You are on page 1of 56

Item Description Unit Nos Length Width Height Qty

2D/ EARTHWORK

2D/01 Clearing site vegetation, bushes, shrubs,


under growth hedges and trees and stumps <
500mm girth removing all debris from site m2
Building area with drain and pavement m2 1 28 12.68 354.90
Ramp area m2 1 9 4 36.00

Removing top soil for preservation average


depth 150mm stock pile, away from works for
2D/02 future use m2
Building area with drain and pavement m2 1 28 12.68 354.90
Ramp area m2 1 9 4 36.00

2D/03 Excavate pits depth not exceeding 1m m3


Grid 1-B m3 1 1.1 1.1 1 1.21
1-C m3 1 1.1 1.1 1 1.21
1-D m3 1 1.1 1.1 1 1.21
1-E m3 1 1 1 1 1.00
8-B m3 1 1.1 1.1 1 1.21
8-C m3 1 1.1 1.1 1 1.21
8-D m3 1 1.1 1.1 1 1.21
8-E m3 1 1 1 1 1.00
2-E m3 1 1 1 1 1.00
2-F m3 1 1.5 1.5 1 2.25
2-G m3 1 1.5 1.5 1 2.25
2-H m3 1 1.5 1.5 1 2.25
2-J m3 1 1.5 1.5 1 2.25
2-K m3 1 1.5 1.5 1 2.25
7-E m3 1 1 1 1 1.00
7-F m3 1 1.5 1.5 1 2.25
7-G m3 1 1.5 1.5 1 2.25
7-H m3 1 1.4 1.4 1 1.96
7-J m3 1 1.5 1.5 1 2.25
7-K m3 1 1.4 1.4 1 1.96
A-3 m3 1 1 1 1 1.00
A-6 m3 1 1 1 1 1.00
4-E m3 1 1.5 1.5 1 2.25
4-F m3 1 1.5 1.5 1 2.25
4-G m3 1 1.5 1.5 1 2.25
4-H m3 1 1.5 1.5 1 2.25
4-J m3 1 1.6 1.6 1 2.56
5-E m3 1 1.5 1.5 1 2.25
5-F m3 1 1.5 1.5 1 2.25
5-G m3 1 1.5 1.5 1 2.25
5-H m3 1 1.5 1.5 1 2.25
5-J m3 1 1.5 1.5 1 2.25
3-C m3 1 1.1 1.1 1 1.21
3-D m3 1 1.1 1.1 1 1.21
6-C m3 1 1.1 1.1 1 1.21
6-D m3 1 1.1 1.1 1 1.21
RAFT m3 1 2.925 2.625 1 7.68

2D/04 Excavate pits depth 1-2 m m3


Grid 1-B m3 1 1.1 1.1 1 1.21
1-C 1 1.1 1.1 1 1.21
1-D 1 1.1 1.1 1 1.21
1-E 1 1 1 1 1.00
8-B 1 1.1 1.1 1 1.21
8-C 1 1.1 1.1 1 1.21
8-D 1 1.1 1.1 1 1.21
8-E 1 1 1 1 1.00
2-E 1 1 1 1 1.00
2-F 1 1.5 1.5 1 2.25
2-G 1 1.5 1.5 1 2.25
2-H 1 1.5 1.5 1 2.25
2-J 1 1.5 1.5 1 2.25
2-K 1 1.5 1.5 1 2.25
7-E 1 1 1 1 1.00
7-F 1 1.5 1.5 1 2.25
7-G 1 1.5 1.5 1 2.25
7-H 1 1.4 1.4 1 1.96
7-J 1 1.5 1.5 1 2.25
7-K 1 1.4 1.4 1 1.96
A-3 1 1 1 1 1.00
A-6 1 1 1 1 1.00
4-E 1 1.5 1.5 1 2.25
4-F 1 1.5 1.5 1 2.25
4-G 1 1.5 1.5 1 2.25
4-H 1 1.5 1.5 1 2.25
4-J 1 1.6 1.6 1 2.56
5-E 1 1.5 1.5 1 2.25
5-F 1 1.5 1.5 1 2.25
5-G 1 1.5 1.5 1 2.25
5-H 1 1.5 1.5 1 2.25
5-J 1 1.5 1.5 1 2.25
3-C 1 1.1 1.1 1 1.21
3-D 1 1.1 1.1 1 1.21
6-C 1 1.1 1.1 1 1.21
6-D 1 1.1 1.1 1 1.21
RAFT 1 2.925 2.625 1 7.68

2D/05 Excavate pits depth 2-3m m3


7-F m3 1 1.5 1.5 0.15 0.34
7-G 1 1.5 1.5 0.1 0.23
7-H 1 1.4 1.4 0.05 0.10
7-J 1 1.5 1.5 0.13 0.29
7-K 1 1.4 1.4 0.15 0.29
4-E 1 1.5 1.5 0.02 0.05
4-F 1 1.5 1.5 0.05 0.11
4-G 1 1.5 1.5 0.05 0.11
4-H 1 1.5 1.5 0.08 0.18
4-J 1 1.6 1.6 0.1 0.26
5-E 1 1.5 1.5 0.1 0.23
5-F 1 1.5 1.5 0.3 0.68
5-G 1 1.5 1.5 0.35 0.79
5-H 1 1.5 1.5 0.3 0.68
5-J 1 1.5 1.5 0.3 0.68
3-C 1 1.1 1.1 0.05 0.06
3-D 1 1.1 1.1 0.1 0.12
6-C 1 1.1 1.1 0.05 0.06
6-D 1 1.1 1.1 0.075 0.09

Excavate trenches width>300mm, depth not


2D/06 exceeding 1m m3
Along Grid 1
E-D m3 1 1.69 0.45 1 0.76
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F2 -1 0.4375 0.45 0.25 (0.05)
D-C 1 1.685 0.45 1 0.76
ddt F2 -2 0.4375 0.45 0.25 (0.10)
C-B 1 1.35 0.45 1 0.61
ddt F1 -2 0.3875 0.45 0.25 (0.09)
B-A 1 1.3875 0.45 1 0.62
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid 8
E-D m3 1 1.69 0.45 1 0.76
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F2 -1 0.4375 0.45 0.25 (0.05)
D-C 1 1.685 0.45 1 0.76
ddt F2 -2 0.4375 0.45 0.25 (0.10)
C-B 1 1.35 0.45 1 0.61
ddt F1 -2 0.3875 0.45 0.25 (0.09)
B-A 1 1.3875 0.45 1 0.62
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid 2
E-F 1 2.1 0.45 1 0.95
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F4 -1 0.6375 0.45 0.3 (0.09)
F-G 1 3.005 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
G-H 1 2.995 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
H-J 1 4 0.45 1 1.80
ddt F4 -2 0.6375 0.45 0.3 (0.17)
J-K 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Along Grid 7
E-F 1 2.1 0.45 1 0.95
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F4 -1 0.6375 0.45 0.3 (0.09)
F-G 1 3.005 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
G-H 1 2.995 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
H-J 1 4 0.45 1 1.80
ddt F4 -2 0.6375 0.45 0.3 (0.17)
J-K 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Along Grid 3
A and beyond 1 0.6 0.45 1 0.27
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid 6
A and beyond 1 0.6 0.45 1 0.27
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid A
3 to 6 1 4.2 0.45 1 1.89
ddt F1 -2 0.3875 0.45 0.25 (0.09)
Along Grid E
1 to 2 1 0.825 0.45 1 0.37
ddt F1 -2 0.3875 0.45 0.25 (0.09)
7 to 8 1 0.825 0.45 1 0.37
ddt F1 -2 0.3875 0.45 0.25 (0.09)
Excavation for drain as directed by the
engineer
A gravel layer of average height 0.6m was
filled and compacted for the pavement as per
consultant's instructions. The filled gravel had
to be excavated and removed due to change
in design, and the lognote pertaining to the
drain has been attached herewith in
Attachment No.1
Removal of compacted gravel 2 21.85 0.6 0.6 15.73
Removal of earth from EGL 2 21.85 0.35 1 15.30

*The Ramp had to be excavated thrice, due to


changes in configuration of the ramp by the
project architect, the lognotes pertaining to
these changes have been attached as
Attachment No. 2
Ramp Excavation 1 (as per drawing) 2 9 0.45 1 8.10
1 3.6 0.45 1 1.62
Ramp Excavation 2 (refer attachment 02) 2 9 0.45 1 8.10
Ramp Rxcavation 3 (refer attachment 02) 2 11 0.45 1 9.90
Grid K
2 to 4 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
5 to 7 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Grid B
1 to 3 1 3.6 0.45 1 1.62
ddt F1 -2 0.3875 0.45 0.25 (0.09)
6 to 8 1 3.6 0.45 1 1.62
ddt F1 -2 0.3875 0.45 0.25 (0.09)

Excavation of trenches width >300mm , depth


2D/07 1-2m
Along Grid 1
E-D m3 1 1.69 0.45 0.98 0.75
D-C 1 1.685 0.45 1.15 0.87
C-B 1 1.35 0.45 1.15 0.70
B-A 1 1.3875 0.45 1.15 0.72
Along Grid 8
E-D m3 1 1.69 0.45 1.2 0.91
D-C 1 1.685 0.45 1.2 0.91
C-B 1 1.35 0.45 1.15 0.70
B-A 1 1.3875 0.45 1 0.62
Along Grid 2
E-F 1 2.1 0.45 0.98 0.93
F-G 1 3.005 0.45 0.73 0.99
G-H 1 2.995 0.45 0.98 1.32
H-J 1 4 0.45 0.55 0.99
J-K 1 3.6 0.45 0.36 0.58
Along Grid 7
E-F 1 2.1 0.45 1.2 1.13
F-G 1 3.005 0.45 1.1 1.49
G-H 1 2.995 0.45 0.8 1.08
H-J 1 4 0.45 0.55 0.99
J-K 1 3.6 0.45 0.39 0.63
Along Grid 3
A and beyond 1 0.6 0.45 0.7 0.19
Along Grid 6
A and beyond 1 0.6 0.45 0.4 0.11
Along Grid A
3 to 6 1 4.2 0.45 0.9 1.70
Along Grid E
1 to 2 1 0.825 0.45 0.95 0.35
7 to 8 1 0.825 0.45 0.95 0.35

*The Ramp had to be excavated thrice, due to


changes in configuration of the ramp by the
project architect, the lognotes pertaining to
these changes have been attached as
Attachment No. 2

Ramp Excavation 1 (as per drawing) 2 9 0.45 0.45 3.65


1 3.6 0.45 0.45 0.73
Ramp Excavation 2 (refer attachment 02) 2 9 0.45 0.45 3.65
Ramp Rxcavation 3 (refer attachment 02) 2 11 0.45 0.45 4.46
Grid K
2 to 4 1 3.6 0.45 0.35 0.57
5 to 7 1 3.6 0.45 0.45 0.73
Grid B
1 to 3 1 3.6 0.45 0.4 0.65
6 to 8 1 3.6 0.45 0.475 0.77
EARTHWORK SUPPORT

Total depth =<2.0m and distance between


opposing faces =< 2.0m commencing from
2D/08 formed ground level.
RF1 (Lift) m2 1 11 1.8 19.80
Length = 2x(2.625+2.925)

Total depth =<3.0m and distance between


opposing faces =< 2.0m commencing from
2D/09 formed ground level. m2 -
All F1 footings m2 4 4 2.05 32.80
All F2 footings m2 12 4.4 2.05 108.24
F3 footing m2 2 5.6 2.05 22.96
All F4 footings m2 17 6 2.05 209.10
F5 footing m2 1 6.4 2.05 13.12
2D/10 Surface Water Item 1 -
2D/11 Ground Water Item 1 -
2D/13 Disposal of excavated material off site m3 -
Excavated earth from column pits
Grid 1-B 0 1 1.1 1.1 2 2.42
1-C 0 1 1.1 1.1 2 2.42
1-D 0 1 1.1 1.1 2 2.42
1-E 0 1 1 1 2 2.00
8-B 0 1 1.1 1.1 2 2.42
8-C 0 1 1.1 1.1 2 2.42
8-D 0 1 1.1 1.1 2 2.42
8-E 0 1 1 1 2 2.00
2-E 0 1 1 1 2 2.00
2-F 0 1 1.5 1.5 2 4.50
2-G 0 1 1.5 1.5 2 4.50
2-H 0 1 1.5 1.5 2 4.50
2-J 0 1 1.5 1.5 2 4.50
2-K 0 1 1.5 1.5 2 4.50
7-E 0 1 1 1 2 2.00
7-F 0 1 1.5 1.5 2.15 4.84
7-G 0 1 1.5 1.5 2.1 4.73
7-H 0 1 1.4 1.4 2.05 4.02
7-J 0 1 1.5 1.5 2.13 4.79
7-K 0 1 1.4 1.4 2.15 4.21
A-3 0 1 1 1 2 2.00
A-6 0 1 1 1 2 2.00
4-E 0 1 1.5 1.5 2.02 4.55
4-F 0 1 1.5 1.5 2.05 4.61
4-G 0 1 1.5 1.5 2.05 4.61
4-H 0 1 1.5 1.5 2.08 4.68
4-J 0 1 1.6 1.6 2.1 5.38
5-E 0 1 1.5 1.5 2.1 4.73
5-F 0 1 1.5 1.5 2.3 5.18
5-G 0 1 1.5 1.5 2.35 5.29
5-H 0 1 1.5 1.5 2.3 5.18
5-J 0 1 1.5 1.5 2.3 5.18
3-C 0 1 1.1 1.1 2.05 2.48
3-D 0 1 1.1 1.1 2.1 2.54
6-C 0 1 1.1 1.1 2.05 2.48
6-D 0 1 1.1 1.1 2.075 2.51
RAFT 0 1 2.925 2.625 2 15.36
Excavated earth from Trenches
Along Grid 1
E-D m3 1 1.69 0.45 1.98 1.51
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F2 -1 0.4375 0.45 0.25 (0.05)
D-C 1 1.685 0.45 2.15 1.63
ddt F2 -2 0.4375 0.45 0.25 (0.10)
C-B 1 1.35 0.45 2.15 1.31
ddt F1 -2 0.3875 0.45 0.25 (0.09)
B-A 1 1.3875 0.45 2.15 1.34
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid 8
E-D m3 1 1.69 0.45 2.2 1.67
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F2 -1 0.4375 0.45 0.25 (0.05)
D-C 1 1.685 0.45 2.2 1.67
ddt F2 -2 0.4375 0.45 0.25 (0.10)
C-B 1 1.35 0.45 2.15 1.31
ddt F1 -2 0.3875 0.45 0.25 (0.09)
B-A 1 1.3875 0.45 2 1.25
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid 2
E-F 1 2.1 0.45 1.98 1.87
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F4 -1 0.6375 0.45 0.3 (0.09)
F-G 1 3.005 0.45 1.73 2.34
ddt F4 -2 0.6375 0.45 0.3 (0.17)
G-H 1 2.995 0.45 1.98 2.67
ddt F4 -2 0.6375 0.45 0.3 (0.17)
H-J 1 4 0.45 1.55 2.79
ddt F4 -2 0.6375 0.45 0.3 (0.17)
J-K 1 3.6 0.45 1.36 2.20
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Along Grid 7
E-F 1 2.1 0.45 2.2 2.08
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F4 -1 0.6375 0.45 0.3 (0.09)
F-G 1 3.005 0.45 2.1 2.84
ddt F4 -2 0.6375 0.45 0.3 (0.17)
G-H 1 2.995 0.45 1.8 2.43
ddt F4 -2 0.6375 0.45 0.3 (0.17)
H-J 1 4 0.45 1.55 2.79
ddt F4 -2 0.6375 0.45 0.3 (0.17)
J-K 1 3.6 0.45 1.39 2.25
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Along Grid 3
A and beyond 1 0.6 0.45 1.7 0.46
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid 6
A and beyond 1 0.6 0.45 1.4 0.38
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along Grid A
3 to 6 1 4.2 0.45 1.9 3.59
ddt F1 -2 0.3875 0.45 0.25 (0.09)
Along Grid E
1 to 2 1 0.825 0.45 1.95 0.72
ddt F1 -2 0.3875 0.45 0.25 (0.09)
7 to 8 1 0.825 0.45 1.95 0.72
ddt F1 -2 0.3875 0.45 0.25 (0.09)
Side Drains
Removal of earth from EGL 2 21.85 0.35 1 15.30

*The Ramp had to be excavated thrice, due to


changes in configuration of the ramp by the
project architect, the lognotes pertaining to
these changes have been attached as
Attachment No. 2
Ramp 1 (as per drawing) 2 9 0.45 1.45 11.75
1 3.6 0.45 1.45 2.35
Ramp 2 (refer attachment 02) 2 9 0.45 1.45 11.75
Ramp 3 (refer attachment 02) 2 11 0.45 1.45 14.36
Grid K
2 to 4 1 3.6 0.45 1.35 2.19
ddt F4 -2 0.6375 0.45 0.3 (0.17)
5 to 7 1 3.6 0.45 1.45 2.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Grid B
1 to 3 1 3.6 0.45 1.4 2.27
ddt F1 -2 0.3875 0.45 0.25 (0.09)
6 to 8 1 3.6 0.45 1.475 2.39
ddt F1 -2 0.3875 0.45 0.25 (0.09)
DEBRIS
i. 6' x 6' x 1' Footing m3 1 1.8 1.8 0.3 0.97
ii. 4.5' x 4.5' x 10" Footing m3 2 1.4 1.4 0.25 0.98
iii. 4' x 4' x 10" Footing m3 1 1.2 1.2 0.25 0.36
iv. 3.5' x 3.5' x 10" Footing m3 1 1.1 1.1 0.25 0.30
v. 3.5' x 3.5' x 1' Footing m3 3 1.1 1.1 0.3 1.09
vi. 1' x 1' Columns m3 5 0.3 0.3 1.5 0.68
vii. Timber Log , diameter 400mm m3 3.14 0.2 0.2 1.5 0.19
Backfilling with selected earth to sides of of
2D/14 foundation m3 -
Along Grid 1
E-D m3 1 1.69 0.1 0.4 0.07
D-C 1 1.685 0.1 0.4 0.07
C-B 1 1.35 0.1 0.4 0.05
B-A 1 1.3875 0.1 0.4 0.06
Along Grid 8
E-D m3 1 1.69 0.1 0.4 0.07
D-C 1 1.685 0.1 0.4 0.07
C-B 1 1.35 0.1 0.4 0.05
B-A 1 1.3875 0.1 0.4 0.06
Along Grid 2
E-F 1 2.1 0.1 0.4 0.08
F-G 1 3.005 0.1 0.4 0.12
G-H 1 2.995 0.1 0.4 0.12
H-J 1 4 0.1 0.4 0.16
J-K 1 3.6 0.1 0.4 0.14
Along Grid 7
E-F 1 2.1 0.1 0.4 0.08
F-G 1 3.005 0.1 0.4 0.12
G-H 1 2.995 0.1 0.4 0.12
H-J 1 4 0.1 0.4 0.16
J-K 1 3.6 0.1 0.4 0.14
Along Grid 3
A and beyond 1 0.6 0.1 0.4 0.02
Along Grid 6
A and beyond 1 0.6 0.1 0.4 0.02
Along Grid A
3 to 6 1 4.2 0.1 0.4 0.17
Along Grid E
1 to 2 1 0.825 0.1 0.4 0.03
7 to 8 1 0.825 0.1 0.4 0.03

*The Ramp had to be excavated thrice, due to


changes in configuration of the ramp by the
project architect, the lognotes pertaining to
these changes have been attached as
Attachment No. 2

Ramp Excavation 1 (as per drawing) 2 9 0.1 0.4 0.72


1 3.6 0.1 0.4 0.14
Ramp Excavation 2 (refer attachment 02) 2 9 0.1 0.4 0.72
Ramp Rxcavation 3 (refer attachment 02) 2 11 0.1 0.4 0.88
Grid K
2 to 4 1 3.6 0.1 0.4 0.14
5 to 7 1 3.6 0.1 0.4 0.14
Grid B
1 to 3 1 3.6 0.1 0.4 0.14
6 to 8 1 3.6 0.1 0.4 0.14
Filling with approved imported gravel to make
up 150mm thick layers well rammed and
2D/15 consolidated m3

Backfill of column pits (Refer attachment 03)


Grid 1-B m3 1 1.1 1.1 1.2 1.45
1-C m3 1 1.1 1.1 1.2 1.45
1-D m3 1 1.1 1.1 1.2 1.45
ddt Columns m3 -3 0.225 0.225 1.2 (0.18)
1-E m3 1 1 1 1.2 1.20
ddt Columns m3 -1 0.225 0.225 1.2 (0.06)
8-B m3 1 1.1 1.1 1.2 1.45
8-C m3 1 1.1 1.1 1.2 1.45
8-D m3 1 1.1 1.1 1.2 1.45
ddt Columns m3 -3 0.225 0.225 1.2 (0.18)
8-E m3 1 1 1 1.2 1.20
2-E m3 1 1 1 1.2 1.20
ddt Columns m3 -2 0.225 0.225 1.2 (0.12)
2-F m3 1 1.5 1.5 1.15 2.59
2-G m3 1 1.5 1.5 1.15 2.59
2-H m3 1 1.5 1.5 1.15 2.59
2-J m3 1 1.5 1.5 1.15 2.59
2-K m3 1 1.5 1.5 1.15 2.59
ddt Columns m3 -5 0.225 0.225 1.15 (0.29)
7-E m3 1 1 1 1.35 1.35
ddt Columns m3 -1 0.225 0.225 1.35 (0.07)
7-F m3 1 1.5 1.5 1.25 2.81
ddt Columns m3 -1 0.225 0.225 1.25 (0.06)
7-G m3 1 1.5 1.5 1.2 2.70
ddt Columns m3 -1 0.225 0.225 1.2 (0.06)
7-H m3 1 1.4 1.4 1.28 2.51
ddt Columns m3 -1 0.225 0.225 1.28 (0.06)
7-J m3 1 1.5 1.5 1.3 2.93
ddt Columns m3 -1 0.225 0.225 1.3 (0.07)
7-K m3 1 1.4 1.4 1.17 2.29
ddt Columns m3 -1 0.225 0.225 1.17 (0.06)
A-3 m3 1 1 1 1.25 1.25
A-6 m3 1 1 1 1.25 1.25
ddt Columns m3 -2 0.225 0.225 1.25 (0.13)
4-E m3 1 1.5 1.5 1.23 2.77
ddt Columns m3 -1 0.225 0.225 1.23 (0.06)
4-F m3 1 1.5 1.5 1.25 2.81
4-G m3 1 1.5 1.5 1.25 2.81
ddt Columns m3 -2 0.225 0.225 1.25 (0.13)
4-H m3 1 1.5 1.5 1.45 3.26
ddt Columns m3 -1 0.225 0.225 1.45 (0.07)
4-J m3 1 1.6 1.6 1.5 3.84
ddt Columns m3 -1 0.225 0.225 1.5 (0.08)
5-E m3 1 1.5 1.5 1.45 3.26
5-F m3 1 1.5 1.5 1.45 3.26
ddt Columns m3 -1 0.225 0.225 1.45 (0.07)
5-G m3 1 1.5 1.5 1.2 2.70
ddt Columns m3 -1 0.225 0.225 1.2 (0.06)
5-H m3 1 1.5 1.5 1.25 2.81
ddt Columns m3 -1 0.225 0.225 1.25 (0.06)
5-J m3 1 1.5 1.5 1.2 2.70
ddt Columns m3 -1 0.225 0.225 1.2 (0.06)
3-C m3 1 1.1 1.1 1.275 1.54
ddt Columns m3 -1 0.225 0.225 1.275 (0.06)
3-D m3 1 1.1 1.1 1.2 1.45
6-C m3 1 1.1 1.1 1.2 1.45
6-D m3 1 1.1 1.1 1.2 1.45
ddt Columns m3 -3 0.225 0.225 1.2 (0.18)
ddt Rubble walls in perimeter
Along Grid 1 m3 -1 0.3875 0.45 1.2 (0.21)
-1 0.4375 0.45 1.2 (0.24)
-2 0.4375 0.45 1.2 (0.47)
-2 0.3875 0.45 1.2 (0.42)
-1 0.3875 0.45 1.2 (0.21)
Along Grid 8 m3 -1 0.3875 0.45 1.2 (0.21)
-1 0.4375 0.45 1.2 (0.24)
1 1.685 0.45 1.2 0.91
-2 0.4375 0.45 1.2 (0.47)
1 1.35 0.45 1.2 0.73
-2 0.3875 0.45 1.2 (0.42)
1 1.3875 0.45 1.2 0.75
-1 0.3875 0.45 1.2 (0.21)
Along Grid 2 m3 -1 0.3875 0.45 1.15 (0.20)
-1 0.6375 0.45 1.15 (0.33)
-2 0.6375 0.45 1.15 (0.66)
-2 0.6375 0.45 1.15 (0.66)
-2 0.6375 0.45 1.15 (0.66)
-2 0.6375 0.45 1.15 (0.66)
Along Grid 7 m3 -1 0.3875 0.45 1.25 (0.22)
-1 0.6375 0.45 1.25 (0.36)
-2 0.6375 0.45 1.3 (0.75)
-2 0.6375 0.45 1.3 (0.75)
-2 0.6375 0.45 1.3 (0.75)
-2 0.6375 0.45 1.25 (0.72)
Fill up to DPC level (Refer Attachment 03 for
Calculation) 192.37
ddt Columns (from EGL to DPC) m3
Along Grid A -2 0.225 0.225 0.48 (0.05)
B -2 0.225 0.225 0.23 (0.02)
C -4 0.225 0.225 0.3125 (0.06)
D -4 0.225 0.225 0.3125 (0.06)
E -6 0.225 0.225 0.415 (0.13)
F -4 0.225 0.225 0.69 (0.14)
G -4 0.225 0.225 0.81 (0.16)
H -4 0.225 0.225 0.95 (0.19)
J -4 0.225 0.225 1.07 (0.22)
K -2 0.225 0.225 1.12 (0.11)
260.10

Filling with approved imported gravel to make


up levels outside area, in 150mm thick layers
2D/16 well rammed and consolidated m3
Filling pavement area up to 300mm DPC Level
(Refer Attachment 04) m3 21.71
2D/17 Sand filling under foundations m3
Grid 1-B m3 1 1.1 1.1 1 1.21
1-C m3 1 1.1 1.1 1 1.21
1-D m3 1 1.1 1.1 1 1.21
1-E m3 1 1 1 1 1.00
8-B m3 1 1.1 1.1 1 1.21
8-C m3 1 1.1 1.1 1 1.21
8-D m3 1 1.1 1.1 1 1.21
8-E m3 1 1 1 1 1.00
2-E m3 1 1 1 1 1.00
2-F m3 1 1.5 1.5 1 2.25
2-G m3 1 1.5 1.5 1 2.25
2-H m3 1 1.5 1.5 1 2.25
2-J m3 1 1.5 1.5 1 2.25
2-K m3 1 1.5 1.5 1 2.25
7-E m3 1 1 1 1 1.00
7-F m3 1 1.5 1.5 1 2.25
7-G m3 1 1.5 1.5 1 2.25
7-H m3 1 1.4 1.4 1 1.96
FOOTINGS
7-J m3 1 1.5 1.5 1 2.25
7-K m3 1 1.4 1.4 1 1.96
A-3 m3 1 1 1 1 1.00
A-6 m3 1 1 1 1 1.00
4-E m3 1 1.5 1.5 1 2.25
4-F m3 1 1.5 1.5 1 2.25
4-G m3 1 1.5 1.5 1 2.25
4-H m3 1 1.5 1.5 1 2.25
4-J m3 1 1.6 1.6 1 2.56
5-E m3 1 1.5 1.5 1 2.25
5-F m3 1 1.5 1.5 1 2.25
5-G m3 1 1.5 1.5 1 2.25
5-H m3 1 1.5 1.5 1 2.25
5-J m3 1 1.5 1.5 1 2.25
3-C m3 1 1.1 1.1 1 1.21
3-D m3 1 1.1 1.1 1 1.21
6-C m3 1 1.1 1.1 1 1.21
6-D m3 1 1.1 1.1 1 1.21
RAFT m3 1 2.925 2.625 1 7.68
Along Grid 1
E-D m3 1 1.69 0.45 0.5 0.38
ddt F1 -1 0.3875 0.45 0.5 (0.09)
ddt F2 -1 0.4375 0.45 0.5 (0.10)
D-C 1 1.685 0.45 0.5 0.38
ddt F2 -2 0.4375 0.45 0.5 (0.20)
C-B 1 1.35 0.45 0.5 0.30
ddt F1 -2 0.3875 0.45 0.5 (0.17)
B-A 1 1.3875 0.45 0.5 0.31
ddt F1 -1 0.3875 0.45 0.5 (0.09)
Along Grid 8
E-D m3 1 1.69 0.45 0.5 0.38
ddt F1 -1 0.3875 0.45 0.5 (0.09)
ddt F2 -1 0.4375 0.45 0.5 (0.10)
D-C 1 1.685 0.45 0.5 0.38
ddt F2 -2 0.4375 0.45 0.5 (0.20)
C-B 1 1.35 0.45 0.5 0.30
ddt F1 -2 0.3875 0.45 0.5 (0.17)
B-A 1 1.3875 0.45 0.5 0.31
ddt F1 -1 0.3875 0.45 0.5 (0.09)
Along Grid 2
E-F 1 2.1 0.45 0.5 0.47
ddt F1 -1 0.3875 0.45 0.5 (0.09)
ddt F4 -1 0.6375 0.45 0.5 (0.14)
F-G 1 3.005 0.45 0.5 0.68
ddt F4 -2 0.6375 0.45 0.5 (0.29)
G-H 1 2.995 0.45 0.5 0.67
ddt F4 -2 0.6375 0.45 0.5 (0.29)
H-J 1 4 0.45 0.5 0.90
ddt F4 -2 0.6375 0.45 0.5 (0.29)
J-K 1 3.6 0.45 0.5 0.81
ddt F4 -2 0.6375 0.45 0.5 (0.29)
Along Grid 7
E-F 1 2.1 0.45 0.5 0.47
ddt F1 -1 0.3875 0.45 0.5 (0.09)
ddt F4 -1 0.6375 0.45 0.5 (0.14)
F-G 1 3.005 0.45 0.5 0.68
ddt F4 -2 0.6375 0.45 0.5 (0.29)
G-H 1 2.995 0.45 0.5 0.67
ddt F4 -2 0.6375 0.45 0.5 (0.29)
H-J 1 4 0.45 0.5 0.90
ddt F4 -2 0.6375 0.45 0.5 (0.29)
J-K 1 3.6 0.45 0.5 0.81
ddt F4 -2 0.6375 0.45 0.5 (0.29)
Along Grid 3
A and beyond 1 0.6 0.45 0.5 0.14
ddt F1 -1 0.3875 0.45 0.5 (0.09)
Along Grid 6
A and beyond 1 0.6 0.45 0.5 0.14
ddt F1 -1 0.3875 0.45 0.5 (0.09)
Along Grid A
3 to 6 1 4.2 0.45 0.5 0.95
ddt F1 -2 0.3875 0.45 0.5 (0.17)
Along Grid E
1 to 2 1 0.825 0.45 0.5 0.19
ddt F1 -2 0.3875 0.45 0.5 (0.17)
7 to 8 1 0.825 0.45 0.5 0.19
ddt F1 -2 0.3875 0.45 0.5 (0.17)
Ramp Sand fill 1 (as per drawing) 2 9 0.45 0.5 4.05
1 3.6 0.45 0.5 0.81
Ramp Sand fill 2 (refer attachment 02) 2 9 0.45 0.5 4.05
Ramp Sand fill 3 (refer attachment 02) 2 11 0.45 0.5 4.95
Grid K
2 to 4 1 3.6 0.45 0.5 0.81
ddt F4 -2 0.6375 0.45 0.5 (0.29)
5 to 7 1 3.6 0.45 0.5 0.81
ddt F4 -2 0.6375 0.45 0.5 (0.29)
Grid B
1 to 3 1 3.6 0.45 0.5 0.81
ddt F1 -2 0.3875 0.45 0.5 (0.17)
6 to 8 1 3.6 0.45 0.5 0.81
ddt F1 -2 0.3875 0.45 0.5 (0.17)
93.35

Anti-termite treatment to building area to


approved specialist contractor's specification
2D/18 and technical literature m2
Building, including pavement 1 23.475 12.3 288.74
2F/ CONCRETE WORKS
Screed; 50mm thick. Under Column / walls /
2F/01 Staircase foundation
Pad Footings
All F1 footings m2 4 1 1 4.00
All F2 footings m2 12 1.1 1.1 14.52
F3 footing m2 2 1.4 1.4 3.92
All F4 footings m2 17 1.5 1.5 38.25
F5 footing m2 1 1.6 1.6 2.56
RAFT m2 1 2.925 2.625 7.68
Trenches
Along Grid 1
E-D m3 1 1.69 0.45 2.54
ddt F1 -1 0.3875 0.45 (0.58)
ddt F2 -1 0.4375 0.45 (0.44)
D-C 1 1.685 0.45 2.53
ddt F2 -2 0.4375 0.45 (1.31)
C-B 1 1.35 0.45 1.89
ddt F1 -2 0.3875 0.45 (1.16)
B-A 1 1.3875 0.45 1.94
ddt F1 -1 0.3875 0.45 (0.39)
Along Grid 8 -
E-D m3 1 1.69 0.45 2.54
ddt F1 -1 0.3875 0.45 (0.58)
ddt F2 -1 0.4375 0.45 (0.66)
D-C 1 1.685 0.45 2.53
ddt F2 -2 0.4375 0.45 (1.40)
C-B 1 1.35 0.45 2.03
ddt F1 -2 0.3875 0.45 (1.16)
B-A 1 1.3875 0.45 2.08
ddt F1 -1 0.3875 0.45 (0.58)
Along Grid 2 -
E-F 1 2.1 0.45 2.31
ddt F1 -1 0.3875 0.45 (0.43)
ddt F4 -1 0.6375 0.45 (0.70)
F-G 1 3.005 0.45 3.31
ddt F4 -2 0.6375 0.45 (3.35)
G-H 1 2.995 0.45 -
ddt F4 -2 0.6375 0.45 -
H-J 1 4 0.45 6.00
ddt F4 -2 0.6375 0.45 (1.91)
J-K 1 3.6 0.45 5.04
ddt F4 -2 0.6375 0.45 (1.91)
Along Grid 7 -
E-F 1 2.1 0.45 3.15
ddt F1 -1 0.3875 0.45 (0.58)
ddt F4 -1 0.6375 0.45 (0.96)
F-G 1 3.005 0.45 4.51
ddt F4 -2 0.6375 0.45 (2.04)
G-H 1 2.995 0.45 4.49
ddt F4 -2 0.6375 0.45 (1.91)
H-J 1 4 0.45 6.00
ddt F4 -2 0.6375 0.45 (1.91)
J-K 1 3.6 0.45 5.40
ddt F4 -2 0.6375 0.45 (1.40)
Along Grid 3 -
A and beyond 1 0.6 0.45 0.66
ddt F1 -1 0.3875 0.45 (0.43)
Along Grid 6 -
A and beyond 1 0.6 0.45 -
ddt F1 -1 0.3875 0.45 -
Along Grid A -
3 to 6 1 4.2 0.45 1.89
ddt F1 -2 0.3875 0.45 (0.35)
Along Grid E -
1 to 2 1 0.825 0.45 0.37
ddt F1 -2 0.3875 0.45 (0.35)
7 to 8 1 0.825 0.45 0.37
ddt F1 -2 0.3875 0.45 (0.35)
Drain -
350mm wide screed 2 21.85 0.35 19.67
Ramp Excavation 1 (as per drawing) 2 9 0.45 8.10
1 3.6 0.45 1.62
Ramp Excavation 2 (refer attachment 02) 2 9 0.45 8.10
Ramp Rxcavation 3 (refer attachment 02) 2 11 0.45 9.90
Grid K -
2 to 4 1 3.6 0.45 1.62
ddt F4 -2 0.6375 0.45 -
5 to 7 1 3.6 0.45 1.62
ddt F4 -2 0.6375 0.45 (0.57)
Grid B -
1 to 3 1 3.6 0.45 1.62
ddt F1 -2 0.3875 0.45 (0.35)
6 to 8 1 3.6 0.45 1.62
ddt F1 -2 0.3875 0.45 (0.35)
Plinth Beams
Along Grid 4&5
EF 2 4 0.225 1.80
FG 2 2.995 0.225 1.35
GH 2 3 0.225 1.35
HJ 2 2.1 0.225 0.95
Along Grid 3&6
AC 2 2.4 0.225 1.08
CD 2 1.685 0.225 0.76
DE 2 1.69 0.225 0.76

Grid H'/2-4, F/5-7, G/5-7, H/5-7, E/2-4 & E/5-7


2G/01 300mm thick brick work m2
Grid 7/G-H & 5/G-H m2 2 2.85 3.2 18.24
H/5-7 & G/5-7 m2 2 3.525 3.2 22.56
RADIOLOGY
ROOM ddt D4 -1 2.1 2.4 (5.04)
-
2G/02 225mm thick brick wall - Ground Floor m2 -
Grid C/3-6 1 4.2 3.2 13.44
ddt D1 -1 1.5 2.7 (4.05)
3/C-E & 6/C-E 2 3.375 3.2 21.60
ddt SD -4 1.5 2.7 (16.20)
E/5-7 & F/5-7 2 3.6 3.2 23.04
7/E-F 1 2.1 3.2 6.72
5/F-G & 7/F-G 2 3 3.2 19.20
ddt D3 -1 2.1 2.4 (5.04)
ddt SW1 -1 1.5 1.8 (2.70)
J/5-7 1 3.6 3.2 11.52
7/H-J 1 4 3.2 12.80
ddt SW1 -1 1.5 1.8 (2.70)
E/2-4 & F'/2-4 2 3.6 3.2 23.04
ddt D2a -1 1 2.4 (2.40)
2/E-G & 4/E-G 2 5.15 3.2 32.96
ddt FL -2 0.9 1.2 (2.16)
ddt D2a -1 1 2.4 (2.40)
2/G-H & 4/G-H 2 3 3.2 19.20
ddt D2 -1 2.1 2.4 (5.04)
2/H-J & 4/H-J 2 4 3.2 25.60
J/2-4 & G'/2-4 2 3.6 3.2 23.04
ddt DD -2 0.6 1.8 (2.16)
ddt D8 -2 0.9 2.7 (4.86)
ddt D8b -1 0.9 2.1 (1.89)
K/2-4 1 3.6 3.2 11.52
K/4-5 1 0.9 2.1 1.89
LIFT 2 2.1 0.9 3.78
2 1.8 0.9 3.24
Grid K/6-8 1 3.6 3.2 11.52

2G/03 225mm thick brick work Upper floor m2


Grid A/3-6 1 4.65 0.9 4.19
3/A-C & 6/A-C 2 2.4 0.9 4.32
3/C-E & 6/C-E 2 3.375 3.5 23.63
Gable walls E/2-7 & K/2-7 2/0.5 10.2 3.685 37.59
2 10.2 3.1 63.24
ddt FG1 -2 1 1.8 (3.60)
ddt FL1 -1 0.6 1.2 (0.72)
ddt SW2 -1 1.5 1.8 (2.70)
ddt OPENING -1 1.5 2.7 (4.05)

2/E-F & 7/E-F (*All walls were erected an


extra 100mm to accommodate the support
structure of the suspended ceiling at 3000mm 2 2.1 2.875 12.08
height, Thus the height of walls shall be
2875m instead of 2775m)

ddt SW1 -1 1.5 1.8 (2.70)


ddt FG2 -1 1.5 1.5 (2.25)
F/2-4 & G/2-4 2 4.15 3.1 25.73
F/5-7 & G/5-7 2 4.1 3.1 25.42
2/F-G & 7/F-G 2 3 2.875 17.25
ddt SW1 -2 1.5 1.8 (5.40)
ddt D8 -1 0.9 2.7 (2.43)
2/G-H & 7/G-H 2 3 2.875 17.25
ddt SW1 -2 1.5 1.8 (5.40)
ddt D8 -1 0.9 2.7 (2.43)
H/2-4 1 4.15 3.1 12.87
H/5-7 1 0.6 3.1 1.86
2/H-J & 7/H-J 2 4 2.875 23.00
ddt W -1 0.6 1.8 (1.08)
ddt D8 -1 0.9 2.7 (2.43)
ddt FL1 -1 0.6 1.2 (0.72)
ddt FL -1 0.9 1.2 (1.08)
ddt SW1 -1 1.5 1.8 (2.70)
J/2-4 1 3.6 3.35 12.06
ddt DD -2 0.6 1.8 (2.16)
J/5-7 1 4.1 3.1 12.71
J'/2-3 1 2.6 3.35 8.71
2/J-K & 7/J-K 2 3.6 2.875 20.70
ddt FL1 -2 0.6 1.2 (1.44)
ddt D8 -1 0.9 2.7 (2.43)
ddt SW2 -1 1.5 1.8 (2.70)
4/J-K & 5/J-K 2 3.6 3.1 22.32
ddt D6 -1 1 2.4 (2.40)
ddt OPENING -1 0.9 3.1 (2.79)
4/H-J 1 0.6 3.1 1.86

2G/04 112mm thick brick work m2

Grid F/2-3 1 2.6 3.2 8.32


Ground 3/E-G 1 4.2 3.2 13.44
Floor ddt D8a -2 0.9 2.7 (4.86)
DUCTS 2 1.2 3.6 8.64
H-J/2-3 1 2.2 3.6 7.92

4/E-F 1 2.1 3.1 6.51


4/F-G & 5/F-G 2 3 3.1 18.60
ddt D6 -1 1 2.1 (2.10)
ddt FW1 -1 1.2 2.7 (3.24)
4/G-H & 5/G-H 2 3 3.1 18.60
ddt D6 -1 1 2.1 (2.10)
ddt FW1 -1 1.2 2.7 (3.24)
5/H-J 1 4 3.1 12.40
ddt D7 -1 0.75 2.1 (1.58)
4/H-J 1 2.3 3.1 7.13
Upper Floor H-J/2-3 (L shaped) 1 1.9 3.1 5.89
1 1.62 3.35 5.43
H-J/3-4 1 0.6 3.1 1.86
ddt D7 -1 0.75 2.1 (1.58)
DUCTS 2 1.2 3.35 8.04
3/J-K 1 1.5 3.35 5.03
ddt D7 -1 0.75 2.1 (1.58)
TOILET J-K/2-4 1 1.875 3.35 6.28
ddt D7 -1 0.75 2.1 (1.58)
STORE J-K/2-4 1 1.685 3.35 5.64
ddt D7 -1 0.75 2.1 (1.58)
5-7/H-J 1 4.1 3.1 12.71
-
-
-
-
-
-
-

16mm thick plastyering to wall cement, &


sand (1:5) plaster finished smooth with two
coats of skim coat (internally)
2T/30 wall with< 300mm (ground floor) m
Grid C/3-6 - D1 1 6.9 6.90
Grid E/3-6 1 8.7 8.70
Grid 3/E-(G-F Wall) -D8a 4 2.1 8.40
Grid 2/E-(G-F Wall0 FL 2 2.1 4.20
Grid 4/E-G 1 1.6 1.60
Grid H-J & 2-4-D8b (Surgical wasteroom) 1 2.1 2.10
Grid J/2-4-D8 (Surgical wasteroom ) 2 3.3 6.60
Grid J/2-4-D8 1 6.3 6.30
MINISTORE
Grid J/2-4-D8 2 6.3 12.60
Grid J/2-4 DD 4 4.8 19.20
Grid J/4-5 1 7.5 7.50
K/4-5 1 9.35 9.35
Grid 2/J-K & 7/J-K (WALL) 2 3.475 6.95
Grid 2/J-K & 7/J-K (Beam side) 2 3.605 7.21
Grid 2/J-K & 7/J-K (Beam bottom) 2 3.605 7.21
7/H-J SW1 1 2.7 2.70
5/G-H D4 1 2.7 2.70
7/F-G SW1 1 2.7 2.70
5/F-G D3 1 2.1 2.10
4/G-H D2 1 2.7 2.70
5/G-H D4 1 2.7 2.70
5/G-F D3 1 2.7 2.70
4/E-F D2a 1 1.6 1.60

2T/31 width <300mm (Upper floor)

Grid 3/C-E & Grid 6/C-E (SW2) 4 5.1 20.40


ENTRANCE
LOBBY E/3-6 1 7.25 7.25
E/2-4 (FG1) 1 5.6 5.60
2/E-F (SW1) 1 6.6 6.60
RECORD
ROOM 4/E-F (D6) 1 5.8 5.80
2/F-G (SW1) 1 6.6 6.60
2/F-G (D8) 1 6.3 6.30
VETERINARY 4/F-G (D6) 1 5.8 5.80
ROOM
2/G-H (SW1) 1 6.6 6.60
2/G-H (D8) 1 6.3 6.30
4/G-H (D6) 1 5.8 5.80
2/H-J (W) 1 4.8 4.80
WORKERS 2/H-J (D8) 1 6.3 6.30
ROOM H-J/2-4 (D7) 1 4.95 4.95
4/H-J (D6) 1 5.8 5.80
H-J/2-4 (D7) 1 1.95 1.95
WORKERS
TOILET H-J/2-4 (FL1) 1 3.6 3.60
J-K/2-4 (TOILET-M D7) 1 1.95 1.95
J-K/2-4 (TOILET-M FL1) 1 3.6 3.60
TOILETS
J-K/2-4 (TOILET-F D7) 1 1.95 1.95
J-K/2-4 (TOILET-F FL1) 1 3.6 3.60
J-K/2-4 (STORE - FL1) 1 3.6 3.60
STORE
J-K/2-4 (STORE - D7) 1 4.95 4.95
J-K/2-4 (AREA NEAR TOILET - D7) 3 4.95 14.85
J-K/2-4 (AREA NEAR TOILET - DD) 1 4.8 4.80
J-K/2-4 (AREA NEAR TOILET - OPENING) 1 6.2 6.20
5/K-J (D6) 1 5.8 5.80
DINING 7/K-J (D8) 1 6.3 6.30
ROOM 5/H-J (D7) 1 3.95 3.95
7/H-J (FL) 1 4.2 4.20
Grid 7/G-H' (SW1) 2 6.6 13.20
LABORATORY
Grid 5/G-H' (FL1) 1 6.6 6.60
Grid 5/F-G (FW1) 1 6.6 6.60
DRUG STORE
Grid 7/F-G (SW1) 1 6.6 6.60
Grid E/5-7 (FG1) 1 5.6 5.60
STAIRS
Grid 7/E-F (FG2) 1 6 6.00
K/4-5 (SW2) 1 6.6 6.60
4/E-F (D6) 1 5.8 5.80
4/F-K (D6) 3 5.8 17.40
CORRIDOR
5/F-K (D6) 1 5.8 5.80
5/F-K (D7) 1 4.95 4.95
5/F-K (FW1) 2 6.6 13.20
2T/32 Walls Width > 300mm GROUND FLOOR m2
Grid C/3-6 & E/3-6 2 4.2 3.475 29.19
ddt D1 -1 1.5 2.7 (4.05)
ddt OPENING -1 2.1 3.2 (6.72)
3/C-E & 6/C-E 2 3.6 3.475 25.02
ddt SD -4 1.5 2.7 (16.20)
E/2-3 & F'/2-3 2 3.488 1.375 9.59
2/E-G' & 3/E-G' 2 4.075 1.375 11.21
ddt D8a 2 0.9 0.6 1.08
ddt FL -2 0.9 0.6 (1.08)
F/2-3 2 2.6 1.375 7.15
3/E-G & 4/E-G 2 4.413 1.375 12.14
ddt D8a -2 0.9 0.6 (1.08)
D2a -1 1 0.3 (0.30)
2/f'-h' & 4/f'-h' 2 6 0.475 5.70
H-J/2-4 ( Surgical Waste Disposal room) 1 7.79 1.975 15.39
ddt D8b -1 0.9 0.6 (0.54)
ddt D8 -1 0.9 1.2 (1.08)
H-J/2-4 (Mini store) 1 7.79 3.475 27.07
ddt D8 -1 0.9 2.7 (2.43)
J/2-7 & K/2-7 2 9.75 3.475 67.76
ddt D8 -2 0.9 2.7 (4.86)
ddt DD -2 0.6 1.8 (2.16)
ddt FW -1 2.1 2.7 (5.67)
ddt LIFT -1 2.575 2.1 (5.41)
4/H-J & 7/H-J 2 4 1.375 11.00
ddt SW -1 0.6 1.5 (0.90)
J/5-7 & H/5-7 2 3.825 1.375 10.52
H/5-7 & G/5-7 2 3.525 1.375 9.69
5/H-G & 7/H-G 2 2.85 1.375 7.84
ddt D4 -1 2.1 0.3 (0.63)
5/F-G & 7/F-G 2 2.97 1.375 8.17
ddt SW1 -1 1.5 0.6 (0.90)
ddt D3 -1 1.5 0.3 (0.45)
4/F-H & 5/F-H 2 6.45 1.375 17.74
ddt D2 -1 2.1 0.3 (0.63)
ddt D4 -1 2.1 0.3 (0.63)
ddt D3 -1 2.1 0.3 (0.63)
4/E-F (D6) 1 2.1 1.375 2.89
ddt D2a -1 1 0.3 (0.30)
F/5-7 & E/5-7 2 3.6 3.6 25.92
7/E-F 1 2.1 3.6 7.56

2T/33 Walls Width > 300mm UPPER FLOOR m2


3/C-E & 6/C-E 2 3.6 3.5 25.20
ddt SW2 -4 1.5 1.8 (10.80)
E/3-6 1 4.2 3.5 14.70
GABALE WALL
0.5 4.2 1.645 3.45
ddt OPEN -1 1.5 2.875 (4.31)
E/2-4 & F/2-4 2 4.015 3.1 24.89
ddt FG1 -1 1 1.8 (1.80)
2/E-F & 4/E-F 2 2.1 3.1 13.02
ddt Sw1 -1 1.5 1.8 (2.70)
ddt D6 -1 1 2.4 (2.40)
F/2-4 & G/2-4 2 4.015 3.1 24.89
2/G-F & 4/G-F 2 3 3.1 18.60
ddt SW1 -1 1.5 1.8 (2.70)
ddt D8 -1 0.9 2.7 (2.43)
ddt D6 -1 1 2.4 (2.40)
G/2-4 & H/2-4 2 4.015 3.1 24.89
2/G-H & 4/G-H 2 3 3.1 18.60
ddt SW1 -1 1.5 1.8 (2.70)
ddt D8 -1 0.9 2.7 (2.43)
ddt D6 -1 1 2.4 (2.40)
H/2-4 1 4.015 3.1 12.45
2/H-J 1 2.27 3.1 7.04
ddt W -1 0.6 1.8 (1.08)
ddt D8 -1 0.9 2.7 (2.43)
WORKERS 1 1.988 3.1 6.16
ROOM GRID BETWEEN H-J & 2-4
1 1.615 3.1 5.01
ddt D7 -1 0.75 2.1 (1.58)
J/2-4 & AROUND THE DUCT 1 2.212 3.1 6.86
4/H-J 1 3.888 3.1 12.05
ddt D6 -1 1 2.4 (2.40)
GRID BETWEEN H-J & 2-4 1 6.98 1.6 11.17
TOILET AREA ddt D7 -1 0.75 0.6 (0.45)
ddt FL1 -1 0.6 1.2 (0.72)
GRID BETWEEN J-K & 2-4 1 8.2 1.6 13.12
TOILET M
ddt FL1 -1 0.6 1.2 (0.72)
TOILET M
ddt D7 -1 0.75 0.6 (0.45)
ddt DD -1 0.6 0.6 (0.36)
GRID BETWEEN J-K & 2-4 1 7.35 1.6 11.76
TOILET F ddt FL1 -1 0.6 1.2 (0.72)
ddt D7 -1 0.75 0.6 (0.45)
GRID BETWEEN J-K & 2-4 1 5.17 3.1 16.03
STORE ddt FL1 -1 0.6 1.2 (0.72)
ddt D7 -1 0.75 2.1 (1.58)
GRID BETWEEN J-K & 2-4 1 8.545 3.1 26.49
ddt D7 -3 0.75 2.1 (4.73)
NEAR THE TOILET
ddt DD -1 0.6 1.8 (1.08)
OPEN -1 0.6 3.1 (1.86)
K/4-5 1 2.1 3.1 6.51
ddt SW2 -1 1.5 1.8 (2.70)
4/F-K & 5/F-K 2 15 3.1 93.00
ddt OPEN -1 0.6 3.1 (1.86)
CORRIDOOR ddt D6 -4 1 2.4 (9.60)
ddt D7 -1 0.75 2.1 (1.58)
ddt FW1 -2 1.2 2.7 (6.48)
4/E-F 1 2.1 3.1 6.51
ddt D6 -1 1 2.4 (2.40)
K/5-7 & J/5-7 2 3.6 3.1 22.32
5/K-J & 7/K-J 2 3.6 3.1 22.32
ddt D6 -1 1 2.4 (2.40)
ddt D8 -1 0.9 2.7 (2.43)
J/5-7 & H'/5-7 2 4.01 1.6 12.83
5/H'-J & 7/H'-J 2 2.1 1.6 6.72
CHANGING ROOM
ddt FL1 -1 0.9 1.2 (1.08)
ddt D7 -1 0.75 2.1 (1.58)
H'/5-7 & G/5-7 2 4.01 3.1 24.86
ddt WORK TOP -1 4.01 0.6 (2.41)
7/G-H' 1 5.015 3.1 15.55
LABORATARY ddt SW1 -2 1.5 1.8 (5.40)
5/G-H' 1 6.215 3.1 19.27
ddt WORK TOP -1 1.8 0.6 (1.08)
ddt FW1 -1 1.2 2.7 (3.24)
G/5-7 & F/5-7 2 4.01 3.1 24.86
5/F-G & 7/F-G 2 3 3.1 18.60
ddt FW1 -1 1.2 2.7 (3.24)
ddtSW1 -1 1.5 1.8 (2.70)
F/5-7 & E/5-7 2 4.01 3.1 24.86
ddt FG1 -1 1 1.8 (1.80)
7/E-F 1 2.1 3.1 6.51
ddt FG2 -1 1.5 1.5 (2.25)
-
2T/34 WALL WIDTH <300 GROUND FLOOR m
C/3-6 D1 1 6.9
3/C-E & 6/C-E SD 4 6.9 -
2/E-K FL 2 4.2 -
2/E-K G2 1 8.1 -
7/E-K SW1 2 6.6 -
7/E-K G2 1 8.1 -
COLUMNS 1/A-E ,8/A-E & A/3-6 40 3.2 -
1/B-E & 8/B-E 6 4.725 -
E/1-2 & E/7-8 2 0.825 -
A/3-6 2 4.65 -
BEAM A/3-6 1 4.2 -
3/A-C & 6/A-C 4 2.62 -
3/A-C & 6/A-C 2 2.395 -
B/1-3 ,C/1-3 ,D/1-3 ,B/6-7 ,C/6-7 & D/ 6-7 18 3.6 -
DUCTS 2 4.8 -
-
2T/35 WALL WIDTH <300 UPPER FLOOR m -
3/C-E & 6/C-E SW2 4 6.6 -
2/E-K SW1 3 6.6 -
2/E-K D8 3 6.3 -
2/E-K W 1 4.8 -
2/E-K FL1 3 3.6 -
7/E-K SW1 3 6.6 -
7/E-K SW2 1 6.6 -
7/E-K D8 1 6.3 -
7/E-K FG2 1 6 -
7/E-K FL 1 4.2 -
K/2-7 FL1 1 3.6 -
K/2-7 SW2 1 6.6 -
E/2-3 FG1 1 5.6 -
E/6-7 1 5.6 -
DUCTS 2 4.8 -
-
-
-
-
-
-
-
-
Total Qty

390.90 50 19,545.00
-

-
-
390.90 145 56,680.50
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
70.51 700 49,355.69
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
70.51 1175 82,847.05
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5.32 1175 6,254.82
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
84.88 700 59,418.10
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
34.20 1175 40,183.85
-

-
19.80 1135 22,473.00
-

-
-
-
-
-
386.22 1745 673,953.90
100000 -
150000 -
-
-
-
-
-
-
-
254.26 620 157,638.98

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
5.07 910 4,610.97
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2190 569,612.97

2190 47,537.85
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6260 584,343.61

-
410 118,384.43 2,492,840.72
35.76
212.51
293.16

129.02
134.72
274.55
488.50
280.00 335.00 415.00 415.00 510.00
255.00 295.00 365.00 375.00 465.00 765.00 890 980 1045 1145 1195
200.00 270.00 325.00 310.00 420.00
720.00 815 955 990 1060 1120
500.00 570.00 525.00 610.00 720.00
465.00 455.00 575.00 560.00 685.00
685.00 770 935 970 1050 1080
165.00 155.00 275.00 260.00 385.00
125.00 145.00 250.00 225.00 320.00 620.00 725 910 925 995 1045
85.00 125.00 210.00 210.00 320.00

1,385.00 1615 1890 1970 2140 2240


692.50 807.5 945 985 1070 1120
6.91 8.05 9.43 9.83 10.67 11.17

480.00 605.00 740.00 725.00 930.00


240.00 302.50 370.00 362.50 465.00
0.92 1.16 1.42 1.39 1.78

965.00 1,025.00 1,100.00 1,170.00 1,405.00


482.50 512.50 550.00 585.00 702.50
2.14 2.27 2.43 2.59 3.11

250.00 280.00 485.00 470.00 705.00


125.00 140.00 242.50 235.00 352.50
0.48 0.54 0.93 0.90 1.35

AB BC CD DE EF FG GH HJ
R 1.09 2.03 2.68 3.03 17.39 28.23 31.00 43.30
C 2.31 3.70 4.80 5.46
L 0.53 1.15 1.74 2.15

3.93 6.88 9.22 10.64


JK
41.78

192.37
67.98
22.66
765.00 890 980 1045 1145 1195
720.00 815 955 990 1060 1120

685.00 770 935 970 1050 1080

620.00 725 910 925 995 1045

465.00 590.00 680.00 745.00 845.00 895.00 1,360.00 680.00 11.594

420.00 515.00 655.00 690.00 760.00 820.00

385.00 470.00 635.00 670.00 750.00 780.00


320.00 425.00 610.00 625.00 695.00 745.00 1,065.00 532.50 9.079125
12.1737

9.533081
Along
Grid 1
E-D m3 1 1.69 0.45 1 0.76
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F2 -1 0.4375 0.45 0.25 (0.05)
D-C 1 1.685 0.45 1 0.76
ddt F2 -2 0.4375 0.45 0.25 (0.10)
C-B 1 1.35 0.45 1 0.61
ddt F1 -2 0.3875 0.45 0.25 (0.09)
B-A 1 1.3875 0.45 1 0.62
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along
Grid 8
E-D m3 1 1.69 0.45 1 0.76
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F2 -1 0.4375 0.45 0.25 (0.05)
D-C 1 1.685 0.45 1 0.76
ddt F2 -2 0.4375 0.45 0.25 (0.10)
C-B 1 1.35 0.45 1 0.61
ddt F1 -2 0.3875 0.45 0.25 (0.09)
B-A 1 1.3875 0.45 1 0.62
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along
Grid 2
E-F 1 2.1 0.45 1 0.95
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F4 -1 0.6375 0.45 0.3 (0.09)
F-G 1 3.005 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
G-H 1 2.995 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
H-J 1 4 0.45 1 1.80
ddt F4 -2 0.6375 0.45 0.3 (0.17)
J-K 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Along
Grid 7
E-F 1 2.1 0.45 1 0.95
ddt F1 -1 0.3875 0.45 0.25 (0.04)
ddt F4 -1 0.6375 0.45 0.3 (0.09)
F-G 1 3.005 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
G-H 1 2.995 0.45 1 1.35
ddt F4 -2 0.6375 0.45 0.3 (0.17)
H-J 1 4 0.45 1 1.80
ddt F4 -2 0.6375 0.45 0.3 (0.17)
J-K 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Along
Grid 3
A and
beyond 1 0.6 0.45 1 0.27
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along
Grid 6
A and
beyond 1 0.6 0.45 1 0.27
ddt F1 -1 0.3875 0.45 0.25 (0.04)
Along
Grid A
3 to 6 1 4.2 0.45 1 1.89
ddt F1 -2 0.3875 0.45 0.25 (0.09)
Along
Grid E
1 to 2 1 0.825 0.45 1 0.37
ddt F1 -2 0.3875 0.45 0.25 (0.09)
7 to 8 1 0.825 0.45 1 0.37
ddt F1 -2 0.3875 0.45 0.25 (0.09)

Excavatio
n for
drain as
directed
by the
engineer
A gravel
layer of
average
height
0.6m was
filled and
compacte
d for the
pavement
as per
consultan
t's
instructio
ns. The
filled
gravel
had to be
excavated
and
removed
due to
change in
design,
and the
lognote
pertainin
g to the
drain has
been
attached
herewith
in
Attachme
nt No.1

Removal
of
compacte
d gravel 2 21.85 0.6 0.6 15.73

Removal
of earth
from EGL 2 21.85 0.35 1 15.30
*The
Ramp
had to be
excavated
thrice,
due to
changes
in
configura
tion of
the ramp
by the
project
architect,
the
lognotes
pertainin
g to these
changes
have
been
attached
as
Attachme
nt No. 2

Ramp
Excavatio
n 1 (as
per
drawing) 2 9 0.45 1 8.10
1 3.6 0.45 1 1.62

Ramp
Excavatio
n 2 (refer
attachme
nt 02) 2 9 0.45 1 8.10

Ramp
Rxcavatio
n 3 (refer
attachme
nt 02) 2 11 0.45 1 9.90
Grid K
2 to 4 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
5 to 7 1 3.6 0.45 1 1.62
ddt F4 -2 0.6375 0.45 0.3 (0.17)
Grid B
1 to 3 1 3.6 0.45 1 1.62
ddt F1 -2 0.3875 0.45 0.25 (0.09)
6 to 8 1 3.6 0.45 1 1.62
ddt F1 -2 0.3875 0.45 0.25 (0.09)