1.00 49.92
Calle Trans 01/Tramo 02 1.00 1.00 19.13
Calle Trans 02/Tramo 01 1.00 1.00 71.03
Calle Trans 02/Tramo 02 1.00 1.00 47.58
Calle Trans 03/Tramo 01 1.00 1.00 49.64
Calle Trans 03/Tramo 02 1.00 1.00 49.43
Calle Trans 04/Tramo 01 1.00 1.00 34.44
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle Trans 04/Tramo 02 1.00 1.00 29.97


Calle Trans 04/Tramo 03 1.00 1.00 47.34
Calle Trans 05/Tramo 01 1.00 1.00 50.09
Calle Trans 05/Tramo 02 1.00 1.00 112.94
Calle Trans 06/Tramo 01 1.00 1.00 128.80
Calle Trans 07/Tramo 01 1.00 1.00 46.12
Calle Trans 08/Tramo 01 1.00 1.00 54.40
Calle Trans 08/Tramo 02 1.00 1.00 48.47
Zona 02
Calle Long 01/ Tramo 02 1.00 1.00 35.46
Calle Long 01/ Tramo 03 1.00 1.00 84.15
Calle Long 01/Tramo 01 1.00 1.00 67.92
Calle Long 01/Tramo 04 1.00 1.00 108.18
Calle Long 02/Tramo 01 1.00 1.00 162.29
Calle Long 02/Tramo 02 1.00 1.00 113.45
Calle Long 2.5/Tramo 01 1.00 1.00 110.74
Calle Long 2.5/Tramo 02 1.00 1.00 117.06
Calle Long 2.5-02/Tramo 01 1.00 1.00 101.85
Calle Long 03/Tramo 01 1.00 1.00 143.58
Calle Long 03/Tramo 02 1.00 1.00 66.91
Calle Long 03/Tramo 03 1.00 1.00 33.12
Calle Long 03/Tramo 04 1.00 1.00 110.48
Calle Long 04/Tramo 01 1.00 1.00 76.15
Calle Long 04/Tramo 02 1.00 1.00 138.41
Calle Long 04/Tramo 03 1.00 1.00 100.87
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle Long 04/Tramo 04 1.00 1.00 129.03


Calle Trans 09/Tramo 01 1.00 1.00 36.24
Calle Trans 09/Tramo 02 1.00 1.00 44.31
Calle Trans 09/Tramo 03 1.00 1.00 38.02
Calle Trans 09/Tramo 04 1.00 1.00 51.08
Calle Trans 09/Tramo 05 1.00 1.00 45.83
Calle Trans 10/Tramo 01 1.00 1.00 45.37
Calle Trans 11/Tramo 01 1.00 1.00 40.97
Calle Trans 11/Tramo 02 1.00 1.00 48.80
Calle Trans 11/Tramo 03 1.00 1.00 56.57
Calle Trans 12/Tramo 01 1.00 1.00 47.08
Calle Trans 13/Tramo 01 1.00 1.00 20.03
Calle Trans 14/Tramo 01 1.00 1.00 64.20
Calle Trans 14/Tramo 03 1.00 1.00 49.59
Calle Trans 14/Trans 02 1.00 1.00 15.46

Err:509 Err:509
Err:509 Err:509 Err:509
LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49

Zona 01
Calle Lon 03/Tramo 01 1.00 1.00 69.95
Calle Lon 03/Tramo 02 1.00 1.00 57.67
Calle Lon 2.5/ Tramos 01 1.00 1.00 128.39
Calle Lon 2.5/ Tramos 02 1.00 1.00 47.25
Calle Trans 01/Tramo 01 1.00 1.00 49.92
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle Trans 01/Tramo 02 1.00 1.00 19.13


Calle Trans 02/Tramo 01 1.00 1.00 71.03
Calle Trans 02/Tramo 02 1.00 1.00 47.58
Calle Trans 03/Tramo 01 1.00 1.00 49.64
Calle Trans 03/Tramo 02 1.00 1.00 49.43
Calle Trans 04/Tramo 01 1.00 1.00 34.44
Calle Trans 04/Tramo 02 1.00 1.00 29.97
Calle Trans 04/Tramo 03 1.00 1.00 47.34
Calle Trans 05/Tramo 01 1.00 1.00 50.09
Calle Trans 05/Tramo 02 1.00 1.00 112.94
Calle Trans 06/Tramo 01 1.00 1.00 128.80
Calle Trans 07/Tramo 01 1.00 1.00 46.12
Calle Trans 08/Tramo 01 1.00 1.00 54.40
Calle Trans 08/Tramo 02 1.00 1.00 48.47
Zona 02
Calle Long 01/ Tramo 02 1.00 1.00 35.46
Calle Long 01/ Tramo 03 1.00 1.00 84.15
Calle Long 01/Tramo 01 1.00 1.00 67.92
Calle Long 01/Tramo 04 1.00 1.00 108.18
Calle Long 02/Tramo 01 1.00 1.00 162.29
Calle Long 02/Tramo 02 1.00 1.00 113.45
Calle Long 2.5/Tramo 01 1.00 1.00 110.74
Calle Long 2.5/Tramo 02 1.00 1.00 117.06
Calle Long 2.5-02/Tramo 01 1.00 1.00 101.85
Calle Long 03/Tramo 01 1.00 1.00 143.58
Calle Long 03/Tramo 02 1.00 1.00 66.91
Calle Long 03/Tramo 03 1.00 1.00 33.12
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Calle Long 03/Tramo 04 1.00 1.00 110.48


Calle Long 04/Tramo 01 1.00 1.00 76.15
Calle Long 04/Tramo 02 1.00 1.00 138.41
Calle Long 04/Tramo 03 1.00 1.00 100.87
Calle Long 04/Tramo 04 1.00 1.00 129.03
Calle Trans 09/Tramo 01 1.00 1.00 36.24
Calle Trans 09/Tramo 02 1.00 1.00 44.31
Calle Trans 09/Tramo 03 1.00 1.00 38.02
Calle Trans 09/Tramo 04 1.00 1.00 51.08
Calle Trans 09/Tramo 05 1.00 1.00 45.83
Calle Trans 10/Tramo 01 1.00 1.00 45.37
Calle Trans 11/Tramo 01 1.00 1.00 40.97
Calle Trans 11/Tramo 02 1.00 1.00 48.80
Calle Trans 11/Tramo 03 1.00 1.00 56.57
Calle Trans 12/Tramo 01 1.00 1.00 47.08
Calle Trans 13/Tramo 01 1.00 1.00 20.03
Calle Trans 14/Tramo 01 1.00 1.00 64.20
Calle Trans 14/Tramo 03 1.00 1.00 49.59
Calle Trans 14/Trans 02 1.00 1.00 15.46

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49
Err:509 Err:509
Err:509 Err:509 Err:509
LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49

Err:509 Err:509 Err:509


LINEA PARA TUB. PVC-UF C-10 NTP ISO 1452 DN=63mm EN TERR. NORMAL 1.00 1.00 3481.49

Err:509 Err:509
Err:509 Err:509 Err:509
CODO PVC-UF 45° DN=63 mm 11.00 1.00

Err:509 Err:509 Err:509


REDUCCION 90 x 63 mm 10.00 1.00
Err:509 Err:509 Err:509
TEE DN=90 x 63 mm 17.00 1.00
Err:509 Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

TEE DN=63 mm 19.00 1.00

Err:509 Err:509 Err:509


Cruz DN=63 mm 1.00 1.00
Err:509 Err:509 Err:509
Cruz DN=90 x 63 mm 5.00 1.00

Err:509 Err:509 Err:509


Union corrediza DN=63 mm 67.00 1.00

Err:509 Err:509 Err:509


TAPON PVC-UF DN=63 mm 6.00 1.00

Err:509 Err:509 Err:509


INSTALACION DE ACCESORIOS 186.00 1.00

Err:509 Err:509 Err:509


DADOS 66.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
CAMARA PARA VALVULA DE AIRE Ø = 2" 7.00 1.00
CAMARA PARA VALVULA DE AIRE Ø = 3" 5.00 1.00

Err:509 Err:509 Err:509


HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

SUMINISTRO DE VALVULA DE AIRE Ø = 1/2" 7.00 1.00

Err:509 Err:509 Err:509


CAMARA PARA VALVULA DE PURGA DE Ø = 2" 4.00 1.00
CAMARA PARA VALVULA DE PURGA DE Ø = 3" 4.00 1.00

Err:509 Err:509 Err:509


SUMINISTRO E INSTALACION DE VALVULA DE PURGA DE Ø = 2" 4.00 1.00

Err:509 Err:509 Err:509


CAMARA PARA VALVULA DE COTROL DN=63 MM 17.00 1.00
CAMARA PARA VALVULA DE COTROL DN=90 mm 24.00 1.00

Err:509 Err:509 Err:509


SUM. E INST. DE VALVULA DE COTROL DN=63 MM 17.00 1.00

Err:509 Err:509 Err:509


CAMARA ´/VALVULA REDUCTORA DE PRESION DN=63 1.00 1.00

Err:509 Err:509 Err:509


ACCESORIOS EN CAMARA REDUCTORA DE PRESION DN=63 1.00 1.00

Err:509 Err:509
Err:509 Err:509 Err:509
EMPALME 1.00 12.00 3.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CALLE PARALELO CARRETERA CENTRAL SECTOR A 1.00 1.00 108.63
1.00 1.00 94.76
1.00 1.00 99.38
1.00 1.00 151.26
CALLE PARALELO CARRETERA CENTRAL SECTOR B 1.00 1.00 123.71
1.00 1.00 54.79
1.00 1.00 128.17
1.00 1.00 108.12
CALLE PARALELO CARRETERA CENTRAL SECTOR C 1.00 1.00 129.03
1.00 1.00 100.87
1.00 1.00 138.41
1.00 1.00 76.15

Err:509 Err:509 Err:509


EMPALME 1.00 12.00 3.00

Err:509 Err:509 Err:509


CALLE PARALELO CARRETERA CENTRAL SECTOR A 1.00 1.00 108.63
1.00 1.00 94.76
1.00 1.00 99.38
1.00 1.00 151.26
CALLE PARALELO CARRETERA CENTRAL SECTOR B 1.00 1.00 123.71
1.00 1.00 54.79
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

1.00 1.00 128.17


1.00 1.00 108.12
CALLE PARALELO CARRETERA CENTRAL SECTOR C 1.00 1.00 129.03
1.00 1.00 100.87
1.00 1.00 138.41
1.00 1.00 76.15

Err:509 Err:509 Err:509


CALLE PARALELO CARRETERA CENTRAL SECTOR A 1.00 1.00 108.63
1.00 1.00 94.76
1.00 1.00 99.38
1.00 1.00 151.26
CALLE PARALELO CARRETERA CENTRAL SECTOR B 1.00 1.00 123.71
1.00 1.00 54.79
1.00 1.00 128.17
1.00 1.00 108.12
CALLE PARALELO CARRETERA CENTRAL SECTOR C 1.00 1.00 129.03
1.00 1.00 100.87
1.00 1.00 138.41
1.00 1.00 76.15

EMPALME 1.00 12.00 3.00

Err:509 Err:509
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


TUB. PVC UF ISO 1452 63mm C-7.5 1.00 1.00 3,481.49
TUB. PVC UF ISO 1452 90mm C-7.5 1.00 1.00 2,302.91

Err:509 Err:509 Err:509


TUB. PVC UF ISO 1452 63mm C-7.5 1.00 1.00 3,481.49
TUB. PVC UF ISO 1452 90mm C-7.5 1.00 1.00 2,302.91

Err:509 Err:509
Err:509 Err:509 Err:509

357.00 1.00

Err:509 Err:509 Err:509


226.00 1.00

Err:509 Err:509 Err:509


106.00 1.00

Err:509 Err:509 Err:509


689.00 1.00
HOJA DE METRAD
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AGUA


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA, PR
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.00 3.00
600.00 600.00
6.00 6.00
6.00 6.00
1.00 1.00
1.00 1.00
175.50 175.50
3.00 3.00
2.00 2.00
15.00 15.00
382.00 382.00
40.00 40.00
5.00 5.00

1.00 1.00
80.00 80.00

3797.59 3797.59
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

40.96
Area=40.96 m2 40.96

40.96
Area=40.96 m2 40.96

1.48
0.10 0.80 1.28
1.00 0.10 0.10
1.00 0.10 0.10

20.81
1.90 1.35 4.87
1.90 0.30 0.09
1.90 0.45 0.17
0.80 0.80 0.54
1.76 Area=5.76 m2 10.14
0.50 1.00 5.00

9.29
1.90 3.61
0.80 0.68
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.50 5.00

1.47
0.29 Area=5.08 m2 1.47

1.98
0.13 Area=5.08 m2 0.66
0.26 Area=5.08 m2 1.32

0.24
0.50 0.80 0.24

0.76
0.15 Area=5.08 m2 0.76

27.06
27.06

4.63
1.90 3.61
0.80 0.68
0.15 0.34
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.01
0.20 0.20 0.01

0.76
0.15 Area=5.08 m2 0.76

3.81
0.75 Area=5.08 m2 3.81

10.16
Area=5.08 m2 5.08
Area=5.08 m2 5.08

12.39
Peso=0.56 kg 0.67
Peso=0.56 kg 0.80
Peso=0.56 kg 5.46
Peso=0.56 kg 5.46

1.38
0.15 0.54
0.15 0.54
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.10 0.16
0.10 0.14

0.78
1.90 0.20 0.06
1.80 0.35 0.13
1.90 0.15 0.53
0.80 0.10 0.07

82.87
Peso=0.56 kg 6.85
Peso=0.56 kg 4.23
Peso=0.56 kg 19.77
Peso=0.56 kg 4.94
Peso=0.56 kg 6.78
Peso=0.56 kg 3.75
Peso=0.56 kg 4.45
Peso=0.56 kg 16.67
Peso=0.56 kg 15.42

33.41
1.10 3.96
1.10 3.96
1.00 3.00
1.00 3.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
1.76 15.84
1.76 0.53

2.41
0.15 1.00 0.54
0.15 1.00 0.45
0.10 0.60 0.10
0.10 0.60 0.06
0.15 1.76 1.19
4.78 Area=0.02 m2 0.07

11.93
2.13 Peso=0.56 kg 5.96
2.13 Peso=0.56 kg 5.96

2.25
1.50 2.25

0.29
1.80 0.10 0.32
0.60 -0.10 -0.04
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

38.21
1.10 3.96
1.10 3.96
1.00 3.00
1.00 3.00
1.50 2.25
1.50 2.25
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.76 15.84
1.76 0.53

19.40
1.00 3.00
1.00 3.00
1.80 3.24
1.10 1.98
1.76 7.92
1.76 0.26
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

19.79
1.10 3.96
1.10 1.98
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.76 7.92
1.76 0.26
1.50 2.25

26.64
1.10 3.96
1.10 3.96
1.80 3.24
0.60 0.96
0.60 0.84
1.76 7.92
Area=5.76 m2 5.76

1.56
0.65 0.85
0.55 0.72
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00

1.00
1.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.70
0.70

8.25
1.00 3.00
1.00 3.00
1.50 2.25

28.22
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

28.22

28.22
1.00 Area=14.11 m2 28.22

28.22
Area=14.11 m2 28.22

36.69
36.69

36.69
1.00 Area=14.11 m2 36.69

24.00
24.00

0.86
0.40 0.60 0.86

1.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.40 1.44

4.10
0.10 Area=40.96 m2 4.10

1.12
1.12

0.86
0.40 0.60 0.86

1.00
1.00

45.54
2.00 45.54

9.00
9.00

24.00
24.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

29.16
Area=29.16 m2 29.16

29.16
Area=29.16 m2 29.16

0.22
0.15 0.60 0.11
0.15 0.60 0.07
0.40 0.10 0.02
0.40 0.05 0.01

9.60
1.10 1.30 1.57
1.10 0.30 0.05
1.10 0.45 0.10
0.70 0.80 0.59
1.48 Area=1.55 m2 2.29
0.50 1.00 5.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

6.95
1.10 1.21
0.70 0.74
0.50 5.00

0.68
0.23 Area=2.96 m2 0.68

1.15
0.15 Area=2.96 m2 0.44
0.24 Area=2.96 m2 0.71

0.24
0.50 0.80 0.24

0.44
0.15 Area=2.96 m2 0.44

12.48
12.48

2.11
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.10 1.21
0.70 0.74
0.15 0.17

0.01
0.20 0.20 0.01

0.44
0.15 Area=2.96 m2 0.44

2.37
0.80 Area=2.96 m2 2.37

5.92
Area=2.96 m2 2.96
Area=2.96 m2 2.96

5.97
Peso=0.56 kg 0.67
Peso=0.56 kg 0.80
Peso=0.56 kg 2.25
Peso=0.56 kg 2.25
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.02
0.15 0.36
0.15 0.36
0.10 0.16
0.10 0.14

0.36
1.10 0.20 0.03
1.10 0.35 0.08
1.10 0.15 0.17
0.70 0.10 0.07

63.01
Peso=0.56 kg 6.85
Peso=0.56 kg 4.23
Peso=0.56 kg 12.99
Peso=0.56 kg 3.53
Peso=0.56 kg 4.84
Peso=0.56 kg 2.25
Peso=0.56 kg 2.67
Peso=0.56 kg 13.64
Peso=0.56 kg 12.00

25.03
1.10 2.64
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.10 2.64
1.00 1.80
1.00 1.80
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
1.71 12.52
1.71 0.51

1.23
0.15 1.05 0.32
0.15 1.05 0.22
0.10 0.60 0.12
0.10 0.60 0.05
0.15 1.48 0.49
2.34 Area=0.02 m2 0.04

5.17
Peso=0.56 kg 2.59
Peso=0.56 kg 2.59

0.81
0.90 0.81
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.03
1.00 0.05 0.05
0.60 -0.05 -0.02

26.95
1.10 2.64
1.10 2.64
1.00 1.80
1.00 1.80
0.90 0.81
0.90 0.81
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.71 12.52
1.71 0.51

12.88
1.00 1.80
1.00 1.80
1.20 1.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.10 1.32
1.71 6.26
1.71 0.26

14.71
1.10 2.64
1.10 1.32
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.71 6.26
1.71 0.26
0.90 0.81

18.29
1.10 2.64
1.10 2.64
1.20 1.44
0.60 0.96
0.60 0.84
1.71 6.26
Area=3.51 m2 3.51
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.56
0.65 0.85
0.55 0.72

1.00
1.00

1.00
1.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.70
0.70

4.41
1.00 1.80
1.00 1.80
0.90 0.81
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

35.90
16.94
18.96

35.90
1.00 Area=16.94 m2 16.94
1.00 Area=18.96 m2 18.96

35.90
Area=16.94 m2 16.94
Area=18.96 m2 18.96

46.67
46.67

35.90
1.00 Area=16.94 m2 16.94
1.00 Area=18.96 m2 18.96

20.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

20.00

0.86
0.40 0.60 0.86

1.44
0.40 1.44

2.92
0.10 Area=29.16 m2 2.92

1.12
1.12

0.86
0.40 0.60 0.86

1.00
1.00

37.54
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00 37.54

9.00
9.00

20.00
20.00

60.16
Area=60.16 m2 60.16

60.16
Area=60.16 m2 60.16

1.48
0.10 0.80 1.28
1.00 0.10 0.10
1.00 0.10 0.10

11.55
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.30 1.35 2.28


1.30 0.30 0.06
1.30 0.45 0.12
0.80 0.80 0.54
1.48 Area=2.40 m2 3.55
0.50 1.00 5.00

7.37
1.30 1.69
0.80 0.68
0.50 5.00

0.10
0.05 Area=1.98 m2 0.10

1.09
0.30 Area=1.98 m2 0.59
0.25 Area=1.98 m2 0.50

0.24
0.50 0.80 0.24

0.30
0.15 Area=1.98 m2 0.30
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

15.02
15.02

2.58
1.30 1.69
0.80 0.68
0.15 0.21

0.01
0.20 0.20 0.01

0.30
0.15 Area=1.98 m2 0.30

1.23
0.62 Area=1.98 m2 1.23

3.96
Area=1.98 m2 1.98
Area=1.98 m2 1.98

5.97
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Peso=0.56 kg 0.67
Peso=0.56 kg 0.80
Peso=0.56 kg 2.25
Peso=0.56 kg 2.25

1.02
0.15 0.36
0.15 0.36
0.10 0.16
0.10 0.14

0.44
1.30 0.20 0.04
1.30 0.35 0.09
1.30 0.15 0.24
0.80 0.10 0.07

56.58
Peso=0.56 kg 6.85
Peso=0.56 kg 4.23
Peso=0.56 kg 13.08
Peso=0.56 kg 3.53
Peso=0.56 kg 4.84
Peso=0.56 kg 2.25
Peso=0.56 kg 2.67
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Peso=0.56 kg 10.55
Peso=0.56 kg 8.57

20.79
1.10 2.64
1.10 2.64
1.00 1.80
1.00 1.80
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
1.48 8.35
1.48 0.44

1.46
0.15 1.00 0.36
0.15 1.00 0.27
0.10 0.60 0.10
0.10 0.60 0.06
0.15 1.48 0.63
2.98 Area=0.02 m2 0.04

8.62
1.54 Peso=0.56 kg 4.31
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.54 Peso=0.56 kg 4.31

0.81
0.90 0.81

0.11
1.20 0.10 0.14
0.60 -0.10 -0.04

22.71
1.10 2.64
1.10 2.64
1.00 1.80
1.00 1.80
0.90 0.81
0.90 0.81
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.48 8.35
1.48 0.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

10.76
1.00 1.80
1.00 1.80
1.20 1.44
1.10 1.32
1.48 4.17
1.48 0.22

12.59
1.10 2.64
1.10 1.32
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.48 4.17
1.48 0.22
0.90 0.81

15.09
1.10 2.64
1.10 2.64
1.20 1.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.96
0.60 0.84
1.48 4.17
Area=2.40 m2 2.40

1.56
0.65 0.85
0.55 0.72

1.00
1.00

1.00
1.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.70
0.70
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

4.41
1.00 1.80
1.00 1.80
0.90 0.81

15.00
15.00

0.67
0.40 0.60 0.67

1.12
0.40 1.12

6.02
0.10 Area=60.16 m2 6.02

0.87
0.87
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.67
0.40 0.60 0.67

1.00
1.00

27.54
2.00 27.54

7.00
7.00

15.00
15.00

84.60
Area=84.60 m2 84.60

84.60
Area=84.60 m2 84.60
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.48
0.10 0.80 1.28
1.00 0.10 0.10
1.00 0.10 0.10

26.59
2.70 1.35 9.84
2.70 0.30 0.12
2.70 0.45 0.24
0.80 0.80 0.61
1.53 Area=7.04 m2 10.77
0.50 1.00 5.00

13.05
2.70 7.29
0.80 0.76
0.50 5.00

1.72
0.27 Area=6.36 m2 1.72

2.48
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.13 Area=6.36 m2 0.83


0.26 Area=6.36 m2 1.65

0.24
0.50 0.80 0.24

0.95
0.15 Area=6.36 m2 0.95

34.56
34.56

8.39
2.70 7.29
0.80 0.76
0.15 0.34

0.01
0.20 0.20 0.01

0.95
0.15 Area=6.36 m2 0.95
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

5.28
0.83 Area=6.36 m2 5.28

12.72
Area=6.36 m2 6.36
Area=6.36 m2 6.36

23.18
Peso=0.56 kg 0.67
Peso=0.56 kg 0.80
Peso=0.56 kg 10.86
Peso=0.56 kg 10.86

1.88
0.15 0.78
0.15 0.78
0.10 0.18
0.10 0.14

1.38
2.70 0.20 0.08
2.70 0.35 0.19
2.60 0.15 1.03
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 0.10 0.08

102.63
Peso=0.56 kg 6.85
Peso=0.56 kg 4.23
Peso=0.56 kg 28.73
Peso=0.56 kg 7.50
Peso=0.56 kg 9.80
Peso=0.56 kg 6.00
Peso=0.56 kg 7.21
Peso=0.56 kg 16.67
Peso=0.56 kg 15.62

40.28
1.10 5.72
1.10 5.72
1.00 4.60
1.00 4.60
0.60 1.08
0.60 0.84
0.60 0.84
0.60 0.60
1.75 15.75
1.75 0.53
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.75
0.15 1.00 0.78
0.15 1.00 0.69
0.10 0.60 0.11
0.10 0.60 0.06
0.15 1.53 1.03
5.58 Area=0.02 m2 0.08

26.34
2.94 Peso=0.56 kg 13.17
2.94 Peso=0.56 kg 13.17

5.29
2.30 5.29

0.64
2.60 0.10 0.68
0.60 -0.10 -0.04

51.21
1.10 5.72
1.10 5.72
1.00 4.60
1.00 4.60
2.30 5.29
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.30 5.29
0.60 1.08
0.60 0.84
0.60 0.84
0.60 0.60
0.50 0.35
1.75 15.75
1.75 0.53

26.96
1.00 4.60
1.00 4.60
2.60 6.76
1.10 2.86
1.75 7.88
1.75 0.26

25.72
1.10 5.72
1.10 2.86
0.60 1.08
0.60 0.84
0.60 0.84
0.60 0.60
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.50 0.35
1.75 7.88
1.75 0.26
2.30 5.29

35.04
1.10 5.72
1.10 5.72
2.60 6.76
0.60 1.08
0.60 0.84
1.75 7.88
Area=7.04 m2 7.04

1.67
0.65 0.85
0.55 0.83

1.00
1.00

1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.70
0.70

14.49
1.00 4.60
1.00 4.60
2.30 5.29

18.00
18.00

0.58
0.40 0.60 0.58
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.96
0.40 0.96

8.46
0.10 Area=84.60 m2 8.46

0.75
0.75

0.58
0.40 0.60 0.58

36.00
2.00 36.00

6.00
6.00

18.00
18.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

40.96
Area=40.96 m2 40.96

40.96
Area=40.96 m2 40.96

1.48
0.10 0.80 1.28
1.00 0.10 0.10
1.00 0.10 0.10

13.21
1.50 1.35 3.04
1.50 0.30 0.07
1.50 0.45 0.14
0.80 0.80 0.54
1.49 Area=2.97 m2 4.43
0.50 1.00 5.00

7.93
1.50 2.25
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 0.68
0.50 5.00

0.28
0.11 Area=2.50 m2 0.28

0.85
0.11 Area=2.50 m2 0.28
0.23 Area=2.50 m2 0.58

0.24
0.50 0.80 0.24

0.63
0.25 Area=2.50 m2 0.63

17.17
17.17

3.16
1.50 2.25
0.80 0.68
0.15 0.23
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.01
0.20 0.20 0.01

0.38
0.15 Area=2.50 m2 0.38

1.50
0.60 Area=2.50 m2 1.50

5.00
Area=2.50 m2 2.50
Area=2.50 m2 2.50

8.46
Peso=0.56 kg 0.67
Peso=0.56 kg 0.80
Peso=0.56 kg 3.49
Peso=0.56 kg 3.49

1.14
0.15 0.42
0.15 0.42
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.10 0.16
0.10 0.14

0.54
1.50 0.20 0.05
1.50 0.35 0.11
1.50 0.15 0.33
0.80 0.10 0.07

65.49
Peso=0.56 kg 6.85
Peso=0.56 kg 4.23
Peso=0.56 kg 15.51
Peso=0.56 kg 4.23
Peso=0.56 kg 5.91
Peso=0.56 kg 3.00
Peso=0.56 kg 3.56
Peso=0.56 kg 11.89
Peso=0.56 kg 10.28

23.30
1.10 3.08
1.10 3.08
1.00 2.20
1.00 2.20
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
1.48 9.18
1.48 0.44

1.65
0.15 1.00 0.42
0.15 1.00 0.33
0.10 0.60 0.10
0.10 0.60 0.06
0.15 1.49 0.69
3.38 Area=0.02 m2 0.05

7.75
1.73 Peso=0.56 kg 3.88
1.73 Peso=0.56 kg 3.88

1.21
1.10 1.21

0.16
1.40 0.10 0.20
0.60 -0.10 -0.04
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

26.02
1.10 3.08
1.10 3.08
1.00 2.20
1.00 2.20
1.10 1.21
1.10 1.21
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.48 9.18
1.48 0.44

12.71
1.00 2.20
1.00 2.20
1.40 1.96
1.10 1.54
1.48 4.59
1.48 0.22
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

14.06
1.10 3.08
1.10 1.54
0.60 0.96
0.60 0.84
0.60 0.72
0.60 0.60
0.50 0.30
1.48 4.59
1.48 0.22
1.10 1.21

21.55
1.10 3.08
1.10 3.08
1.40 1.96
0.60 0.96
0.60 0.84
1.48 4.59
Area=7.04 m2 7.04

1.56
0.65 0.85
0.55 0.72
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00

1.00
1.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.70
0.70

5.61
1.00 2.20
1.00 2.20
1.10 1.21
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

24.00
24.00

0.86
0.40 0.60 0.86

1.44
0.40 1.44

4.10
0.10 Area=40.96 m2 4.10

1.12
1.12

0.86
0.40 0.60 0.86

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

45.54
2.00 45.54

9.00
9.00

24.00
24.00

3.78
1.50 3.78

3.78
1.50 3.78

2.40
1.50 0.75 1.80
0.80 0.75 0.60
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.80
1.50 0.75 1.80
0.80 0.75

0.25
0.15 0.40 0.01
0.50 0.80 0.24

0.25
1.15. Vol=0.25 m3 0.25

2.40
Area=2.40 m2 2.40

3.22
1.61 2.42
0.80 0.80

0.01
0.20 0.20 0.01

17.20
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Peso=0.56 kg 5.61
Peso=0.56 kg 5.61
Peso=0.56 kg 2.86
Peso=0.56 kg 3.12

1.50
0.15 0.48
0.15 0.48
0.15 0.30
0.15 0.24

0.50
1.60 0.15 0.38
0.80 0.15 0.12

66.03
Peso=0.56 kg 5.19
Peso=0.56 kg 5.05
Peso=0.56 kg 5.29
Peso=0.56 kg 5.13
Peso=0.56 kg 10.58
Peso=0.56 kg 9.61
Peso=0.56 kg 1.34
Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
Peso=0.56 kg 6.70
Peso=0.56 kg 6.94

14.64
1.00 3.00
1.00 3.00
1.00 2.40
1.00 2.40
0.60 1.20
0.60 0.96
0.60 0.96
0.60 0.72

1.00
0.15 1.00 0.45
0.15 1.00 0.36
0.10 0.60 0.12
0.10 0.60 0.07

10.31
Peso=0.56 kg 3.20
Peso=0.56 kg 3.53
Peso=0.56 kg 0.84
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Peso=0.56 kg 0.76
Peso=0.56 kg 0.76
Peso=0.56 kg 0.67
Peso=0.56 kg 0.56

3.62
1.20 1.44
0.10 0.60
0.65 0.20 0.52
0.85 0.10 0.34
0.60 0.12
0.10 0.20
0.10 0.16
0.10 0.24

0.25
1.50 0.10 0.23
0.60 -0.10 -0.04
0.10 0.10 0.01
0.10 0.10 0.01
0.80 0.10 0.02
0.10 0.10 0.01
0.10 0.10 0.01
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

22.11
1.20 1.44
1.20 1.00 4.80
1.20 1.44
0.60 -0.36
0.20 0.48
1.20 7.20
1.50 2.25
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

7.80
1.20 1.44
1.20 1.00 4.80
1.20 1.44
0.60 -0.36
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.20 0.48

13.86
1.20 7.20
1.20 1.80
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

13.86
1.20 7.20
1.20 1.80
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

0.72
0.60 0.36
0.60 0.36

2.00
2.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80
0.80

7.68
1.20 1.44
1.00 4.80
1.20 1.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.78
1.50 3.78

3.78
1.50 3.78

2.40
1.50 0.75 1.80
0.80 0.75 0.60

1.80
1.50 0.75 1.80
0.80 0.75

0.25
0.15 0.40 0.01
0.50 0.80 0.24

0.25
1.15. Vol=0.25 m3 0.25

2.40
Area=2.40 m2 2.40
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.22
1.61 2.42
0.80 0.80

0.01
0.20 0.20 0.01

17.20
Peso=0.56 kg 5.61
Peso=0.56 kg 5.61
Peso=0.56 kg 2.86
Peso=0.56 kg 3.12

1.50
0.15 0.48
0.15 0.48
0.15 0.30
0.15 0.24

0.50
1.60 0.15 0.38
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 0.15 0.12

66.03
Peso=0.56 kg 5.19
Peso=0.56 kg 5.05
Peso=0.56 kg 5.29
Peso=0.56 kg 5.13
Peso=0.56 kg 10.58
Peso=0.56 kg 9.61
Peso=0.56 kg 1.34
Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
Peso=0.56 kg 6.70
Peso=0.56 kg 6.94

14.64
1.00 3.00
1.00 3.00
1.00 2.40
1.00 2.40
0.60 1.20
0.60 0.96
0.60 0.96
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.72

1.00
0.15 1.00 0.45
0.15 1.00 0.36
0.10 0.60 0.12
0.10 0.60 0.07

10.31
Peso=0.56 kg 3.20
Peso=0.56 kg 3.53
Peso=0.56 kg 0.84
Peso=0.56 kg 0.76
Peso=0.56 kg 0.76
Peso=0.56 kg 0.67
Peso=0.56 kg 0.56

3.62
1.20 1.44
0.10 0.60
0.65 0.20 0.52
0.85 0.10 0.34
0.60 0.12
0.10 0.20
0.10 0.16
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.10 0.24

0.25
1.50 0.10 0.23
0.60 -0.10 -0.04
0.10 0.10 0.01
0.10 0.10 0.01
0.80 0.10 0.02
0.10 0.10 0.01
0.10 0.10 0.01

22.11
1.20 1.44
1.20 1.00 4.80
1.20 1.44
0.60 -0.36
0.20 0.48
1.20 7.20
1.50 2.25
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

7.80
1.20 1.44
1.20 1.00 4.80
1.20 1.44
0.60 -0.36
0.20 0.48

13.86
1.20 7.20
1.20 1.80
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.10 0.12

13.86
1.20 7.20
1.20 1.80
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

0.72
0.60 0.36
0.60 0.36

2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80

7.68
1.20 1.44
1.00 4.80
1.20 1.44

6.74
2.10 6.74

6.74
2.10 6.74

4.07
2.10 0.75 3.47
0.80 0.75 0.60

4.07
2.10 0.75 3.47
0.80 0.75 0.60
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.25
0.15 0.40 0.01
0.50 0.80 0.24

0.25
1.15. Vol=0.25 m3 0.25

4.07
Area=4.07 m2 4.07

5.42
2.10 4.62
0.80 0.80

0.01
0.20 0.20 0.01

28.59
Peso=0.56 kg 11.37
Peso=0.56 kg 11.24
Peso=0.56 kg 2.86
Peso=0.56 kg 3.12
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.83
0.15 0.63
0.15 0.66
0.15 0.30
0.15 0.24

0.81
2.20 0.15 0.69
0.80 0.15 0.12

83.27
Peso=0.56 kg 7.42
Peso=0.56 kg 7.87
Peso=0.56 kg 7.56
Peso=0.56 kg 7.99
Peso=0.56 kg 13.61
Peso=0.56 kg 13.64
Peso=0.56 kg 1.34
Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
Peso=0.56 kg 6.70
Peso=0.56 kg 6.94
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

19.44
1.00 4.20
1.00 4.20
1.00 3.60
1.00 3.60
0.60 1.20
0.60 0.96
0.60 0.96
0.60 0.72

1.36
0.15 1.00 0.63
0.15 1.00 0.54
0.10 0.60 0.12
0.10 0.60 0.07

22.07
Peso=0.56 kg 8.74
Peso=0.56 kg 8.40
Peso=0.56 kg 0.84
Peso=0.56 kg 1.43
Peso=0.56 kg 1.43
Peso=0.56 kg 0.67
Peso=0.56 kg 0.56
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

5.62
1.80 3.24
0.10 0.84
0.60 0.20 0.48
0.85 0.10 0.34
0.60 0.12
0.10 0.20
0.10 0.16
0.10 0.24

0.47
2.10 0.10 0.44
0.60 -0.10 -0.04
0.10 0.10 0.01
0.10 0.10 0.01
0.80 0.10 0.02
0.10 0.10 0.01
0.10 0.10 0.01

33.15
1.80 3.24
1.80 1.00 7.20
1.80 3.24
0.60 -0.36
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.20 0.48
1.20 10.08
2.10 4.41
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

13.80
1.80 3.24
1.80 1.00 7.20
1.80 3.24
0.60 -0.36
0.20 0.48

19.35
1.20 10.08
2.10 4.41
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

17.46
1.20 10.08
1.20 2.52
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.72
0.60 0.36
0.60 0.36

2.00
2.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80
0.80

13.68
1.80 3.24
1.00 7.20
1.80 3.24

5.24
1.80 5.24

5.24
1.80 5.24
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.17
1.80 0.75 2.57
0.80 0.75 0.60

3.17
1.80 0.75 2.57
0.80 0.75 0.60

0.25
0.15 0.40 0.01
0.50 0.80 0.24

0.25
1.15. Vol=0.25 m3 0.25

3.17
Area=3.17 m2 3.17

4.22
1.80 3.42
0.80 0.80
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.01
0.20 0.20 0.01

21.49
Peso=0.56 kg 7.75
Peso=0.56 kg 7.75
Peso=0.56 kg 2.86
Peso=0.56 kg 3.12

1.65
0.15 0.57
0.15 0.54
0.15 0.30
0.15 0.24

0.63
1.80 0.15 0.51
0.80 0.15 0.12

73.19
Peso=0.56 kg 5.94
Peso=0.56 kg 6.10
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Peso=0.56 kg 6.05
Peso=0.56 kg 6.20
Peso=0.56 kg 12.10
Peso=0.56 kg 11.63
Peso=0.56 kg 1.34
Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
Peso=0.56 kg 2.56
Peso=0.56 kg 2.53
Peso=0.56 kg 6.70
Peso=0.56 kg 6.94

17.04
1.00 3.60
1.00 3.60
1.00 3.00
1.00 3.00
0.60 1.20
0.60 0.96
0.60 0.96
0.60 0.72

1.18
0.15 1.00 0.54
0.15 1.00 0.45
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.10 0.60 0.12


0.10 0.60 0.07

15.39
Peso=0.56 kg 5.81
Peso=0.56 kg 5.38
Peso=0.56 kg 0.84
Peso=0.56 kg 1.01
Peso=0.56 kg 1.01
Peso=0.56 kg 0.78
Peso=0.56 kg 0.56

4.51
1.50 2.25
0.10 0.72
0.60 0.20 0.48
0.85 0.10 0.34
0.60 0.12
0.10 0.20
0.10 0.16
0.10 0.24

0.35
1.80 0.10 0.32
0.60 -0.10 -0.04
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.10 0.10 0.01


0.10 0.10 0.01
0.80 0.10 0.02
0.10 0.10 0.01
0.10 0.10 0.01

27.36
1.50 2.25
1.50 1.00 6.00
1.50 2.25
0.60 -0.36
0.20 0.48
1.20 8.64
1.80 3.24
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

10.62
1.50 2.25
1.50 1.00 6.00
1.50 2.25
0.60 -0.36
0.20 0.48

16.74
1.20 8.64
1.80 3.24
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

16.74
1.20 8.64
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.80 3.24
-0.60 -0.36
0.60 0.48
0.60 0.96
0.60 0.72
0.10 0.24
0.85 1.36
0.85 1.02
0.80 0.24
0.10 0.08
0.10 0.12

0.72
0.60 0.36
0.60 0.36

2.00
2.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80
0.80

10.50
1.50 2.25
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00 6.00
1.50 2.25

58295.19 58295.19

5987.75
5,953.47
5.79
4.57
2.57
21.35

2410.37
266.75
789.50
346.48
105.00
455.00
431.91
1.50
2.29
1.29
10.68
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2410.37
266.75
789.50
346.48
105.00
455.00
431.91
1.50
2.29
1.29
10.68

540.00
240.00
300.00

2410.37
266.75
789.50
346.48
105.00
455.00
431.91
1.50
2.29
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.29
10.68

5360.74
533.50
240.00
1,579.00
692.95
210.00
300.00
910.00
863.81
2.99
4.57
2.57
21.35

5360.74
533.50
240.00
1,579.00
692.95
210.00
300.00
910.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

863.81
2.99
4.57
2.57
21.35

5360.74
533.50
240.00
1,579.00
692.95
210.00
300.00
910.00
863.81
2.99
4.57
2.57
21.35

5376.99
226.20
126.04
1,425.90
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

519.32
100.22
142.00
230.30
182.02
1,541.83
583.39
269.01
2.29
4.56
2.57
21.34

610.76
30.00
25.00
25.00
284.55
5.00
5.00
5.00
25.00
48.95
8.00
33.13
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

25.00
37.63
30.00
15.00
5.00
3.50

5376.99
226.20
126.04
1,425.90
519.32
100.22
142.00
230.30
182.02
1,541.83
583.39
269.01
2.29
4.56
2.57
21.34

610.76
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

30.00
25.00
25.00
284.55
5.00
5.00
5.00
25.00
48.95
8.00
33.13
25.00
37.63
30.00
15.00
5.00
3.50

2.00
2.00

8.00
8.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

29.00
29.00

2.00
2.00

10.00
3.00
3.00
4.00

24.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00

4.00
4.00

8.00
8.00

3.00
3.00

41.00
41.00

50.00
50.00

364.00
364.00

7.00
2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.00

21.00
21.00

21.00
21.00

22.00
22.00

22.00
22.00

3.00
3.00

3.00
3.00

597.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.00 180.00
3.00 225.00
3.00 120.00
3.00 72.00

96.98

1.60 Area=3.32 m2 10.62


1.60 Area=3.54 m2 11.33
1.20 Area=3.17 m2 7.61
1.20 Area=2.47 m2 5.93

1.40 Area=2.90 m2 12.18


1.40 Area=2.48 m2 10.42
1.10 Area=2.41 m2 7.95
1.10 Area=1.75 m2 5.78

1.40 Area=2.46 m2 6.89


1.40 Area=3.06 m2 8.57
1.10 Area=1.55 m2 3.41
1.10 Area=1.95 m2 4.29

0.40 Area=0.35 m2 0.84


0.50 Area=0.39 m2 1.17
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

59.28

1.60 Area=1.53 m2 6.36


1.60 Area=1.71 m2 7.11
1.20 Area=1.63 m2 5.09
1.20 Area=0.92 m2 2.87

1.40 Area=1.51 m2 8.24


1.40 Area=1.18 m2 6.44
1.10 Area=1.30 m2 5.58
1.10 Area=0.65 m2 2.79

1.40 Area=1.16 m2 4.22


1.40 Area=1.69 m2 6.15
1.10 Area=0.45 m2 1.29
1.10 Area=0.85 m2 2.43

0.50 Area=0.07 m2 0.27


0.50 Area=0.11 m2 0.43

49.01
37.70 49.01

31.76
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.60 10.24

1.40 11.76

1.40 7.84

0.40 1.92

19.01

1.20 1.20 6.91

1.10 1.00 7.26

1.10 1.00 4.84

17.86

1.20 5.76
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.10 7.26

1.10 4.84

21.10
1.60 0.80 8.19
1.40 0.60 7.06
1.40 0.60 4.70
0.40 0.60 1.15

496.92
Ø5/8 1.55 kg 150.98
Ø5/8 1.55 kg 172.09
Ø5/8 1.55 kg 114.72

Ø3/8 0.56 kg 25.80


Ø3/8 0.56 kg 33.33

5.82
0.30 3.20 1.92
0.30 2.60 2.34
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.30 2.60 1.56

1026.69

Ø1/2 0.99 kg 219.00


Ø3/8 0.56 kg 114.15

Ø1/2 0.99 kg 271.24


Ø3/8 0.56 kg 144.88

Ø1/2 0.99 kg 180.83


Ø3/8 0.56 kg 96.59

88.24

0.30 3.20 15.36


0.25 3.20 12.80

0.30 2.60 18.72


0.25 2.60 15.60

0.30 2.60 12.48


0.25 2.60 10.40

0.30 0.40 2.88


METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.13
0.30 0.30 0.32
0.30 0.30 0.49
0.30 0.30 0.32

164.48

Ø1/2 0.99 kg 30.06


Ø3/8 0.56 kg 16.93

Ø1/2 0.99 kg 45.09


Ø3/8 0.56 kg 25.40

Ø1/2 0.99 kg 30.06


Ø3/8 0.56 kg 16.93

11.76

0.90 0.30 2.16


0.30 0.72
0.30 0.48

0.90 0.30 3.24


0.30 1.08
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.30 0.72

0.90 0.30 2.16


0.30 0.72
0.30 0.48

107.38

0.30 3.20 15.36


0.25 3.20 12.80
0.90 0.30 2.16
0.30 0.72
0.30 0.96
0.30 1.08

0.30 2.60 18.72


0.25 2.60 15.60
0.90 0.30 3.24
0.30 1.08
0.30 1.44
0.30 1.62

0.30 2.60 12.48


0.25 2.60 10.40
0.90 0.30 2.16
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.30 0.72
0.30 0.96
0.30 1.08

0.30 0.40 2.88


0.40 1.92

85.36

0.30 3.20 15.36


0.25 3.20 12.80

0.30 2.60 18.72


0.25 2.60 15.60

0.30 2.60 12.48


0.25 2.60 10.40

19.32

0.90 0.30 2.16


0.30 0.72
0.30 0.48
0.30 2.16
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

-
0.90 0.30 3.24
0.30 1.08
0.30 0.72
0.30 3.24
-
0.90 0.30 2.16
0.30 0.72
0.30 0.48
0.30 2.16

100.90

0.30 3.20 15.36


0.25 3.20 12.80
0.90 0.30 2.16
0.30 0.72
0.30 0.48
0.30 1.08

0.30 2.60 18.72


0.25 2.60 15.60
0.90 0.30 3.24
0.30 1.08
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.30 0.72
0.30 1.62

0.30 2.60 12.48


0.25 2.60 10.40
0.90 0.30 2.16
0.30 0.72
0.30 0.48
0.30 1.08

14.00
4.00
6.00
4.00

14.00
4.00
6.00
4.00

14.00
4.00
6.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

4.00

188.35
65.90
79.11
43.34

188.35
65.90
79.11
43.34

42.00
12.00
18.00
12.00

100.70

3.00
6.36
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

7.36
9.12
11.64

16.14
12.12
9.78
4.50

3.00
7.08
10.60

100.70

3.00
6.36
7.36
9.12
11.64

16.14
12.12
9.78
4.50
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.00
7.08
10.60

196.00
72.00
84.00
40.00

5987.75
5,376.99
610.76

5987.75
5,376.99
610.76

552.96 552.96

69.31
38.94
10.14
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

20.23

69.31
38.94
10.14
20.23

69.31
38.94
10.14
20.23

69.31
38.94
10.14
20.23

69.31
38.94
10.14
20.23

20.79
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.50 0.60 11.68


0.50 0.60 3.04
0.50 0.60 6.07

69.31
38.94
10.14
20.23

69.31
38.94
10.14
20.23

5.00
5.00
2.00
2.00
2.00
2.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00
2.00
3.00
3.00
9.00
9.00
6.00
6.00
6.00
6.00
6.00
6.00

2.00
2.00
1.00
1.00
2.00
2.00

11422.90 11422.90

1,163.48
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

366.78
796.70

564.67
222.98
54.36
54.36
129.76
103.21

376.44
148.65
36.24
36.24
86.50
68.81

906.26
336.78
90.60
90.60
216.26
172.02
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

906.26
336.78
90.60
90.60
216.26
172.02

906.26
336.78
90.60
90.60
216.26
172.02

329.88
0.50 0.56 329.88

1,088.79
371.63
80.67
201.44
153.23
273.82
8.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

38.00
15.00
5.00
15.00
3.00

1,088.79
371.63
80.67
201.44
153.23
273.82
8.00

38.00
15.00
5.00
15.00
3.00

2.00
2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00
8.00
2.00
2.00
2.00
2.00

22.00
22.00
4.00
4.00

6.00
6.00

6.00
6.00

5.00
5.00

5.00
5.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00
2.00

2.00
2.00

2.00
2.00

2.00
2.00

261.00
3.00 180.00
3.00 60.00
3.00 21.00

59.24

1.60 Area=3.32 m2 10.62


METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.60 Area=3.54 m2 11.33


1.20 Area=3.17 m2 7.61
1.20 Area=2.47 m2 5.93

1.40 Area=2.46 m2 6.89


1.40 Area=3.06 m2 8.57
1.10 Area=1.55 m2 3.41
1.10 Area=1.95 m2 4.29

0.50 Area=0.68 m2 0.34


0.50 Area=0.52 m2 0.26

35.79

1.60 Area=1.53 m2 6.36


1.60 Area=1.71 m2 7.11
1.20 Area=1.63 m2 5.09
1.20 Area=0.92 m2 2.87

1.40 Area=1.16 m2 4.22


1.40 Area=1.69 m2 6.15
1.10 Area=0.45 m2 1.29
1.10 Area=0.85 m2 2.43

0.50 Area=0.29 m2 0.19


METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.50 Area=0.11 m2 0.07

30.49
23.46 30.49

14.66

1.60 10.24

1.40 3.92

0.50 0.50

9.33

1.20 1.20 6.91

1.10 1.00 2.42

8.18
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.20 5.76

1.10 2.42

11.68
1.60 0.80 8.19
1.40 0.80 3.14
0.50 0.70 0.35

156.86
Ø5/8 1.55 kg 75.49
Ø5/8 1.55 kg 57.36

Ø3/8 0.56 kg 16.67


Ø3/8 0.56 kg 7.35

1.74
0.30 3.20 0.96
0.30 2.60 0.78

471.86

Ø1/2 0.99 kg 219.00


METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Ø3/8 0.56 kg 114.15

Ø1/2 0.99 kg 90.41


Ø3/8 0.56 kg 48.29

40.08

0.30 3.20 15.36


0.25 3.20 12.80

0.30 2.60 6.24


0.25 2.60 5.20

0.30 0.40 0.48

0.49
0.30 0.30 0.32
0.30 0.30 0.16

35.24

Ø1/2 0.99 kg 15.03


Ø3/8 0.56 kg 8.47

Ø1/2 0.99 kg 7.51


METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

Ø3/8 0.56 kg 4.23

5.04

0.90 0.30 2.16


0.30 0.72
0.30 0.48

0.90 0.30 1.08


0.30 0.36
0.30 0.24

47.36

0.30 3.20 15.36


0.25 3.20 12.80
0.90 0.30 2.16
0.30 0.72
0.30 0.48
0.30 1.08

0.30 2.60 6.24


0.25 2.60 5.20
0.90 0.30 1.08
0.30 0.36
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.30 0.24
0.30 0.54

0.30 0.50 0.60


0.50 0.50

52.64

0.30 3.20 15.36


0.25 3.20 12.80

0.30 2.60 12.48


0.25 2.60 10.40

0.30 0.40 0.96


0.40 0.64

6.66

0.90 0.30 2.16


0.30 0.72
0.30 0.48
0.30 1.08
-
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.90 0.30 1.08


0.30 0.36
0.30 0.24
0.30 0.54

47.36

0.30 3.20 15.36


0.25 3.20 12.80
0.90 0.30 2.16
0.30 0.72
0.30 0.48
0.30 1.08

0.30 2.60 6.24


0.25 2.60 5.20
0.90 0.30 1.08
0.30 0.36
0.30 0.24
0.30 0.54

0.30 0.50 0.60


0.50 0.50
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

6.00
4.00
2.00

6.00
4.00
2.00

6.00
4.00
2.00

87.57
65.90
21.67

87.57
65.90
21.67
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

18.00
12.00
6.00

47.82

3.00
6.36
7.36
9.12
11.64

1.50
3.54
5.30

47.82

3.00
6.36
7.36
9.12
11.64
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.50
3.54
5.30

92.00
72.00
20.00

1,126.79
1,126.79

1,126.79
1,126.79

24364.25 24364.25

-
- 2,077.57
127.25
143.96
164.95
99.17
155.09
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

145.59
127.97
116.78
127.98
108.12
128.17
54.79
123.71
151.26
99.38
94.76
108.63

2,077.57

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

108.12
128.17
54.79
123.71
151.26
99.38
94.76
108.63

2,077.57
-

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
108.12
128.17
54.79
123.71
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

151.26
99.38
94.76
108.63

2,077.57

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
108.12
128.17
54.79
123.71
151.26
99.38
94.76
108.63
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2,077.57
-

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
108.12
128.17
54.79
123.71
151.26
99.38
94.76
108.63

2,077.57
-
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
108.12
128.17
54.79
123.71
151.26
99.38
94.76
108.63

509.00

0.50 0.49 31.18


0.50 0.49 35.27
0.50 0.49 40.41
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.50 0.49 24.30


0.50 0.49 38.00
0.50 0.49 35.67
0.50 0.49 31.35
0.50 0.49 28.61
0.50 0.49 31.36
0.50 0.49 26.49
0.50 0.49 31.40
0.50 0.49 13.42
0.50 0.49 30.31
0.50 0.49 37.06
0.50 0.49 24.35
0.50 0.49 23.22
0.50 0.49 26.62

2,077.57

127.25
143.96
164.95
99.17
155.09
145.59
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

127.97
116.78
127.98
108.12
128.17
54.79
123.71
151.26
99.38
94.76
108.63

2,077.57
-

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
108.12
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

128.17
54.79
123.71
151.26
99.38
94.76
108.63

7.00
7.00

2.00
2.00

3.00
3.00

2.00
2.00

1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

33.00
33.00

2.00
2.00

186.00
186.00

66.00
66.00

12.00
7.00
5.00

7.00
7.00

8.00
4.00
4.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

4.00
4.00

24.00
24.00

24.00
24.00

36.00
36.00

1,313.28
108.63
94.76
99.38
151.26
123.71
54.79
128.17
108.12
129.03
100.87
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

138.41
76.15

18.00
0.50 18.00

656.64
0.50 54.32
0.50 47.38
0.50 49.69
0.50 75.63
0.50 61.86
0.50 27.40
0.50 64.09
0.50 54.06
0.50 64.52
0.50 50.44
0.50 69.21
0.50 38.08

674.64
0.50 54.32
0.50 47.38
0.50 49.69
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.50 75.63
0.50 61.86
0.50 27.40
0.50 64.09
0.50 54.06
0.50 64.52
0.50 50.44
0.50 69.21
0.50 38.08

0.50 18.00

2,077.57
-

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

108.12
128.17
54.79
123.71
151.26
99.38
94.76
108.63

2,077.57

127.25
143.96
164.95
99.17
155.09
145.59
127.97
116.78
127.98
108.12
128.17
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.79
123.71
151.26
99.38
94.76
108.63

3,445.75

69.95
57.67
128.39
47.25
49.92
19.13
71.03
47.58
49.64
49.43
34.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

29.97
47.34
50.09
112.94
128.80
46.12
54.40
48.47

35.46
84.15
67.92
108.18
162.29
113.45
110.74
117.06
101.85
143.58
66.91
33.12
110.48
76.15
138.41
100.87
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

129.03
36.24
44.31
38.02
51.08
45.83
45.37
40.97
48.80
56.57
47.08
20.03
64.20
49.59
15.46

3,481.49
3,481.49

69.95
57.67
128.39
47.25
49.92
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

19.13
71.03
47.58
49.64
49.43
34.44
29.97
47.34
50.09
112.94
128.80
46.12
54.40
48.47

35.46
84.15
67.92
108.18
162.29
113.45
110.74
117.06
101.85
143.58
66.91
33.12
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

110.48
76.15
138.41
100.87
129.03
36.24
44.31
38.02
51.08
45.83
45.37
40.97
48.80
56.57
47.08
20.03
64.20
49.59
15.46

3,481.49
3,481.49

3,481.49
3,481.49
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3,481.49
3,481.49

3,481.49
3,481.49

805.96
0.50 0.46 805.96

3,481.49
3,481.49

3,481.49
3,481.49

11.00
11.00

#REF!
10.00
#REF!
17.00
10.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

19.00

#REF!
1.00
17.00
5.00

19.00
67.00

1.00
6.00

186.00
186.00

66.00
66.00

12.00
7.00
5.00

7.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

7.00

8.00
4.00
4.00

4.00
4.00

41.00
17.00
24.00

17.00
17.00

1.00
1.00

1.00
1.00

36.00
36.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1,313.28
108.63
94.76
99.38
151.26
123.71
54.79
128.17
108.12
129.03
100.87
138.41
76.15

18.00
0.50 18.00

656.64
0.50 54.32
0.50 47.38
0.50 49.69
0.50 75.63
0.50 61.86
0.50 27.40
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.50 64.09
0.50 54.06
0.50 64.52
0.50 50.44
0.50 69.21
0.50 38.08

674.64
0.50 54.32
0.50 47.38
0.50 49.69
0.50 75.63
0.50 61.86
0.50 27.40
0.50 64.09
0.50 54.06
0.50 64.52
0.50 50.44
0.50 69.21
0.50 38.08

0.50 18.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

5,784.40
3,481.49
2,302.91

5,784.40
3,481.49
2,302.91

1378.00 1378.00

357.00
357.00

226.00
226.00

106.00
106.00

689.00
689.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado: MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509

Err:509 Err:509 Err:509


BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-51 a BZ-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
Bz-37 a Bz-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
Bz-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00

Err:509 Err:509 Err:509


BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BZ-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73

Err:509 Err:509 Err:509


BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18

Err:509 Err:509 Err:509


ALTURA
BR-14 1.4 1.00
BP-113 1.5 1.00
BR-1 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-3 1.5 1.00


BR-4 1.5 1.00
BR-10 1.5 1.00
BR-11 1.5 1.00
BR-12 1.5 1.00
BR-18 1.5 1.00
BR-19 1.5 1.00
BR-23 1.5 1.00
BR-26 1.5 1.00
BR-27 1.5 1.00
BR-28 1.5 1.00
BR-29 1.5 1.00
BR-30 1.5 1.00
BR-31 1.5 1.00
BR-32 1.5 1.00
BR-34 1.5 1.00
BR-35 1.5 1.00
BR-36 1.5 1.00
BR-40 1.5 1.00
BR-47 1.5 1.00
BR-48 1.5 1.00
BR-49 1.5 1.00
BR-50 1.5 1.00
BR-51 1.5 1.00
BR-52 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-53 1.5 1.00


BR-61 1.5 1.00
BR-62 1.5 1.00
BR-66 1.5 1.00
BR-68 1.5 1.00
BR-69 1.5 1.00
BR-74 1.5 1.00
BR-83 1.5 1.00
BR-90 1.5 1.00
BR-92 1.5 1.00
BR-94 1.5 1.00
BR-95 1.5 1.00
BR-100 1.5 1.00
BR-101 1.5 1.00
BR-104 1.5 1.00
BR-105 1.5 1.00
BR-114 1.5 1.00
BR-115 1.5 1.00
BR-116 1.5 1.00
BR-117 1.5 1.00
BR-118 1.5 1.00
BR-119 1.5 1.00
BR-124 1.5 1.00
BR-37 1.5 1.00
BR-38 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-43 1.5 1.00

Err:509 Err:509 Err:509


ALTURA
BR-13 1.6 1.00
BR-39 1.6 1.00
BR-15 1.65 1.00
BR-7 1.7 1.00
BR-72 1.7 1.00
BR-103 1.7 1.00
BR-8 1.8 1.00
BR-25 1.8 1.00
BR-54 1.8 1.00
BR-73 1.8 1.00
BR-24 1.9 1.00
BR-9 2 1.00
BR-102 2.25 1.00
BR-2 2.6 1.00

Err:509 Err:509 Err:509


BR-5 3 1.00
BR-6 3 1.00
BR-55 3.1 1.00
BR-65 3.5 1.00
BR-80 3.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-81 3.5 1.00


BR-82 3.5 1.00

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509 Err:509


BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
101 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.77
BR-104 a BR-
105 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.29
BR-105 a BR-
114 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 63.77
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
115 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 42.93
BR-115 a BR-
116 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.20
BR-116 a BR-
117 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.66
BR-117 a BR-
120 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.77
BR-118 a BR-
119 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.49
BR-119 a BR-
117 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.32
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-51 a BZ-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
Bz-37 a Bz-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
Bz-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00

Err:509 Err:509 Err:509


BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-103 a BR-
104 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.19
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BE-110 a BR-
111 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.80
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
110 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 7.77
BR-105 a BP-
113 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 76.84
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-101 a BR-
102 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.09
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-102 a BR-
103 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.96
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BZ-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73

Err:509 Err:509 Err:509


BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18

Err:509 Err:509 Err:509


ALTURA RESTALD 1ER RELLENO
BE-110 a BR-
1.65 0.6 1.00 54.80
111
BE-58 a BR-74 1.5 0.6 1.00 72.93
BE-67 a BR-68 1.5 0.6 1.00 48.56
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BE-75 a BR-64 1.4 0.6 1.00 54.56


BE-85 a BR-90 1.5 0.6 1.00 55.64
BE87 a BR-92 1.625 0.6 1.00 49.04
BE-96 a BR-79 1.65 0.6 1.00 54.49
BP-113 a BE-
1.65 0.6 1.00 7.77
110
BR-1 a BR-2 2.05 0.6 1.00 33.46
BR-10 a BR-19 1.5 0.6 1.00 39.87
BR-10 a BR-23 1.5 0.6 1.00 62.93
BR-100 a BR-
1.5 0.6 1.00 50.77
101
BR-101 a BR-
1.875 0.6 1.00 40.09
102
BR-102 a BE-
2 0.6 1.00 52.58
107
BR-102 a BR-
1.975 0.6 1.00 53.96
103
BR-103 a BR-
1.6 0.6 1.00 47.19
104
BR-104 a BR-
1.5 0.6 1.00 49.29
105
BR-105 a BR-
1.5 0.6 1.00 63.77
114
BR-105 a BP-
1.65 0.6 1.00 76.84
113
BR-11 a BR-10 1.5 0.6 1.00 73.81
BR-114 a BR-
1.5 0.6 1.00 42.93
115
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-115 a BR-
1.5 0.6 1.00 47.20
116
BR-116 a BR-
1.5 0.6 1.00 49.66
117
BR-117 a BR-
1.5 0.6 1.00 29.77
120
BR-118 a BR-
1.5 0.6 1.00 45.49
119
BR-119 a BR-
1.5 0.6 1.00 75.32
117
BR-12 a BR-13 1.55 0.6 1.00 51.00
BR-124 a BR-6 2.25 0.6 1.00 47.90
BR-13 a BR-8 1.7 0.6 1.00 51.00
BR-14 a BR-15 1.525 0.6 1.00 65.51
BR-15 a BR-9 1.825 0.6 1.00 43.03
BR-18 a BP-20 1.5 0.6 1.00 54.71
BR-19 a BR-18 1.5 0.6 1.00 45.20
BR-2 a BR-3 2.05 0.6 1.00 33.94
BR-23 a BR-24 1.7 0.6 1.00 46.90
BR-23 a BR-28 1.5 0.6 1.00 70.61
BR-24 a BR-25 1.85 0.6 1.00 54.10
BR-25 a BR-26 1.65 0.6 1.00 33.08
BR-25 a BR-18 1.65 0.6 1.00 67.59
BR-26 a BR-39 1.55 0.6 1.00 16.39
BR-26 a BR-22 1.5 0.6 1.00 54.61
BR-27 a BR-23 1.5 0.6 1.00 47.23
BR-28 a BR-29 1.5 0.6 1.00 50.13
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-29 a BR-30 1.5 0.6 1.00 47.66


BR-3 a BR-4 1.5 0.6 1.00 33.78
BR-30 a BR-31 1.5 0.6 1.00 30.00
BR-31 a BR-32 1.5 0.6 1.00 49.25
BR-32 a BR-33 1.5 0.6 1.00 51.81
BR-34 a BR-28 1.5 0.6 1.00 29.72
BR-35 a BR-29 1.5 0.6 1.00 33.00
BR-36 a BR-30 1.5 0.6 1.00 75.83
BR-39 a BR-40 1.55 0.6 1.00 50.23
BR-4 a BR-73 1.65 0.6 1.00 19.90
BR-40 a BR-32 1.5 0.6 1.00 48.01
BR-47 a BR-48 1.5 0.6 1.00 58.52
BR-48 a BR-49 1.5 0.6 1.00 58.53
BR-49 a BR-46 1.5 0.6 1.00 54.93
BR-49 a BR-62 1.5 0.6 1.00 64.10
BR-5 a BR-6 2.25 0.6 1.00 48.70
BR-50 a BR-51 1.5 0.6 1.00 53.91
BR-50 a BR-54 1.65 0.6 1.00 70.79
BR-51 a BZ-43 1.5 0.6 1.00 64.50
BR-51 a BR-52 1.5 0.6 1.00 66.14
BR-52 a BR-53 1.5 0.6 1.00 40.00
BR-53 a BR-49 1.5 0.6 1.00 37.21
BR-54 a BR-55 2.45 0.6 1.00 59.24
BR-55 a BE-56 3.1 0.6 1.00 53.22
BR-6 a BR-61 2.25 0.6 1.00 13.31
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-61 a BR-72 1.6 0.6 1.00 9.39


BR-62 a BE-59 1.6 0.6 1.00 64.05
BR-65 a BR-55 3.3 0.6 1.00 70.37
BR-65 a BR-66 2.5 0.6 1.00 72.21
BR-66 a BR-80 2.5 0.6 1.00 34.26
BR-66 a BE-67 1.5 0.6 1.00 52.47
BR-68 a BR-69 1.5 0.6 1.00 41.88
BR-69 a BE-70 1.4 0.6 1.00 51.68
BR-7 a BR-11 1.6 0.6 1.00 50.51
BR-7 a BR-8 1.75 0.6 1.00 51.58
BR-72 a BR-7 1.7 0.6 1.00 28.53
BR-73 a BR-5 1.65 0.6 1.00 27.49
BR-74 a BR-69 1.5 0.6 1.00 55.00
BR-8 a BR-9 1.9 0.6 1.00 12.65
BR-80 a BR-81 3.5 0.6 1.00 47.22
BR-81 a BR-82 3.5 0.6 1.00 47.18
BR-82 a BR-83 2.5 0.6 1.00 37.73
BR-83 a BE87 1.625 0.6 1.00 52.43
BR-9 a BR-16 1.9 0.6 1.00 52.53
BR-90 a BE-91 1.55 0.6 1.00 70.87
BR-92 a BE-93 1.55 0.6 1.00 64.27
BR-94 a BR-95 1.5 0.6 1.00 34.27
BR-95 a BE-96 1.65 0.6 1.00 31.34
BR-37 a BR-38 1.5 0.6 1.00 66.00
BR-38 a BR-31 1.5 0.6 1.00 31.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-43 a BE-56 2.3 0.6 1.00 64.50

Err:509 Err:509

Err:509 Err:509 Err:509


BE-110 a BR-
111 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.80
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 2.00
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BP-113 a BE-
_____ø 200 mm_________ 2.00
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00


BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-100 a BR-
_____ø 200 mm_________ 2.00
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 2.00
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 2.00
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 2.00
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 2.00
104 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 2.00
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 2.00
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 2.00
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-114 a BR-
_____ø 200 mm_________ 2.00
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 2.00
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 2.00
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 2.00
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 2.00
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 2.00
117 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00


BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00


BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00


BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 2.00

Err:509 Err:509

Err:509 Err:509 Err:509


BR-14 1.4 1.00
BP-113 1.5 1.00
BR-1 1.5 1.00
BR-3 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-4 1.5 1.00


BR-10 1.5 1.00
BR-11 1.5 1.00
BR-12 1.5 1.00
BR-18 1.5 1.00
BR-19 1.5 1.00
BR-23 1.5 1.00
BR-26 1.5 1.00
BR-27 1.5 1.00
BR-28 1.5 1.00
BR-29 1.5 1.00
BR-30 1.5 1.00
BR-31 1.5 1.00
BR-32 1.5 1.00
BR-34 1.5 1.00
BR-35 1.5 1.00
BR-36 1.5 1.00
BR-40 1.5 1.00
BR-47 1.5 1.00
BR-48 1.5 1.00
BR-49 1.5 1.00
BR-50 1.5 1.00
BR-51 1.5 1.00
BR-52 1.5 1.00
BR-53 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-61 1.5 1.00


BR-62 1.5 1.00
BR-66 1.5 1.00
BR-68 1.5 1.00
BR-69 1.5 1.00
BR-74 1.5 1.00
BR-83 1.5 1.00
BR-90 1.5 1.00
BR-92 1.5 1.00
BR-94 1.5 1.00
BR-95 1.5 1.00
BR-100 1.5 1.00
BR-101 1.5 1.00
BR-104 1.5 1.00
BR-105 1.5 1.00
BR-114 1.5 1.00
BR-115 1.5 1.00
BR-116 1.5 1.00
BR-117 1.5 1.00
BR-118 1.5 1.00
BR-119 1.5 1.00
BR-124 1.5 1.00
BR-37 1.5 1.00
BR-38 1.5 1.00
BR-43 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


BR-13 1.6 1.00
BR-39 1.6 1.00
BR-15 1.65 1.00
BR-7 1.7 1.00
BR-72 1.7 1.00
BR-103 1.7 1.00
BR-8 1.8 1.00
BR-25 1.8 1.00
BR-54 1.8 1.00
BR-73 1.8 1.00
BR-24 1.9 1.00
BR-9 2 1.00
BR-102 2.25 1.00
BR-2 2.6 1.00

Err:509 Err:509 Err:509


BR-5 3 1.00
BR-6 3 1.00
BR-55 3.1 1.00
BR-65 3.5 1.00
BR-80 3.5 1.00
BR-81 3.5 1.00
BR-82 3.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509

Err:509 Err:509 Err:509


BZ - EMPALME 1.00 12.00 8.50

Err:509 Err:509 Err:509


BE-56 A BR-55 53.22 1.00 2.00 53.22
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Corte para conexión en Buzones


BE-56 1.00 2.00 5.00
BE-58 1.00 2.00 5.00
BE-59 1.00 2.00 5.00
BE-67 1.00 2.00 5.00
BE-70 1.00 2.00 5.00
BE-75 1.00 2.00 5.00
BE-85 1.00 2.00 5.00
BE-86 1.00 2.00 5.00
BE87 1.00 2.00 5.00
BE-91 1.00 2.00 5.00
BE-93 1.00 2.00 5.00
BE-96 1.00 2.00 5.00
BE-107 1.00 2.00 5.00
BE-110 1.00 2.00 5.00

Err:509 Err:509 Err:509


BZ - EMPALME 1.00 12.00 8.50

Err:509 Err:509 Err:509


BE-56 A BR-55 53.22 1.00 1.00 53.22
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Corte para conexión en Buzones


BE-56 1.00 5.00
BE-58 1.00 5.00
BE-59 1.00 5.00
BE-67 1.00 5.00
BE-70 1.00 5.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BE-75 1.00 5.00


BE-85 1.00 5.00
BE-86 1.00 5.00
BE87 1.00 5.00
BE-91 1.00 5.00
BE-93 1.00 5.00
BE-96 1.00 5.00
BE-107 1.00 5.00
BE-110 1.00 5.00

Err:509 Err:509 Err:509


BE-56 A BR-55 53.22 1.00 1.00 53.22
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Corte para conexión en Buzones


BE-56 1.00 5.00
BE-58 1.00 5.00
BE-59 1.00 5.00
BE-67 1.00 5.00
BE-70 1.00 5.00
BE-75 1.00 5.00
BE-85 1.00 5.00
BE-86 1.00 5.00
BE87 1.00 5.00
BE-91 1.00 5.00
BE-93 1.00 5.00
BE-96 1.00 5.00
BE-107 1.00 5.00
BE-110 1.00 5.00

BZ - EMPALME 1.00 12.00 8.50


HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


BR-14 1.4 1.00
BP-113 1.5 1.00
BR-1 1.5 1.00
BR-3 1.5 1.00
BR-4 1.5 1.00
BR-10 1.5 1.00
BR-11 1.5 1.00
BR-12 1.5 1.00
BR-18 1.5 1.00
BR-19 1.5 1.00
BR-23 1.5 1.00
BR-26 1.5 1.00
BR-27 1.5 1.00
BR-28 1.5 1.00
BR-29 1.5 1.00
BR-30 1.5 1.00
BR-31 1.5 1.00
BR-32 1.5 1.00
BR-34 1.5 1.00
BR-35 1.5 1.00
BR-36 1.5 1.00
BR-40 1.5 1.00
BR-47 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-48 1.5 1.00


BR-49 1.5 1.00
BR-50 1.5 1.00
BR-51 1.5 1.00
BR-52 1.5 1.00
BR-53 1.5 1.00
BR-61 1.5 1.00
BR-62 1.5 1.00
BR-66 1.5 1.00
BR-68 1.5 1.00
BR-69 1.5 1.00
BR-74 1.5 1.00
BR-83 1.5 1.00
BR-90 1.5 1.00
BR-92 1.5 1.00
BR-94 1.5 1.00
BR-95 1.5 1.00
BR-100 1.5 1.00
BR-101 1.5 1.00
BR-104 1.5 1.00
BR-105 1.5 1.00
BR-114 1.5 1.00
BR-115 1.5 1.00
BR-116 1.5 1.00
BR-117 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-118 1.5 1.00


BR-119 1.5 1.00
BR-124 1.5 1.00
BR-37 1.5 1.00
BR-38 1.5 1.00
BR-43 1.5 1.00

BR-13 1.6 1.00


BR-39 1.6 1.00
BR-15 1.65 1.00
BR-7 1.7 1.00
BR-72 1.7 1.00
BR-103 1.7 1.00
BR-8 1.8 1.00
BR-25 1.8 1.00
BR-54 1.8 1.00
BR-73 1.8 1.00
BR-24 1.9 1.00
BR-9 2 1.00
BR-102 2.25 1.00
BR-2 2.6 1.00

BR-5 3 1.00
BR-6 3 1.00
BR-55 3.1 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-65 3.5 1.00


BR-80 3.5 1.00
BR-81 3.5 1.00
BR-82 3.5 1.00
Err:509 Err:509

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509 Err:509


BE-110 a BR-
_____ø 200 mm_________ 1.00 1.00 54.80
111 TUBERIA PVC-UF D
BE-58 a BR-74 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.93
BE-67 a BR-68 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.56
BE-75 a BR-64 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.56
BE-85 a BR-90 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.64
BE87 a BR-92 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.04
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BE-96 a BR-79 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.49
BP-113 a BE-
_____ø 200 mm_________ 1.00 1.00 7.77
110 TUBERIA PVC-UF D
BR-1 a BR-2 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.46
BR-10 a BR-19 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 39.87
BR-10 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 62.93
BR-100 a BR-
_____ø 200 mm_________ 1.00 1.00 50.77
101 TUBERIA PVC-UF D
BR-101 a BR-
_____ø 200 mm_________ 1.00 1.00 40.09
102 TUBERIA PVC-UF D
BR-102 a BE-
_____ø 200 mm_________ 1.00 1.00 52.58
107 TUBERIA PVC-UF D
BR-102 a BR-
_____ø 200 mm_________ 1.00 1.00 53.96
103 TUBERIA PVC-UF D
BR-103 a BR-
_____ø 200 mm_________ 1.00 1.00 47.19
104 TUBERIA PVC-UF D
BR-104 a BR-
_____ø 200 mm_________ 1.00 1.00 49.29
105 TUBERIA PVC-UF D
BR-105 a BR-
_____ø 200 mm_________ 1.00 1.00 63.77
114 TUBERIA PVC-UF D
BR-105 a BP-
_____ø 200 mm_________ 1.00 1.00 76.84
113 TUBERIA PVC-UF D
BR-11 a BR-10 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 73.81
BR-114 a BR-
_____ø 200 mm_________ 1.00 1.00 42.93
115 TUBERIA PVC-UF D
BR-115 a BR-
_____ø 200 mm_________ 1.00 1.00 47.20
116 TUBERIA PVC-UF D
BR-116 a BR-
_____ø 200 mm_________ 1.00 1.00 49.66
117 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-117 a BR-
_____ø 200 mm_________ 1.00 1.00 29.77
120 TUBERIA PVC-UF D
BR-118 a BR-
_____ø 200 mm_________ 1.00 1.00 45.49
119 TUBERIA PVC-UF D
BR-119 a BR-
_____ø 200 mm_________ 1.00 1.00 75.32
117 TUBERIA PVC-UF D
BR-12 a BR-13 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-124 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.90
BR-13 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.00
BR-14 a BR-15 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 65.51
BR-15 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 43.03
BR-18 a BP-20 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.71
BR-19 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 45.20
BR-2 a BR-3 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.94
BR-23 a BR-24 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 46.90
BR-23 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.61
BR-24 a BR-25 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.10
BR-25 a BR-26 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.08
BR-25 a BR-18 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 67.59
BR-26 a BR-39 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 16.39
BR-26 a BR-22 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.61
BR-27 a BR-23 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.23
BR-28 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.13
BR-29 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.66
BR-3 a BR-4 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.78
BR-30 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 30.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-31 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 49.25
BR-32 a BR-33 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.81
BR-34 a BR-28 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 29.72
BR-35 a BR-29 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 33.00
BR-36 a BR-30 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 75.83
BR-39 a BR-40 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.23
BR-4 a BR-73 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 19.90
BR-40 a BR-32 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.01
BR-47 a BR-48 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.52
BR-48 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 58.53
BR-49 a BR-46 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 54.93
BR-49 a BR-62 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.10
BR-5 a BR-6 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 48.70
BR-50 a BR-51 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.91
BR-50 a BR-54 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.79
BR-51 a BR-43 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50
BR-51 a BR-52 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.14
BR-52 a BR-53 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 40.00
BR-53 a BR-49 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.21
BR-54 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 59.24
BR-55 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 53.22
BR-6 a BR-61 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 13.31
BR-61 a BR-72 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 9.39
BR-62 a BE-59 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.05
BR-65 a BR-55 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.37
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-65 a BR-66 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 72.21
BR-66 a BR-80 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.26
BR-66 a BE-67 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.47
BR-68 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 41.88
BR-69 a BE-70 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.68
BR-7 a BR-11 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 50.51
BR-7 a BR-8 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 51.58
BR-72 a BR-7 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 28.53
BR-73 a BR-5 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 27.49
BR-74 a BR-69 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 55.00
BR-8 a BR-9 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 12.65
BR-80 a BR-81 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.22
BR-81 a BR-82 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 47.18
BR-82 a BR-83 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 37.73
BR-83 a BE87 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.43
BR-9 a BR-16 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 52.53
BR-90 a BE-91 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 70.87
BR-92 a BE-93 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.27
BR-94 a BR-95 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 34.27
BR-95 a BE-96 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.34
BR-37 a BR-38 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 66.00
BR-38 a BR-31 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 31.00
BR-43 a BE-56 TUBERIA PVC-UF D _____ø 200 mm_________ 1.00 1.00 64.50

Err:509 Err:509
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509

Err:509 Err:509 Err:509


BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47

Err:509 Err:509 Err:509


BP-123 1.08 1.00
BP-20 1.5 1.00
BR-111 1.5 1.00
BR-120 1.5 1.00
BR-22 1.5 1.00
BR-33 1.5 1.00
BR-41 1.5 1.00
BR-42 1.5 1.00
BR-44 1.5 1.00
BR-45 1.5 1.00
BR-46 1.5 1.00
BR-64 1.5 1.00
BR-76 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-78 1.5 1.00


BR-79 1.5 1.00

Err:509 Err:509 Err:509


BR-17 1.6 1.00
BR-121 1.73 1.00
BR-16 1.8 1.00
BR-63 1.8 1.00
BP-122 2.79 1.00

Err:509 Err:509 Err:509


BR-21 3.7 1.00

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-120 a BR-
121 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 35.01
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BP-123 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
122 TUBERIA PVC-UF D
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


h=
BR-120 a BR-
1.615 _____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 2.6 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 2.6 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 1.6 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 1.65 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 1.65 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 1.7 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
2.26 _____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 1.55 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-123 a BP-
1.935 _____ø 250 mm_________ 1.00 1.00 69.20
122 TUBERIA PVC-UF D
BR-22 a BR-41 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 1.6 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BE-99 a BR-111 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 1.5 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
1.5 _____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 2.00 1.00
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-121 a BP-
_____ø 250 mm_________ 2.00 1.00
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BP-122 a BP-
_____ø 250 mm_________ 2.00 1.00
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 2.00 1.00

Err:509 Err:509

Err:509 Err:509 Err:509


BP-123 1.08 1.00
BP-20 1.5 1.00
BR-111 1.5 1.00
BR-120 1.5 1.00
BR-22 1.5 1.00
BR-33 1.5 1.00
BR-41 1.5 1.00
BR-42 1.5 1.00
BR-44 1.5 1.00
BR-45 1.5 1.00
BR-46 1.5 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-64 1.5 1.00


BR-76 1.5 1.00
BR-78 1.5 1.00
BR-79 1.5 1.00

Err:509 Err:509 Err:509


BR-17 1.6 1.00
BR-121 1.73 1.00
BR-16 1.8 1.00
BR-63 1.8 1.00

Err:509 Err:509 Err:509


BR-21 3.7 1.00
BP-122 2.79 1.00

Err:509 Err:509

Err:509 Err:509 Err:509


BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 63.72
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 67.00
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 69.01
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 2.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 2.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 65.41
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 67.00


BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 69.01
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 67.00
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 69.01
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 72.27


BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-111 1.5 1.00
BR-120 1.5 1.00
BR-22 1.5 1.00
BR-33 1.5 1.00
BR-41 1.5 1.00
BR-42 1.5 1.00
BR-44 1.5 1.00
BR-45 1.5 1.00
BR-46 1.5 1.00
BR-64 1.5 1.00
BR-76 1.5 1.00
BR-78 1.5 1.00
BR-79 1.5 1.00
BR-17 1.6 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-121 1.73 1.00


BR-16 1.8 1.00
BR-63 1.8 1.00
BR-21 3.7 1.00
BR-20 3.7 1.00
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509 Err:509


1.00 1.00 50.00

Err:509 Err:509

Err:509 Err:509 Err:509


CORTE DE TERRENO 1.00 1.00
EXCAVACION MANUAL EN ZAPATA IZQUIERDA 1.00 1.00
EXCAVACION MANUAL EN ZAPATA DERECHA 1.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE IZQUIERDO 1.00 1.00
EXCAVACION MANUAL EN CAMARA DE ANCLAJE DERECHO 1.00 1.00

Err:509 Err:509 Err:509


CONFORMACION DE BANQUETAS 1.00 1.00
RELLENO CON MATERIAL PROPIO IZQUIERDA 1.00 1.00
RELLENO CON MATERIAL PROPIO DERECHA 1.00 1.00
RELLENO CON MATERIAL PROPIO IZQUIERDO 1.00 1.00
RELLENO CON MATERIAL PROPIO DERECHO 1.00 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


ELIMINACION DE MATERIAL EXCEDENTE 1.00 1.00

Err:509 Err:509

Err:509 Err:509 Err:509


ZAPATA 2.00 1.00 2.50

Err:509 Err:509 Err:509


DADO DE ANCLAJE 2.00 1.00 2.50

Err:509 Err:509 Err:509


FALSA ZAPATA EN EL DADO IZQUIERDO 1.00 1.00 2.50

Err:509 Err:509 Err:509


ESTRUCTURAS 1 1
Err:509 Err:509

Err:509 Err:509 Err:509


ZAPATA 2.00 1.00 2.50

Err:509 Err:509 Err:509


ACERO PARA PARRILLA 26.00 2.00 2.42

Err:509 Err:509 Err:509


HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

COLUMNA 4.00 1.00 0.25

Err:509 Err:509 Err:509


ACERO PRINCIPAL DE COLUMNA 4.00 6.00 6.39
ACERO DE ESTRIBO PARA COLUMNA 39.00 4.00 0.95

Err:509 Err:509 Err:509


COLUMNA LADO FROTAL 2.00 4.00
COLUMNA LADO LATERAL 2.00 4.00

Err:509 Err:509 Err:509


VIGA 1.00 1.00 0.90

Err:509 Err:509 Err:509


ACERO PRINCIPAL DE VIGA 2.00 3.00 1.26
ACERO DE ESTRIBO PARA VIGA 7.00 1.00 1.05

Err:509 Err:509 Err:509


VIGA LADO FRONTAL 2.00 2.00
VIGA LADO LATERAL 2.00 2.00 0.30
VIGA BASE 0.40

Err:509 Err:509 Err:509


CURADO 1 1
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509

Err:509 Err:509 Err:509

COLUMNA LADO FROTAL 2.00 4.00 0.30


COLUMNA LADO LATERAL 2.00 4.00 0.25

Err:509 Err:509 Err:509

VIGA LADO FRONTAL 2.00 2.00 0.90


VIGA LADO LATERAL 2.00 2.00 0.30
VIGA BASE 1.00 0.40 0.30
VIGA SUP 1.00 0.40 0.30

Err:509 Err:509

Err:509 Err:509 Err:509

COLUMNA LADO FROTAL 2.00 4.00 0.30


COLUMNA LADO LATERAL 2.00 4.00 0.25
VIGA LADO FRONTAL 2.00 2.00 0.90
VIGA LADO LATERAL 2.00 2.00 0.30
VIGA BASE 1.00 0.40 0.30
VIGA SUP 1.00 0.40 0.30

Err:509 Err:509
Err:509 Err:509
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509

2 1

Err:509 Err:509 Err:509

2 1

Err:509 Err:509 Err:509

2 1

Err:509 Err:509

Err:509 Err:509 Err:509


CABLE 1 1 53.6

Err:509 Err:509 Err:509


CABLE 1 1 53.6

Err:509 Err:509

Err:509 Err:509 Err:509


GRILLETES 6 1

Err:509 Err:509

Err:509 Err:509 Err:509


HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PENDOLA 1 1.00 1.00 1.50


PENDOLA 2 2.00 1.00 1.51
PENDOLA 3 2.00 1.00 1.55
PENDOLA 4 2.00 1.00 1.61
PENDOLA 5 2.00 1.00 1.69
PENDOLA 6 2.00 1.00 1.79
PENDOLA 7 2.00 1.00 1.91
PENDOLA 8 2.00 1.00 2.06
PENDOLA 9 2.00 1.00 2.23
PENDOLA 10 2.00 1.00 2.42
PENDOLA 11 2.00 1.00 2.63
PENDOLA 12 2.00 1.00 2.87
PENDOLA 13 2.00 1.00 3.13
PENDOLA 14 2.00 1.00 3.42
PENDOLA 15 2.00 1.00 3.71
PENDOLA 16 2.00 1.00 4.07
PENDOLA 17 2.00 1.00 4.43
PENDOLA 18 2.00 1.00 4.81

Err:509 Err:509 Err:509


PENDOLA 1 1.00 1.00 1.50
PENDOLA 2 2.00 1.00 1.51
PENDOLA 3 2.00 1.00 1.55
PENDOLA 4 2.00 1.00 1.61
PENDOLA 5 2.00 1.00 1.69
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

PENDOLA 6 2.00 1.00 1.79


PENDOLA 7 2.00 1.00 1.91
PENDOLA 8 2.00 1.00 2.06
PENDOLA 9 2.00 1.00 2.23
PENDOLA 10 2.00 1.00 2.42
PENDOLA 11 2.00 1.00 2.63
PENDOLA 12 2.00 1.00 2.87
PENDOLA 13 2.00 1.00 3.13
PENDOLA 14 2.00 1.00 3.42
PENDOLA 15 2.00 1.00 3.71
PENDOLA 16 2.00 1.00 4.07
PENDOLA 17 2.00 1.00 4.43
PENDOLA 18 2.00 1.00 4.81

Err:509 Err:509 Err:509


GRILLETES 140 1

Err:509 Err:509

Err:509 Err:509 Err:509

1 1 35

Err:509 Err:509 Err:509

2 1
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509

1 1 35

Err:509 Err:509

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509 Err:509


BR-120 a BR-
_____ø 250 mm_________ 1.00 1.00 35.01
121 TUBERIA PVC-UF D
BR-44 a BR-45 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.35
BR-21 a BR-22 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 49.76
BP-20 a BR-21 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 50.47
BR-64 a BR-76 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BE-60 a BR-64 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 59.39
BR-76 a BE-77 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 60.30
BR-41 a BR-33 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.30
BR-63 a BE-60 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 63.72
BR-46 a BR-63 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 64.72
BR-45 a BR-46 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 65.41
BR-16 a BR-17 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 67.00
BR-121 a BP-
_____ø 250 mm_________ 1.00 1.00 67.96
122 TUBERIA PVC-UF D
BR-17 a BP-20 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 69.01
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

BP-122 a BP-
_____ø 250 mm_________ 1.00 1.00 69.20
123 TUBERIA PVC-UF D
BR-22 a BR-41 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 72.27
BE-77 a BR-78 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 73.64
BR-78 a BR-79 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 76.30
BR-33 a BR-42 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BR-42 a BR-44 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 82.06
BE-99 a BR-111 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 93.42
BR-79 a BE-99 TUBERIA PVC-UF D _____ø 250 mm_________ 1.00 1.00 100.56
BR-111 a BR-
_____ø 250 mm_________ 1.00 1.00 110.52
120 TUBERIA PVC-UF D

Err:509 Err:509

Err:509 Err:509 Err:509

346 1

Err:509 Err:509 Err:509

104 1

Err:509 Err:509 Err:509

11 1

Err:509 Err:509
Err:509 Err:509
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


TRAZO 1.00 10.87

Err:509 Err:509 Err:509


SEÑALIZACION 1.00

Err:509 Err:509

Err:509 Err:509 Err:509


PERFILADO CON MOTO NIVELADORA 1.00 100.00 10.80

Err:509 Err:509 Err:509


PERFILADO CON MOTO NIVELADORA 1.00 100.00 10.80

Err:509 Err:509

Err:509 Err:509 Err:509


Corte de pavimento en vial principal 1.00 10.87

Err:509 Err:509 Err:509


Corte de pavimento en vial principal 1.00 10.87 1.00

Err:509 Err:509

Err:509 Err:509 Err:509


HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Excavacion en via principal 1.00 10.87 1.00

Err:509 Err:509 Err:509


Relleno en excavacion en via principal 1.00 10.87 1.00

Err:509 Err:509 Err:509


REFINE, NIVELACION Y COMPACTACION EN TERRENO SEMIROCOSO 1.00 10.87

Err:509 Err:509 Err:509


Excavacion 1.30 10.87 1.00
Relleno 1.20 10.87 1.00
Conformacion de base de afirmado 1.00 10.87 1.00
Err:509 Err:509

Err:509 Err:509 Err:509


Concreto en cruce de carretera 1.00 10.87 1.00

Err:509 Err:509 Err:509


Acero en losa armada 5 Ø1/2'' |_____| 2.00 10.87 0.50
Estribo : 56 Und de Ø3/8'' en 1 Elem. Simil. 1.00 2.20

Err:509 Err:509 Err:509


ENCOFRADO 1.56 1.56
ENCOFRADO 2.00 1.00
HOJA DE METRA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE A


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA
ITEMS DESCRIPCIÓN

Err:509 Err:509

Fecha : 5/1/2018

DIMENSIONES

PARTIDA DESCRIPCIÓN UND


Cantidad N° Veces Long (m)

Err:509 Err:509 Err:509


CURADO 1.00 1.00
1.00 10.87 1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

104368.47 104368.47

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
39.87
62.93

50.77

40.09

52.58

53.96

47.19
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32

51.00
47.90
51.00
65.51
43.03
54.71
45.20
33.94
46.90
70.61
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
50.23
19.90
48.01
58.52
58.53
54.93
64.10
48.70
53.91
70.79
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
50.51
51.58
28.53
27.49
55.00
12.65
47.22
47.18
37.73
52.43
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

2414.19
54.56
51.68
72.93
48.56
55.64
39.87
62.93

50.77

49.29

63.77

73.81
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

42.93

47.20

49.66

29.77

45.49

75.32

54.71
45.20
70.61
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
48.01
58.52
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

58.53
54.93
64.10
53.91
64.50
66.14
40.00
37.21
52.47
41.88
55.00
34.27
66.00
31.00

1967.17
65.51
51.00
16.39
50.23
70.87
64.27

47.19

9.39
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

64.05
50.51
49.04
52.43

54.80

54.49

7.77

76.84

33.08
67.59
19.90
70.79
27.49
31.34
46.90
28.53
51.00
51.58
43.03
54.10

40.09

12.65
52.53
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

53.96

52.58

33.46
33.94
47.90
48.70
13.31
64.50
59.24
72.21
34.26
37.73

217.99
53.22
70.37
47.22
47.18

54.00

1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00

14.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

7.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
39.87
62.93

50.77

40.09

52.58

53.96

47.19
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32

51.00
47.90
51.00
65.51
43.03
54.71
45.20
33.94
46.90
70.61
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
50.23
19.90
48.01
58.52
58.53
54.93
64.10
48.70
53.91
70.79
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
50.51
51.58
28.53
27.49
55.00
12.65
47.22
47.18
37.73
52.43
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
39.87
62.93

50.77

40.09
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

52.58

53.96

47.19

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32

51.00
47.90
51.00
65.51
43.03
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.71
45.20
33.94
46.90
70.61
54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
50.23
19.90
48.01
58.52
58.53
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.93
64.10
48.70
53.91
70.79
64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
50.51
51.58
28.53
27.49
55.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

12.65
47.22
47.18
37.73
52.43
52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

39.87
62.93

50.77

40.09

52.58

53.96

47.19

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

51.00
47.90
51.00
65.51
43.03
54.71
45.20
33.94
46.90
70.61
54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

50.23
19.90
48.01
58.52
58.53
54.93
64.10
48.70
53.91
70.79
64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

50.51
51.58
28.53
27.49
55.00
12.65
47.22
47.18
37.73
52.43
52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

2414.19
54.56
51.68
72.93
48.56
55.64
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

39.87
62.93
50.77
49.29
63.77
73.81
42.93
47.20
49.66
29.77
45.49
75.32
54.71
45.20
70.61
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

75.83
48.01
58.52
58.53
54.93
64.10
53.91
64.50
66.14
40.00
37.21
52.47
41.88
55.00
34.27
66.00
31.00

1967.17
65.51
51.00
16.39
50.23
70.87
64.27
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

47.19
9.39
64.05
50.51
49.04
52.43
54.80
54.49
7.77
76.84
33.08
67.59
19.90
70.79
27.49
31.34
46.90
28.53
51.00
51.58
43.03
54.10
40.09
12.65
52.53
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

53.96

52.58

33.46
33.94
47.90
48.70
13.31
64.50
59.24
72.21
34.26
37.73

217.99
53.22
70.37
47.22
47.18

2483.65

0.60 0.90 29.59

0.60 0.90 39.38


0.60 0.90 26.22
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.90 29.46


0.60 0.90 30.05
0.60 0.90 26.48
0.60 0.90 29.42

0.60 0.90 4.20

0.60 0.90 18.07


0.60 0.90 21.53
0.60 0.90 33.98

0.60 0.90 27.42

0.60 0.90 21.65

0.60 0.90 28.39

0.60 0.90 29.14

0.60 0.90 25.48

0.60 0.90 26.62

0.60 0.90 34.44

0.60 0.90 41.49

0.60 0.90 39.86

0.60 0.90 23.18


METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.90 25.49

0.60 0.90 26.82

0.60 0.90 16.08

0.60 0.90 24.56

0.60 0.90 40.67

0.60 0.90 27.54


0.60 0.90 25.87
0.60 0.90 27.54
0.60 0.90 35.38
0.60 0.90 23.24
0.60 0.90 29.54
0.60 0.90 24.41
0.60 0.90 18.33
0.60 0.90 25.33
0.60 0.90 38.13
0.60 0.90 29.21
0.60 0.90 17.86
0.60 0.90 36.50
0.60 0.90 8.85
0.60 0.90 29.49
0.60 0.90 25.50
0.60 0.90 27.07
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.90 25.74


0.60 0.90 18.24
0.60 0.90 16.20
0.60 0.90 26.60
0.60 0.90 27.98
0.60 0.90 16.05
0.60 0.90 17.82
0.60 0.90 40.95
0.60 0.90 27.12
0.60 0.90 10.75
0.60 0.90 25.93
0.60 0.90 31.60
0.60 0.90 31.61
0.60 0.90 29.66
0.60 0.90 34.61
0.60 0.90 26.30
0.60 0.90 29.11
0.60 0.90 38.23
0.60 0.90 34.83
0.60 0.90 35.72
0.60 0.90 21.60
0.60 0.90 20.09
0.60 0.90 31.99
0.60 0.90 28.74
0.60 0.90 7.19
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.90 5.07


0.60 0.90 34.59
0.60 0.90 38.00
0.60 0.90 38.99
0.60 0.90 18.50
0.60 0.90 28.33
0.60 0.90 22.62
0.60 0.90 27.91
0.60 0.90 27.28
0.60 0.90 27.85
0.60 0.90 15.41
0.60 0.90 14.84
0.60 0.90 29.70
0.60 0.90 6.83
0.60 0.90 25.50
0.60 0.90 25.48
0.60 0.90 20.37
0.60 0.90 28.31
0.60 0.90 28.37
0.60 0.90 38.27
0.60 0.90 34.71
0.60 0.90 18.51
0.60 0.90 16.92
0.60 0.90 35.64
0.60 0.90 16.74
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.90 34.83

4599.35
54.80
72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
39.87
62.93

50.77

40.09

52.58

53.96

47.19
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32

51.00
47.90
51.00
65.51
43.03
54.71
45.20
33.94
46.90
70.61
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
50.23
19.90
48.01
58.52
58.53
54.93
64.10
48.70
53.91
70.79
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
50.51
51.58
28.53
27.49
55.00
12.65
47.22
47.18
37.73
52.43
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
39.87
62.93

50.77

40.09
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

52.58

53.96

47.19

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32

51.00
47.90
51.00
65.51
43.03
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.71
45.20
33.94
46.90
70.61
54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
50.23
19.90
48.01
58.52
58.53
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.93
64.10
48.70
53.91
70.79
64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
50.51
51.58
28.53
27.49
55.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

12.65
47.22
47.18
37.73
52.43
52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

188.00

2.00

2.00
2.00
2.00
2.00
2.00
2.00

2.00

2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00
2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

54.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

14.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

7.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

102.00
102.00

246.44
106.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00

81.60
0.80 81.60

98.58
0.80 42.58
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00

180.18
0.80 42.58
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00
0.80 4.00

0.80 81.60
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

75.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
39.87
62.93

50.77

40.09

52.58

53.96
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

47.19

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32

51.00
47.90
51.00
65.51
43.03
54.71
45.20
33.94
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

46.90
70.61
54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
50.23
19.90
48.01
58.52
58.53
54.93
64.10
48.70
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

53.91
70.79
64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
50.51
51.58
28.53
27.49
55.00
12.65
47.22
47.18
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

37.73
52.43
52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
54.49

7.77

33.46
39.87
62.93
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

50.77

40.09

52.58

53.96

47.19

49.29

63.77

76.84

73.81

42.93

47.20

49.66

29.77

45.49

75.32

51.00
47.90
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

51.00
65.51
43.03
54.71
45.20
33.94
46.90
70.61
54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
49.25
51.81
29.72
33.00
75.83
50.23
19.90
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

48.01
58.52
58.53
54.93
64.10
48.70
53.91
70.79
64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
72.21
34.26
52.47
41.88
51.68
50.51
51.58
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

28.53
27.49
55.00
12.65
47.22
47.18
37.73
52.43
52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

4599.35

54.80

72.93
48.56
54.56
55.64
49.04
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

54.49

7.77

33.46
39.87
62.93

50.77

40.09

52.58

53.96

47.19

49.29

63.77

76.84

73.81

42.93

47.20

49.66
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

29.77

45.49

75.32

51.00
47.90
51.00
65.51
43.03
54.71
45.20
33.94
46.90
70.61
54.10
33.08
67.59
16.39
54.61
47.23
50.13
47.66
33.78
30.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

49.25
51.81
29.72
33.00
75.83
50.23
19.90
48.01
58.52
58.53
54.93
64.10
48.70
53.91
70.79
64.50
66.14
40.00
37.21
59.24
53.22
13.31
9.39
64.05
70.37
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

72.21
34.26
52.47
41.88
51.68
50.51
51.58
28.53
27.49
55.00
12.65
47.22
47.18
37.73
52.43
52.53
70.87
64.27
34.27
31.34
66.00
31.00
64.50

25085.09 25085.09
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1584.82

35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
63.72
64.72
65.41
67.00

67.96

69.01

69.20

72.27
73.64
76.30
82.06
82.06
93.42
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

100.56

110.52

914.03
49.35
59.39
59.39
63.30
65.41
72.27
76.30
82.06
82.06
93.42
100.56

110.52

570.56
69.01
60.30
73.64

35.01
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

63.72
64.72
67.00

69.20

67.96

100.23
49.76
50.47

15.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00

5.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00

1584.82

35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
63.72
64.72
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

65.41
67.00

67.96

69.01

69.20

72.27
73.64
76.30
82.06
82.06
93.42
100.56

110.52

1584.82

35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

63.72
64.72
65.41
67.00

67.96

69.01

69.20

72.27
73.64
76.30
82.06
82.06
93.42
100.56

110.52

1584.82

35.01

49.35
49.76
50.47
59.39
59.39
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

60.30
63.30
63.72
64.72
65.41
67.00

67.96

69.01

69.20

72.27
73.64
76.30
82.06
82.06
93.42
100.56

110.52

914.03
49.35
59.39
59.39
63.30
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

65.41
72.27
76.30
82.06
82.06
93.42
100.56

110.52

570.56
69.01
60.30
73.64
35.01
63.72
64.72
67.00

69.20

67.96

100.23
49.76
50.47
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

855.80

0.60 0.90 18.91

0.60 0.90 26.65


0.60 0.90 26.87
0.60 0.90 27.25
0.60 0.90 32.07
0.60 0.90 32.07
0.60 0.90 32.56
0.60 0.90 34.18
0.60 0.90 34.41
0.60 0.90 34.95
0.60 0.90 35.32
0.60 0.90 36.18

0.60 0.90 36.70

0.60 0.90 37.27

0.60 0.90 37.37

0.60 0.90 39.03


0.60 0.90 39.77
0.60 0.90 41.20
0.60 0.90 44.31
0.60 0.90 44.31
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.60 0.90 50.45


0.60 0.90 54.30

0.60 0.90 59.68

1584.82

35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
63.72
64.72
65.41
67.00

67.96

69.01

69.20

72.27
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

73.64
76.30
82.06
82.06
93.42
100.56

110.52

1584.82

35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
63.72
64.72
65.41
67.00

67.96

69.01
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

69.20

72.27
73.64
76.30
82.06
82.06
93.42
100.56

110.52

44.00

2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00

2.00

2.00

2.00
2.00
2.00
2.00
2.00
2.00
2.00

15.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00

4.00
1.00
1.00
1.00
1.00

2.00
1.00
1.00

2825.30
98.70
99.52
100.94
118.78
118.78
120.60
126.60
127.44
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

129.44
130.82
134.00
138.02
144.54
147.28
152.60
164.12
164.12
186.84
201.12

221.04

1130.12
0.80 39.48
0.80 39.81
0.80 40.38
0.80 47.51
0.80 47.51
0.80 48.24
0.80 50.64
0.80 50.98
0.80 51.78
0.80 52.33
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 53.60
0.80 55.21
0.80 57.82
0.80 58.91
0.80 61.04
0.80 65.65
0.80 65.65
0.80 74.74
0.80 80.45

0.80 88.42

1130.12
0.80 39.48
0.80 39.81
0.80 40.38
0.80 47.51
0.80 47.51
0.80 48.24
0.80 50.64
0.80 50.98
0.80 51.78
0.80 52.33
0.80 53.60
0.80 55.21
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.80 57.82
0.80 58.91
0.80 61.04
0.80 65.65
0.80 65.65
0.80 74.74
0.80 80.45

0.80 88.42

19.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.00
1.00
1.00
1.00
1.00

200.00
4.00 200.00

130.13
4.00 Area=19.10 m2 76.40
2.50 Area=7.63 m2 19.08
2.50 Area=4.87 m2 12.18
2.50 Area=5.25 m2 13.13
2.50 Area=3.74 m2 9.35

33.57
Area=9.65 m2 9.65
2.50 Area=3.19 m2 9.17
2.50 Area=1.64 m2 4.72
2.50 Area=2.50 m2 7.19
2.50 Area=0.99 m2 2.85
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

111.04
Vol=96.56 m3 111.04

12.50
2.50 12.50

12.50
2.50 1.00 12.50

3.13
2.50 0.50 3.13

25.00
Area=25.00 m2 25.00

13.75
2.50 1.10 13.75

195.30
Ø5/8 1.55 kg 195.30

1.41
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

0.30 4.70 1.41

235.43
Ø1/2 0.99 kg 152.44
Ø3/8 0.56 kg 82.99

20.68
0.30 4.70 11.28
0.25 4.70 9.40

0.08
0.30 0.30 0.08

11.63
Ø1/2 0.99 kg 7.51
Ø3/8 0.56 kg 4.12

1.56
0.90 0.30 1.08
0.30 0.36
0.30 0.12

35.74
Area=35.74 m2 35.74
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

20.68

4.70 11.28
4.70 9.40

1.68

0.30 1.08
0.30 0.36
0.12
0.12

22.36

4.70 11.28
4.70 9.40
0.30 1.08
0.30 0.36
0.12
0.12
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.00

2.00

2.00

2.00

2.00

2.00

53.60

53.60

53.60

53.60

6.00

6.00

93.18
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

1.50
3.02
3.10
3.22
3.38
3.58
3.82
4.12
4.46
4.84
5.26
5.74
6.26
6.84
7.42
8.14
8.86
9.62

93.18
1.50
3.02
3.10
3.22
3.38
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

3.58
3.82
4.12
4.46
4.84
5.26
5.74
6.26
6.84
7.42
8.14
8.86
9.62

140.00
140.00

35.00
35.00

2.00
2.00
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

35.00
35.00

1584.82
35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
63.72
64.72
65.41
67.00

67.96

69.01

69.20

72.27
73.64
76.30
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

82.06
82.06
93.42
100.56

110.52

1584.82
35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
63.72
64.72
65.41
67.00

67.96

69.01

69.20

72.27
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

73.64
76.30
82.06
82.06
93.42
100.56

110.52

1584.82
35.01

49.35
49.76
50.47
59.39
59.39
60.30
63.30
63.72
64.72
65.41
67.00

67.96

69.01
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

69.20

72.27
73.64
76.30
82.06
82.06
93.42
100.56

110.52

461.00 461.00

346.00
346.00

104.00
104.00

11.00
11.00

2463.37 2463.37
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

10.87
10.87

1.00
1.00

1080.00
1080.00

1080.00
1080.00

10.87
10.87

10.87
10.87

24.13
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

2.22 24.13

15.44
1.42 15.44

10.87
10.87

52.07
2.22 31.37

1.42 18.52

0.20 2.17

2.17
0.20 2.17

150.38
0.50 5 27.18

56 123.20

2.83
2.43

0.20 0.40
METRADOS
STEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
E LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen,
Ancho (m) Altura (m) Peso, Forma y Parcial Total Observaciones
Otros

11.87
1.00
10.87
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)


06.05.01 TRABAJOS PRELIMINARES
06.05.01.01 TRAZO Y REPLANTEO DE OBRA m2
m3 1 1 60

06.05.01.02 EXPLANACION EN MATERIAL SUELTO m3


m3 1 1

06.05.01.03 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3

1 1

06.05.02 CAMARA DE REJAS


06.05.02.01 MOVIMIENTO DE TIERRAS
06.05.02.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3
VOLUMEN CAD 1 1.00 1.00
VOLUMEN CAD 2 1.00 1.00
VOLUMEN CAD ADIC X ESTABILIZACIÓN 1.00 1.00

06.05.02.01.02 REFINE Y COMP. DE TERRENO m2


AREA CAD 1.00 1.00

06.05.02.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


VOLUMEN CAD 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.02.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2


VOLUMEN CAD 1.00 1.00

06.05.02.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


VOLUMEN CAD EXCAVACIOON 1.00 1.30
VOLUMEN CAD RELLENO 1.00 1.30

06.05.02.02 OBRAS DE CONCRETO SIMPLE


06.05.02.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2
AREA CAD 1.00 1.00

06.05.02.02.02 CONCRETO F'C = 140 KG/CM2 - DADO DE CONCRETO m3


VOLUMEN 1.00 1.00 0.40

06.05.02.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2


ENCOFRADO 1.00 1.00

06.05.02.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2


AREA 1.00 1.00

06.05.02.02.05 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO DE VEREDA 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.02.03 OBRAS DE CONCRETO ARMADO


06.05.02.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
ACERO LONGITUDINAL CR 1.00 4.00 3.19
ACERO TRANVERSAL CR 1.00 19.00 0.55
ACERO LONGITUDINAL BY PASS 1.00 2.00 2.42
ACERO TRANSVERSAL BY PASS 1.00 10.00 0.57

06.05.02.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3


VOLUMEN 1 1.00 1.00
VOLUMEN 2 1.00 1.00

06.05.02.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


ACERO HORIZONTAL CR 1.00 3.00 6.61
ACERO VERTICAL CR 1.00 34.00 0.50
ACERO HORIZONTAL BY PASS 1.00 3.00 3.71
ACERO VERTICAL BY PASS 1.00 14.00 0.50

06.05.02.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2


ENCOFRADO 1.00
ENCOFRADO EXTERNO CR 1 1.00 1.00
ENCOFRADO EXTERNO CR 2 1.00 2.00
ENCOFRADO EXTERNO CR 3 1.00 2.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ENCOFRADO INTERNO CR 1 1.00 1.00


ENCOFRADO INTERNO CR 2 1.00 2.00
ENCOFRADO EXTERNO BY PASS 1 1.00 1.00
ENCOFRADO EXTERNO BY PASS 2 1.00 1.00
ENCOFRADO EXTERNO BY PASS 3 1.00 1.00
ENCOFRADO INTERNO BY PASS 1 1.00 1.00
ENCOFRADO INTERNO BY PASS 2 1.00 1.00
ENCOFRADO INTERNO BY PASS 3 1.00 1.00

06.05.02.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


VOLUMEN EJE A-A (CR) 1.00 1.00
VOLUMEN EJE B-B (CR) 1.00 1.00
VOLUMEN EJE 1-1 (CR) 1.00 1.00 0.40
VOLUMEN EJE 2-2 (CR) 1.00 1.00 0.40
VOLUMEN DE VENTANA 1 (CR) 1.00 1.00 0.40
VOLUMEN DE VENTANA 2 (CR) 1.00 1.00 0.40
VOLUMEN BY PASS 1 1.00 1.00
VOLUMEN BY PASS 2 1.00 1.00 0.55
VOLUMEN BY PASS 3 1.00 1.00 0.55

06.05.02.03.06 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - LOSA DE TECHO kg


ACERO LONGITUDINAL TECHO 1.00 4.00 0.84
ACERO TRANSVERSAL TECHO 1.00 5.00 0.62
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.02.03.07 ENCOFRADO Y DESENCOFRADO - LOSA DE TECHO m2


ENCOFRADO TECHO 1.00 1.00 0.92
ENCOFRADO TECHO BORDE 1.00 1.00

06.05.02.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE TECHO m3


VOLUMEN EN TAPA 1.00 1.00 0.92

06.05.02.03.09 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO BORDE DE LOSA 1.00
CURADO MURO EXTERNO CR 1 1.00 1.00
CURADO MURO EXTERNO CR 2 1.00 2.00
CURADO MURO EXTERNO CR 3 1.00 2.00
CURADO MURO INTERNO CR 1 1.00 1.00
CURADO MURO INTERNO CR 2 1.00 2.00
CURADO BORDE SUPERIOR CR 1.00 1.00
CURADO MURO EXTERNO BY PASS 1 1.00 1.00
CURADO MURO EXTERNO BY PASS 2 1.00 1.00
CURADO MURO EXTERNO BY PASS 3 1.00 1.00
CURADO MURO INTERNO BY PASS 1 1.00 1.00
CURADO MURO INTERNO BY PASS 2 1.00 1.00
CURADO MURO INTERNO BY PASS 3 1.00 1.00
CURADO BORDE SUPERIOR BY PASS 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.02.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.02.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
CAMARA HUMEDA INTERNA CR 1 1.00 1.00
CAMARA HUMEDA INTERNA CR 2 1.00 2.00
CAMARA HUMEDA INTERNA FONDO DE CR 1.00 1.00
CAMARA HUMEDA INTERNA BY PASS 1 1.00 1.00
CAMARA HUMEDA INTERNA BY PASS 2 1.00 1.00
CAMARA HUMEDA INTERNA BY PASS 3 1.00 1.00
CAMARA HUMEDA INTERNA FONDO DE BY PASS 1.00 1.00

06.05.02.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2


CAMARA EXTERNA CR 1 1.00 1.00
CAMARA EXTERNA CR 2 1.00 2.00
CAMARA EXTERNA CR 3 1.00 2.00
CAMARA EXTERNA BORDE SUPERIOR CR 1.00 1.00
CAMARA EXTERNA BY PASS 1 1.00 1.00
CAMARA EXTERNA BY PASS 2 1.00 1.00
CAMARA EXTERNA BY PASS 3 1.00 1.00
CAMARA EXTERNA BORDE SUPERIOR BY PASS 1.00 1.00

06.05.02.05 PINTURA
06.05.02.05.01 PINTADO C/ESMALTE (2 MANOS) m2
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

PINTURA EXTERNA BORDE SUPERIOR CR 1.00 1.00


PINTURA EXTERNA BORDE SUPERIOR BY PASS 1.00 1.00

06.05.02.06 CARPINTERIA METALICA


06.05.02.06.01 SUM. E INST. DE REJA METALICA CON FoLo 1/4" INC. PINTURA ANTICORROSIVA EPOXICA - CAMARA DE REJAS und
REJA METALICA 1.00

06.05.02.07 VARIOS
06.05.02.07.01 COLOCACION DE TUB. DE VENTILACION EN LOSA DE OPERACION (PVC DN = 2") - CAMARA DE REJAS m
TUBERIAS 1.00 10.00 0.15

06.05.02.07.02 JUNTA DE DILATACION CON ASFALTO e = 1" m


JUNTA 1.00 1.00 0.40

06.05.03 DESARENADOR
06.05.03.01 MOVIMIENTO DE TIERRAS
06.05.03.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3
VOLUMEN CAD 1 1.00 1.00
VOLUMEN CAD 2 1.00 1.00 1.40
VOLUMEN CAD ADIC X ESTABILIZACIÓN 1 1.00 1.00
VOLUMEN CAD ADIC X ESTABILIZACIÓN 2 1.00 2.00 0.50
VOLUMEN CAD ADIC X ESTABILIZACIÓN 3 1.00 1.00 1.40
VOLUMEN CAD ADIC X ESTABILIZACIÓN 4 1.00 2.00 0.73
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.03.01.02 REFINE Y COMP. DE TERRENO m2


AREA CAD 1 1.00 1.00
AREA CAD 2 1.00 1.00 1.40

06.05.03.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


VOLUMEN CAD 1 1.00 1.00
VOLUMEN CAD 2 1.00 2.00 0.50
VOLUMEN CAD 3 1.00 1.00 1.40
VOLUMEN CAD 4 1.00 2.00 0.73

06.05.03.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2


AREA 1.00 1.00

06.05.03.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


VOLUMEN CAD EXCAVACIOON 1.00 1.30
VOLUMEN CAD RELLENO 1.00 1.30

06.05.03.02 OBRAS DE CONCRETO SIMPLE


06.05.03.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2
AREA CAD 1 1.00 1.00
AREA CAD 2 1.00 1.00 1.40
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.03.02.02 CONCRETO F'C = 140 KG/CM2 - DADO DE CONCRETO m3


VOLUMEN 1.00 2.00 0.25

06.05.03.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2


ENCOFRADO 1.00 1.00

06.05.03.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2


AREA 1.00 1.00

06.05.03.02.05 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO DE VEREDA 1.00 1.00

06.05.03.03 OBRAS DE CONCRETO ARMADO


06.05.03.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
ACERO LONGITUDINAL 1 1.00 7.00 2.21
ACERO TRANSVERSAL 1 1.00 11.00 0.84
ACERO LONGITUDINAL 2 1.00 9.00 6.45
ACERO TRANSVERSAL 2 1.00 35.00 1.20
ACERO LONGITUDINAL CAJA DE VALVULAS 2.00 4.00 0.50
ACERO TRANVERSAL CAJA DE VALVULAS 2.00 4.00 0.60

06.05.03.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3


VOLUMEN DESARENADOR 1 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

VOLUMEN DESARENADOR 2 1.00 1.00 1.40


VOLUMEN CAJA DE VALVULAS 1.00 2.00 0.70

06.05.03.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


ACERO HORIZONTAL 1 2.00 7.00 8.03
ACERO VERTICAL 1 1.00 7.00 0.83
1.00 3.00 0.83
1.00 3.00 0.83
1.00 3.00 0.75
1.00 3.00 0.75
1.00 3.00 0.76
1.00 3.00 0.78
1.00 3.00 0.79
1.00 3.00 0.81
1.00 3.00 0.82
1.00 3.00 0.83
1.00 3.00 0.85
1.00 3.00 0.88
1.00 3.00 0.90
1.00 3.00 0.91
1.00 3.00 0.92
1.00 3.00 0.94
1.00 3.00 0.95
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

1.00 3.00 0.97


1.00 3.00 0.99
1.00 3.00 1.00
1.00 3.00 1.02
1.00 3.00 1.34
1.00 3.00 1.34
1.00 3.00 1.02
1.00 3.00 0.93
1.00 3.00 0.86
1.00 3.00 0.78
1.00 3.00 0.71
1.00 26.00 0.64
ACERO HORIZONTAL 2 1.00 7.00 6.44
ACERO HORIZONTAL CAJA DE VALVULAS 1.00 6.00 2.64
ACERO VERTICAL CAJA DE VALVULAS 1.00 12.00 1.33

06.05.03.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2


ENCOFRADO 1 LOSA DE PISO 1.00 1.00
ENCOFRADO 2 LOSA DE PISO 1.00 2.00
ENCOFRADO 3 LOSA DE PISO 1.00 1.40
ENCOFRADO CAJA DE VALVULAS LOSA DE PISO 1.00 2.00 2.00
ENCOFRADO 1 1.00 4.00 2.25
ENCOFRADO 2 1.00 6.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ENCOFRADO 3 1.00 2.00 1.40


ENCOFRADO DE BORDE DE DESARENADOR 1.00 2.00 0.20
ENCOFRADO CAJA DE VALVULAS EXTERNO 2.00 1.00
ENCOFRADO CAJA DE VALVULAS INTERNO 2.00 1.00

06.05.03.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


VOLUMEN DESARENADOR 1 1.00 2.00 2.25
VOLUMEN DESARENADOR 2 1.00 3.00 0.20
VOLUMEN DESARENADOR 3 1.00 2.00 0.40
VOLUMEN CAJA DE VALVULA 1 2.00 2.00 0.70
VOLUMEN CAJA DE VALVULA 2 2.00 2.00 0.40

06.05.03.03.06 TAPA DE CONCRETO PRE FABRICADO und


TAPA DE CONCRETO 2.00

06.05.03.03.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO BORDE DE LOSA DE PISO 1 1.00 1.00
CURADO BORDE DE LOSA DE PISO 2 1.00 2.00
CURADO BORDE DE LOSA DE PISO 3 1.00 1.40
CURADO LOSA DE PISO DESARENADOR 1.00 1.00
CURADO BORDE DE LOSA DE PISO CAJA DE VALVULAS 1.00 2.00 2.00
CURADO LOSA DE PISO CAJA DE VALVULAS 1.00 1.00
CURADO MUROS 1 1.00 4.00 2.25
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CURADO MUROS 2 1.00 6.00


CURADO MUROS 3 1.00 2.00 1.40
CURADO BORDE SUPERIOR DESARENADOR 1.00 1.00
CURADO MUROS DE BORDE DE DESARENADOR 1.00 2.00 0.20
CURADO MUROS CAJA DE VALVULAS EXTERNO 2.00 1.00
CURADO MUROS CAJA DE VALVULAS INTERNO 2.00 1.00
CURADO DE BORDE SUPERIOR DE CAJA DE VALVULAS 1.00 1.00
CURADO DE TAPA DE CAJA DE VALVULAS 2.00 1.00
CURADO DE LOSA DE TECHO DE TAPA DE CAJA DE VALVULAS 1.00 2.00 0.50

06.05.03.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.03.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
CAMARA INTERNA DES 1 1.00 2.00 2.25
CAMARA INTERNA DES 2 1.00 4.00
CAMARA INTERNA DES 3 1.00 2.00 0.40
CAMARA INTERNA DE BORDE DE DESARENADOR 1.00 2.00 2.00
CAMARA INTERNA FONDO DE LOSA 1 1.00 1.00
CAMARA INTERNA FONDO DE LOSA 2 1.00 2.00 0.40

06.05.03.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2


CAMARA EXTERNA DES 1 1.00 2.00 2.25
CAMARA EXTERNA DES 2 1.00 2.00
CAMARA EXTERNA DES 3 1.00 1.00 1.40
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CAMARA EXTERNA BORDE DES 1.00 1.00


CAJA DE VALVULAS EXTERNO 1.00 1.00
CAJA DE VALVULAS INTERNO 1.00 1.00
CAJA DE VALVULAS BORDE 1.00 1.00
CAJA DE VALVULAS FONDO DE LOSA 1.00 1.00

06.05.03.05 PINTURA
06.05.03.05.01 PINTADO C/ESMALTE (2 MANOS) m2
PINTURA EXTERNA BORDE SUPERIOR DESARENADOR 1.00 1.00
PINTURA CAJA DE VALVULAS BORDE SUPERIOR 1.00 1.00
PINTURA CAJA DE VALVULAS TAPA 1.00 2.00 0.50

06.05.03.06 EQUIPAMIENTO HIDRAULICO - DESARENADOR


06.05.03.06.01 SUMINISTRO E INST. DE EQUIPAMIENTO HIDRAULICO DE DESARENADOR und
BRIDA ROMPE AGUA DE ACERO PARA SOLDAR DN = 250 MM
1.00
VALVULA COMPUERTA HFD ISO 5996 BB PN-10 DN = 250 MM
NIPLE ACERO SCH-40 DN = 250 MM BE PN-10 L=0.40m

06.05.03.07 VARIOS
06.05.03.07.01 JUNTA DE DILATACION CON ASFALTO e = 1" m
JUNTA 1.00 2.00 0.60

06.05.03.07.02 SUM. E INST.DE COMPUERTA TIPO TARJETA PL PVC E=2" x 0.45 x 0.60 und
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

COMPUERTA 2.00

06.05.03.07.03 SUM. E INST.DE VERTEDERO TIPO SUTRO PL PVC E=1" x 0.45 x 0.50 und
VERTEDERO 2.00

06.05.04 CAMARA DISTRIBUCION DE CAUDALES (CDC)


06.05.04.01 MOVIMIENTO DE TIERRAS
06.05.04.01.01 EXCAVACION MANUAL m3
VOLUMEN CAD 1.00 1.00 1.05
VOLUMEN CAD ADIC X ESTABILIZACIÓN 1.00 1.00 1.05

06.05.04.01.02 REFINE Y COMP. DE TERRENO m2


AREA CAD 1.00 1.00

06.05.04.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


VOLUMEN CAD 1.00 1.00 1.05

06.05.04.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2


AREA 1.00 1.00

06.05.04.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


VOLUMEN CAD EXCAVACIOON 1.00 1.30
VOLUMEN CAD RELLENO 1.00 1.30
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.04.02 OBRAS DE CONCRETO SIMPLE


06.05.04.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2
AREA CAD 1.00 1.00

06.05.04.02.02 ENCOFRADO Y DESENCOFRADO - VEREDA m2


ENCOFRADO 1.00 1.00

06.05.04.02.03 CONCRETO F'C = 175 KG/CM2 - VEREDA m2


AREA 1.00 1.00

06.05.04.02.04 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO DE VEREDA 1.00 1.00

06.05.04.03 OBRAS DE CONCRETO ARMADO


06.05.04.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
ACERO LONGITUDINAL 1.00 10.00 2.40
ACERO TRANSVERSAL 1.00 14.00 1.67

06.05.04.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3


VOLUMEN 1 1.00 1.00 2.55

06.05.04.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ACERO HORIZONTAL 1 1.00 4.00


ACERO VERTICAL 1 1.00 44.00
ACERO HORIZONTAL 2 2.00 4.00
ACERO VERTICAL 2 2.00 5.00
ACERO HORIZONTAL 3 1.00 3.00
ACERO VERTICAL 3 1.00 8.00

06.05.04.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2


ENCOFRADO LOSA DE PISO 1.00 1.00
ENCOFRADO EXTERNO 1 1.00 2.00 1.80
ENCOFRADO EXTERNO 2 1.00 2.00 2.55
ENCOFRADO INTERNO 1 1.00 2.00 1.50
ENCOFRADO INTERNO 2 1.00 2.00 2.25
ENCOFRADO INTERNO 3 1.00 4.00 0.90
ENCOFRADO VIGA INTERNO 1 1.00 2.00 1.50
ENCOFRADO VIGA INTERNO 2 1.00 1.00 1.50

06.05.04.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


VOLUMEN 1 (EJE 1-1) 1.00 2.00 1.80
VOLUMEN 2 (EJE A-A) 1.00 2.00 2.25
VOLUMEN 3 (EJE B-B) 1.00 2.00 0.90
VOLUMEN 3 (EJE INTERMEDIO) 1.00 1.00 1.50
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.04.03.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO BORDE DE LOSA 1.00 1.00
CURADO LOSA DE PISO 1.00 1.00
CURADO MURO EXTERNO 1 1.00 2.00 1.80
CURADO MURO EXTERNO 2 1.00 2.00 2.55
CURADO MURO INTERNO 1 1.00 2.00 1.50
CURADO MURO INTERNO 2 1.00 2.00 2.25
CURADO MURO INTERNO 3 1.00 4.00 0.90
CURADO VIGA INTERNO 1 1.00 2.00 1.50
CURADO VIGA INTERNO 2 1.00 2.00 1.50
CURADO BORDE SUPERIOR 1.00 1.00

06.05.04.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.04.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
CAMARA HUMEDA LOSA DE PISO 1.00 1.00
CAMARA HUMEDA MURO INTERNO 1 1.00 2.00 1.50
CAMARA HUMEDA MURO INTERNO 2 1.00 2.00 2.25
CAMARA HUMEDA MURO INTERNO 3 1.00 4.00 0.90
CAMARA HUMEDA VIGA INTERNO 1 1.00 2.00 1.50
CAMARA HUMEDA VIGA INTERNO 2 1.00 2.00 1.50

06.05.04.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2


CAMARA MURO EXTERNO 1 1.00 2.00 1.80
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CAMARA MURO EXTERNO 2 1.00 2.00 2.55


CAMARA MURO INTERNO 1 1.00 2.00 1.50
CAMARA EXTERNA BORDE SUPERIOR 1.00 1.00

06.05.04.05 PINTURA
06.05.04.05.01 PINTADO C/ESMALTE (2 MANOS) m2
PINTURA MURO EXTERNO 1 1.00 2.00 1.80
PINTURA MURO EXTERNO 2 1.00 2.00 2.55
PINTURA MURO INTERNO 1 1.00 2.00 1.50
PINTURA EXTERNA BORDE SUPERIOR 1.00 1.00

06.05.04.06 VARIOS
06.05.04.06.01 SUM. E INST.DE VERTEDERO TRIANGULAR PL PVC E=1" x 0.50 x 0.20 und
VERTEDERO 3.00

06.05.04.06.02 SUM. E INST. BRIDA ROMPE AGUA DE ACERO PARA SOLDAR DN = 160 MM und
BRIDA 3.00
06.05.05 TANQUES IMHOFF
06.05.05.01 MOVIMIENTO DE TIERRAS
06.05.05.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3

3.00 1.00 11.10


CONSIDERANDO UN RETIRO DE 2.00 M A CADA LADO DEL TANQUE
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.05.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2


3.00 1.00 9.30

06.05.05.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


EXCAVACION 1.00 1.20 1657.87
ESTRUCTURA 3.00 -1.20 9.10
MATERIAL DE PRESTAMO -1.00 153.45

06.05.05.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2

3.00 1.00 9.30

06.05.05.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3

EXCAVACION 1.00 1.20 1657.87


RELLENO -1.00 1.20 774.62

06.05.05.02 OBRAS DE CONCRETO SIMPLE


06.05.05.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2
3.00 1.00 9.30

06.05.05.02.02 CONCRETO F'C = 175 KG/CM2 - DADOS DE CONCRETO m3


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

INSTALACIONES SANITARIAS 3.00 9.00 0.30

06.05.05.02.03 ENCOFRADO Y DESENCOFRADO - DADOS DE CONCRETO m2

INSTALACIONES SANITARIAS 3.00 9.00 1.20

06.05.05.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2


AREA 1.00

06.05.05.02.05 ENCOFRADO Y DESENCOFRADO - VEREDA m2


ENCOFRADO 1.00
06.05.05.02.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2
AREA 1.00

06.05.05.03 OBRAS DE CONCRETO ARMADO


06.05.05.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
3.00 657.28
3.00 115.20
3.00 592.62
3.00 122.40

06.05.05.03.02 ENCOFRADO Y DESENCOFRADO EN PISO m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

3.00 2.00
3.00 2.00

06.05.05.03.03 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3


3.00 1.00 9.13

06.05.05.03.04 ACERO Fy = 4200 kg/cm2 EN MUROS kg


ACERO VERTICAL - MURO EXTERIOR 51 Ø3/4'' |_____| 3.00 714.00
ACERO VERTICAL - MURO EXTERIOR 51 Ø3/4'' |_____| 3.00 724.20
BASTON DE REFUERZO - MURO EXTERIOR 51 Ø3/4'' |______ 3.00 734.40
Estribo : 6 Und de Ø3/8'' en 2 Elem. Simil. 3.00 306.00
HORIZONTAL LONGITUDINAL 33 Ø1/2'' |_____| 3.00 1280.40

CAJA DE VALVULAS - VERTICAL 14 Ø3/8'' ______| 3.00 25.90


CAJA DE VALVULAS - HORIZONTAL 10 Ø3/8'' |_____| 3.00 46.00

CAJA DE VALVULAS - PISO 7 Ø3/8'' |______ 3.00 11.41


CAJA DE VALVULAS - PISO 7 Ø3/8'' |_____| 3.00 13.51

CAJA DE REGISTRO INGRESO - VERTICAL 10 Ø3/8'' |_____| 3.00 19.00


Estribo :ANILLO DE CAJA DE REGISTRO 4 Und de Ø3/8'' en 1 Elem. Simil. 3.00 12.00
VERTICAL LONGITUDINAL - SEDIMENTADOR 36 Ø1/2'' _______ 3.00 1.00
HORIZONTAL LONGITUDINAL - SEDIMENTADOR 39 Ø1/2'' |_____| 3.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.05.03.05 ENCOFRADO Y DESENCOFRADO EN MUROS m2


Muros Longitudinales - Exterior 3.00 2.00 8.40
Muros Longitudinales - Interior 3.00 2.00 7.90
Muros Tranversales - Exterior 3.00 1.00 4.60
Muros Tranversales - Interior 3.00 1.00 4.10
3.00 2.00 3.20
Encofrado Interior 3.00 1.00 1.40
Encofrado Exterior 3.00 1.00 1.40
CAJA DE VALVULAS 3.00 1.00 1.10
3.00 4.00
CAJA DE REGISTRO 3.00 1.00 2.40
3.00 1.00 2.70
Muros Longitudinales - Camara de Sedimentacion 3.00 1.00 7.90

06.05.05.03.06 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


Muros Longitudinales 3.00 2.00 8.40
Muros Tranversales 3.00 1.00 4.60
Muros Tranversales 3.00 1.00 3.20
3.00 1.00 1.40
CAJA VACIA 3.00 1.00 1.10
3.00 -1.00 0.70
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TAPA 3.00 1.00 1.00


CAJA VACIA 3.00 1.00 0.90
3.00 -1.00 0.60
Muros Longitudinales - Camara de Sedimentacion 3.00 1.00 7.90

06.05.05.03.07 TAPA DE CONCRETO PRE FABRICADO und


3.00 1.00

06.05.05.03.08 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


3.00 1.00 9.13
Muros Longitudinales - Exterior 3.00 2.00 8.40
Muros Longitudinales - Interior 3.00 2.00 7.90
Muros Tranversales - Exterior 3.00 1.00 4.60
Muros Tranversales - Interior 3.00 1.00 4.10

3.00 2.00 3.20


Encofrado INTERIOR 3.00 1.00 1.40
Encofrado Exterior 3.00 1.00 1.40
Caja de Valvulas 3.00 1.00 1.10
3.00 4.00
Caja de Registro 3.00 1.00 2.40
3.00 1.00 2.70
Muros Longitudinales - Camara de Sedimentacion 3.00 1.00 7.90
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.05.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.05.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
Losa de Piso 3.00 1.00 7.95
Muros Longitudinales - Interior 3.00 2.00 7.90
Muros Tranversales - Interior 3.00 1.00 4.10
Muros Tranversales - Interior 3.00 2.00 3.20
Muros Longitudinales - Camara de Sedimentacion 3.00 1.00 7.90

06.05.05.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2


Borde de piso 3.00 2.00
Borde de piso 3.00 2.00
Muros Longitudinales - Exterior 3.00 2.00 8.40
Muros Tranversales - Exterior 3.00 1.00 4.60
Caja de valvulas 3.00 1.00 1.10
Caja de valvulas 3.00 4.00
Caja de registro 3.00 1.00 2.40
Caja de registro 3.00 1.00 2.70

06.05.05.05 PINTURA
06.05.05.05.01 PINTADO C/ESMALTE (2 MANOS) m2
Borde superior de tanque 3.00 1.00
Borde lateral de tanque 3.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.05.06 CARPINTERIA DE MADERA


06.05.05.06.01 SUM. E INST.DE BAFLE DE MADERA 2" 1.20m x 0.80 m und
BAFLE 3.00 2.00

06.05.05.07 EQUIPAMIENTO HIDRAULICO


06.05.05.07.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - TANQUE IMHOFF und
EQUIPAMIENTO HIDRAULICO TANQUE IMHOFF 3.00 1.00

CANASTILLA PVC DN = 200MM BRIDADA


YEE PVC PN 10 DN= 200 MM
CODO 45° PVC PN 10 DN= 8"
NIPLE PVC DN = 200 MM L=0.30 m
ADAPTADOR BRIDA CAMPANA DN = 8"
NIPLE HFD/CON BRIDA ROMPEAGUA BB DN=8"
VALVULA COMPUERTA HFD ISO 5996 BB PN-10 DN = 200 MM
NIPLE PVC DN = 200 MM L=2.70 m
NIPLE PVC DN = 200 MM L=2.30 m
TAPON DE PROTECCCION CON PERFORACIONES D= 200 MM
NIPLE PVC DN = 200 MM L=0.50 m
NIPLE SCH-40/CON BRIDA ROMPEAGUA BB DN=6"
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.05.08 OTROS
06.05.05.08.01 JUNTA DE CONSTRUCCION CON WATER STOP m
WATER STOP 3.00 1.00 25.00

06.05.05.08.02 JUNTA DE DILATACION CON ASFALTO e = 1" m


JUNTA 3.00 1.00 0.90

06.05.06 FILTRO BIOLOGICO


06.05.06.01 MOVIMIENTO DE TIERRAS
06.05.06.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3
VOLUMEN CAD 3.00 1.00
VOLUMEN CAD ADIC X ESTABILIZACIÓN 3.00 1.00

06.05.06.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2


AREA CAD 1 3.00 1.00

06.05.06.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


VOLUMEN CAD 1 3.00 1.00
VOLUMEN CAD 2 3.00 1.00

06.05.06.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2


AREA 3.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.06.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


VOLUMEN CAD EXCAVACIOON 3.00 1.30
VOLUMEN CAD RELLENO 3.00 1.30

06.05.06.02 OBRAS DE CONCRETO SIMPLE


06.05.06.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2
AREA CAD 1 3.00 1.00

06.05.06.02.02 CONCRETO F'C = 175 KG/CM2 - VEREDA m2


AREA 1.00 1.00
AREA 1.00 1.00
AREA 1.00 1.00

06.05.06.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2


ENCOFRADO 1.00 1.00
1.00 1.00
1.00 1.00

06.05.06.02.04 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO DE VEREDA 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CURADO DE VEREDA 1.00 1.00


CURADO DE VEREDA 1.00 1.00

06.05.06.03 OBRAS DE CONCRETO ARMADO


06.05.06.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
ACERO LONGITUDINAL LOSA 1 (1 MALLAS) 3.00 34.00 1.11
ACERO TRANSVERSAL LOSA 1 (1 MALLAS) 3.00 4.00 8.56
ACERO LONGITUDINAL LOSA 2 (2 MALLAS) 6.00 35.00 3.49
ACERO TRANSVERSAL LOSA 2 (2 MALLAS) 6.00 14.00 8.76

06.05.06.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3


VOLUMEN 1 3.00 1.00 8.41
VOLUMEN 2 3.00 1.00 8.40

06.05.06.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


ACERO HORIZONTAL (EJE 1-1) PLACA 1 (1 MALLAS) 3.00 7.00 8.26
ACERO VERTICAL (EJE 1-1) PLACA 1 (1 MALLAS) 3.00 34.00 1.24
ACERO HORIZONTAL (EJE INTERMEDIO 1) PLACA 2 (2 MALLAS) 6.00 13.00 8.76
ACERO VERTICAL (EJE INTERMEDIO 1) PLACA 2 (2 MALLAS) 6.00 35.00 3.49
ACERO HORIZONTAL (EJE INTERMEDIO 2) PLACA 3 (2 MALLAS) 6.00 11.00 8.76
ACERO VERTICAL (EJE INTERMEDIO 2) PLACA 3 (2 MALLAS) 6.00 35.00 3.05
ACERO HORIZONTAL (EJE 2-2) PLACA 4 (1 MALLAS) 3.00 5.00 8.25
ACERO VERTICAL (EJE2-2) PLACA 4 (1 MALLAS) 3.00 34.00 1.38
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ACERO HORIZONTAL (EJE A-A) PLACA 5 (1 MALLAS) X2 LADOS 6.00 5.00 1.05
ACERO VERTICAL (EJEA-A) PLACA 5 (1 MALLAS) X2 LADOS 6.00 3.00 1.24
ACERO HORIZONTAL (EJE A-A) PLACA 6 (2 MALLAS) X2 LADOS 12.00 11.00 2.86
ACERO VERTICAL (EJEA-A) PLACA 6 (2 MALLAS) X2 LADOS 12.00 9.00 3.05
ACERO HORIZONTAL (EJE A-A) PLACA 7 (1 MALLAS) X2 LADOS 6.00 5.00 1.12
ACERO VERTICAL (EJEA-A) PLACA 7 (1 MALLAS) X2 LADOS 6.00 3.00 1.38

06.05.06.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2


ENCOFRADO 1 (EJE 1-1) CARA EXTERNA - LOSA DE PISO 3.00 1.00
ENCOFRADO 2 (EJE INTERMEDIO 1) CARA EXTERNA - LOSA DE PISO 3.00 1.00
ENCOFRADO 3 (EJE INTERMEDIO 2) CARA EXTERNA - LOSA DE PISO 3.00 1.00 8.40
ENCOFRADO 4 (EJE 2-2) CARA EXTERNA - LOSA DE PISO 3.00 1.00 8.40
ENCOFRADO 5 (EJE A-A) CARA EXTERNA - LOSA DE PISO 3.00 1.00 1.00
ENCOFRADO 6 (EJE A-A) CARA EXTERNA - LOSA DE PISO 3.00 1.00 2.50
ENCOFRADO 7 (EJE A-A) CARA EXTERNA - LOSA DE PISO 3.00 1.00 0.75
ENCOFRADO 8 (EJE B-B) CARA EXTERNA - LOSA DE PISO 3.00 1.00 1.00
ENCOFRADO 9 (EJE B-B) CARA EXTERNA - LOSA DE PISO 3.00 1.00 2.50
ENCOFRADO 10 (EJE B-B) CARA EXTERNA - LOSA DE PISO 3.00 1.00 0.75
ENCOFRADO 1 (EJE 1-1) CARA INTERNA 3.00 1.00
ENCOFRADO 1 (EJE 1-1) CARA EXTERNA 3.00 1.00
ENCOFRADO 3 (EJE INTERMEDIO 1) CARA INTERNA 3.00 1.00
ENCOFRADO 4 (EJE INTERMEDIO 1) CARA EXTERNA 3.00 1.00
ENCOFRADO 5 (EJE INTERMEDIO 2) CARA INTERNA 3.00 1.00 8.10
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ENCOFRADO 6 (EJE INTERMEDIO 2) CARA EXTERNA 3.00 1.00 8.40


ENCOFRADO 7 (EJE 2-2) CARA INTERNA 3.00 1.00 8.10
ENCOFRADO 8 (EJE 2-2) CARA EXTERNA 3.00 1.00 8.40
ENCOFRADO 9 (EJE A-A) CARA INTERNA 3.00 1.00 0.60
ENCOFRADO 10 (EJE A-A) CARA EXTERNA 3.00 1.00 1.00
ENCOFRADO 11 (EJE A-A) CARA INTERNA 3.00 1.00 2.00
ENCOFRADO 12 (EJE A-A) CARA EXTERNA 3.00 1.00 2.50
ENCOFRADO 13 (EJE A-A) CARA INTERNA 3.00 1.00 0.60
ENCOFRADO 14 (EJE A-A) CARA EXTERNA 3.00 1.00 0.75
ENCOFRADO 15 (EJE B-B) CARA INTERNA 3.00 1.00 0.60
ENCOFRADO 16 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75
ENCOFRADO 17 (EJE B-B) CARA INTERNA 3.00 1.00 2.00
ENCOFRADO 18 (EJE B-B) CARA EXTERNA 3.00 1.00 2.50
ENCOFRADO 19 (EJE B-B) CARA INTERNA 3.00 1.00 0.60
ENCOFRADO 20 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75

06.05.06.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


VOLUMEN 1 (EJE 1-1) 3.00 1.00
VOLUMEN 2 (EJE INTERMEDIO 1) 3.00 1.00 8.40
VOLUMEN 3 (EJE INTERMEDIO 2) 3.00 1.00 8.40
VOLUMEN 4 (EJE 2-2) 3.00 1.00 8.40
VOLUMEN 5 (EJE A-A) 3.00 1.00 0.60
VOLUMEN 6 (EJE A-A) 3.00 1.00 2.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

VOLUMEN 7 (EJE A-A) 3.00 1.00 0.60


VOLUMEN 8 (EJE B-B) 3.00 1.00 0.60
VOLUMEN 9 (EJE B-B) 3.00 1.00 2.00
VOLUMEN 10 (EJE B-B) 3.00 1.00 0.60

06.05.06.03.06 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGUETAS PRE FABRICADAS kg
ACERO LONGITUDINAL 21.00 41.00 0.55
ACERO TRANSVERSAL 21.00 10.00 7.90

06.05.06.03.07 ENCOFRADO Y DESENCOFRADO CARAVISTA - VIGUETAS PRE FABRICADAS m2


AREA CAD 21.00 1.00 7.90

06.05.06.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - VIGUETAS PRE FABRICADAS m3
VOLUMEN 21.00 1.00 7.90

06.05.06.03.09 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO LOSA DE PISO 1 3.00 1.00
CURADO 1 (EJE 1-1) CARA EXTERNA 3.00 1.00
CURADO 2 (EJE INTERMEDIO 1) CARA EXTERNA 3.00 1.00
CURADO 3 (EJE INTERMEDIO 2) CARA EXTERNA 3.00 1.00 8.40
CURADO 4 (EJE 2-2) CARA EXTERNA 3.00 1.00 8.40
CURADO 5 (EJE A-A) CARA EXTERNA 3.00 1.00 1.00
CURADO 6 (EJE A-A) CARA EXTERNA 3.00 1.00 2.50
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CURADO 7 (EJE A-A) CARA EXTERNA 3.00 1.00 0.75


CURADO 8 (EJE B-B) CARA EXTERNA 3.00 1.00 1.00
CURADO 9 (EJE B-B) CARA EXTERNA 3.00 1.00 2.50
CURADO 10 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75
CURADO BORDE SUPERIOR 1 3.00 1.00
CURADO LOSA DE PISO 2 3.00 1.00
CURADO 1 (EJE 1-1) CARA INTERNA 3.00 1.00
CURADO 1 (EJE 1-1) CARA EXTERNA 3.00 1.00
CURADO 3 (EJE INTERMEDIO 1) CARA INTERNA 3.00 1.00
CURADO 4 (EJE INTERMEDIO 1) CARA EXTERNA 3.00 1.00
CURADO 5 (EJE INTERMEDIO 2) CARA INTERNA 3.00 1.00 8.10
CURADO 6 (EJE INTERMEDIO 2) CARA EXTERNA 3.00 1.00 8.40
CURADO 7 (EJE 2-2) CARA INTERNA 3.00 1.00 8.10
CURADO 8 (EJE 2-2) CARA EXTERNA 3.00 1.00 8.40
CURADO 9 (EJE A-A) CARA INTERNA 3.00 1.00 0.60
CURADO 10 (EJE A-A) CARA EXTERNA 3.00 1.00 1.00
CURADO 11 (EJE A-A) CARA INTERNA 3.00 1.00 2.00
CURADO 12 (EJE A-A) CARA EXTERNA 3.00 1.00 2.50
CURADO 13 (EJE A-A) CARA INTERNA 3.00 1.00 0.60
CURADO 14 (EJE A-A) CARA EXTERNA 3.00 1.00 0.75
CURADO 15 (EJE B-B) CARA INTERNA 3.00 1.00 0.60
CURADO 16 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75
CURADO 17 (EJE B-B) CARA INTERNA 3.00 1.00 2.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CURADO 18 (EJE B-B) CARA EXTERNA 3.00 1.00 2.50


CURADO 19 (EJE B-B) CARA INTERNA 3.00 1.00 0.60
CURADO 20 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75
CURADO BORDE SUPERIOR 2 3.00 1.00
CURADO LOSA DE PISO 3 3.00 1.00
CURADO BORDE SUPERIOR 3 3.00 1.00

06.05.06.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.06.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
CAMARA HUMEDA LOSA DE PISO 1 3.00 1.00
CAMARA HUMEDA LOSA DE PISO 2 3.00 1.00
CAMARA HUMEDA LOSA DE PISO 3 3.00 1.00
CAMARA HUMEDA1 (EJE 1-1) CARA INTERNA 3.00 1.00
CAMARA HUMEDA 3 (EJE INTERMEDIO 1) CARA INTERNA 3.00 1.00
CAMARA HUMEDA 4 (EJE INTERMEDIO 1) CARA EXTERNA 3.00 1.00
CAMARA HUMEDA 5 (EJE INTERMEDIO 2) CARA INTERNA 3.00 1.00 8.10
CAMARA HUMEDA 6 (EJE INTERMEDIO 2) CARA EXTERNA 3.00 1.00 8.40
CAMARA HUMEDA 7 (EJE 2-2) CARA INTERNA 3.00 1.00 8.10
CAMARA HUMEDA 9 (EJE A-A) CARA INTERNA 3.00 1.00 0.60
CAMARA HUMEDA 11 (EJE A-A) CARA INTERNA 3.00 1.00 2.00
CAMARA HUMEDA 13 (EJE A-A) CARA INTERNA 3.00 1.00 0.60
CAMARA HUMEDA 15 (EJE B-B) CARA INTERNA 3.00 1.00 0.60
CAMARA HUMEDA 17 (EJE B-B) CARA INTERNA 3.00 1.00 2.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CAMARA HUMEDA 19 (EJE B-B) CARA INTERNA 3.00 1.00 0.60


CAMARA HUMEDA 20 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75

06.05.06.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2


CURADO BORDE SUPERIOR 1 3.00 1.00
CURADO BORDE SUPERIOR 2 3.00 1.00
CURADO BORDE SUPERIOR 3 3.00 1.00
CURADO 1 (EJE 1-1) CARA EXTERNA 3.00 1.00
CURADO 8 (EJE 2-2) CARA EXTERNA 3.00 1.00 8.40
CURADO 10 (EJE A-A) CARA EXTERNA 3.00 1.00 1.00
CURADO 12 (EJE A-A) CARA EXTERNA 3.00 1.00 2.50
CURADO 14 (EJE A-A) CARA EXTERNA 3.00 1.00 0.75
CURADO 16 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75
CURADO 18 (EJE B-B) CARA EXTERNA 3.00 1.00 2.50
CURADO 20 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75

06.05.06.04.03 SELLOS PARA VIGUETAS MORTERO 1:3 m3


MORTERO 3.00 1.00

06.05.06.05 PINTURA
06.05.06.05.01 PINTADO C/ESMALTE (2 MANOS) m2
PINTADO BORDE SUPERIOR 1 3.00 1.00
PINTADO BORDE SUPERIOR 2 3.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

PINTADO BORDE SUPERIOR 3 3.00 1.00


PINTADO 8 (EJE 2-2) CARA EXTERNA 3.00 1.00 8.40
PINTADO 10 (EJE A-A) CARA EXTERNA 3.00 1.00 1.00
PINTADO 12 (EJE A-A) CARA EXTERNA 3.00 1.00 2.50
PINTADO 14 (EJE A-A) CARA EXTERNA 3.00 1.00 0.75
PINTADO 16 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75
PINTADO 18 (EJE B-B) CARA EXTERNA 3.00 1.00 2.50
PINTADO 20 (EJE B-B) CARA EXTERNA 3.00 1.00 0.75

06.05.06.06 CARPINTERIA METALICA


06.05.06.06.01 SUM. E INST. SOPORTE METALICO DE TUBERIAS DE DISTRIBUCION und
SOPORTE 57.00

06.05.06.07 MATERIAL DE SOPORTE Y MEDIO FILTRANTE


06.05.06.07.01 SUM. E INST. MATERIAL DE SOPORTE DE FILTROS - GRAVA P/FILTRO m3
GRAVA - CANTO RODADO DE 2" 3.00 1.00 7.90
GRAVA - CANTO RODADO DE 3" 3.00 1.00 7.90
GRAVA - CANTO RODADO DE 4" 3.00 1.00 7.90

06.05.06.08 OTROS
06.05.06.08.01 JUNTA DE CONSTRUCCION CON WATER STOP m
WATER STOP 1 3.00 1.00 18.10
WATER STOP 2 3.00 1.00 20.80
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

WATER STOP 3 3.00 1.00 9.60

06.05.06.08.02 JUNTA DE DILATACION CON ASFALTO e = 1" m


JUNTA 3.00 1.00 4.70

06.05.06.08.03 SUM. E INST. DE TUBERIA PERFORADA PVC ISO 1452 DN=110 MM C-10 m
TUBERIA 3.00 19.00 2.25

06.05.07 SEDIMENTADORES
06.05.07.01 MOVIMIENTO DE TIERRAS
06.05.07.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3
VOLUMEN CAD 3.00 1.00
VOLUMEN CAD ADIC X ESTABILIZACIÓN 3.00 1.00

06.05.07.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2


AREA CAD 1 3.00 1.00
AREA CAD 2 3.00 1.00

06.05.07.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


VOLUMEN CAD 3.00 1.00

06.05.07.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2


AREA 3.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.07.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


VOLUMEN CAD EXCAVACIOON 3.00 1.30
VOLUMEN CAD RELLENO 3.00 1.30

06.05.07.02 OBRAS DE CONCRETO SIMPLE


06.05.07.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2
AREA CAD 1 3.00 1.00
AREA CAD 2 3.00 1.00

06.05.07.02.02 CONCRETO F'C = 140 KG/CM2 - DADOS DE APOYO m3


DADO 0.20x0.20x0.35m 3.00 1.00 0.20

06.05.07.02.03 MORTERO CEMENTO ARENA 1:3 - FALSO FONDO CANAL RECOLECCION m3


MORTERO 3.00 1.00

06.05.07.02.04 CONCRETO F'C = 175 KG/CM2 - VEREDA m2


AREA 1.00 1.00
AREA 1.00 1.00
AREA 1.00 1.00

06.05.07.02.05 ENCOFRADO Y DESENCOFRADO - VEREDA m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ENCOFRADO 1.00 1.00


1.00 1.00
1.00 1.00

06.05.07.02.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO VEREDA 1.00 1.00
CURADO VEREDA 1.00 1.00
CURADO VEREDA 1.00 1.00

06.05.07.03 OBRAS DE CONCRETO ARMADO


06.05.07.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
ACERO LONGITUDINAL 1 3.00 20.00 5.75
ACERO LONGITUDINAL 2 3.00 20.00 1.87
ACERO LONGITUDINAL 3 3.00 20.00 2.11
ACERO LONGITUDINAL 4 3.00 20.00 1.87
ACERO TRANVERSAL 1 3.00 20.00 5.75
ACERO TRANVERSAL 2 3.00 20.00 1.87
ACERO TRANVERSAL 3 3.00 20.00 2.11
ACERO TRANVERSAL 4 3.00 20.00 1.87
ACERO LONGITUDINAL CAJA DE VALVULAS 3.00 0.75
ACERO TRANSVERSAL CAJA DE VALVULAS 3.00 1.77

06.05.07.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

VOLUMEN 1 3.00 1.00 4.79


VOLUMEN DE CAJA DE VALVULAS 3.00 1.00 1.37

06.05.07.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


ACERO HORIZONTAL MALLA EXTERNO 12.00 15.00 5.26
ACERO VERTICAL MALLA EXTERNA 1 3.00 76.00 3.81
ACERO VERTICAL MALLA EXTERNA 2 3.00 76.00 2.19
ACERO HORIZONTAL MALLA INTERNA 12.00 15.00 5.18
ACERO VERTICAL MALLA INTERNA 1 3.00 72.00 4.19
ACERO HORIZONTAL CILINDRICO 3.00 8.00 6.64
ACERO VERTICAL CILINDRICO 3.00 32.00 1.71
ACERO HORIZONTAN CAJA DE VALVULAS 3.00 9.00 3.71
ACERO VERTICAL CAJA DE VALVULAS 3.00 12.00 2.24

06.05.07.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2


ENCOFRADO EXTERNO 3.00 1.00
ENCOFRADO INTERNO 3.00 1.00
ENCOFRADO EXTERNO CILINDRO 3.00 1.00
ENCOFRADO INTERNO CILINDRO 3.00 1.00
ENCOFRADO EXTERNO BASE CILINDRO 3.00 1.00
ENCOPFRADO EXTERNO EN CAJA DE VALVULAS 3.00 1.00
ENCOPFRADO INTERNO EN CAJA DE VALVULAS 3.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.07.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


VOLUMEN 3.00 1.00
VOLUMEN CILINDRO 3.00 1.00
VOLUMEN DE CAJA DE VALVULAS 3.00 1.00

06.05.07.03.06 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGAS kg


ACERO LONGITUDINAL 1 12.00 2.00 1.64
ACERO LONGITUDINAL 2 12.00 2.00 1.74
ACERO LONGITUDINAL 3 12.00 2.00 0.93
ACERO LONGITUDINAL 4 12.00 1.00 1.58
ESTRIBOS 12.00 12.00 0.98

06.05.07.03.07 ENCOFRADO Y DESENCOFRADO - VIGAS m2


ENCOFRADO LADO LATERAL 12.00 2.00
ENCOFRADO LADO INFERIOR 12.00 1.00 1.16
ENCOFRADO LADO FRONTAL 12.00 1.00 0.25

06.05.07.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - VIGAS m3


VOLUMEN 12.00 1.00 0.25

06.05.07.03.09 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - CANAL DE RECOLECCION kg


ACERO TRANSVERSAL 3.00 64.00 0.82
ACERO LONGITUDINAL 12.00 3.00 4.24
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.07.03.10 ENCOFRADO Y DESENCOFRADO - CANAL DE RECOLECCION m2


ENCOFRADO 1 12.00 1.00 3.95
ENCOFRADO 2 12.00 1.00 3.95

06.05.07.03.11 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - CANAL DE RECOLECCION m3


VOLUMEN 1 3.00 1.00 0.18
VOLUMEN 2 3.00 1.00 0.10

06.05.07.03.12 TAPA DE CONCRETO PRE FABRICADO und


TAPA 12.00

06.05.07.03.13 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO LOSA DE PISO 3.00 1.00 4.29
CURADO EXTERNO MURO 3.00 1.00
CURADO INTERNO MURO 3.00 1.00
CURADO BORDE SUPERIOR DE SED 3.00 1.00
CURADO EXTERNO CILINDRO 3.00 1.00
CURADO INTERNO CILINDRO 3.00 1.00
CURADO EXTERNO BASE CILINDRO 3.00 1.00
CURADO EXTERNO TAPA CILINDRO 3.00 1.00
CURADO EXTERNO EN CAJA DE VALVULAS 3.00 1.00
CURADO INTERNO EN CAJA DE VALVULAS 3.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CURA BORDE SUPERIOR DE CAJA DE VALVULAS 3.00 1.00


CURADO LADO LATERAL DE VIGA 12.00 2.00
CURADO LADO INFERIOR DE VIGA 12.00 1.00 1.16
CURADO LADO FRONTAL DE VIGA 12.00 1.00 0.25
CURADO DE VIGA LADO SUPERIOR 12.00 1.00 1.15
CURADO CANAL DE RECOLECCION 1 12.00 1.00 3.95
CURADO CANAL DE RECOLECCION 2 12.00 1.00 3.95

06.05.07.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.07.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
CAMARA HUMEDA LOSA DE PISO 3.00 1.00 4.29
CAMARA HUMEDA INTERNO MURO 3.00 1.00
CAMARA HUMEDA EXTERNO CILINDRO 3.00 1.00
CAMARA HUMEDA INTERNO CILINDRO 3.00 1.00
CAMARA HUMEDA EXTERNO BASE CILINDRO 3.00 1.00
CAMARA HUMEDA EXTERNO TAPA CILINDRO 3.00 1.00
CAMARA HUMEDA LADO LATERAL DE VIGA 12.00 2.00
CAMARA HUMEDA CURADO LADO INFERIOR DE VIGA 12.00 1.00 1.16
CAMARA HUMEDA LADO FRONTAL DE VIGA 12.00 1.00 0.25
CAMARA HUMEDA DE VIGA LADO SUPERIOR 12.00 1.00 1.15
CAMARA HUMEDA CANAL DE RECOLECCION 1 12.00 1.00 3.95
CAMARA HUMEDA CANAL DE RECOLECCION 2 12.00 1.00 3.95
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.07.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2


CAMARA EXTERNO MURO 3.00 1.00
CAMARA BORDE SUPERIOR DE SED 3.00 1.00
CAMARA EXTERNO EN CAJA DE VALVULAS 3.00 1.00
CAMARA INTERNO EN CAJA DE VALVULAS 3.00 1.00
CAMARA BORDE SUPERIOR DE CAJA DE VALVULAS 3.00 1.00

06.05.07.05 PINTURA
06.05.07.05.01 PINTADO C/ESMALTE (2 MANOS) m2
PINTADO EXTERNO MURO 3.00 1.00
PINTADO BORDE SUPERIOR DE SED 3.00 1.00
PINTADO EXTERNO EN CAJA DE VALVULAS 3.00 1.00
PINTADO BORDE SUPERIOR DE CAJA DE VALVULAS 3.00 1.00

06.05.07.06 EQUIPAMIENTO HIDRAULICO


06.05.07.06.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - SEDIMENTADOR und
NIPLE ACERO SCH-40 DN = 160 MM BB PN-10 L=1.90m 3.00
CODO HFD ISO 2531 BB PN-10 DN = 160 MM
NIPLE ACERO SCH-40 DN = 160 MM BB PN-10 L=0.45m
CODO PVC ISO 4435 DN = 160 MM
NIPLE PVC ISO 4435 DN =160 MM L=1.30m
ADAPTADOR HFD BRIDA CAMPANA DN = 160 MM
VALVULA COMPUERTA HFD ISO 5996 BB PN-10 DN = 160 MM
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.07.07 OTROS
06.05.07.07.01 JUNTA DE CONSTRUCCION CON WATER STOP m
WATER STOP 3.00 1.00 17.80

06.05.07.07.02 JUNTA DE DILATACION CON ASFALTO e = 1" m


JUNTA 1 1.00 1.00 0.90
JUNTA 2 1.00 1.00 4.70
JUNTA 1 1.00 2.00 0.90
JUNTA 2 1.00 1.00 4.70
JUNTA 1 1.00 2.00 0.90
JUNTA 2 1.00 1.00 4.70

06.05.08 LECHOS DE SECADO


06.05.08.01 MOVIMIENTO DE TIERRAS
06.05.08.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3

LECHO DE SECADO 01 m3 1 11.10

LECHO DE SECADO 02 m3 1 5.90

LECHO DE SECADO DE ARENA m3 1 4.00


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.08.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2

LECHO DE SECADO 01 m2 1 9.10

LECHO DE SECADO 02 m2 1 3.90

LECHO DE SECADO DE ARENA m2 1 3.00

06.05.08.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3

LECHO DE SECADO 01 m2 2 9.10


m2 2 8.15

LECHO DE SECADO 02 m2 2 3.90


m2 2 5.15

LECHO DE SECADO DE ARENA m2 2 3.00


m2 2 3.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.08.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2

LECHO DE SECADO 01 m2 1 9.10

LECHO DE SECADO 02 m2 1 3.90

LECHO DE SECADO DE ARENA m2 1 3.00

06.05.08.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3

Excavacion de zanjas m3 1 389.68


Relleno con material Propio m3 1 -168.99

06.05.08.02 OBRAS DE CONCRETO SIMPLE


06.05.08.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2

LECHO DE SECADO 01 m2 1 9.10

LECHO DE SECADO 02 m2 1 3.90


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LECHO DE SECADO DE ARENA m2 1 3.00

06.05.08.02.02 CONCRETO F'C = 140 KG/CM2 - DADOS DE APOYO m3


LECHO DE SECADO 01
Brida de Ingreso m3 1 0.30
Brida de Salida m3 1 0.30
Tee m3 1 0.30
Tuberia m3 4 0.30
Codo m3 3 0.30

LECHO DE SECADO 02

Brida de Ingreso m3 1 0.30


Brida de Salida m3 1 0.30
Tuberia m3 1 0.30
Codo

06.05.08.02.03 CONCRETO F'C = 175 KG/CM2 - VEREDA m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LECHO DE SECADO 01 m2 1 56.07


m2 -1 3.90

LECHO DE SECADO 02 m2 1 89.81


m2 -1 9.10
m2 -1 0.90

LECHO DE SECADO DE ARENA m2 1 17.91


m2 -1 3.00

06.05.08.02.04 ENCOFRADO Y DESENCOFRADO - VEREDA m2

LECHO DE SECADO 01 m2 1 56.07


m2 -1 3.90

LECHO DE SECADO 02
m2 1 89.81
m2 -1 9.10
m2 -1 0.90
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LECHO DE SECADO DE ARENA


m2 1 17.91
m2 -1 3.00

06.05.08.02.05 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2

LECHO DE SECADO 01 m2 1 56.07


m2 -1 3.90

LECHO DE SECADO 02 m2 1 89.81


m2 -1 9.10
m2 -1 0.90

LECHO DE SECADO DE ARENA m2 1 17.91


m2 -1 3.00

06.05.08.03 OBRAS DE CONCRETO ARMADO


06.05.08.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg
LECHO DE SECADO 01
gancho empal kg/m
Acero Longitudinal 38 Ø5/8'' |_____| 2 6.15 0.70 0.00 38 520.60 1.55 ###
Acero Tranversal 26 Ø5/8'' |_____| 2 9.10 0.70 0.80 26 551.20 1.55 ###
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LECHO DE SECADO 02
gancho empal kg/m
Acero Tranversal 17 Ø1/2'' |_____| 2 3.15 0.50 0.00 17 124.10 0.99 ###
Acero Longitudinal 14 Ø1/2'' |_____| 2 3.15 0.50 0.00 14 102.20 0.99 ###

LECHO DE SECADO DE ARENA


gancho empal kg/m
Acero Longitudinal 15 Ø3/8'' |_____| 1 3.00 0.40 0.00 15 51.00 0.56 28.56
Acero Tranversal 21 Ø3/8'' |_____| 1 2.00 0.40 0.00 21 50.40 0.56 28.22

06.05.08.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3

LECHO DE SECADO 01 m3 1 9.10


m3 1 9.10

LECHO DE SECADO 02 m3 2 3.15

LECHO DE SECADO DE ARENA m3 1 3.00


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.08.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


LECHO DE SECADO 01 kg
gancho empal kg/m
Acero Vertical 47 Ø5/8'' |______ 4 2.32 0.35 0.00 47 501.96 1.55 ###
Acero Horizontal 12 Ø1/2'' |_____| 4 9.02 0.50 0.50 12 480.96 0.99 ###

Acero Horizontal 12 Ø1/2'' |_____| 4 6.07 0.50 0.00 12 315.36 0.99 ###
Acero Vertical 32 Ø1/2'' |_____| 4 2.56 0.50 0.00 32 391.68 0.99 ###

LECHO DE SECADO 02 kg
gancho empal kg/m
Acero Vertital Lateral 16 Ø5/8'' |_____ 4 2.34 0.70 0.00 16 194.56 1.55 ###
Acero Horirontal Lateral 14 Ø1/2'' |_____ 4 3.82 0.50 0.00 14 241.92 0.99 ###

Acero Vertical Tranversal 14 Ø5/8'' |___ 4 2.34 0.70 0.00 14 170.24 1.55 ###
Acero Horizontal Tranversal 14 Ø1/2'' |_ 4 3.07 0.50 0.00 14 199.92 0.99 ###

LECHO DE SECADO DE ARENA kg


gancho empal kg/m
Acero Vertical 14 Ø3/8'' |_____| 2 0.65 0.40 0.00 14 29.40 0.56 16.46
Acero Horizontal 6 Ø3/8'' |_____| 2 1.92 0.40 0.00 6 27.84 0.56 15.59
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Acero Vertical 21 Ø3/8'' |_____| 2 0.65 0.40 0.00 21 44.10 0.56 24.70
Acero Horizontal 6 Ø3/8'' |_____| 2 2.90 0.40 0.00 6 39.60 0.56 22.18

06.05.08.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2

LECHO DE SECADO 01

Laterales m2 2 9.10
m2 2 8.70

Tranversal m2 2 6.15
m2 2 5.75

LECHO DE SECADO 02

Laterales m2 2 3.90
m2 2 3.50

Tranversal m2 2 3.15
m2 2 2.75

LECHO DE SECADO DE ARENA


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Laterales m2 2 3.00
m2 2 2.70

Tranversal m2 2 2.00
m2 2 1.70

06.05.08.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


LECHO DE SECADO 01

Laterales m3 2 9.10

Tranversal m3 2 6.15

LECHO DE SECADO 02

Laterales m3 2 3.90

Tranversal m3 2 3.15

LECHO DE SECADO DE ARENA

Laterales m3 2 3.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Tranversal m3 2 2.00

06.05.08.03.06 ACERO Fy = 4200 KG/CM2 EN COLUMNAS kg


LECHO DE SECADO 01
gancho empal kg/m
Acero Vertical 4 Ø1/2'' |_____| 8 1.91 0.45 0.00 4 75.52 0.99 74.76
Estribo : Columnas 13 Und de Ø1/4'' en 8 8 0.52 13 54.08 0.25 13.52

LECHO DE SECADO 02

gancho empal kg/m


Acero Vertical 4 Ø1/2'' |_____| 4 1.91 0.45 0.00 4 37.76 0.99 37.38
Estribo : Columnas 13 Und de Ø1/4'' en 4 4 0.52 13 27.04 0.25 6.76

06.05.08.03.07 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2

LECHO DE SECADO 01

Encofrado de Columnas m2 8 0.80

LECHO DE SECADO 02
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Encofrado de Columnas m2 4 0.80

06.05.08.03.08 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - COLUMNAS m3

LECHO DE SECADO 01

Vaciado de Columnas m3 8 0.20

LECHO DE SECADO 02

Vaciado de Columnas m3 4 0.20

06.05.08.03.09 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGAS kg

LECHO DE SECADO 01
gancho empal kg/m
Acero Longitudinal 4 Ø1/2'' |_____| 2 6.07 0.50 0.00 4 52.56 0.99 52.03
Estribo : Vigas 35 Und de Ø3/8'' en 2 Elem. 2 0.84 35 58.80 0.56 32.93

LECHO DE SECADO 02

gancho empal kg/m


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Acero Longitudinal 4 Ø1/2'' |_____| 1 3.07 0.50 0.00 4 14.28 0.99 14.14
Estribo : Vigas 20 Und de Ø3/8'' en 1 Elem. 1 0.84 20 16.80 0.56 9.41

06.05.08.03.10 ENCOFRADO Y DESENCOFRADO - VIGAS m2

LECHO DE SECADO 01

Viga m2 2 6.15
m2 1 6.15

LECHO DE SECADO 02

Viga m2 2 3.15
m2 1 3.15

06.05.08.03.11 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - VIGAS m3

LECHO DE SECADO 01

Viga m3 1 6.15

LECHO DE SECADO 02
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Viga m3 1 3.15

06.05.08.03.12 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - LOSA SALPICADOR kg


LECHO DE SECADO 01
gancho empal kg/m
Acero Salpicador 7 Ø1/4'' _______ 4 0.76 0.00 7 21.28 0.25 5.32

LECHO DE SECADO 02

gancho empal kg/m


Acero Salpicador 7 Ø1/4'' _______ 2 0.76 0.00 7 10.64 0.25 2.66

06.05.08.03.13 ENCOFRADO Y DESENCOFRADO - LOSA SALPICADOR m2

LECHO DE SECADO 01

Encofrado m2 2 0.80
Frizo m2 2 3.20

LECHO DE SECADO 02
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Encofrado m2 1 0.80
Frizo m2 1 3.20

06.05.08.03.14 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA SALPICADOR m3

LECHO DE SECADO 01

Encofrado m3 2 0.80

LECHO DE SECADO 02

Encofrado m3 1 0.80

06.05.08.03.15 ACERO Fy = 4200 kg/cm2 - DADO DE APOYO kg

LECHO DE SECADO 01
gancho empal kg/m

Acero Apoyo 7 Ø1/4'' _______ 4 0.57 0.00 7 15.96 0.25 3.99

LECHO DE SECADO 02
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

gancho empal kg/m

Acero Apoyo 7 Ø1/4'' _______ 2 0.57 0.00 7 7.98 0.25 2.00

06.05.08.03.16 ENCOFRADO Y DESENCOFRADO - DADO DE APOYO m2

LECHO DE SECADO 01

m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60

LECHO DE SECADO 02
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60

06.05.08.03.17 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - DADO DE APOYO m3


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LECHO DE SECADO 01

m3 2 0.60
m3 2 0.60

LECHO DE SECADO 02
m3 2 0.60
m3 2 0.60

06.05.08.03.18 ACERO Fy = 4200 kg/cm2 EN TAPAS DE CANAL CENTRAL kg

LECHO DE SECADO 01
gancho empal kg/m
Canal 6 Ø1/4'' |_____| 1 9.10 0.30 0.30 6 58.20 0.25 14.55
Canal Seccion 92 Ø1/4'' |_____| 1 0.45 0.30 0.00 92 69.00 0.25 17.25

Canal Tapa 4 Ø1/4'' |_____| 1 9.10 0.30 0.30 4 38.80 0.25 9.70
Canal Tapa 90 Ø1/4'' |_____| 1 0.29 0.30 0.00 90 53.10 0.25 13.28

LECHO DE SECADO 02

gancho empal kg/m


Canal 6 Ø1/4'' |_____| 1 9.10 0.30 0.30 6 58.20 0.25 14.55
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Canal Seccion 92 Ø1/4'' |_____| 1 0.45 0.30 0.00 92 69.00 0.25 17.25

Canal Tapa 4 Ø1/4'' |_____| 1 9.10 0.30 0.30 4 38.80 0.25 9.70
Canal Tapa 90 Ø1/4'' |_____| 1 0.29 0.30 0.00 90 53.10 0.25 13.28

06.05.08.03.19 ENCOFRADO Y DESENCOFRADO - TAPAS DE CANAL CENTRAL m2

LECHO DE SECADO 01

m2 2 9.10
m2 1 9.10

LECHO DE SECADO 02
m2 2 3.15
m2 1 9.10

06.05.08.03.20 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - TAPAS DE CANAL CENTRAL m3

LECHO DE SECADO 01
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

m3 1 9.10
m3 1 9.10

LECHO DE SECADO 02
m3 1 3.15
m3 1 3.15

06.05.08.03.21 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2

Lecho de secado de arena m2 1 3.00


m2 2 10.00

Lecho 01 m2 1 9.10
m2 2 15.25

Lecho 02 m2 1 3.15
m2 2 7.05

06.05.08.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.08.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
Lecho de secado de arena
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Piso m2 1 2.70
Muros m2 1 8.80

Lecho 01

Piso m2 1 8.90
Muros m2 1 29.70

Lecho 02

Piso m2 1 2.95
Muros m2 1 13.30

06.05.08.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2

COLUMNAS
LECHO DE SECADO 01

Encofrado de Columnas m2 8 0.80

LECHO DE SECADO 02
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Encofrado de Columnas m2 4 0.80


VIGAS
LECHO DE SECADO 01

Viga m2 2 6.15
m2 1 6.15

LECHO DE SECADO 02

Viga m2 2 3.15
m2 1 3.15
LOSA SALPICADOR
LECHO DE SECADO 01

Encofrado m2 2 0.80
Frizo m2 2 3.20

LECHO DE SECADO 02

Encofrado m2 1 0.80
Frizo m2 1 3.20
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

DADO DE APOYO
LECHO DE SECADO 01

m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60

LECHO DE SECADO 02
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
CANAL CENTRAL
LECHO DE SECADO 01

m2 2 9.10
m2 1 9.10

LECHO DE SECADO 02
m2 2 3.15
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

m2 1 9.10

MUROS

LECHO DE SECADO 01

Laterales m2 1 9.10

Tranversal m2 1 6.15

LECHO DE SECADO 02

Laterales m2 1 3.90

Tranversal m2 1 3.15

LECHO DE SECADO DE ARENA

Laterales m2 1 3.00

Tranversal m2 1 2.00

06.05.08.05 PINTURA
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.08.05.01 PINTADO C/ESMALTE (2 MANOS) m2


VIGAS
LECHO DE SECADO 01
Viga m2 2 6.15
m2 1 6.15

LECHO DE SECADO 02

Viga m2 2 3.15
m2 1 3.15
LOSA SALPICADOR
LECHO DE SECADO 01

Encofrado m2 2 0.80
Frizo m2 2 3.20

LECHO DE SECADO 02

Encofrado m2 1 0.80
Frizo m2 1 3.20
DADO DE APOYO
LECHO DE SECADO 01
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60

LECHO DE SECADO 02
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
m2 2 0.60
CANAL CENTRAL
LECHO DE SECADO 01

m2 2 9.10
m2 1 9.10

LECHO DE SECADO 02
m2 2 3.15
m2 1 9.10
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

MUROS

LECHO DE SECADO 01

Laterales m2 1 9.10

Tranversal m2 1 6.15

LECHO DE SECADO 02

Laterales m2 1 3.90

Tranversal m2 1 3.15

LECHO DE SECADO DE ARENA

Laterales m2 1 3.00

Tranversal m2 1 2.00

06.05.08.05.02 PINTURA C/LATEX VINILICO - COLUMNAS m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

COLUMNAS
LECHO DE SECADO 01

Encofrado de Columnas m2 8 0.80

LECHO DE SECADO 02

Encofrado de Columnas m2 4 0.80

06.05.08.06 EQUIPAMIENTO HIDRAULICO


06.05.08.06.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - LECHOS DE SECADO TIPO 1 und 1
06.05.08.06.02 SUM. E INST. EQUIPAMIENTO HIDRAULICO - LECHOS DE SECADO TIPO 2 und 1
06.05.08.06.03 SUM. E INST. EQUIPAMIENTO HIDRAULICO - LECHOS DE ARENA und 1
06.05.08.07 COBERTURA LIGERA
06.05.08.07.01 FABRICACION DE CARTELAS METALICAS PL e=3/16" PARA RETICULADO DE MADERA m2

LECHO DE SECADO 01
Viga de madera m2 4 12.00

LECHO DE SECADO 02
Viga de madera m2 2 8.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.08.07.02 RETICULADO DE MADERA - INSTALACION DE BRIDAS DE MADERA SUPERIOR E INFERIOR 3" x 6" m
LECHO DE SECADO 02
Viga de madera m 2 3.95
m 2 4.05
LECHO DE SECADO 01
Viga de madera m 4 6.60
m 4 6.90

06.05.08.07.03 RETICULADO DE MADERA - INSTALACION DE BRIDAS DE MADERA SUPERIOR E INFERIOR 3" x 4" m

LECHO DE SECADO 02
Viga de madera m 2 1.30

LECHO DE SECADO 01
Viga de madera m 2 1.35
m 2 0.62

06.05.08.07.04 SUM. E INST. DE COBERTURA LIGERA (INC. ACCS.) m2

LECHO DE SECADO 02
Viga de madera m2 2 2.30
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LECHO DE SECADO 01
Viga de madera m2 2 3.40

06.05.08.08 SUMINISTRO E INSTALACION DE MATERIAL FILTRANTE


06.05.08.08.01 SUM. E INST. DE MATERIAL GRANULAR - GRAVA 1" LECHOS DE SECADO m3

LECHO DE SECADO 01

Area de Relleno m3 1 1.53

LECHO DE SECADO 02

Area de Relleno m3 1 0.84

06.05.08.08.02 SUM. E INST. DE MATERIAL GRANULAR - GRAVA 1/4" LECHOS DE SECADO m3

LECHO DE SECADO 01

Area de Relleno m3 1 0.43


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LECHO DE SECADO 02

Area de Relleno m3 1 0.27

06.05.08.08.03 SUM. E INST. DE MATERIAL FINO - ARENA GRUESA - LECHOS DE SECADO m3

LECHO DE SECADO 01

Area de Relleno m3 1 1.73

LECHO DE SECADO 02

Area de Relleno m3 1 1.04

06.05.08.08.04 SUM. E INST. DE LADRILLOS (ACOMODADOS) - LECHOS DE SECADO m2

LECHO DE SECADO 01
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Area de Relleno m2 1 5.75

LECHO DE SECADO 02

Area de Relleno m2 1 3.50

06.05.08.09 OTROS
06.05.08.09.01 JUNTA DE DILATACION CON ASFALTO e = 1" m

salida de lecho 01 m 1 0.70


salida de lecho 02 m 1

06.05.09 CAMARA DE CONTACTO DE CLORO


06.05.09.01 MOVIMIENTO DE TIERRAS
06.05.09.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3

Escavacion de zanjas m3 1 3.40

Sobre Excavacion m3 1 5.40


m3 1 2.55
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.09.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2 1 3.40

06.05.09.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3

Sobre Excavacion m3 1 2.00


m3 1 0.00

06.05.09.01.04 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO e=0.20 m. m2 1 3.40

06.05.09.01.05 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3

Sobre Excavacion m3 1 2.00


m3 1 0.00

06.05.09.02 OBRAS DE CONCRETO SIMPLE


06.05.09.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m2

Solado m3 1 3.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Solado m3 2 0.29

06.05.09.02.02 CONCRETO F'C = 175 KG/CM2 - VEREDA m2

m2 1 14.92
m2 -1 3.40

06.05.09.02.03 ENCOFRADO Y DESENCOFRADO - VEREDA m2

m2 1 20.22

06.05.09.02.04 CONCRETO F'C = 175 KG/CM2 - DADOS DE APOYO m3

DADOS DE APOYO m3 10 0.30

06.05.09.02.05 ENCOFRADO Y DESENCOFRADO CARAVISTA EN DADOS DE APOYO m2

DADOS DE APOYO m2 1 1.00

06.05.09.02.06 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Vereda m2 1 14.92
m2 -1 3.40

06.05.09.03 OBRAS DE CONCRETO ARMADO


06.05.09.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE FONDO kg
gancho empal kg/m
Acero en Losa 14 Ø1/2'' |_____| 2 3.32 0.50 0.00 14 106.96 0.99 ###
Acero Refuerzo Zapata 14 Ø1/2'' ____ 2 0.96 0.00 14 26.88 0.99 26.61

06.05.09.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3

Solo Losa m3 1 3.40


Diente de Zapata m3 1 1.00
Diente de Zapata m3 1 1.00

06.05.09.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


gancho empal kg/m
Vertical Lado = 2.55 14 Ø1/2'' |_____| 4 2.21 0.45 0.00 14 148.96 0.99 ###
Horizontal Lado = 2.55 13 Ø1/2'' |____ 4 2.47 0.45 0.00 13 151.84 0.99 ###
Vertical Lado = 3.40 18 Ø1/2'' |_____| 4 2.21 0.45 0.00 18 191.52 0.99 ###
Horizontal Lado = 3.40 13 Ø1/2'' |____ 4 3.32 0.45 0.00 13 196.04 0.99 ###
gancho empal kg/m
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Vertical Muro L=2.00 Central 11 Ø1/2'' 2 2.21 0.50 0.00 11 59.62 0.99 59.02
Horizontal Muro L=2.00 Central 11 Ø1/2'' 2 2.12 0.50 0.00 11 57.64 0.99 57.06
gancho empal kg/m
Vertical Muro L=0.97 6 Ø1/2'' |_____| 1 0.96 0.50 0.00 6 8.76 0.99 8.67
Horizontal Muro L=0.97 6 Ø1/2'' |_____ 1 1.29 0.50 0.00 6 10.74 0.99 10.63

06.05.09.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2

Lado 3.40 m Exterior m2 1 3.40


Lado 3.40 m Interior m2 1 3.00

Lado 2.55 m Exterior m2 1 2.55


Lado 2.55 m Interior m2 1 2.15

Lado 2.00 m Interior m2 2 2.00


m2 1

Lado 0.97 m Interior m2 2 0.97

06.05.09.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3

Lado 3.40 m Exterior m3 1 3.40


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Lado 2.55 m Interior m3 1 2.15

Lado 2.00 m Interior m3 2 2.00

Lado 0.97 m Interior m3 2 0.97

06.05.09.03.06 CONCRETO F'C = 175 KG/CM2 - LOSA DE PISO m3

Solo Losa m3 4 1.85


Diente de Zapata m3 1 0.70
m3 1 0.70

06.05.09.03.07 ENCOFRADO Y DESENCOFRADO - LOSA DE PISO m2

Perimetro m2 1 7.10

06.05.09.03.08 ACERO Fy = 4200 kg/cm2 EN LOSA DE PISO kg

gancho empal kg/m


Acero en Losa Caseta 10 Ø1/2'' |_____ 1 1.62 0.50 0.00 10 21.20 0.99 20.99
Acero en Losa Caseta 10 Ø1/2'' |_____ 1 1.77 0.50 0.00 10 22.70 0.99 22.47
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.09.03.09 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2

MUROS
Lado 3.40 m Exterior m2 1 3.40
Lado 3.40 m Interior m2 1 3.00

Lado 2.55 m Exterior m2 1 2.55


Lado 2.55 m Interior m2 1 2.15

Lado 2.00 m Interior m2 2 2.00


m2 1

Lado 0.97 m Interior m2 2 0.97

LOSA
Area m2 1 3.40

LOSA m2 1 1.85

06.05.09.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.09.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
MUROS
Lado 3.40 m Interior m2 1 3.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Lado 2.55 m Interior m2 1 2.15

Lado 2.00 m Interior m2 2 2.00


m2 1

Lado 0.97 m Interior m2 2 0.97

LOSA m2 1 3.00

06.05.09.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2

TARRAJEO DE MUROS
BORDE EXTERIOR 0.30 M. m2 1 11.90

06.05.09.05 PINTURA
06.05.09.05.01 PINTADO C/ESMALTE (2 MANOS) m2

TARRAJEO DE MUROS
BORDE EXTERIOR 0.30 M. m2 1 11.90

06.05.09.05.02 PINTADO DE ESTRUCTURA METALICA m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

m2 2 1.65
m2 2 1.65

m2 4 1.25

06.05.09.06 EQUIPAMIENTO HIDRAULICO


06.05.09.06.01 SUM. E INST. EQUIPAMIENTO HIDRAULICO - CAMARA DE CONTACTO DE CLORO und 1
06.05.09.06.02 SUM. E INST. DE TANQUE DE AGUA POLIETILENO V = 250 L (INC. ACCS) und 1
06.05.09.07 CARPINTERIA METALICA
06.05.09.07.01 FABRICACION DE PLANCHA METALICA DE ANCLAJE PL e=6mm x 0.25m x 0.25m - ANCLAJE DE COLUMNAS EN CASETA und 16
06.05.09.07.02 SUM. E INST. DE PERFIL METALICO TUB. CUADRADO 4" x e=4mm - COLUMNAS EN CASETA m

LADO DE 1.82 M m 2 1.82


LADO DE 2.10 M m 2 2.10

06.05.09.07.03 MALLA METALICA DE PROTECCION C/ALAMBRE GALV N.10 X COCADAS DE 2 x 2 CM. - CASETA m2

m2 2 1.25
m2 1 0.61
m2 1 1.45

06.05.09.07.04 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO C/MALLA DE ALAMBRE GALVANIZADO - CASETA m2 1 0.75
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.09.06.05 SUM. E INST. DE COBERTURA LIGERA - CALAMINON - CASETA m2

Techo Calaminon m2 1 1.87

06.05.09.07.06 CUMBRERA ESTANDAR PARA CALAMINON T - CASETA m 1 2 3.79

06.05.09.07.07 FABRICACION DE PLANCHA METALICA DE ANCLAJE PL e=6mm x 4" x 4" - SOPORTE REJILLA METALICA und 1 16.00

06.05.09.07.08 SUM. E INST. DE PERFIL METALICO TUB. CUADRADO 3" x e=4mm - SOPORTE REJILLA METALICA m

m 4 0.54

06.05.09.07.09 SUM. E INST. DE PERFIL METALICO TIPO "T" 1" x 1" x 1/8" - SOPORTE REJILLA METALICA m

Perfil T m 7 0.85

06.05.09.08 OTROS
06.05.09.08.01 JUNTA DE CONSTRUCCION CON WATER STOP m

Muros Interiores m 1 10.90

06.05.09.08.02 JUNTA DE DILATACION CON ASFALTO e = 1" m


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

Caja de paso m 1 0.90

06.05.09.08.03 SUM. E INST. DE COBERTURA DE POLICARBONATO m2

Muro Policarbonato m2 4 0.77

06.05.10 CAJAS DE PASO Y DE SALIDA


06.05.10.01 MOVIMIENTO DE TIERRAS
06.05.10.01.01 EXCAVACION MANUAL m3
CS-01 I 1.00 1.00 1.00 1.05
CS-02 I 1.00 1.00 1.00 1.05
CS-03 I 1.02 1.00 1.00 1.05
CS-04 II 1.14 1.00 1.00 0.90
CS-05 II 1.40 1.00 1.00 0.90
CS-06 II 1.45 1.00 1.00 0.90
CS-07 II 1.50 1.00 1.00 0.90
CS-08 II 0.70 1.00 1.00 0.90
CS-09 II 1.66 1.00 1.00 0.90
CS-10 II 1.66 1.00 1.00 0.90
CS-11 II 1.40 1.00 1.00 0.90
CS-12 II 1.46 1.00 1.00 0.90
CP-01 II 0.7 1.00 1.00 0.90
CP-02 II 0.7 1.00 1.00 0.90
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CP-03 II 0.35 1.00 1.00 0.90


CP-04 II 0.75 1.00 1.00 0.90
CP-05 II 0.75 1.00 1.00 0.90
CP-06 II 0.35 1.00 1.00 0.90
CP-07 II 0.35 1.00 1.00 0.90
CP-08 II 0.55 1.00 1.00 0.90
CP-09 II 0.6 1.00 1.00 0.90
CP-10 II 0.55 1.00 1.00 0.90
CP-11 II 0.7 1.00 1.00 0.90

CORTE ADICIONAL 1.00 1.00

06.05.10.01.02 REFINE, NIVELACION Y COMPACTACION DE TERRENO m2


CS-01 I 1.00 1.00 1.00 1.05
CS-02 I 1.00 1.00 1.00 1.05
CS-03 I 1.02 1.00 1.00 1.05
CS-04 II 1.14 1.00 1.00 0.90
CS-05 II 1.40 1.00 1.00 0.90
CS-06 II 1.45 1.00 1.00 0.90
CS-07 II 1.50 1.00 1.00 0.90
CS-08 II 0.70 1.00 1.00 0.90
CS-09 II 1.66 1.00 1.00 0.90
CS-10 II 1.66 1.00 1.00 0.90
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CS-11 II 1.40 1.00 1.00 0.90


CS-12 II 1.46 1.00 1.00 0.90
CP-01 II 0.7 1.00 1.00 0.90
CP-02 II 0.7 1.00 1.00 0.90
CP-03 II 0.35 1.00 1.00 0.90
CP-04 II 0.75 1.00 1.00 0.90
CP-05 II 0.75 1.00 1.00 0.90
CP-06 II 0.35 1.00 1.00 0.90
CP-07 II 0.35 1.00 1.00 0.90
CP-08 II 0.55 1.00 1.00 0.90
CP-09 II 0.6 1.00 1.00 0.90
CP-10 II 0.55 1.00 1.00 0.90
CP-11 II 0.7 1.00 1.00 0.90

06.05.10.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


VOLUMEN 1.00 1.00

06.05.10.01.04 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


VOLUMEN CAD EXCAVACIOON 1.00 1.30
VOLUMEN CAD RELLENO 1.00 1.30

06.05.10.02 OBRAS DE CONCRETO SIMPLE


06.05.10.02.01 SOLADO DE CONCRETO F'C=140KG/CM2 e=0.10 M. m3
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

AREA 1.00 1.00

06.05.10.03 OBRAS DE CONCRETO ARMADO


06.05.10.03.01 ACERO Fy = 4200 kg/cm2 EN LOSA DE FONDO kg
CS-01 I 1.00
ACERO LONGITUDINAL 1.00 6.00 0.90
ACERO TRANVERSAL 1.00 7.00 0.75
CS-02 I 1.00
ACERO LONGITUDINAL 1.00 6.00 0.90
ACERO TRANVERSAL 1.00 7.00 0.75
CS-03 I 1.02
ACERO LONGITUDINAL 1.00 6.00 0.90
ACERO TRANVERSAL 1.00 7.00 0.75
CS-04 II 1.14
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CS-05 II 1.40
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CS-06 II 1.45
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CS-07 II 1.50
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ACERO LONGITUDINAL 1.00 6.00 0.75


ACERO TRANVERSAL 1.00 6.00 0.75
CS-08 II 0.70
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CS-09 II 1.66
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CS-10 II 1.66
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CS-11 II 1.40
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CS-12 II 1.46
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-01 II 0.7
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-02 II 0.7
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CP-03 II 0.35
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-04 II 0.75
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-05 II 0.75
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-06 II 0.35
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-07 II 0.35
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-08 II 0.55
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-09 II 0.6
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75
CP-10 II 0.55
ACERO LONGITUDINAL 1.00 6.00 0.75
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ACERO TRANVERSAL 1.00 6.00 0.75


CP-11 II 0.7
ACERO LONGITUDINAL 1.00 6.00 0.75
ACERO TRANVERSAL 1.00 6.00 0.75

06.05.10.03.02 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - LOSA DE FONDO m3


CS-01 I 1.00 1.00 1.00 1.05
CS-02 I 1.00 1.00 1.00 1.05
CS-03 I 1.02 1.00 1.00 1.05
CS-04 II 1.14 1.00 1.00 0.90
CS-05 II 1.40 1.00 1.00 0.90
CS-06 II 1.45 1.00 1.00 0.90
CS-07 II 1.50 1.00 1.00 0.90
CS-08 II 0.70 1.00 1.00 0.90
CS-09 II 1.66 1.00 1.00 0.90
CS-10 II 1.66 1.00 1.00 0.90
CS-11 II 1.40 1.00 1.00 0.90
CS-12 II 1.46 1.00 1.00 0.90
CP-01 II 0.7 1.00 1.00 0.90
CP-02 II 0.7 1.00 1.00 0.90
CP-03 II 0.35 1.00 1.00 0.90
CP-04 II 0.75 1.00 1.00 0.90
CP-05 II 0.75 1.00 1.00 0.90
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CP-06 II 0.35 1.00 1.00 0.90


CP-07 II 0.35 1.00 1.00 0.90
CP-08 II 0.55 1.00 1.00 0.90
CP-09 II 0.6 1.00 1.00 0.90
CP-10 II 0.55 1.00 1.00 0.90
CP-11 II 0.7 1.00 1.00 0.90

06.05.10.03.03 ACERO Fy = 4200 kg/cm2 EN MUROS kg


CS-01 I 1.00
ACERO HORIZONTAL 1.00 8.00 3.64
ACERO VERTICAL 1.00 22.00 1.23
CS-02 I 1.00
ACERO HORIZONTAL 1.00 8.00 3.64
ACERO VERTICAL 1.00 22.00 1.23
CS-03 I 1.02
ACERO HORIZONTAL 1.00 8.00 3.64
ACERO VERTICAL 1.00 22.00 1.25
CS-04 II 1.14
ACERO HORIZONTAL 1.00 9.00 3.34
ACERO VERTICAL 1.00 20.00 1.37
CS-05 II 1.40
ACERO HORIZONTAL 1.00 10.00 3.34
ACERO VERTICAL 1.00 20.00 1.63
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CS-06 II 1.45
ACERO HORIZONTAL 1.00 11.00 3.34
ACERO VERTICAL 1.00 20.00 1.68
CS-07 II 1.50
ACERO HORIZONTAL 1.00 11.00 3.34
ACERO VERTICAL 1.00 20.00 1.73
CS-08 II 0.70
ACERO HORIZONTAL 1.00 6.00 3.34
ACERO VERTICAL 1.00 20.00 0.93
CS-09 II 1.66
ACERO HORIZONTAL 1.00 12.00 3.34
ACERO VERTICAL 1.00 20.00 1.89
CS-10 II 1.66
ACERO HORIZONTAL 1.00 12.00 3.34
ACERO VERTICAL 1.00 20.00 1.89
CS-11 II 1.40
ACERO HORIZONTAL 1.00 10.00 3.34
ACERO VERTICAL 1.00 20.00 1.63
CS-12 II 1.46
ACERO HORIZONTAL 1.00 11.00 3.34
ACERO VERTICAL 1.00 20.00 1.69
CP-01 II 0.7
ACERO HORIZONTAL 1.00 6.00 3.34
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ACERO VERTICAL 1.00 20.00 0.93


CP-02 II 0.7
ACERO HORIZONTAL 1.00 6.00 3.34
ACERO VERTICAL 1.00 20.00 0.93
CP-03 II 0.35
ACERO HORIZONTAL 1.00 3.00 3.34
ACERO VERTICAL 1.00 20.00 0.58
CP-04 II 0.75
ACERO HORIZONTAL 1.00 6.00 3.34
ACERO VERTICAL 1.00 20.00 0.98
CP-05 II 0.75
ACERO HORIZONTAL 1.00 6.00 3.34
ACERO VERTICAL 1.00 20.00 0.98
CP-06 II 0.35
ACERO HORIZONTAL 1.00 3.00 3.34
ACERO VERTICAL 1.00 20.00 0.58
CP-07 II 0.35
ACERO HORIZONTAL 1.00 3.00 3.34
ACERO VERTICAL 1.00 20.00 0.58
CP-08 II 0.55
ACERO HORIZONTAL 1.00 5.00 3.34
ACERO VERTICAL 1.00 20.00 0.78
CP-09 II 0.6
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ACERO HORIZONTAL 1.00 5.00 3.34


ACERO VERTICAL 1.00 20.00 0.83
CP-10 II 0.55
ACERO HORIZONTAL 1.00 5.00 3.34
ACERO VERTICAL 1.00 20.00 0.78
CP-11 II 0.7
ACERO HORIZONTAL 1.00 6.00 3.34
ACERO VERTICAL 1.00 20.00 0.93

06.05.10.03.04 ENCOFRADO Y DESENCOFRADO EN MUROS m2


CS-01 I 1.00 EXTERNO 1.00 1.00
CS-02 I 1.00 EXTERNO 1.00 1.00
CS-03 I 1.02 EXTERNO 1.00 1.00
CS-04 II 1.14 EXTERNO 1.00 1.00
CS-05 II 1.40 EXTERNO 1.00 1.00
CS-06 II 1.45 EXTERNO 1.00 1.00
CS-07 II 1.50 EXTERNO 1.00 1.00
CS-08 II 0.70 EXTERNO 1.00 1.00
CS-09 II 1.66 EXTERNO 1.00 1.00
CS-10 II 1.66 EXTERNO 1.00 1.00
CS-11 II 1.40 EXTERNO 1.00 1.00
CS-12 II 1.46 EXTERNO 1.00 1.00
CP-01 II 0.7 EXTERNO 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CP-02 II 0.7 EXTERNO 1.00 1.00


CP-03 II 0.35 EXTERNO 1.00 1.00
CP-04 II 0.75 EXTERNO 1.00 1.00
CP-05 II 0.75 EXTERNO 1.00 1.00
CP-06 II 0.35 EXTERNO 1.00 1.00
CP-07 II 0.35 EXTERNO 1.00 1.00
CP-08 II 0.55 EXTERNO 1.00 1.00
CP-09 II 0.6 EXTERNO 1.00 1.00
CP-10 II 0.55 EXTERNO 1.00 1.00
CP-11 II 0.7 EXTERNO 1.00 1.00

CS-01 I 1.00 INTERNO 1.00 1.00


CS-02 I 1.00 INTERNO 1.00 1.00
CS-03 I 1.02 INTERNO 1.00 1.00
CS-04 II 1.14 INTERNO 1.00 1.00
CS-05 II 1.40 INTERNO 1.00 1.00
CS-06 II 1.45 INTERNO 1.00 1.00
CS-07 II 1.50 INTERNO 1.00 1.00
CS-08 II 0.70 INTERNO 1.00 1.00
CS-09 II 1.66 INTERNO 1.00 1.00
CS-10 II 1.66 INTERNO 1.00 1.00
CS-11 II 1.40 INTERNO 1.00 1.00
CS-12 II 1.46 INTERNO 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CP-01 II 0.7 INTERNO 1.00 1.00


CP-02 II 0.7 INTERNO 1.00 1.00
CP-03 II 0.35 INTERNO 1.00 1.00
CP-04 II 0.75 INTERNO 1.00 1.00
CP-05 II 0.75 INTERNO 1.00 1.00
CP-06 II 0.35 INTERNO 1.00 1.00
CP-07 II 0.35 INTERNO 1.00 1.00
CP-08 II 0.55 INTERNO 1.00 1.00
CP-09 II 0.6 INTERNO 1.00 1.00
CP-10 II 0.55 INTERNO 1.00 1.00
CP-11 II 0.7 INTERNO 1.00 1.00

06.05.10.03.05 CONCRETO F'C=280 KG/CM2 CON CEM. TIPO-V - MUROS m3


CS-01 I 1.00 1.00 1.00
CS-02 I 1.00 1.00 1.00
CS-03 I 1.02 1.00 1.00
CS-04 II 1.14 1.00 1.00
CS-05 II 1.40 1.00 1.00
CS-06 II 1.45 1.00 1.00
CS-07 II 1.50 1.00 1.00
CS-08 II 0.70 1.00 1.00
CS-09 II 1.66 1.00 1.00
CS-10 II 1.66 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CS-11 II 1.40 1.00 1.00


CS-12 II 1.46 1.00 1.00
CP-01 II 0.7 1.00 1.00
CP-02 II 0.7 1.00 1.00
CP-03 II 0.35 1.00 1.00
CP-04 II 0.75 1.00 1.00
CP-05 II 0.75 1.00 1.00
CP-06 II 0.35 1.00 1.00
CP-07 II 0.35 1.00 1.00
CP-08 II 0.55 1.00 1.00
CP-09 II 0.6 1.00 1.00
CP-10 II 0.55 1.00 1.00
CP-11 II 0.7 1.00 1.00

06.05.10.03.06 TAPA DE CONCRETO PRE FABRICADO und


TAPA TIPO I 3.00 2.00
TAPA TIPO II 20.00 2.00

06.05.10.03.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2


CURADO CARA EXTERNA 1.00 1.00
CURADO CARA INTERNA 1.00 1.00
BORDE SUPERIOR 1.00 1.00
CS-01 I 1.00 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CS-02 I 1.00 1.00 1.00


CS-03 I 1.02 1.00 1.00
CS-04 II 1.14 1.00 1.00
CS-05 II 1.40 1.00 1.00
CS-06 II 1.45 1.00 1.00
CS-07 II 1.50 1.00 1.00
CS-08 II 0.70 1.00 1.00
CS-09 II 1.66 1.00 1.00
CS-10 II 1.66 1.00 1.00
CS-11 II 1.40 1.00 1.00
CS-12 II 1.46 1.00 1.00
CP-01 II 0.7 1.00 1.00
CP-02 II 0.7 1.00 1.00
CP-03 II 0.35 1.00 1.00
CP-04 II 0.75 1.00 1.00
CP-05 II 0.75 1.00 1.00
CP-06 II 0.35 1.00 1.00
CP-07 II 0.35 1.00 1.00
CP-08 II 0.55 1.00 1.00
CP-09 II 0.6 1.00 1.00
CP-10 II 0.55 1.00 1.00
CP-11 II 0.7 1.00 1.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.10.04 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.10.04.01 REVESTIDO DE SUPERFICIES INTERIORES C/ADITIVO IMPERMEABILIZANTE m2
CAMARA HUMEDA FONDO DE LOSA 1.00 1.00
CAMARA HUMEDA CARA INTERNA 1.00 1.00

06.05.10.04.02 TARRAJEO EN MUROS M=1:4, E=1.5 cm. m2


CAMARA EXTERNA 1.00 1.00
BORDE SUPERIOR 1.00 1.00

06.05.10.05 PINTURA
06.05.10.05.01 PINTADO C/ESMALTE (2 MANOS) m2
PINTURA 1.00 1.00

06.05.11 RED DE DISTRIBUCION INTERNA DE A.R.


06.05.11.01 TRABAJOS PRELIMINARES

06.05.11.01.01 TRAZO Y REPLANTEO PARA INSTALACION DE TUBERIAS m


TRAZO 1.00 1.00

06.05.11.01.02 SEÑALIZACION PARA LIMITE DE SEGURIDAD m


SEÑALIZ
1.00 2.00
ACIÓN
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.11.02 MOVIMIENTO DE TIERRAS

06.05.11.02.01 EXC ZANJA C/MAQ. P/TUB. Prof=1.50 m m


BP-123 a CR 1.00 1.00 30.47
DS a CS-02 1.00 1.00 0.96
CS-02 a CS-03 1.00 1.00 4.25
CS-01 a CS-03 1.00 1.00 5.94
CS-03 a CS-04 1.00 1.00 21.40
CS-04 a LSA 1.00 1.00 2.88

LSA a CS-08 1.00 1.00 5.15


CS-08 a CS-07 1.00 1.00 7.32
CS-07 a CS-06 1.00 1.00 9.68
CS-06 a CS-05 1.00 1.00 9.60
DES a CDC 1.00 2.00 1.80
LS-01 a BP-124 1.00 1.00 2.73

CDC a CP-01 1.00 1.00 1.39


CP-01 a CP-02 1.00 1.00 13.36
CP-02 a CP-03 1.00 1.00 2.15
CP-03 a TI-01 1.00 1.00 0.48
TI-01 a FB-01 1.00 1.00 3.90
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TI-02 a FB-02 1.00 1.00 3.90


TI-03 a FB-03 1.00 1.00 3.90
CDC a CP-05 1.00 1.00 5.77
CDC a CP-04 1.00 1.00 4.84
CP-05 a CP-07 1.00 1.00 5.17
CP-04 a CP-06 1.00 1.00 4.61
CP-06 a TI-02 1.00 1.00 0.48
CP-07 a TI-03 1.00 1.00 0.48

CP-08 a CP-09 1.00 1.00 8.55


CP-09 a CP-10 1.00 1.00 10.65
CS-09 a CS-12 1.00 1.00 7.40
CS-10 a CS-11 1.00 1.00 7.40
CS-09 a SD-01 1.00 1.00 0.85
CS-09 a SD-02 1.00 1.00 0.85
CS-10 a CAJA 1.00 1.00 1.14
CP-09 a CCC 1.00 1.00 0.75
CS-11 a CS-12 1.00 1.00 10.39
CS-12 a LS-02 1.00 1.00 2.12
LS-02 a PER 1.00 1.00 1.50

06.05.11.02.02 EXC ZANJA C/MAQ.C/ENTIBADO P/TUB. Hp = 5.50 m. m


CP-10 a BP-124 1.00 1.00 20.43
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.11.02.03 REFINE Y NIV. DE FONDO DE ZANJA m


REFINE 1.00 1.00

06.05.11.02.04 CAMA DE APOYO e=0.10m m


CAMA
DE 1.00 1.00
APOYO

06.05.11.02.05 PRIMER RELLENO DE ZANJA m


RELLEN
1.00 1.00
O

06.05.11.02.06 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 0.90 m. m
BP-123 a CR 1.00 1.00 30.47

06.05.11.02.07 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 4.90 m. m
CP-10 a BP-124 1.00 1.00 20.43

06.05.11.02.08 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


BP-123 a CR 0.60 2.00 30.47
DS a CS-02 0.45 2.00 0.96
CS-02 a CS-03 0.45 2.00 4.25
CS-01 a CS-03 0.45 2.00 5.94
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CS-03 a CS-04 0.45 2.00 21.40


CS-04 a LSA 0.45 2.00 2.88

LSA a CS-08 0.45 2.00 5.15


CS-08 a CS-07 0.45 2.00 7.32
CS-07 a CS-06 0.45 2.00 9.68
CS-06 a CS-05 0.45 2.00 9.60
DES a CDC 0.45 4.00 1.80
LS-01 a BP-124 0.45 2.00 2.73
CP-10 a BP-124 0.60 2.00 20.43

CDC a CP-01 0.45 2.00 1.39


CP-01 a CP-02 0.45 2.00 13.36
CP-02 a CP-03 0.45 2.00 2.15
CP-03 a TI-01 0.45 2.00 0.48
TI-01 a FB-01 0.00 2.00 3.90
TI-02 a FB-02 0.00 2.00 3.90
TI-03 a FB-03 0.00 2.00 3.90
CDC a CP-05 0.45 2.00 5.77
CDC a CP-04 0.45 2.00 4.84
CP-05 a CP-07 0.45 2.00 5.17
CP-04 a CP-06 0.45 2.00 4.61
CP-06 a TI-02 0.45 2.00 0.48
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CP-07 a TI-03 0.45 2.00 0.48

CP-08 a CP-09 0.45 2.00 8.55


CP-09 a CP-10 0.45 2.00 10.65
CS-09 a CS-12 0.45 2.00 7.40
CS-10 a CS-11 0.45 2.00 7.40
CS-09 a SD-01 0.45 2.00 0.85
CS-09 a SD-02 0.45 2.00 0.85
CS-10 a CAJA 0.45 2.00 1.14
CP-09 a CCC 0.45 2.00 0.75
CS-11 a CS-12 0.45 2.00 10.39
CS-12 a LS-02 0.45 2.00 2.12
LS-02 a PER 0.45 2.00 1.50

06.05.11.03 TUBERIAS

06.05.11.03.01 SUM TUB PVC UF ISO 4435 DN=160 mm. S-2 m


CP-08 a CP-09 1.00 1.00 8.55
CP-09 a CP-10 1.00 1.00 10.65
CS-09 a CS-12 1.00 1.00 7.40
CS-10 a CS-11 1.00 1.00 7.40
CS-09 a SD-01 1.00 1.00 0.85
CS-09 a SD-02 1.00 1.00 0.85
CS-10 a CAJA 1.00 1.00 1.14
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CP-09 a CCC 1.00 1.00 0.75


CS-11 a CS-12 1.00 1.00 10.39
CS-12 a LS-02 1.00 1.00 2.12
LS-02 a PER 1.00 1.00 1.50

06.05.11.03.02 SUM TUB PVC UF ISO 4435 DN=200mm S-2 m


LSA a CS-08 1.00 1.00 5.15
CS-08 a CS-07 1.00 1.00 7.32
CS-07 a CS-06 1.00 1.00 9.68
CS-06 a CS-05 1.00 1.00 9.60
DES a CDC 1.00 2.00 1.80
LS-01 a BP-124 1.00 1.00 2.73
CP-10 a BP-124 1.00 1.00 20.43

06.05.11.03.03 SUM TUB PVC UF ISO 4435 DN=250mm S-2 m


BP-123 a CR 1.00 1.00 30.47
DS a CS-02 1.00 1.00 0.96
CS-02 a CS-03 1.00 1.00 4.25
CS-01 a CS-03 1.00 1.00 5.94
CS-03 a CS-04 1.00 1.00 21.40
CS-04 a LSA 1.00 1.00 2.88

06.05.11.03.04 SUMINISTRO DE TUBERIA DE ACERO SCH-40 ASTM A-53 DN = 6" m


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

CDC a CP-01 1.00 1.00 1.39


CP-01 a CP-02 1.00 1.00 13.36
CP-02 a CP-03 1.00 1.00 2.15
CP-03 a TI-01 1.00 1.00 0.48
TI-01 a FB-01 1.00 1.00 3.90
TI-02 a FB-02 1.00 1.00 3.90
TI-03 a FB-03 1.00 1.00 3.90
CDC a CP-05 1.00 1.00 5.77
CDC a CP-04 1.00 1.00 4.84
CP-05 a CP-07 1.00 1.00 5.17
CP-04 a CP-06 1.00 1.00 4.61
CP-06 a TI-02 1.00 1.00 0.48
CP-07 a TI-03 1.00 1.00 0.48

06.05.11.03.05 INST TUB PVC UF m


INSTALACIÓN DE TUBERIA PVC 1.00 1.00

06.05.11.03.06 INSTALACION DE TUBERIA ACERO SCH-40 m


INSTALACIÓN DE TUBERIA ACERO 1.00 1.00

06.05.11.03.07 DADO DE EMPALME A BUZON FC=140 KG/CM2 und


DADO 1.00 2.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.11.04 PRUEBAS HIDRAULICAS

06.05.11.04.01 PRUEBA DE NIVELACION m


PRUEBA 1.00 1.00

06.05.11.04.02 PRUEBA HIDRAULICA A ZANJA ABIERTA P/TUB. m


PRUEBA 1.00 1.00

06.05.11.04.03 PRUEBA HIDRAULICA C/RELLENO COMPACTADO TUB. m


PRUEBA 1.00 1.00

06.05.12 POZO PERCOLADOR


06.05.12.01 MOVIMIENTO DE TIERRAS
06.05.12.01.01 EXCAVACION MANUAL m3
1.00 1.00

06.05.12.01.02 RELLENO CON MATERIAL PROPIO m3


1.00 5.34
1.00 3.14

06.05.12.01.03 ACARREO DE MATERIAL EXCEDENTE m3


1.00 5.34
1.00 3.14
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.12.01.04 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


1.00

06.05.12.02 OBRAS DE CONCRETO ARMADO


06.05.12.02.01 ACERO Fy = 4200 kg/cm2 EN CIMIENTO kg

ACERO HORIZONTAL Ø1/2" R=0.85M 2.00 1.00 5.34

ACERO HORIZONTAL Ø1/2" R=0.75M 2.00 1.00 4.71

ACERO HORIZONTAL Ø1/2" R=0.65M 2.00 1.00 4.08

ESTRIBOS Ø 1/4" 36.00 1.00 0.45

06.05.12.02.02 ENCOFRADO Y DESENCOFRADO EN CIMIENTO m2

ENCOFRADO EXTENO 1.00 5.34

ENCOFRADO INTERNO 1.00 3.96

06.05.12.02.03 CONCRETO F'C = 210 KG/CM2 CON CEM. TIPO-V - CIMIENTO m3


1.00 1.00 5.34

06.05.12.02.04 ACERO Fy = 4200 kg/cm2 EN LOSA SUPERIOR kg

ACERO HORIZONTAL Ø1/2" L=1.8M LOSA CUBIERTA 8.00 1.80

ACERO HORIZONTAL Ø3/8" L=0.5M LOSA CUBIERTA 8.00 0.50

ACERO HORIZONTAL Ø3/8" L=0.75M LOSA CUBIERTA 2.00 0.75

ACERO HORIZONTAL Ø3/8" L=0.60M LOSA CUBIERTA 4.00 0.60

ACERO HORIZONTAL Ø1/2" L=1.8M TAPA DE BUZON 1.00 7.00


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

ACERO AGARRADERA Ø3/8" TAPA DE BUZON 2.00 0.50

06.05.12.02.05 ENCOFRADO Y DESENCOFRADO EN LOSA SUPERIOR m2

ENCOFRADO PERIMETRAL EXTERNO LOSA CUBIERTA 1.00 6.28

ENCOFRADO INTERNO TAPA LOSA CUBIERTA 1.00 2.80

ENCOFRADO TAPA BASE LOSA CUBIERTA 1.00 2.78

ENCOFRADO LATERAL TAPA DE BUZON 4.00 0.70

ENCOFRADO TAPA BASE TAPA DE BUZON 1.00 0.70

06.05.12.02.06 CONCRETO F'C = 210 KG/CM2 CON CEM. TIPO-V - LOSA SUPERIOR m3

LOSA CUBIERTA 1.00 2.78

TAPA DE BUZON 1.00 0.70

06.05.12.02.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2

CIMIENTO 1.00 1.00 5.34

LOSA CUBIERTA 1.00 2.78

TAPA DE BUZON 1.00 0.70

06.05.12.03 ARQUITECTURA
06.05.12.03.01 MURO DE LADRILO DE CABEZA KK und
1.00 45.00

06.05.12.03.02 GRAVA DE 2 1/2" m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

BASE POZO PERCOLACION 1.00


PERIMETRAL JUNTO AL MURO 1.00 5.34

06.05.13 EMISORES EFLUENTES DE A.R Y PLUVIAL

06.05.13.01 TRABAJOS PRELIMINARES


06.05.13.01.01 TRAZO Y REPLANTEO PARA INSTALACION DE TUBERIAS

TRAZO Y REPLANTEO EN EMISOR EFLUENTE DE A.R. m 1.00 1.00 375.00

TRAZO Y REPLANTEO EN PLUVIAL m 1.00 1.00 375.00

06.05.13.01.02 SEÑALIZACION PARA LIMITE DE SEGURIDAD

TRAZO Y REPLANTEO EN EMISOR EFLUENTE DE A.R. m 2.00 1.00 375.00

TRAZO Y REPLANTEO EN PLUVIAL m 2.00 1.00 375.00

06.05.13.02 MOVIMIENTO DE TIERRAS


06.05.13.02.01 EXC ZANJA C/MAQ. P/TUB. Prof=2.50 m

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.02.02 EXC ZANJA C/MAQ.C/ENTIBADO P/TUB. HPROM = 3.50 m.


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

06.05.13.02.03 EXC ZANJA C/MAQ.C/ENTIBADO P/TUB. HPROM = 4.50 m.

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

06.05.13.02.04 EXC ZANJA C/MAQ.C/ENTIBADO P/TUB. HPROM = 5.50 m.

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

06.05.13.02.05 EXC DE BUZONES D=1.20m. HPROM=2.50m

BP - 129 und 1.00 1.00

BP - 128 und 1.00 1.00

BD - 06 und 1.00 1.00

BD - 05 und 1.00 1.00

06.05.13.02.06 EXC DE BUZONES D=1.50m. HPROM=3.50m 0.00

BP - 127 und 1.00 1.00

BP - 126 und 1.00 1.00

BD - 03 und 1.00 1.00


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

BD - 04 und 1.00 1.00

06.05.13.02.07 EXC DE BUZONES D=1.50m. HPROM=4.50m 0.00

BP - 125 und 1.00 1.00

BD - 02 und 1.00 1.00

06.05.13.02.08 EXC DE BUZONES D=1.50m. HPROM=5.50m 0.00

BP - 124 und 1.00 1.00

BD - 01 und 1.00 1.00

06.05.13.02.09 REFINE Y NIV. DE FONDO DE ZANJA 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.13.02.10 CAMA DE APOYO e=0.10m 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.02.11 PRIMER RELLENO DE ZANJA TUB 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.02.12 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 1.90 m. 0.00

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.02.13 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 2.90 m. 0.00

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

06.05.13.02.14 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 3.90 m. 0.00

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

06.05.13.02.15 SEGUNDO RELLENO DE ZANJA MAT. PROPIO COMPACT. C/EQUIP. HRp = 4.90 m. 0.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

06.05.13.02.16 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) 0.00

TRAMO BP - 124 A BP - 125 m3 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m3 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m3 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m3 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m3 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m3 1.00 1.00 22.55

BP - 124 m3 1.00 1.00 Area=2.84m2

BP - 125 m3 1.00 1.00 Area=2.84m2

BP - 126 m3 1.00 1.00 Area=2.84m2

BP - 127 m3 1.00 1.00 Area=2.84m2

BP - 128 m3 1.00 1.00 Area=2.01m2

BP - 129 m3 1.00 1.00 Area=2.01m2

TRAMO BD - 01 A BD - 02 m3 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m3 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m3 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m3 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m3 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m3 1.00 1.00 22.55

BD - 01 m3 1.00 1.00 Area=2.84m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

BD - 02 m3 1.00 1.00 Area=2.84m2

BD - 03 m3 1.00 1.00 Area=2.84m2

BD - 04 m3 1.00 1.00 Area=2.84m2

BD - 05 m3 1.00 1.00 Area=2.01m2

BD - 06 m3 1.00 1.00 Area=2.01m2

06.05.13.03 TUBERIAS
06.05.13.03.01 SUM TUB PVC UF ISO 4435 DN=200mm S-2 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.03.02 INST TUB PVC UF 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.03.03 DADO DE EMPALME A BUZON FC=140 KG/CM2 0.00

BP - 124 und 2.00 1.00

BP - 125 und 2.00 1.00

BP - 126 und 2.00 1.00

BP - 127 und 2.00 1.00

BP - 128 und 2.00 1.00

BP - 129 und 2.00 1.00

BD - 01 und 2.00 1.00

BD - 02 und 2.00 1.00

BD - 03 und 2.00 1.00

BD - 04 und 2.00 1.00


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

BD - 05 und 2.00 1.00

BD - 06 und 2.00 1.00

06.05.13.04 BUZONES
06.05.13.04.01 CONSTRUCCION DE BUZON DE CONC.SIMPLE F'C=210 KG/CM2 TIPO-V, DI = 1.20 Hp = 2.50 m. 0.00

BP - 128 und 1.00 1.00

BP - 129 und 1.00 1.00

BD - 05 und 1.00 1.00

BD - 06 und 1.00 1.00

06.05.13.04.02 CONSTRUCCION DE BUZON DE CONC. ARMADO F'C=210 KG/CM2 TIPO-V, DI = 1.50 Hp = 3.50 m. 0.00

BP - 126 und 1.00 1.00

BP - 127 und 1.00 1.00

BD - 03 und 1.00 1.00

BD - 04 und 1.00 1.00

06.05.13.04.03 CONSTRUCCION DE BUZON DE CONC. ARMADO F'C=210 KG/CM2 TIPO-V, DI = 1.50 Hp = 4.50 m. 0.00

BP - 125 und 1.00 1.00

BD - 02 und 1.00 1.00

06.05.13.04.04 CONSTRUCCION DE BUZON DE CONC. ARMADO F'C=210 KG/CM2 TIPO-V, DI = 1.50 Hp = 5.50 m. 0.00

BP - 124 und 1.00 1.00

BD - 01 und 1.00 1.00


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.13.05 PRUEBAS HIDRAULICAS


06.05.13.05.01 PRUEBA DE NIVELACION 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.05.02 PRUEBA HIDRAULICA A ZANJA ABIERTA P/TUB. 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.13.05.03 PRUEBA HIDRAULICA C/RELLENO COMPACTADO TUB. 0.00

TRAMO BP - 124 A BP - 125 m 1.00 1.00 72.76

TRAMO BP - 125 A BP - 126 m 1.00 1.00 73.20

TRAMO BP - 126 A BP - 127 m 1.00 1.00 51.05

TRAMO BP - 127 A BP - 128 m 1.00 1.00 74.01

TRAMO BP - 128 A BP - 129 m 1.00 1.00 70.20

TRAMO BP - 129 - DADO DE PROTECCION m 1.00 1.00 22.55

TRAMO BD - 01 A BD - 02 m 1.00 1.00 72.76

TRAMO BD - 02 A BD - 03 m 1.00 1.00 73.20

TRAMO BD - 03 A BD - 04 m 1.00 1.00 51.05

TRAMO BD - 04 A BD - 05 m 1.00 1.00 74.01

TRAMO BD - 05 A BD - 06 m 1.00 1.00 70.20

TRAMO BD - 06 A DADO DE PROTECCION m 1.00 1.00 22.55

06.05.14 CERCO PERIMETRICO


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.14.01 MOVIMIENTO DE TIERRAS


06.05.14.01.01 EXC C/RETROEXCAVADORA EN TERRENO NORMAL m3
m3 2.00 1.00 60.00
m3 2.00 1.00 42.20

06.05.14.01.02 REFINE Y COMP. DE TERRENO m2


m2 2.00 1.00 60.00
m2 2.00 1.00 42.20

06.05.14.01.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO m3


m3 2.00 1.00 60.00
m3 2.00 1.00 42.20

06.05.14.01.04 ELIMINACION DE MATERIAL EXCEDENTE (DISTANCIA=10 KM) m3


m3 2.00 1.30 60.00
m3 2.00 1.30 42.20
06.05.14.02 CONCRETO SIMPLE
06.05.14.02.01 CONCRETO F'C=140 KG/CM2 + 30% P.G. PARA CIMIENTOS CORRIDOS m3
m3 62.00 1.00 3.33

06.05.14.02.02 CONCRETO F'C=175 KG/CM2 + 25% P.M. PARA SOBRECIMIENTOS m3


m3 62.00 1.00 3.00
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.14.02.03 ENCOFRADO Y DESENCOFRADO - SOBRECIMIENTOS m2

LADO FRONTAL m2 62.00 2.00 3.00

LADO LATERAL m2 62.00 2.00

06.05.14.02.04 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2

LADO FRONTAL m2 62.00 2.00 3.00

LADO LATERAL m2 62.00 2.00

06.05.14.03 CONCRETO ARMADO


06.05.14.03.01 CONCRETO COLUMNAS F'C = 210 KG/CM2 m3

COLUMNA m3 85.00 1.00 0.25

06.05.14.03.02 ACERO Fy = 4200 KG/CM2 EN COLUMNAS kg

ACERO PRINCIPAL kg 85.00 4.00 3.58

ACERO DE ESTRIBO kg 85.00 19.00 0.88

06.05.14.03.03 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2


m2 85.00 4.00

06.05.14.03.04 CONCRETO F'C=210 KG/CM2 - VIGAS m3


m2 62.00 1.00 3.33
MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

06.05.14.03.05 ACERO ESTRUCTURAL GRADO 60, Fy = 4200 KG/CM2 - VIGAS kg

ACERO PRINCIPAL kg 62.00 4.00 3.58

ACERO DE ESTRIBO kg 62.00 19.00 0.68

06.05.14.03.06 ENCOFRADO Y DESENCOFRADO - VIGAS m2

BASE DE VIGA m2 62.00 1.00 3.00

LADOS DE VIGA m2 62.00 2.00 3.33

06.05.14.03.07 CURADO QUIMICO EN ESTRUCTURAS DE CONCRETO m2

COLUMNA m2 85.00 1.00 0.25

BASE DE VIGA m2 62.00 1.00 3.00

LADOS DE VIGA m2 62.00 2.00 3.33

LADO SUPERIOR DE VIGA m2 62.00 1.00 3.33

06.05.14.04 MUROS Y TABIQUES


06.05.14.04.01 MURO DE LADRILLO K.K. MEZCLA C:A 1:5 TIPO IV P.TARRAJ. DE SOGA m2

MURO m2 62.00 1.00 3.00

06.05.14.05 REVOQUES ENLUCIDOS Y MOLDURAS


06.05.14.05.01 TARRAJEO DE SOBRECIMIENTOS M=1:4, E=1.5 cm. m2

TARRAJEO m2 62.00 2.00 3.00

06.05.14.05.02 TARRAJEO EN COLUMNAS M=1:4, E=1.5 cm. m2


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

TARRAJEO EN COLUMNA m2 85.00 2.00

TARRAJEO EN COLUMNA m2 85.00 2.00 0.10

06.05.14.05.03 TARRAJEO EN VIGAS M=1:4, E=1.5 cm. m2

BASE DE VIGA m2 62.00 1.00 3.00

LADOS DE VIGA m2 62.00 2.00 3.33

LADO SUPERIOR DE VIGA m2 62.00 1.00 3.33

06.05.14.06 CARPINTERIA METALICA


06.05.14.06.01 SUMINISTRO E INSTALACION DE PUERTA METALICA C/PL. LAC. (ACANALADA) 1.40 m. x 2.10 m. INC PINTURA und
und 1.00 1.00

06.05.14.06.02 CERRADURA PARA PUERTA METALICA und

CERRADURA und 1.00 1.00

06.05.14.07 PINTURA
06.05.14.07.01 PINTADO C/ESMALTE (2 MANOS) - CONTRAZOCALOS m2

TARRAJEO m2 62.00 2.00 3.00

06.05.14.07.02 PINTADO EN COLUMNAS Y VIGAS DE CERCO PERIMETRICO C/LATEX VINILICO m2

TARRAJEO EN COLUMNA m2 85.00 2.00

TARRAJEO EN COLUMNA m2 85.00 2.00 0.10

BASE DE VIGA m2 62.00 1.00 3.00


MUNICIPALIDAD PROVINCIAL DE YAULI - LA
HOJA DE METRAD
OROYA

"MEJORAMIENTO Y AMPLIACIÓN DEL SISTEMA DE AG


EXPEDIENTE TECNICO:
DISTRITO DE LA OROYA,
ITEMS DESCRIPCIÓN

06.05 CONSTRUCCION DE PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES (PTAR)

Fecha : 5/1/2018

DIMENSIONES
PARTIDA DESCRIPCIÓN UND
Cantidad N° Veces Long (m)

LADOS DE VIGA m2 62.00 2.00 3.33

LADO SUPERIOR DE VIGA m2 62.00 1.00 3.33

PINTADO DE PUERTA METALICA und 1.00 1.00

08 EDUCACION SANITARIA
08.01 TALLER PRACTICAS SALUDABLES DE HIGIENE und
08.02 TALLER DISPOSICION SANITARIA DE EXCRETAS Y AGUAS RESIDUALES und
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2700
45 2700

2200
Vol=2200.00 m3 2200

2860
1.3 Vol=2200.00 m3 2860

4.64 4.64
0.70 Area=1.77 m2 1.24
0.55 Area=1.28 m2 0.70
0.50 Area=5.41 m2 2.70

3.65 3.65
Area=3.65 m2 3.65

2.70 2.70
0.50 Area=5.41 m2 2.70
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

3.65 3.65
Area=3.65 m2 3.65

2.52 2.52
Vol=4.64 m3 6.04
-Vol=2.70 m3 -3.51

3.48 3.48
Area=3.48 m2 3.48

0.06 0.06
0.40 0.40 0.06

2.08 2.08
0.15 Perim=13.88 m 2.08

12.00 12.00
Area=12.00 m2 12.00

12.00 12.00
Area=12.00 m2 12.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

18.90 18.90
Peso=0.56 kg 7.14
Peso=0.56 kg 5.85
Peso=0.56 kg 2.71
Peso=0.56 kg 3.19

0.37 0.37
0.70 Area=0.33 m2 0.23
0.55 Area=0.25 m2 0.14

30.78 30.78
Peso=0.56 kg 11.11
Peso=0.56 kg 9.52
Peso=0.56 kg 6.23
Peso=0.56 kg 3.92

9.95 9.95
0.10 Perim=8.80 m 0.88
0.70 0.37 0.26
Area=1.44 m2 2.88
0.15 0.57 0.17
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.40 0.37 0.15


Area=1.38 m2 2.76
0.55 0.41 0.23
Area=1.03 m2 1.03
0.55 0.57 0.31
0.40 0.41 0.16
Area=0.89 m2 0.89
0.40 0.57 0.23

0.66 0.66
0.15 Area=1.44 m2 0.22
0.15 Area=1.44 m2 0.22
0.15 0.37 0.02
0.15 0.57 0.03
0.15 -0.36 -0.02
0.15 -0.38 -0.02
0.15 Area=0.89 m2 0.13
0.15 0.41 0.03
0.15 0.57 0.05

3.63 3.63
Peso=0.56 kg 1.89
Peso=0.56 kg 1.74
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.13 1.13
0.70 0.64
0.15 Perim=3.25 m 0.49

0.10 0.10
0.70 0.15 0.10

11.42 11.42
0.10 Perim=8.80 m 0.88
0.70 0.37 0.26
Area=1.44 m2 2.88
0.15 0.57 0.17
0.40 0.37 0.15
Area=1.38 m2 2.76
Area=1.00 m2 1.00
0.55 0.41 0.23
Area=1.03 m2 1.03
0.55 0.57 0.31
0.40 0.41 0.16
Area=0.89 m2 0.89
0.40 0.57 0.23
Area=0.47 m2 0.47
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

6.32 6.32
0.40 0.37 0.15
Area=1.38 m2 2.76
Area=1.20 m2 1.20
0.40 0.41 0.16
Area=0.89 m2 0.89
0.40 0.57 0.23
Area=0.93 m2 0.93

6.35 6.35
0.70 0.37 0.26
Area=1.44 m2 2.88
0.15 0.57 0.17
Area=1.00 m2 1.00
0.55 0.41 0.23
Area=1.03 m2 1.03
0.55 0.57 0.31
Area=0.47 m2 0.47

1.47 1.47
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=1.00 m2 1.00
Area=0.47 m2 0.47

1.00 1.00

1.00

1.50 1.50

1.50

0.40 0.40

0.40

22.21 22.21
0.75 Area=2.47 m2 1.85
Area=5.84 m2 8.17
0.75 Area=3.15 m2 2.36
Area=6.31 m2 6.31
Area=0.47 m2 0.66
Area=1.95 m2 2.85
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

11.67 11.67
Area=2.47 m2 2.47
Perim=6.57 m 9.20

12.18 12.18
0.75 Area=3.15 m2 2.36
Area=6.31 m2 6.31
Area=0.47 m2 0.66
Area=1.95 m2 2.85

11.67 11.67
Area=11.67 m2 11.67

13.03 13.03
Vol=22.21 m3 28.87
-Vol=12.18 m3 -15.84

11.67 11.67
Area=2.47 m2 2.47
Perim=6.57 m 9.20
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.03 0.03
0.25 0.20 0.03

7.26 7.26
0.15 Perim=48.42 m 7.26

32.96 32.96
Area=32.96 m2 32.96

32.96 32.96
Area=32.96 m2 32.96

73.36 73.36
Peso=0.56 kg 8.66
Peso=0.56 kg 5.17
Peso=0.56 kg 32.52
Peso=0.56 kg 23.52
Peso=0.4 kg 1.58
Peso=0.4 kg 1.90

1.78 1.78
0.15 Area=2.47 m2 0.37
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=0.93 m2 1.31
0.60 0.12 0.10

155.77 155.77
Peso=0.56 kg 62.96
Peso=0.56 kg 3.25
Peso=0.56 kg 1.39
Peso=0.56 kg 1.39
Peso=0.56 kg 1.26
Peso=0.56 kg 1.26
Peso=0.56 kg 1.28
Peso=0.56 kg 1.31
Peso=0.56 kg 1.33
Peso=0.56 kg 1.36
Peso=0.56 kg 1.38
Peso=0.56 kg 1.39
Peso=0.56 kg 1.43
Peso=0.56 kg 1.48
Peso=0.56 kg 1.51
Peso=0.56 kg 1.53
Peso=0.56 kg 1.55
Peso=0.56 kg 1.58
Peso=0.56 kg 1.60
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 1.63
Peso=0.56 kg 1.66
Peso=0.56 kg 1.68
Peso=0.56 kg 1.71
Peso=0.56 kg 2.25
Peso=0.56 kg 2.25
Peso=0.56 kg 1.71
Peso=0.56 kg 1.56
Peso=0.56 kg 1.44
Peso=0.56 kg 1.31
Peso=0.56 kg 1.19
Peso=0.56 kg 9.32
Peso=0.56 kg 25.24
Peso=0.4 kg 6.26
Peso=0.4 kg 6.30

50.72 50.72
0.15 Perim=5.32 m 0.80
Area=0.93 m2 1.87
0.15 0.21
0.12 0.48
0.60 5.40
Area=4.90 m2 29.40
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.79 2.21
0.60 0.24
1.33 Perim=2.00 m 5.32
1.33 Perim=1.80 m 4.79

4.19 4.19
0.20 0.60 0.54
Area=4.90 m2 2.94
0.20 0.79 0.13
0.10 1.33 0.37
0.10 1.33 0.21

2.00 2.00

2.00

63.37 63.37
0.15 Perim=5.32 m 0.80
Area=0.93 m2 1.87
0.15 0.21
Area=6.72 m2 6.72
0.12 0.48
Area=0.20 m2 0.20
0.60 5.40
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=4.90 m2 29.40
0.79 2.21
Area=4.47 m2 4.47
0.60 0.24
1.33 Perim=2.00 m 5.32
1.33 Perim=1.80 m 4.79
Area=0.22 m2 0.22
0.10 Perim=2.20 m 0.44
0.60 0.60

32.05 32.05
0.60 2.70
Area=4.90 m2 19.60
0.79 0.63
0.60 2.40
Area=1.53 m2 1.53
Perim=6.48 m 5.19

23.55 23.55
0.60 2.70
Area=4.90 m2 9.80
0.79 1.11
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=4.47 m2 4.47
1.33 Perim=2.00 m 2.66
1.33 Perim=1.80 m 2.39
Area=0.22 m2 0.22
Area=0.20 m2 0.20

5.29 5.29
Area=4.47 m2 4.47
Area=0.22 m2 0.22
0.60 0.60

1.00 6.00

1.00

1.20 1.20

1.20

2.00 2.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.00

2.00 2.00

2.00

10.44 10.44
Area=4.59 m2 4.82
Area=5.35 m2 5.62

4.59 4.59
Area=4.59 m2 4.59

5.62 5.62
Area=5.35 m2 5.62

4.59 4.59
Area=4.59 m2 4.59

6.27 6.27
Vol=10.44 m3 13.57
-Vol=5.62 m3 -7.30
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

4.59 4.59
Area=4.59 m2 4.59

6.66 6.66
0.15 Perim=44.39 m 6.66

40.47 40.47
Area=40.47 m2 40.47

40.47 40.47
Area=40.47 m2 40.47

26.53 26.53
Peso=0.56 kg 13.44
Peso=0.56 kg 13.09

0.69 0.69
1.80 0.15 0.69

55.83 55.83
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

8.54 Peso=0.56 kg 19.13


0.84 Peso=0.56 kg 20.57
1.16 Peso=0.56 kg 5.17
1.02 Peso=0.56 kg 5.68
2.09 Peso=0.56 kg 3.51
0.39 Peso=0.56 kg 1.76

18.42 18.42
0.15 Perim=8.70 m 1.31
0.80 2.88
0.80 4.08
0.80 2.40
0.80 3.60
0.80 2.88
0.35 1.05
0.15 0.23

1.27 1.27
0.15 0.80 0.43
0.15 0.80 0.54
0.15 0.80 0.22
0.15 0.35 0.08
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

23.51 23.51
0.15 Perim=8.70 m 1.31
Area=3.38 m2 3.38
0.80 2.88
0.80 4.08
0.80 2.40
0.80 3.60
0.80 2.88
0.35 1.05
0.15 0.45
Area=1.49 m2 1.49

13.76 13.76
Area=3.38 m2 3.38
0.80 2.40
0.80 3.60
0.80 2.88
0.35 1.05
0.15 0.45

10.85 10.85
0.80 2.88
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.80 4.08
0.80 2.40
Area=1.49 m2 1.49

10.85 10.85
0.80 2.88
0.80 4.08
0.80 2.40
Area=1.49 m2 1.49

3.00 3.00

3.00

3.00 3.00

3.00

1657.87

7.30 6.82 1657.87


E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

153.45
5.50 153.45

774.62

1989.45
5.30 6.82 -1184.14
0.20 -30.69

153.45

5.50 153.45

1059.91

1989.45
-929.54

153.45
5.50 153.45

0.73
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.30 0.30 0.73

9.72

0.30 9.72

94.14
Area=94.14 m2 94.14

29.18
0.15 Perim=194.52 m 29.18
94.14
Area=94.14 m2 94.14

8798.50
2.24 kg 4416.92
0.56 kg 193.54
2.24 kg 3982.41
0.56 kg 205.63

43.80
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=2.72 m2 16.32
Area=4.58 m2 27.48

74.50
Area=2.72 m2 74.50

20933.97
2.24 kg 4798.08
2.24 kg 4866.62
2.24 kg 4935.17
0.56 kg 514.08
0.99 kg 3802.79

0.56 kg 43.51
0.56 kg 77.28
kg/m
0.56 kg 19.17
0.56 kg 22.70
kg/m
0.56 kg 31.92
0.56 kg 20.16
205.20 0.99 kg 609.44
401.70 0.99 kg 1193.05
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1230.89
5.90 297.36 297.36
5.90 279.66 279.66
5.90 81.42 81.42
5.90 72.57 72.57
5.90 113.28 113.28
6.36 26.71
6.18 25.96
4.72 15.58 15.58
1.73 20.76 20.76
0.50 3.60 3.60
0.60 4.86 4.86
12.20 289.14 289.14

236.87
0.33 5.90 96.64
0.33 5.90 26.46
0.33 5.90 18.41
13.52 56.78
1.05 1.60 5.54
0.85 1.40 -2.50
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.00 0.04 0.12


0.90 0.65 1.58
0.60 0.50 -0.54
1.45 34.37

3.00

3.00

1345.93
4.20 115.04
5.90 297.36
5.90 279.66
5.90 81.42
5.90 72.57

5.90 113.28
6.36 26.71
6.18 25.96
4.72 15.58
1.73 20.76
0.50 3.60
0.60 4.86
12.20 289.14
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

855.70
4.24 101.05
5.90 279.66
5.90 72.57
5.90 113.28
12.20 289.14

467.38
Area=2.72 m2 16.32
Area=4.58 m2 27.48
5.90 297.36
5.90 81.42
4.72 15.58
1.73 20.76
0.50 3.60
0.60 4.86

59.18
Area=6.28 m2 18.83
0.50 Perim=26.90 m 40.35
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

6.00

6.00

3.00

3.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

75.00

75.00

2.70

2.70

359.10
2.85 Area=33.60 m2 287.28
2.85 Area=8.40 m2 71.82

100.80
Area=33.60 m2 100.80

111.51
2.85 Area=8.40 m2 71.82
2.10 Area=6.30 m2 39.69

100.80
Area=33.60 m2 100.80
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

321.87
Vol=119.70 m3 466.83
-Vol=37.17 m3 -144.96

100.80
Area=33.60 m2 100.80

53.62
Area=17.00 m2 17.00
Area=16.78 m2 16.78
Area=19.85 m2 19.85

18.32
0.15 Perim=40.35 m 6.05
0.15 Perim=40.27 m 6.04
0.15 Perim=41.51 m 6.23

53.62
Area=17.00 m2 17.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=16.78 m2 16.78
Area=19.85 m2 19.85

1580.57
Peso=0.56 kg 63.12
Peso=0.56 kg 57.52
Peso=0.99 kg 728.50
Peso=0.99 kg 731.42

23.31
0.75 0.15 2.84
3.25 0.25 20.48

2250.23
Peso=0.56 kg 97.14
Peso=0.56 kg 70.71
Peso=0.56 kg 382.64
Peso=0.56 kg 410.42
Peso=0.56 kg 323.77
Peso=0.56 kg 358.68
Peso=0.56 kg 69.30
Peso=0.56 kg 78.83
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 17.64
Peso=0.56 kg 12.50
Peso=0.56 kg 211.41
Peso=0.56 kg 184.46
Peso=0.56 kg 18.82
Peso=0.56 kg 13.91

488.06
Area=1.26 m2 3.78
Area=2.10 m2 6.30
0.00 0.00
0.25 6.30
0.15 0.45
0.25 1.88
0.25 0.56
0.15 0.45
0.25 1.88
0.25 0.56
Area=8.10 m2 24.30
Area=8.40 m2 25.20
Area=25.20 m2 75.60
Area=25.20 m2 75.60
2.60 63.18
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.60 65.52
1.00 24.30
1.00 25.20
0.80 1.44
0.80 2.40
2.60 15.60
2.60 19.50
1.00 1.80
1.00 2.25
1.20 2.16
1.20 2.70
2.60 15.60
2.60 19.50
1.00 1.80
1.00 2.25

51.72
0.15 Area=8.40 m2 3.78
0.25 3.00 18.90
0.25 2.60 16.38
0.15 1.00 3.78
0.15 0.80 0.22
0.25 2.60 3.90
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.15 1.00 0.27


0.15 1.20 0.32
0.25 2.60 3.90
0.15 1.00 0.27

1194.23
Peso=0.56 kg 265.19
Peso=0.56 kg 929.04

217.99
Perim=1.31 m 217.99

9.12
Area=0.06 m2 9.12

588.86
Area=4.86 m2 14.58
Area=1.26 m2 3.78
Area=2.10 m2 6.30
0.00 0.00
0.25 6.30
0.15 0.45
0.25 1.88
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.25 0.56
0.15 0.45
0.25 1.88
0.25 0.56
Area=3.54 m2 10.62
Area=15.80 m2 47.40
Area=8.10 m2 24.30
Area=8.40 m2 25.20
Area=25.20 m2 75.60
Area=25.20 m2 75.60
2.60 63.18
2.60 65.52
1.00 24.30
1.00 25.20
0.80 1.44
0.80 2.40
2.60 15.60
2.60 19.50
1.00 1.80
1.00 2.25
1.20 2.16
1.20 2.70
2.60 15.60
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.60 19.50
1.00 1.80
1.00 2.25
Area=3.10 m2 9.30
Area=4.86 m2 14.58
Area=1.44 m2 4.32

445.71
Area=4.86 m2 14.58
Area=15.80 m2 47.40
Area=4.86 m2 14.58
Area=8.10 m2 24.30
Area=25.20 m2 75.60
Area=25.20 m2 75.60
2.60 63.18
2.60 65.52
1.00 24.30
0.80 1.44
2.60 15.60
1.00 1.80
1.20 2.16
2.60 15.60
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.00 1.80
1.00 2.25

123.24
Area=3.54 m2 10.62
Area=3.10 m2 9.30
Area=1.44 m2 4.32
Area=8.40 m2 25.20
1.00 25.20
0.80 2.40
2.60 19.50
1.00 2.25
1.20 2.70
2.60 19.50
1.00 2.25

3.00
Vol=1.00 m3 3.00

98.04
Area=3.54 m2 10.62
Area=3.10 m2 9.30
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=1.44 m2 4.32
1.00 25.20
0.80 2.40
2.60 19.50
1.00 2.25
1.20 2.70
2.60 19.50
1.00 2.25

57.00
57.00

61.46
Area=1.00 m2 23.70
Area=1.00 m2 23.70
Area=0.59 m2 14.06

145.50
54.30
62.40
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

28.80

14.10
14.10

128.25
128.25

137.18
Area=22.09 m2 66.27
Area=23.64 m2 70.91

69.24
Area=22.07 m2 66.21
Area=1.01 m2 3.04

70.91
Area=23.64 m2 70.91

69.24
Area=23.08 m2 69.24
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

86.15
Vol=45.73 m3 178.34
-Vol=23.64 m3 -92.19

69.24
Area=22.07 m2 66.21
Area=1.01 m2 3.04

0.04
0.20 0.35 0.04

0.58
0.08 Area=2.43 m2 0.58

106.51
Area=35.52 m2 35.52
Area=35.59 m2 35.59
Area=35.40 m2 35.40

24.98
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.15 Perim=65.04 m 9.76


0.15 Perim=46.91 m 7.04
0.15 Perim=54.56 m 8.18

106.51
Area=35.52 m2 35.52
Area=35.59 m2 35.59
Area=35.40 m2 35.40

1387.81
Peso=0.99 kg 342.72
Peso=0.99 kg 111.77
Peso=0.99 kg 125.54
Peso=0.99 kg 111.77
Peso=0.99 kg 342.72
Peso=0.99 kg 111.77
Peso=0.99 kg 125.54
Peso=0.99 kg 111.77
Peso=0.56 kg 1.26
Peso=0.56 kg 2.97

18.08
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

4.79 0.25 17.18


1.10 0.20 0.90

4481.38
Peso=0.99 kg 941.12
Peso=0.99 kg 864.19
Peso=0.99 kg 495.30
Peso=0.99 kg 926.81
Peso=0.99 kg 900.34
Peso=0.56 kg 89.24
Peso=0.99 kg 163.13
Peso=0.56 kg 56.10
Peso=0.56 kg 45.16

490.05
3.77 Perim=18.80 m 212.63
3.58 Perim=16.80 m 180.43
1.55 Perim=6.91 m 32.14
1.55 Perim=5.97 m 27.76
Area=0.97 m2 2.90
2.00 Perim=3.15 m 18.90
2.00 Perim=2.55 m 15.30
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

54.85
3.58 Area=4.45 m2 47.79
1.55 Area=0.97 m2 4.49
2.00 Area=0.43 m2 2.57

200.72
Peso=0.99 kg 39.12
Peso=0.99 kg 41.54
Peso=0.99 kg 22.19
Peso=0.99 kg 18.85
Peso=0.56 kg 79.03

13.20
Area=0.37 m2 8.97
0.25 3.48
0.25 0.75

1.12
Area=0.37 m2 1.12

173.64
Peso=0.56 kg 88.17
Peso=0.56 kg 85.48
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

40.76
Perim=0.33 m 15.64
Perim=0.53 m 25.12

2.01
Area=1.52 m2 0.82
Area=3.95 m2 1.19

12.00

12.00

568.48
0.27 3.48
3.77 Perim=18.80 m 212.63
3.58 Perim=16.80 m 180.43
Area=4.45 m2 13.35
1.55 Perim=6.91 m 32.14
1.55 Perim=5.97 m 27.76
Area=0.97 m2 2.90
Area=0.97 m2 2.90
2.00 Perim=3.15 m 18.90
2.00 Perim=2.55 m 15.30
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=0.43 m2 1.28
Area=0.37 m2 8.97
0.25 3.48
0.25 0.75
0.25 3.45
Perim=0.33 m 15.64
Perim=0.53 m 25.12

307.02
0.27 3.48
3.58 Perim=16.80 m 180.43
1.55 Perim=6.91 m 32.14
1.55 Perim=5.97 m 27.76
Area=0.97 m2 2.90
Area=0.97 m2 2.90
Area=0.37 m2 8.97
0.25 3.48
0.25 0.75
0.25 3.45
Perim=0.33 m 15.64
Perim=0.53 m 25.12
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

261.46
3.77 Perim=18.80 m 212.63
Area=4.45 m2 13.35
2.00 Perim=3.15 m 18.90
2.00 Perim=2.55 m 15.30
Area=0.43 m2 1.28

246.16
3.77 Perim=18.80 m 212.63
Area=4.45 m2 13.35
2.00 Perim=3.15 m 18.90
Area=0.43 m2 1.28

3.00

3.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

53.40

53.40

18.60

0.90
4.70
1.80
4.70
1.80
4.70

389.68

8.15 3.15 284.96

5.15 3.15 95.71

3.00 0.75 9.00


E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

74.25

6.15 55.97

3.15 12.29

2.00 6.00

168.99

1.00 3.15 57.33


1.00 3.15 51.35

1.00 3.15 24.57


1.00 3.15 32.45

0.50 0.55 1.65


0.50 0.55 1.65
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

74.25

6.15 55.97

3.15 12.29

2.00 6.00

303.79

506.58
-202.79

74.25

6.15 55.97

3.15 12.29
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.00 6.00

0.35

0.30 0.30 0.03


0.30 0.30 0.03
0.30 0.30 0.03
0.30 0.30 0.11
0.30 0.30 0.08

0.30 0.30 0.03


0.30 0.30 0.03
0.30 0.30 0.03

88.73
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

56.07
3.15 -12.29

89.81
6.15 -55.97
0.90 -0.81

17.91
2.00 -6.00

13.31

0.15 8.41
3.15 0.15 -1.84

0.15 13.47
6.15 0.15 -8.39
0.90 0.15 -0.12
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.15 2.69
2.00 0.15 -0.90

88.73

56.07
3.15 -12.29

89.81
6.15 -55.97
0.90 -0.81

17.91
2.00 -6.00

1942.11
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

13.96

2.87 0.20 5.22


2.92 0.20 5.31

1.76 0.20 2.22

2.00 0.20 1.20


E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

3035.95
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

207.18

2.32 42.22
2.12 36.89

2.42 29.77
2.22 25.53

2.42 18.88
2.22 15.54

2.42 15.25
2.22 12.21
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.65 3.90
0.50 2.70

0.65 2.60
0.50 1.70

22.52

0.20 2.32 8.44

0.20 2.42 5.95

0.20 2.42 3.78

0.20 2.42 3.05

0.20 0.65 0.78


E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.20 0.65 0.52

132.43

18.72

1.95 12.48
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.95 6.24

0.94

0.20 1.95 0.62

0.20 1.95 0.31

108.51
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

5.58

0.20 2.46
0.20 1.23

0.20 1.26
0.20 0.63

0.37

0.20 0.20 0.25


E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.20 0.20 0.13

7.98

2.64

0.80 1.28
0.08 0.48
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.80 0.64
0.08 0.24

0.14

0.80 0.08 0.10

0.80 0.08 0.05

5.99
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

3.60

0.10 0.12
0.10 0.12
0.10 0.12
0.60 0.72
0.60 0.72

0.10 0.12
0.10 0.12
0.10 0.12
0.60 0.72
0.60 0.72

0.29
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.60 0.10 0.07


0.60 0.10 0.07

0.60 0.10 0.07


0.60 0.10 0.07

109.55
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

8.47

0.16 2.91
0.25 2.28

0.16 1.01
0.25 2.28

4.93
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.35 3.19
0.05 0.46

0.16 0.50
0.25 0.79

192.13

2.00 6.00
0.65 13.00

6.15 55.97
2.32 70.76

3.90 12.29
2.42 34.12

175.27
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.70 4.59
0.65 5.72

5.95 52.96
2.32 68.90

3.70 10.92
2.42 32.19

56.12

1.95 12.48
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.95 6.24

0.20 2.46
0.20 1.23

0.20 1.26
0.20 0.63

0.80 1.28
0.08 0.48

0.80 0.64
0.08 0.24
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.10 0.12
0.10 0.12
0.10 0.12
0.60 0.72
0.60 0.72

0.10 0.12
0.10 0.12
0.10 0.12
0.60 0.72
0.60 0.72

0.16 2.91
0.25 2.28

0.16 1.01
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.25 2.28

0.70 6.37

0.70 4.31

0.70 2.73

0.70 2.21

0.30 0.90

0.30 0.60
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

37.40

0.20 2.46
0.20 1.23

0.20 1.26
0.20 0.63

0.80 1.28
0.08 0.48

0.80 0.64
0.08 0.24
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.10 0.12
0.10 0.12
0.10 0.12
0.60 0.72
0.60 0.72

0.10 0.12
0.10 0.12
0.10 0.12
0.60 0.72
0.60 0.72

0.16 2.91
0.25 2.28

0.16 1.01
0.25 2.28
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.70 6.37

0.70 4.31

0.70 2.73

0.70 2.21

0.30 0.90

0.30 0.60

18.72
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.95 12.48

1.95 6.24

1.00 1.00

1.00 1.00

1.00 1.00

6.40

0.10 4.80

0.10 1.60
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

70.00

7.90
8.10

26.40
27.60

6.54

2.60

2.70
1.24

86.56

4.70 21.62
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

9.55 64.94

15.62

8.70 13.31

2.75 2.31

4.48

8.70 3.74
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.75 0.74

17.91

8.70 15.05

2.75 2.86

59.65
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

8.70 50.03

2.75 9.63

1.70

0.70
1.00

33.81

2.55 2.13 18.47

1.00 1.93 10.42


1.00 1.93 4.92
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.55 8.67 8.67

3.86

1.00 1.93 3.86


1.00 1.93 0.00

2.55 8.67 8.67

3.86

1.00 1.93 3.86


1.00 1.93 0.00

9.13

2.55 7.65
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.55 1.48

6.25

14.92
2.55 -8.67

4.04

0.20 4.04

0.27

0.30 0.30 0.27

0.05

0.05 0.05

6.25
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

14.92
2.55 -8.67

132.50 132.50

2.65

2.55 0.20 1.73


2.90 0.20 0.51
2.05 0.20 0.41

816.87 816.87
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

34.69

2.41 8.19
2.01 6.03

2.41 6.15
2.01 4.32

2.01 8.04
0.20 2.01 0.40

0.80 1.55

3.99

0.20 2.01 1.37


E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.20 2.01 0.86

0.20 2.01 1.61

0.10 0.80 0.16

2.89

1.70 0.20 2.52


1.50 0.20 0.18
1.35 0.20 0.19

2.50

0.40 2.50

43.46 43.46
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

46.50

2.41 8.19
2.01 6.03

2.41 6.15
2.01 4.32

2.01 8.04
0.20 2.01 0.40

0.80 1.55

2.55 8.67

1.70 3.15

26.80

2.01 6.03
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.01 4.32

2.01 8.04
0.20 2.01 0.40

0.80 1.55

2.15 6.45

3.57

0.30 3.57

3.57

0.30 3.57

22.74
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.82 6.01
2.10 6.93

1.96 9.80

1.00 1.00

1.00 1.00

16.00 16.00
7.84

3.64
4.20

9.06

1.96 4.90
1.82 1.11
2.10 3.05

1.80 1.35 1.35


E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

3.59

1.92 3.59

7.58 7.58

16.00 16.00

2.16

2.16

5.95

5.95

10.90

10.90

0.90
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.90

1.66

0.54 1.66

27.76
0.90 1.22 1.15
0.90 1.22 1.15
0.90 1.24 1.17
0.90 1.36 1.10
0.90 1.62 1.31
0.90 1.67 1.35
0.90 1.72 1.39
0.90 0.92 0.75
0.90 1.88 1.52
0.90 1.88 1.52
0.90 1.62 1.31
0.90 1.68 1.36
0.90 0.92 0.75
0.90 0.92 0.75
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.90 0.57 0.46


0.90 0.97 0.79
0.90 0.97 0.79
0.90 0.57 0.46
0.90 0.57 0.46
0.90 0.77 0.62
0.90 0.82 0.66
0.90 0.77 0.62
0.90 0.92 0.75

5.55

19.04
0.90 0.95
0.90 0.95
0.90 0.95
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81
0.90 0.81

5.55
5.55

28.87
Vol=27.76 m3 36.08
-Vol=5.55 m3 -7.22

19.04
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=19.04 m2 19.04

118.69

Peso=0.56 kg 3.02
Peso=0.56 kg 2.94

Peso=0.56 kg 3.02
Peso=0.56 kg 2.94

Peso=0.56 kg 3.02
Peso=0.56 kg 2.94

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 2.52

Peso=0.56 kg 2.52
Peso=0.56 kg 2.52

2.86
0.90 0.15 0.14
0.90 0.15 0.14
0.90 0.15 0.14
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.90 0.15 0.12


0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12
0.90 0.15 0.12

627.59

Peso=0.56 kg 16.31
Peso=0.56 kg 15.09

Peso=0.56 kg 16.31
Peso=0.56 kg 15.09

Peso=0.56 kg 16.31
Peso=0.56 kg 15.34

Peso=0.56 kg 16.83
Peso=0.56 kg 15.29

Peso=0.56 kg 18.70
Peso=0.56 kg 18.20
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 20.57
Peso=0.56 kg 18.76

Peso=0.56 kg 20.57
Peso=0.56 kg 19.32

Peso=0.56 kg 11.22
Peso=0.56 kg 10.36

Peso=0.56 kg 22.44
Peso=0.56 kg 21.11

Peso=0.56 kg 22.44
Peso=0.56 kg 21.11

Peso=0.56 kg 18.70
Peso=0.56 kg 18.20

Peso=0.56 kg 20.57
Peso=0.56 kg 18.87

Peso=0.56 kg 11.22
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 10.36

Peso=0.56 kg 11.22
Peso=0.56 kg 10.36

Peso=0.56 kg 5.61
Peso=0.56 kg 6.44

Peso=0.56 kg 11.22
Peso=0.56 kg 10.92

Peso=0.56 kg 11.22
Peso=0.56 kg 10.92

Peso=0.56 kg 5.61
Peso=0.56 kg 6.44

Peso=0.56 kg 5.61
Peso=0.56 kg 6.44

Peso=0.56 kg 9.35
Peso=0.56 kg 8.68
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Peso=0.56 kg 9.35
Peso=0.56 kg 9.24

Peso=0.56 kg 9.35
Peso=0.56 kg 8.68

Peso=0.56 kg 11.22
Peso=0.56 kg 10.36

154.59
1.22 Perim=3.90 m 4.76
1.22 Perim=3.90 m 4.76
1.24 Perim=3.90 m 4.84
1.36 Perim=3.60 m 4.90
1.62 Perim=3.60 m 5.83
1.67 Perim=3.60 m 6.01
1.72 Perim=3.60 m 6.19
0.92 Perim=3.60 m 3.31
1.88 Perim=3.60 m 6.77
1.88 Perim=3.60 m 6.77
1.62 Perim=3.60 m 5.83
1.68 Perim=3.60 m 6.05
0.92 Perim=3.60 m 3.31
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.92 Perim=3.60 m 3.31


0.57 Perim=3.60 m 2.05
0.97 Perim=3.60 m 3.49
0.97 Perim=3.60 m 3.49
0.57 Perim=3.60 m 2.05
0.57 Perim=3.60 m 2.05
0.77 Perim=3.60 m 2.77
0.82 Perim=3.60 m 2.95
0.77 Perim=3.60 m 2.77
0.92 Perim=3.60 m 3.31

1.07 Perim=2.70 m 2.89


1.07 Perim=2.70 m 2.89
1.09 Perim=2.70 m 2.94
1.21 Perim=2.40 m 2.90
1.47 Perim=2.40 m 3.53
1.52 Perim=2.40 m 3.65
1.57 Perim=2.40 m 3.77
0.77 Perim=2.40 m 1.85
1.73 Perim=2.40 m 4.15
1.73 Perim=2.40 m 4.15
1.47 Perim=2.40 m 3.53
1.53 Perim=2.40 m 3.67
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.77 Perim=2.40 m 1.85


0.77 Perim=2.40 m 1.85
0.42 Perim=2.40 m 1.01
0.82 Perim=2.40 m 1.97
0.82 Perim=2.40 m 1.97
0.42 Perim=2.40 m 1.01
0.42 Perim=2.40 m 1.01
0.62 Perim=2.40 m 1.49
0.67 Perim=2.40 m 1.61
0.62 Perim=2.40 m 1.49
0.77 Perim=2.40 m 1.85

10.65
1.07 Area=0.50 m2 0.53
1.07 Area=0.50 m2 0.53
1.09 Area=0.50 m2 0.54
1.21 Area=0.45 m2 0.54
1.47 Area=0.45 m2 0.66
1.52 Area=0.45 m2 0.68
1.57 Area=0.45 m2 0.71
0.77 Area=0.45 m2 0.35
1.73 Area=0.45 m2 0.78
1.73 Area=0.45 m2 0.78
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.47 Area=0.45 m2 0.66


1.53 Area=0.45 m2 0.69
0.77 Area=0.45 m2 0.35
0.77 Area=0.45 m2 0.35
0.42 Area=0.45 m2 0.19
0.82 Area=0.45 m2 0.37
0.82 Area=0.45 m2 0.37
0.42 Area=0.45 m2 0.19
0.42 Area=0.45 m2 0.19
0.62 Area=0.45 m2 0.28
0.67 Area=0.45 m2 0.30
0.62 Area=0.45 m2 0.28
0.77 Area=0.45 m2 0.35

46.00
6.00
40.00

173.63
Area=97.58 m2 97.58
Area=57.01 m2 57.01
Area=10.49 m2 10.49
Area=0.45 m2 0.45
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

Area=0.45 m2 0.45
Area=0.45 m2 0.45
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
Area=0.36 m2 0.36
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

65.56
Area=8.55 m2 8.55
Area=57.01 m2 57.01

30.00
Area=19.52 m2 19.52
Area=10.49 m2 10.49

19.04
Area=19.04 m2 19.04

226.43
226.43 226.43

452.87

226.43 452.87
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

206.00
30.47
0.96
4.25
5.94
21.40
2.88
0.00
5.15
7.32
9.68
9.60
3.60
2.73
0.00
0.00
1.39
13.36
2.15
0.48
3.90
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

3.90
3.90
5.77
4.84
5.17
4.61
0.48
0.48
0.00
8.55
10.65
7.40
7.40
0.85
0.85
1.14
0.75
10.39
2.12
1.50

20.43
20.43
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

226.43
226.43 226.43

226.43

226.43 226.43

226.43

226.43 226.43

30.47
30.47

20.43
20.43

80.34
0.60 0.60 1.30 17.11
0.60 0.45 1.30 0.30
0.60 0.45 1.30 1.34
0.60 0.45 1.30 1.88
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.60 0.45 1.30 6.76


0.60 0.45 1.30 0.91

0.60 0.45 1.30 1.63


0.60 0.45 1.30 2.31
0.60 0.45 1.30 3.06
0.60 0.45 1.30 3.03
0.60 0.45 1.30 1.14
0.60 0.45 1.30 0.86
0.60 0.60 1.30 11.47

0.60 0.45 1.30 0.44


0.60 0.45 1.30 4.22
0.60 0.45 1.30 0.68
0.60 0.45 1.30 0.15
0.60 0.00 1.30 0.00
0.60 0.00 1.30 0.00
0.60 0.00 1.30 0.00
0.60 0.45 1.30 1.82
0.60 0.45 1.30 1.53
0.60 0.45 1.30 1.63
0.60 0.45 1.30 1.46
0.60 0.45 1.30 0.15
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.60 0.45 1.30 0.15

0.60 0.45 1.30 2.70


0.60 0.45 1.30 3.36
0.60 0.45 1.30 2.34
0.60 0.45 1.30 2.34
0.60 0.45 1.30 0.27
0.60 0.45 1.30 0.27
0.60 0.45 1.30 0.36
0.60 0.45 1.30 0.24
0.60 0.45 1.30 3.28
0.60 0.45 1.30 0.67
0.60 0.45 1.30 0.47

51.60
8.55
10.65
7.40
7.40
0.85
0.85
1.14
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.75
10.39
2.12
1.50

58.51
5.15
7.32
9.68
9.60
3.60
2.73
20.43

65.89
30.47
0.96
4.25
5.94
21.40
2.88

50.43
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.39
13.36
2.15
0.48
3.90
3.90
3.90
5.77
4.84
5.17
4.61
0.48
0.48

176.00
176.00 176.00

50.43
50.43 50.43

2.00
2.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

226.43
226.43 226.43

226.43
226.43 226.43

226.43
226.43 226.43

8.48
2.70 Area=3.14 m2 8.48

1.11
0.15 0.60 0.48
0.20 0.63

1.11
0.15 0.60 0.48
0.20 0.63
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

9.58
Vol=9.58 m3 9.58

32.14
0.99 10.62
0.99 9.36
0.99 8.11
0.25 4.05

3.72
0.40 2.14
0.40 1.58

0.64
0.30 0.40 0.64

21.05
0.99 14.31
0.56 2.24
0.56 0.84
0.56 1.34
0.25 1.75
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.56 0.56

4.46
0.10 0.63
0.15 0.42
2.78
0.05 0.14
0.70 0.49

0.30
0.10 0.28
0.70 0.05 0.02

2.37
0.30 1.60
0.10 0.28
0.70 0.49

765.00
17.00 765.00

1.70
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.40 Area=1.25 m2 0.50


0.15 1.50 1.20

375.00
375.00
375.00

1500.00
750.00
750.00

185.50
70.20
22.55
70.20
22.55

250.12
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

51.05
74.01
51.05
74.01

146.40
73.20
73.20

145.52
72.76
72.76

4.00
1.00
1.00
1.00
1.00

4.00
1.00
1.00
1.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1.00

2.00
1.00
1.00

2.00
1.00
1.00

727.54
72.76
73.20
51.05
74.01
70.20
22.55
72.76
73.20
51.05
74.01
70.20
22.55
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

727.54
72.76
73.20
51.05
74.01
70.20
22.55
72.76
73.20
51.05
74.01
70.20
22.55

727.54
72.76
73.20
51.05
74.01
70.20
22.55
72.76
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

73.20
51.05
74.01
70.20
22.55

185.50
70.20
22.55
70.20
22.55

250.12
51.05
74.01
51.05
74.01

146.40
73.20
73.20

145.52
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

72.76
72.76

421.73
0.60 0.70 30.56
0.60 0.70 30.74
0.60 0.70 21.44
0.60 0.70 31.08
0.60 0.70 29.48
0.60 0.70 9.47
5.54 15.71
4.62 13.10
3.76 10.66
3.26 9.24
2.62 5.27
2.04 4.10
0.60 0.70 30.56
0.60 0.70 30.74
0.60 0.70 21.44
0.60 0.70 31.08
0.60 0.70 29.48
0.60 0.70 9.47
5.54 15.71
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

4.62 13.10
3.76 10.66
3.26 9.24
2.62 5.27
2.04 4.10

727.54
72.76
73.20
51.05
74.01
70.20
22.55
72.76
73.20
51.05
74.01
70.20
22.55

727.54
72.76
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

73.20
51.05
74.01
70.20
22.55
72.76
73.20
51.05
74.01
70.20
22.55

24.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

2.00
2.00

4.00
1.00
1.00
1.00
1.00

4.00
1.00
1.00
1.00
1.00

2.00
1.00
1.00

2.00
1.00
1.00
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

727.54
72.76
73.20
51.05
74.01
70.20
22.55
72.76
73.20
51.05
74.01
70.20
22.55

727.54
72.76
73.20
51.05
74.01
70.20
22.55
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

72.76
73.20
51.05
74.01
70.20
22.55

727.54
72.76
73.20
51.05
74.01
70.20
22.55
72.76
73.20
51.05
74.01
70.20
22.55
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

65.41
0.40 0.80 38.40
0.40 0.80 27.01

81.76
0.40 48.00
0.40 33.76

10.22
0.25 0.20 6.00
0.25 0.20 4.22

63.77
0.40 0.60 37.44
0.40 0.60 26.33

49.55
0.40 0.60 49.55

13.95
0.15 0.50 13.95
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

195.30
0.50 186.00
0.15 0.50 9.30

195.30
0.50 186.00
0.15 0.50 9.30

14.08
0.25 2.65 14.08

1563.78
Ø 1/2=0.99 1209.90
Ø 1/4=0.25 353.88

225.25
0.25 2.65 225.25

5.16
0.25 0.10 5.16
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

1081.97
Ø 1/2=0.99 882.51
Ø 1/4=0.25 199.46

80.54
0.10 18.60
0.15 61.94

146.23
0.25 2.65 14.08
0.10 18.60
0.15 61.94
0.25 51.62

399.90
2.15 399.90

186.00
0.50 186.00

157.68
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.25 2.65 112.63


2.65 45.05

132.15
0.10 18.60
0.15 61.94
0.25 51.62

1.00
1.00

1.00
1.00

111.60
0.30 111.60

289.83
0.25 2.65 112.63
2.65 45.05
0.10 18.60
E METRADOS
SISTEMA DE AGUA POTABLE Y DESAGUE EN LA URBANIZACIÓN CURIPATA,
O DE LA OROYA, PROVINCIA DE YAULI – JUNIN”

ENTIDAD
Página: 1 de 1
Realizado:
MUNICIPALIDAD
Revisado: PROVINCIAL DE
YAULI
Aprobado:
DIMENSIONES RESULTADOS

Area, Volumen, Peso,


Ancho (m) Altura (m) Parcial Total Observaciones
Forma y Otros

0.15 61.94
0.25 51.62

1.00

1 1
1 1