You are on page 1of 6

JOB SAFETY ANALYSIS

Ref
Rev 000 INSTALLATION OF FCU Date 04-06-2018

Who might be Current Risk Responsible Final Risk


Task (Steps) Potential Hazard Consequence details Existing Control Additional Control
affected Con Prob Risk person Cons Prob Risk

3rd Party certified Main contractor’s


Trained & competent instruction and site
operator should do the rules and regulation to
job. be followed
Lti Area should be Barricade shall be kept
barricaded. at least 3m around the
Equpment Damage Tool Box talk training to be crane movement.
Collapse of Forklifts conducted. Monitor the weather
Atmospheric condition Fire Worker/ Co- 3rd party certificate and condition Supervisor/
Monitoring wind speed workers 4 3 12 3 2 6
license of the operator Close monitoring Engineer/hse
Ground condition Man injuries Supervisor
should be verified Suitable officer
Uneven surface
Dropping objects from Forklift should be anchoring/lifting
Use of Forklifts
height inspected by main pointof adequate
Injury to workers below. contractor before entering strength should be
Fall from height in sie available to lifting
Hydraulic failure
Conduct toolbox talk loads
before starting the work Do not use more than
Use rope for control lift 20 year old
loads equipments
Only competent Do not work under
banksman must control suspened loads
lifting operation all time

Use of electrical Electric Shock Pre use inspection of the


powertools tool and electric cables  Safe Use of power
Flying particles shall be carried out by the tools training shall
Page 1 of 6
JOB SAFETY ANALYSIS
Ref
Rev 000 INSTALLATION OF FCU Date 04-06-2018

Who might be Current Risk Responsible Final Risk


Task (Steps) Potential Hazard Consequence details Existing Control Additional Control
affected Con Prob Risk person Cons Prob Risk
operative.
Double insulated tools
Worker/ Co- shall be used to prevent
workers electric shock.
Supervisor Cable management shall
Lti be carried out to prevent
slips, trips and falls.
Equpment Damage Power supply to be cut off
while repairs or changing be arranged for the
Supervisor/
Fire grinding blades. operatives. 8
Engineer/ 4
All combustibles materials 2
Eye injuries 4 3 12 Workers/
Noice polition to be moved from the  All power tools to
Safety
area or should be covered be 110v.
Noise
Man And Material with fire blankets.
Ear defenders shall be  Power supply to be
Fire
Man injuries provided to the operatives taken through ELCB
for hearing protection. only.
Un inspected tools
Serviceable, inspected fire  Main contactors
extinguisher to be kept instruction to be
Lack of PPEs
near the working area. followed.
All tools and equipment’s  PAT Done by
Havs
shall be inspected and electrical engineer
color coded by competent
person.
Adequate PPEs like face
shields and eye protection
shall be worn by the
workers for the task in
area.
Amana Permit to work
system shall be followed
and strictly enforced.
Page 2 of 6
JOB SAFETY ANALYSIS
Ref
Rev 000 INSTALLATION OF FCU Date 04-06-2018

Who might be Current Risk Responsible Final Risk


Task (Steps) Potential Hazard Consequence details Existing Control Additional Control
affected Con Prob Risk person Cons Prob Risk
Do not work continues 10
minutes

Give TBT to workers about


safe manual handling
Safe Manual handling
methods shall be adopted
by keeping the back
straight and knees bended
Back Injuries
Lti to prevent back injuries.
Lifting of heavy load
Sprains
Equpment Damage Operatives, , should be avoided and
 Safety Precautions
property shall be lifted by
Strains with the workforce
Man And Material mechanical means or by
to be discussed by
team lift.
Hernias the supervisor.
Man injuries Area shall be kept clean
 Supervision to
and tidy to prevent slips Supervisor/
Manual handling Slips and Trips monitor the task.
and falls. 5 3 15 Engineer/ 4 2 8
of Materials  Manual Handling
Adequate personnel Workers
Work related upper training to the
protective equipment’s to
limbs disorder operatives shall be
be worn by the operatives
delivered.
to prevent cuts injuries
Cuts injuries  D not allow to take
caused by sharp edges.
more than 20 kgs.
Job rotation or sufficient
Lack of PPEs
breaks shall be given to
the workers.
Ergonomics hazards
Tool box talks to be
conducted by the
concerned supervisor
prior the task.
Provision of cool drinking
water in the area to be
Page 3 of 6
JOB SAFETY ANALYSIS
Ref
Rev 000 INSTALLATION OF FCU Date 04-06-2018

Who might be Current Risk Responsible Final Risk


Task (Steps) Potential Hazard Consequence details Existing Control Additional Control
affected Con Prob Risk person Cons Prob Risk
ensured.

Tool Box talk training to be  Ladder must be


conducted. installed on firm &
All scaffolding material to level footing.
be of sound materials.  Leveling device to be
Training and tool box talk used if required.
Fall and trip Hazards to be conducted regarding  Always face the
working at heights. ladder and hold on
Fall from Height. Only trained scaffolders to with both hands
Lti be used on the job.Use when climbing up or
Erecting scaffolding down.Ladder work is
approproate PPE,
Equpment Damage a two mens job,one
Working at Scaffolding collapse including inspected Supervisor/
fullbody harness to be to hold and support
height using Man injuries Engineer/
Mobile Falling materials used.Harness should be 5 4 20 the ladder as the Workers/hse 3 3 9
Scaffolding and hooked in a safe anchor climbs up. officer
ladder. Un inspected ladders Worker/ co-  Monthly inspection
point.
workers of ladders to be
Scaffolding should be
Movement of Mobile Supervisor conducted.
inspected by certified
Scaffold  Must follow ladder
person.
PTW system
Uneven Ground Tool box talk Training to  Scaffold must
condition workers prior to start inspect after
work about ladder use. shifting/moving
Ladder must be installed  Mobile scaffold
on firm & level footing. outrigger should be
Leveling device to be used placed.
if required.  Close monitoring of
Page 4 of 6
JOB SAFETY ANALYSIS
Ref
Rev 000 INSTALLATION OF FCU Date 04-06-2018

Who might be Current Risk Responsible Final Risk


Task (Steps) Potential Hazard Consequence details Existing Control Additional Control
affected Con Prob Risk person Cons Prob Risk
Straight ladder to be tied
on top,
Do not use the top two
steps.
During working on ladder
one person should hold work.
the ladder  Castor wheel
Always face the ladder should lock before
and hold on with both starting the work.
hands when climbing up  Ladder Work Permit
system will be
or down. Monthly
strickly followed
inspection of ladders to be
conducted.
Scaffold should be
evacuate during
shifting/moving from one
place to another

Page 5 of 6
JOB SAFETY ANALYSIS
Ref
Rev 000
INSTALLATION OF FCU Date 04-06-2018

Risk Matrix
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
Financial A B C D E
No Safety Health Environ. No Frequency R=CxP
Equip. Product. 1 2 3 4 5
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5

RISK ASSESSMENT ORIENTATION ATTENDEES


Name Date Designation Comments Signature
1 Shajin Sayed Hse officer
2
RISK ASSESSORS
Name Date Designation Comments Signature
1 Shajin Sayed Hse officer
2

Page 6 of 6

You might also like