b DG YARD 36.3m(L) x 5.5m(W) or 19.0m(L) x Open area Common for both Block-01 & 02
10.0m(W)
c DG PANEL ROOM 12.0m(L) x 5.0m(W) x 3.5m(H) Ground Floor Common for both Block-01 & 02
d HT Metering Panel 5.6m(L) x 5.2m(W) Open area
b Boiler Room 10m(L) x 9.9m(W) x4.2m(H) Basement Commomn for both Block-01 & 02
Sewage Treatment plant 27.5m(L) x 10m(W) x6m(H) Basement Commomn for both Block-01 & 02
c
Under Ground Tanks(2 days storage 200cum-1 no-Fire Tank Basement Commomn for both Block-01 & 02
is considered) 60cum-1no-Fire water curtain
75cum-2nos-Raw water tank
75cum-2nos-Treated water tank
d
e OHT 10cum-1no-Fire tank Terrace Block-01
5cum-1no -Domestic tank