You are on page 1of 95

Heavy Plate Symposium 2008

Agenda

● Mechanical Testing at Ilsenburger Grobblech

● Production of Heavy Plates

● Major Developments at Ilsenburger Grobblech

● Investment Program Ilsenburger Grobblech

Andreas Rost

Firma, Abteilung, Folie 1,


Manager Quality Control, Product Development and
Application Services
Heavy Plate Symposium 2008

Mechanical Testing at Ilsenburger Grobblech

Firma, Abteilung, Folie 2,


Heavy Plate Symposium 2008
Mechanical Properties

Tensile and Yield Strengths

Calculation of minimum requirements

● Yield: Reh, Rp 0.2, Rt 0.2

● Tensile: Rm

σ existing </= σ allowed


F/A Re/ SF

Firma, Abteilung, Folie 3,


Heavy Plate Symposium 2008
Mechanical Properties

Toughness
● Empiric Min. Requirements
● Charpy-V Noch, Bead on Plate Test
● Pellini DWT Test
● Fracture Mechanics

Firma, Abteilung, Folie 4,


Heavy Plate Symposium 2008
Tensile Test

Firma, Abteilung, Folie 5,


Heavy Plate Symposium 2008
Tensile Testing - Ilsenburg

● Number of Tests 2007:


approx. 71,000

● Standards:
DIN EN 10002
ASTM E8

● Test Equipment: RM 1000


Load 1,000 kN

- Automatic measurement of
prismatic tensile specimen
- portal handling system
- direct data transfer for certification

Firma, Abteilung, Folie 6,


Heavy Plate Symposium 2008
Tensile Testing - Ilsenburg

● Test Equipment: Z1200

Automatic for Tensile Testing

Load 1,200 kN

- Magazin for 175 specimen

- Portal handling system

- Direct data transfer for

certification

Firma, Abteilung, Folie 7,


Heavy Plate Symposium 2008
Tensile testing - Ilsenburg

● Test Equipment: UTS-100

Tensile Testing of cylindric

specimen

Load 100 kN

- tensile test up to 1,000°C

- digital temperatur controlling

System

Firma, Abteilung, Folie 8,


Heavy Plate Symposium 2008
Trough Thickness Test DIN EN 10164

Result:

Elongation in Z - direction

Equipment:

Elongation (s0 – sU) / s0 x 100 [%]

(15 – 400mm and Rp0,2 ≤ 960MPa)

Firma, Abteilung, Folie 9,


Heavy Plate Symposium 2008

Mechanical Testing – Assessment of Brittle Fracture

Transition temperature
Charpy – V notch Shear area
Lateral Expansion

DWT, Pellini Test Borderline temperature test

Not valid for constructions, due to influence of samples-geometry and


or defect size
Results are empiric values. Not useful for any calculation

Firma, Abteilung, Folie 10,


Heavy Plate Symposium 2008
Charpy-V-Notch DIN EN 10045

Determination of toughness by providing critical ambient conditions


Equipment:
Impact testing unit
Results:
Joule- value at defended temperature
lateral expansion
shear fracture area

Firma, Abteilung, Folie 11,


Heavy Plate Symposium 2008
Charpy-V-Notch DIN EN 10045

200
Toughness in Joule

150
good
100

50

27
bad

Firma, Abteilung, Folie 12,


-80 -60 -40 -20 20 40
Temperature in C°
Heavy Plate Symposium 2008
Impact Testing Ilsenburg

● Number of Tests 2007:


approx. 60,000

● Standards:
DIN EN 10045
ASTM E23

● Test Equipment: PW 75 / 30
Impact Testing System
Energy: 750 Joule

- Automatic system of cooling an testing of impact test specimen


- cooling unit up to -70°C

Firma, Abteilung, Folie 13,


- automatic specimen transfer
- direct data transfer for certification
Heavy Plate Symposium 2008
Impact Testing - Ilsenburg

● Test Equipment:

PW 75 / 30, PW 30 / 15

Impact Testing System

Energy: 750 / 450 Joule

- Cooling unit up to -70°C

- N2 cooling up to -196°C

- direct data transfer for

certification

Firma, Abteilung, Folie 14,


Heavy Plate Symposium 2008
Impact Testing - Ilsenburg

● Test Equipment:
TE – Temperature Unit
- temperature unit
+300 < T ≤ -190°C
- digital temperature
controlling system

Firma, Abteilung, Folie 15,


Heavy Plate Symposium 2008
Hardness Measurement - Ilsenburg

● Number of Tests 2007:


Brinell approx. 9,000
Vickers approx. 2,000
Rockwell approx. < 50

● Standards:
DIN EN ISO 6506, 6507, 6508
ASTM

● Test Equipment: TESTOR 971


Semi automatic measurement for
Brinell, Rockwell and Vickers

Firma, Abteilung, Folie 16,


Load 3,000 kg
Heavy Plate Symposium 2008
Hardness Measurement - Ilsenburg

● Test Equipment: EMCO-Test M4C

Automatic for Brinell, Vickers, Rockwell

Load 250 kg

- 5-times revolving system

- High sensitive camera for focussing


and determination

- direct data transfer for certification

Firma, Abteilung, Folie 17,


Heavy Plate Symposium 2008
Bead on Plate Test SEP 1390

Determination of materials crack arresting possibilities

Test equipment: Bend test – Tensile tester

Result:

● o.k. / not o. k.
(Crack behavior at a bending radius of 60°)

Firma, Abteilung, Folie 18,


Heavy Plate Symposium 2008
Experimental Determination of the CTOD

Standards:
• ISO 12135
• ESIS P2
• ASTM E 1820
• BS 7448

Firma, Abteilung, Folie 19,


•…
Heavy Plate Symposium 2008

Production of Heavy plates

Firma, Abteilung, Folie 20,


Heavy Plate Symposium 2008
Development of Tensile Strength

Development of structural steels

1350
S1100QL
1200
S960QL
Minimum yield (MPa)

1050
S890QL1
900
S690QL1
750
X100
600
StE460 X80
450 St52 X70/S460ML
St37 X60/S420ML
300
X52/S355ML

Firma, Abteilung, Folie 21,


150
1925 1950 1975 1990 2005
Heavy Plate Symposium 2008
Design of Material Properties

Chemical Composition Microstructure

● 150 different compositions ● TM


● normalized
● annealed
● quenched

Firma, Abteilung, Folie 22,


Heavy Plate Symposium 2008
Chemical Composition

Increase of Yield / Tensile Strength

● N-Steels / N+A Steels


Alloying of C, Mn, Re up to 355 MPa
+ Cu, Cr, Ni, Mo, Nb, N, V approx. 500 MPa

Decrease of thougness, weldbility, formability

● TM - Steels
Mirco alloying of Nb, V, Ti Re up to 550 MPa

● Q&T Steels
Alloying of C, Mn, Re up to 1100 MPa

Firma, Abteilung, Folie 23,


Cu, Cr, Ni, Mo, Nb, N
Heavy Plate Symposium 2008
Rolling Methods

as rolled normalized rolled TMCP

Mikrolegierung

Mn Ar3
Ar1
Haspeln beschleunigte
Abkühlung

Time

Firma, Abteilung, Folie 24,


Heavy Plate Symposium 2008
Rolling Methods

Normalized rolled Thermo mechanic controlled processed

S355J2G3 S355M
C 0.18 % Re 429MPa C 0.08 % Re 420MPa
Si 0.35 % Rm 568MPa Si 0.35 % Rm568MPa

Firma, Abteilung, Folie 25,


Mn 1.50 % Mn1.50 %
40 mm 40mm
Heavy Plate Symposium 2008
TMCP Steels

Toughness Re/CEV
500

200 400

100 300

-100 - 50 0 ]a
[n
M
p
ize
rckg
tS
0,34 0,38 0,42 0,46 0,50

Firma, Abteilung, Folie 26,


Z
ä
h
g
ik
e
tn
[J
]

TM Steels N Steels
Heavy Plate Symposium 2008
Heat treatment: Normalizing

● Heating up to 900°C followed by cooling in still air

Necessary: plate thickness > 80 mm


low Charpy test temp < -50°C

RT 900 °C slow cooling:


Ferrit Austenit Ferrit

Firma, Abteilung, Folie 27,


Heavy Plate Symposium 2008
Quenching

Chemical composition: CEV 1. Slow cooling


Austenitisation temperature Austenit Ferrit
Cooling intensity

Ac3

Ac1
2. Fast cooling
Austenit Martensit

Firma, Abteilung, Folie 28,


Heavy Plate Symposium 2008
Abrasion Resistant Steels

IMPROVEMENT OF LIFETIME

HARDNESS CARBIDES
BRINAR® 400, 450 BRINAR® 400 Cr
BRINAR® 500

Firma, Abteilung, Folie 29,


Heavy Plate Symposium 2008
High Strength Steels Q&T

Chemical composition:
C = 0,18 Si = 0,40 Mn = 1,60

Firma, Abteilung, Folie 30,


Heavy Plate Symposium 2008
High Strength Steels Q&T

Water-quenching equipment:
- state-of-the-art facility, one of the most modern
facilities worldwide
- patented water distribution

Results after quenching:


- steady steel properties and low inner tension
- high flatness
- excellent working properties

Steel grades:
- high-tensile steels
MAXIL® 500 Q, QL, QL 1 to MAXIL® 1.100 Q
- wear-resistant steels
BRINAR® 400, BRINAR® 500

Plate dimensions:
Thickness: 5 - 80 mm

Firma, Abteilung, Folie 31,


Width: up to 3.500 mm
Length: max. 13,5 m
Heavy Plate Symposium 2008

Major Developments at Ilsenburger Grobblech


Andreas Rost
Manager Quality Control, Product Development and Application Services

Firma, Abteilung, Folie 32,


Heavy Plate Symposium 2008
Agenda

 Conditions for a constant development


- Steel plant Salzgitter
- Heavy plate mill Ilsenburg

 Quality performance

 Product development
- Low temperature steels
- High ambient temperature steels
- Sour gas resistant steels
- Steels supposed for extended PWHT
- Stainless steels

Firma, Abteilung, Folie 33,


Heavy Plate Symposium 2008
Major Developments

 Conditions:

- Extensive standards and regulations

- Additional limitations by specifications


Largely unchangeable chemical contents, production processes,
properties ….

Firma, Abteilung, Folie 34,


Heavy Plate Symposium 2008
Major Developments

 Improved properties

 Meeting challenging specifications

 Process optimisation

Cost reduction

 Quality improvement

Firma, Abteilung, Folie 35,


Heavy Plate Symposium 2008
Major Developments Steel Plant

 Optimized use of raw materials

 Efficient pig iron desulphurisation,


efficient primary and secondary metallurgy

 Improved slag retaining when tapping

 Modification of segregation properties during continuous cast

Firma, Abteilung, Folie 36,


Heavy Plate Symposium 2008
Major Developments Steel Plant

 Slag retain improvement (1999)


 Special alloy converter (2004)
 Modernisation process system converter (2007)
 Modernisation process system secondary metallurgy (2008)
 Building of the fifth secondary metallurgy stand (2008)
 SGA 4 (2010)

Firma, Abteilung, Folie 37,


Heavy Plate Symposium 2008
New Caster No. 4

Improvement of piece weight

</= 2500 mm 20,5 t

> 2500 mm 15,1 t

Actual 2010

Firma, Abteilung, Folie 38,


 20,5 t up to 3500 mm
Heavy Plate Symposium 2008
New Caster No. 4

Improvement of thickness

180
150
120
90

ASTM / ASME EN- Standard

Firma, Abteilung, Folie 39,


Heavy Plate Symposium 2008
New Caster No. 4

Improvement of Dimensions

Thickness in mm maximal lenght vs. width


Width in mm 1,50 1,75 2,00 2,25 2,50 2,75 3,00 3,25 3,50
60 24,0 24,0 21,8 19,3 17,4 15,8 14,5 13,4 12,4
70 24,0 21,3 18,7 16,6 14,9 13,6 12,4 11,5 10,7
80 21,8 18,7 16,3 14,5 13,1 11,9 10,9 10,0 9,3
90 19,3 16,6 14,5 12,9 11,6 10,6 9,7 8,9 8,3
100 17,4 14,9 13,1 11,6 10,4 9,5 8,7 8,0 7,5
110 15,8 13,6 11,9 10,6 9,5 8,6 7,9 7,3 6,8
120 14,5 12,4 10,9 9,7 8,7 7,9 7,3 6,7 6,2
130 13,4 11,5 10,0 8,9 8,0 7,3 6,7 6,2 5,7
140 12,4 10,7 9,3 8,3 7,5 6,8 6,2 5,7 5,3
150 11,6 9,9 8,7 7,7 7,0 6,3 5,8 5,4 5,0
160 10,9 9,3 8,2 7,3 6,5 5,9 5,4 5,0 4,7
170 10,2 8,8 7,7 6,8 6,1 5,6 5,1 4,7 4,4

Firma, Abteilung, Folie 40,


Heavy Plate Symposium 2008
Major Developments Roller Stand

Roller stand enlargement



 Improved logistics, heavier plates
 Stationary water quenching equipment, car bottom furnace
 Modernisation mill stand and hot leveller
 Modernisation pusher type furnaces
 Dispatch and shape cutting hall
 ACC unit, cold leveller

Firma, Abteilung, Folie 41,


Heavy Plate Symposium 2008
Product Development

Possibility's for product design:

Chemical composition Alloying concept



Microstructure Rolling methods, Heat treatment


Firma, Abteilung, Folie 42,


Heavy Plate Symposium 2008
Extended Product Range

Blech-
dicke Röhrengüten
TM/IK-gew alzt
in mm < XX80
70 X80 X100
2007

=60
2007
=50

=40
2007

=30

=25

=12

2006 2007 2007 2008

Product range with new accelerated cooling (ACC)


Sortimentserweiterung neue ACC-Anlage

Firma, Abteilung, Folie 43,


Product range with old intensive cooling
Sortiment Pilotanlage
Heavy Plate Symposium 2008
Technology Comparison API X70

Firma, Abteilung, Folie 44,


Heavy Plate Symposium 2008
Cold Leveler 3

Firma, Abteilung, Folie 45,


Heavy Plate Symposium 2008
Product Related Development

Nickel-alloy
Nickel-alloysteels
steelsfor
for
liquid ethylene tanks
liquid ethylene tanks

Case
Casehardened
hardened
nickel-alloy
nickel-alloysteels
steels

Sour
Sourgas
gasresistant
resistant
vessel plates
vessel plates

Case
Casehardened
hardenedheat
heat
resistant steels
resistant steels

Steels
Steelswith
with modified
modified
elastic limits
elastic limits

Firma, Abteilung, Folie 46,


Heavy Plate Symposium 2008
Steel for Cold Tank Constructions

Flat floor tank for Tanker for

Firma, Abteilung, Folie 47,


Liquid Natural Gas (LNG) Liquid Natural Gas (LNG)
Heavy Plate Symposium 2008
Steel for Cold Tank Constructions

Standard Steel Type S Re Rm A T Charpy V Lateral Heat


Grade [mm] [MPa] [MPa] [%] [°C] [J] Exp. Treat-
Trans / [mm] ment
Long
EN 12Ni1 ≤ 30 ≥ 355 490 to ≥ 22 -100 ≥ 27 / ≥ 40 N
10028-4 4 >30≤ ≥ 345 640 N+T
[3,5%] 50 ≥ 335 Q+T
>50≤
80
EN X12Ni ≤ 30 ≥ 390 530 to ≥ 20 -120 ≥ 27 / ≥ 40 N
10028-4 5 >30≤ ≥ 380 710 N+T
[5%] 50 Q+T

EN X8Ni9 QT ≤ 30 ≥ 490 640 to ≥ 18 -196 ≥ 40 / ≥ 50 Q+T


10028-4 [9%] 640 >30≤ ≥ 480 840 ≥ 20 ≥ 0,381 N+N+T
A/SA Type 50 ≥ 515 690 to Q+T
ASTM 353 I 825
Type ≥ 585 690 to
ASME A/SA I 825
553

Firma, Abteilung, Folie 48,


Spec. 9% Ni Acc. Acc. Acc. -196 27J…100J 0,381…
Requirem Stand. Stand. Stand. 80% 0,51
Heavy Plate Symposium 2008
Reduction of Alloyed Elements

Firma, Abteilung, Folie 49,


Heavy Plate Symposium 2008
Technology Optimisation 9 % Ni

 Improved surface quality


 Shorter throughput times
 Increased capacity
 Larger dimensions
 Reduction of flaws
 Increased tensile strength for special applications

Firma, Abteilung, Folie 50,


Heavy Plate Symposium 2008
Product Development –
High Ambient Temperature Steels

 Chrome-Molybdenum steel

13 CrMo 44
10 CrMo 910
A387 Gr 11 /12 /22

Firma, Abteilung, Folie 51,


Heavy Plate Symposium 2008
Background

Conventional production method for A387 Gr. 12/11 steels:


Normalizing at 910 °C (1670°F)
Tempering at 650°C -700°C (1200-1292°F)

Problem: Requirements (due to design reasons or of HAZ max hardness)


for higher tempering temperature can not be guaranteed.
Diffusions processes lead to microstructures which change
the material properties.

Solution: Accelerated cooling and tempering

Firma, Abteilung, Folie 52,


Heavy Plate Symposium 2008
SA 516 Gr 60-70 PWHT

 Restriction max 6 h at 610°C

 Requirements PWHT up to 16h holding times or and 640°C

 Improvement Chemical Compositions

Firma, Abteilung, Folie 53,


Heavy Plate Symposium 2008
SA516Gr. 70 Influence PWHT

PWHT 6,6 h 610 °C 38 mm A516.70

570
550
530
510
490
470
450
Rt0,5 S
S: PWHT 6,6 h
430
Rm S
at 610°C
Mpa

410
Rt0,5 U
390
370
Rm U U: without PWHT
350
330
310
290
270
250
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Firma, Abteilung, Folie 54,


Number of Tests
Heavy Plate Symposium 2008
Distribution Charpy V -45°C transverse

Without PWHT PWHT


A516.70 -45°C U A516.70 -45°C S 6,6 h 610°C

35 40

35
30

30
25

25
20
approx. 40Joule
Häufigkeit

Häufigkeit
20

15
15

10
10

5
5

0 0
1

0
42

59

77

94

53

68

83

99
er

er
11

12

14

16

18

19

21

23

11

12

14

15

17

19

20

22
öß

öß
gr

gr
d

d
un

un
Klasse Klasse

Firma, Abteilung, Folie 55,


Heavy Plate Symposium 2008
Influence Holding Time up to 16 h – Tensile Test

Rp0,2 640°C
Rp0,2
Tensile Test after PWHT 640 °C and 620 °C Rm 640 °C Tensile Test after PWHT 610°C
Rm
Rp0,2 min
Rp0,2 min
650 Rm min 650
Rm min
Rm max
Rm max
Rp0,2 620 °C
600 Rm 620 °C 600

550 550

500 500
Rp0,2 / Rm (MPa)

Rp0,2 / Rm (MPa)
450 450

400 400

350 350

300 300

250 250

Firma, Abteilung, Folie 56,


200 200
0 5 10 15 20 0 5 10 15 20
t (h) t (h)
Heavy Plate Symposium 2008
Influence Holding Time up to 16 h – Charpy V Notch

Charpy V transv. 910 °C + 640 °C Charpy V transv. 910 °C + 620 °C and


-50 °C
Charpy V long. 910 °C + 610 °C
-40 °C
250 250 -50 °C Anlasstemp. 620 °C
-20 °C -40 °C Anlasstemp. 620 °C
-20 °C Anlasstemp. 620 °C
225 225 -29 °C Anlasstemp. 610 °C

200 200

175 175

150 150
KV (J)

KV (J)
125 125

100 100

75 75

50 50

25 25

Firma, Abteilung, Folie 57,


0 0
0 5 10 15 20 0 5 10 15 20
t (h) t (h)
Heavy Plate Symposium 2008

Firma, Abteilung, Folie 58,


Heavy Plate Symposium 2008
Mechanics of Damaging

Influenced by:
 Chemical composition
 Strength level
 Microstructure

 Hydrogen sulphide pressure


 Acidity pH –value
 Temperature
 Stress level (residual and actual)
 Exposure time

Firma, Abteilung, Folie 59,


Heavy Plate Symposium 2008
Mechanics of Damaging

H2S S
S
Corrosive Gas
H2S S H2S  Reduction of hydrosulphide
H H2S → S + 2H
H H H
Dislocation H  Collection of hydrogen atoms in structural
Flaw
Steel H Non-metallic flaws
enclosure Grain boundary

H H
H2
 Compounding of molecular hydrogen
(= recombination) at enclosures and flaws

 Pressure caused by larger volume


H2
 start and growth of cracks

Firma, Abteilung, Folie 60,


Heavy Plate Symposium 2008
Sulphide Stress Cracking (SSC)

Firma, Abteilung, Folie 61,


Heavy Plate Symposium 2008

Firma, Abteilung, Folie 62,


Heavy Plate Symposium 2008
Product Development - Sour Gas Resistant Steel

 Steel plant:
- Adjustment of defined components and ratios in the heat (e.g. S, P, H, C)
- Vacuum degassing
- CaSi – treatment
- Avoiding brittle structures, (carbide strings, enclosures)
- Avoiding central segregation (C, Mn, P, casting conditions)

 Rolling:
- Homogenous, fine-grain structure (low tolerances of the rolling
parameters)
- High durability
- Low hardening when subject to cold

Firma, Abteilung, Folie 63,


Heavy Plate Symposium 2008
US-Testing and CAR-Measurement

Firma, Abteilung, Folie 64,


Heavy Plate Symposium 2008
Metallographic Assessment per NACE TM 02-84

Evaluation of Test Specimens:

b
25mm 50mm 75mm
a
b

Firma, Abteilung, Folie 65,


ILG – KGE K. Tigges
Heavy Plate Symposium 2008
Product Development – Sour Gas Resistant Steel

Firma, Abteilung, Folie 66,


Heavy Plate Symposium 2008

www.ilsenburger-grobblech.de

Firma, Abteilung, Folie 67,


Heavy Plate Symposium 2008

Salzgitter AG
and
Salzgitter Steel

Firma, Abteilung, Folie 68,


Heavy Plate Symposium 2008
Group Structure and Key Data FY 2007

Salzgitter AG Group
External Sales cons.: € 10.2 billion Employees: 23,107
Internal Sales: € 3.6 billion

Steel Tubes Trading Services Technology

• Total Sales: • Total Sales: • Total Sales: • Total Sales: • Total Sales:
€ 4.0 billion € 2.6 billion € 5.0 billion € 1.2 billion € 0.6 billion
(H2 2007)

• Employees: • Employees: • Employees: • Employees: • Employees:


6,829 5,978 1,867 4,043 4,252

Firma, Abteilung, Folie 69,


All data about employees as of 31.12.2007
Heavy Plate Symposium 2008
Salzgitter AG - Group Structure

Salzgitter AG (Holding)

Salzgitter Mannesmann GmbH – Intermediate holding company

Steel Röhren
Tubes Trading Services Technology
Salzgitter Stahl GmbH Mannesmannröhren-
Werke GmbH

Salzgitter Mannesmann Klöckner-Werke AG


Salzgitter Flachstahl Europipe (50%) DEUMU
Handel Group (86%)

Salzgitter Mannesmann Salzgitter Service


Ilsenburger Grobblech Universal KHS-Gruppe
Grobblech und Technik

Salzgitter Mannesmann Verkehrsbetriebe Klöckner DESMA


Peiner Träger Hövelmann&Lueg Elastomertechnik
Grossrohr Peine-Salzgitter

HSP Hoesch Salzgitter Mannesmann telcat Klöckner DESMA


Spundwand und Profil Line Pipe Schuhmaschinen
SIT
Salzgitter Mannesmann GESIS Klöckner Hänsel
Salzgitter Bauelemente Processing
Precision
Hansaport (51%)
Salzgitter Mannesmann SIG Beverages
Salzgitter Europlatinen
Stainless Tubes

Firma, Abteilung, Folie 70,


Salzgitter Mannesmann
Forschung
Hüttenwerke Krupp
Mannesmann (30%) Salzgitter Automotive
Engineering

simplified structure
Heavy Plate Symposium 2008
Steel Division - Overview

Steel Division
Crude steel production 2007: 5.7 m tons
Rolled steel production 2007: 5.5 m tons

Strip steel Heavy plate Sections Processing

2007 2007 2007 2007


Shipment: 3,037 Tt Shipment: 805 Tt Shipment: 1,595 Tt Shipment: 108 Tt
Turnover: 1,953 m € Turnover: 800 m € Turnover: 1,097 m € Turnover: 117 m €

Firma, Abteilung, Folie 71,


As of: December 31, 2007
Heavy Plate Symposium 2008
Main Slab Supplier: Salzgitter Flachstahl GmbH

Coking Plant:
2 batteries: total of 108 coke ovens, each with 46.0 m3

3 Blast Furnaces:
Hearth diameter: 11.2 m, 11.2 m and 8.2 m

Steel Works:
Primary Metallurgy: 3 * 210 t LD Converter
Secondary Metallurgy: vacuum degassing, ladle
furnace and alloying
3 Continuous Casters:
1 Strand
210 - 250 mm thick, 1,100 – 2,000 mm wide
1 Strand
210 - 250 mm thick, 1,900 – 2,600 mm wide
1 Strand

Firma, Abteilung, Folie 72,


(vertical / bending; soft reduction)
250 mm thick, 850 – 2,100 mm wide
Heavy Plate Symposium 2008
Processing Lines Steel Group

Salzgitter Hot-Dip Galvanising


Cold Strip Mill
Hot Strip Mill

Electro-Galvanising

Hot Strip Cutting Plant

Surface Coating
Large Diameter Pipes

Profile Sheets

Peine
Ilsenburg
Heavy Section Mill
Heavy Plate Mill Universal Medium Section Mill

Firma, Abteilung, Folie 73,


Heavy Plate Symposium 2008

Key Facts
Ilsenburger Grobblech GmbH

Firma, Abteilung, Folie 74,


Heavy Plate Symposium 2008

“Top producer of Quarto plates with a


broad product range for the upper
segment of the market”

Firma, Abteilung, Folie 75,


Heavy Plate Symposium 2008
Heavy Plates Made in Ilsenburg

Facts:

Capacity: app. 800.000 t/year


Work force: 810
Location: Ilsenburg & Salzgitter

Firma, Abteilung, Folie 76,


Heavy Plate Symposium 2008
Abstract Ilsenburg

Headquarters Ilsenburg:
• Heavy Plate Mill with adjustment line and dispatch area
• Supply with slabs mainly from Salzgitter, computer controlled production
scheduling, Quality Management
• Main supplier of heavy plates in the Salzgitter group
• Investments of more than 115 Mill. Euros during the last 15 years
Benefits: improving the plant, plate quality and logistics

Further Processing at Salzgitter

• Water quenching equipment, for the production of BRINAR® (abrasion-resistant


steels) and MAXIL® (high-strength steels)
• Wide range of possibilities for individual plate-steel processing (shot blast and
coating facilities, edge preparation, plate bending)

Firma, Abteilung, Folie 77,


• Investments of more than 15 Mill. Euros during the last 15 years
Heavy Plate Symposium 2008
History

1595 Foundation of the Ilsenburger Copper hammer


1843 Start of operation of a Copper Mill
1946 First heavy plates
1954 Start of operation of a new two-high mill stand and a double pusher type
furnace; the production of copper is continued on the basis of recycling
1979- Extensive modernisation of the production line:
1982 modern 4-high mill stand, 2 pusher type furnaces, 1 pit furnace,
modernisation of the shear line and dispatch area, automation,
New capacity: 650.000 t
1992 Takeover by Preussag Stahl AG as a subsidiary
1995 Only heavy plate mill of the Preussag Stahl AG
1998 Separation of the Preussag Stahl AG: Foundation of the Salzgitter AG –
Steel and Technology
2001 Foundation of the ILSENBURGER GROBBLECH GmbH
2002 Modernisation of the 4-high mill stand and the hot leveller, revamping of
the pusher type furnaces
2005 New dispatch bay and burning facilities
2006 Installation of a new accelerated cooling system (ACC)

Firma, Abteilung, Folie 78,


2007 Commissioning of a cold leveller
Heavy Plate Symposium 2008
Steel Grades

Fine
Finegrain
grainstructural
structural
steel
steel
HIC-resistant
HIC-resistant
General
Generalstructural
structural steel
steel
steel
steel

Shipbuilding
Shipbuilding
Corrosion-,
Corrosion-,acid-
acid- steel
and heat steel
and heat
resistant
resistantsteel
steel

Nickel
Nickelalloyed
alloyed TMCP-/SZ-
TMCP-/SZ-
low temperature
low temperature steel
steel
steel
steel

Stainless
Stainless Pressure
Pressure
Abrasion
Abrasionresistant
resistant

Firma, Abteilung, Folie 79,


steel
steel vessel
vesselsteel
steel
and
and
high
high strengthsteel
strength steel
Heavy Plate Symposium 2008
Key Facts

Ilsenburger Grobblech GmbH

• Broad diversified heavy


2003plate program
2004 2005 2003 2004 2005 2006
Production (T tons) 729 754 772 xxx
- more than 350 steel grades Shipments (T tons) 735 753 767 xxx
Turnover (m€) 327 402 610 xxx
- about 8,000 orders per year Employees (31/12/2005) 756 742 742 xxx

Production (T tons) 729 754 772


• Brands by ILG - BRINAR 400, 450 and 500
®

- MAXIL® 500 up to 1100


- RESTIL® 60, 65 and 70
Shipments (T tons) 735 753 767

Production (T 2003 2004 2005 2006 2007


tons)
Shipments (T 729 754 772 796 834
Turnover (m€) 327 402
tons) 735 753 767610 775 805

Firma, Abteilung, Folie 80,


Turnover (m €) 327 402 610 649 800

Employees
(31/12/2005) 756 742 742
As of: March 31, 2008
Heavy Plate Symposium 2008
Current Production Program

Thickness: 5 – 125 mm
(5 – 80 mm for ASTM)
Width: max. 3.500 mm
Length: 4.000 – 24.000 mm
Max. plate weight : 15,1 t > 2.500 mm
20,5 t < 2.500 mm

Delivery conditions: as rolled, N, N&T, Q, Q&T & TMCP


Normalizing: 290.000 t per year* up to 3.500 mm
Tempering: 60.000 t per year* up to 3.500 mm
Quenching: more than 70.000 t per year*

Firma, Abteilung, Folie 81,


* Including second finishing line in
Salzgitter
Heavy Plate Symposium 2008
Prefabrication & Added Value

1. Profiling line Ilsenburg (mainly wind mill industry)


• 70,000 t per year
• Max. plate weight 20,5 t
2. Water quenching Ilsenburg/Salzgitter:
• High strength grades: MAXIL® 500 up to 960
• Abrasion resistant grades: BRINAR® 400
• Thickness: 5 – 125 mm
• Width: 2,000 – 3,500 mm
3. Prefabrication line Salzgitter:
• Shot-blasting and coating (min. 15 µm – max. 25 µm; up to 3,200 mm width)
• Edge preparation (V, X, Y, double-Y seams; up to 3.000 mm)
• 4 roll bending (min. diameter 1,200 mm, up to 35 mm and 3,000 mm)

Firma, Abteilung, Folie 82,


Heavy Plate Symposium 2008
Water Quenching Line – Salzgitter

Water-quenching equipment
- state-of-the-art facility, one of the most modern
facilities worldwide
- patented water distribution

Results after quenching


- steady steel properties and low inner tension
- high flatness
- excellent working properties

Brands
- BRINAR® 400, 450 and 500
- MAXIL® 500 up to 1100

Plate dimensions
Thickness: 5 - 80 mm
Width: up to 3,500 mm
Length: max. 13,5 m

Firma, Abteilung, Folie 83,


Heavy Plate Symposium 2008
Special Grades

Offshore Grades
e.g. 355 EM/ EMZ, API-2 H, S 355 M1/ 2/ 3 /4. S 420 G1/2, S 460 G1/2 …

Thickness: 5 – 65 mm (depending on Certification Company LRS, …)


5 – 80 mm for API-2 H

Boiler Plates
e.g. P 265/ 295GH, 16 Mo 3, 13 CrMo 4-5, SA 516 Gr. 60/ 65/ 70 (HIC), SA 387 Gr. 11 cl.2

Thickness: 5 – 120 mm
(5 - 80 mm for ASTM)

Pipe Steels
e.g. A, B, X 52 – X 70, Sour gas X 65/70, L 360MB – L485MB

Thickness: 5 – 120 mm

Firma, Abteilung, Folie 84,


(5 - 80 mm for X 60 – X 70, L 415 – L 450; L 485 max. 60
mm)
Heavy Plate Symposium 2008
Products

Heat and low temperature resistant steels, pressure vessels steels


• temperature range: -196°C up to + 500 °C

heat resistant steels: steels for low temperatures:


i.e. 16Mo3, 13CrMo4.5, 10CrMo9.10, i.e. P355/460NL2, 13MnNi63, 10Ni14
A/SA 387Gr 11/12/22 CL1/Cl2 (ASTM A 203 Gr. D), 12Ni14, X8Ni9 (ASTM
A 553 NNA or A 559 Q+T), STZ36A/SA
553/335/203 A516/537

Firma, Abteilung, Folie 85,


Heavy Plate Symposium 2008
Products

High-strength steels MAXIL®

• weight reduction combined with high lifting capacity


• reduction of expenses for the welding process
• high resistance against brittle fracture

MAXIL® 500, MAXIL® 620, MAXIL® 690, MAXIL® 890, MAXIL® 960, MAXIL® 1100

Firma, Abteilung, Folie 86,


(corresponding to the steel grades S 500 - S 1100)
Heavy Plate Symposium 2008
Products

Abrasion-Resistant Steels - BRINAR®

• increasing of the service life combined with good workability


• steady properties, low inner tension
• high dimensional accuracy, high flatness

Water-quenched
abrasion-resistant steels
BRINAR® 400
BRINAR® 450
BRINAR® 500

Chromium-alloyed
abrasion-resistant steels
BRINAR® 325 Cr
BRINAR® 400 Cr

Firma, Abteilung, Folie 87,


Heavy Plate Symposium 2008
Heavy Plates in Practice

Regenerative Energy Sources

• up till now delivered more than 660T t


plates (2008)
• steel grades S 235 - S 355 NL/ML
• thickness range 8 - 120 mm
• construction of more than 5,500 wind
mill towers, total capacity > 8,250 MW
• At wind force of 15 m/sec.
supply of 8 mill households

Firma, Abteilung, Folie 88,


Heavy Plate Symposium 2008
Quality Assurance & Approvals

1. Certified Integrated Management System according to ISO 9000:2000 /


ISO 14001:2004 / OHSAS 18001:2007 by Lloyds Register

2. Authorisation to perform testing and inspection without the attendance of


the Surveyor (ABS, BV, DNV, GL and LR)

3. Numerous product approvals (TÜV, Decreto Ministeriale)

4. Accreditation of the mechanical engineering laboratory

Firma, Abteilung, Folie 89,


Heavy Plate Symposium 2008
Integrated Management Certificate

Firma, Abteilung, Folie 90,


Heavy Plate Symposium 2008

Development,
Sales Policy
and
Customer Relationship

Firma, Abteilung, Folie 91,


Heavy Plate Symposium 2008
Sales Policy

- long term orientated


- reliable
- capacity and productivity related sales
- monitoring of >20 partial capacities
- continuous improvement of product mix
- risk limitation (10% Q+T, 10% wind industry, 10% pipe, 10% shipyard, …)
- management of payment terms
- analysis of margins per market, customer, sales person, …
- binding price and quantity management
- continuous, but careful improvement of customer structure

Firma, Abteilung, Folie 92,


Heavy Plate Symposium 2008
Regional Split of Sales

Strong German export


29 % 58 % tradition:

EU 27 - Indirect trade ex stocks

Germany - Machinery

Export - Heavy and special trucks


- Pipe
- Mining equipment
13 % - Vessels
- Yellow Goods

Germany biggest single market, but


indirect export and influence of global market

Firma, Abteilung, Folie 93,


Total Sales app. 771.115 t
(2007)
Heavy Plate Symposium 2008
Tonnage ASTM/ASME Development India

T
21.000 20.190

14.000

11.320

7.190
6.680
6.180
7.000

4.520 4.790
4.370
3.780
3.120 3.050

Firma, Abteilung, Folie 94,


0
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
Heavy Plate Symposium 2008

Thank you for your


attention!
attention!