MC150-4 TYPICAL INSTALLATION

MC150-4 FEATURES (genset 4) MAINS


The MC150-4 is a system controller S
designed to perform load related
functions on an isolated bus system (genset 3)
comprising two to four PCCP
controlled generators connected via
synchronising switchgear. Control
MC150-4 3
• Contact start.
• Ready To Load Status Output. Voltage & Current sensing
• 4 Stage Load Add/Shed Control. Control LOAD
• Load Demand Control. Interfacing and
MFSS
• System restart.
PCCP
• Digital multi-function metering (for paralleling)
for generator bus. Generator 2 4
• Annunciator with status / fault PERCENT LOAD

Non-Automatic

Warning
HERZ AC VOLTS PERC ENT AMPERES

Upper Scale

Lower Scale

LEDs. Shutdown

Paralleling Breaker

Closed
Voltage

3 ph 1 ph
Am ps

L1- L2 L1- L2 L1
L2 - L3 L1- L2 L2

• BMS interface (volt free signals).


L3 - L1

Open Self Test Panel Lam ps Phase Select

Run Off Auto Push For


Em ergency Stop

• Manual Control. 2
• Wall mount or free-standing. Generator 1
Load Share control
• Configurable for:
- Generator Demand Sequence and PERC ENT LOAD

N on-Autom atic
HERZ AC VOLTS PERCENT AMPERES

Upper Scale

timing. 1
Warning Low er Scale

Shutdow n
Voltage Am ps
Paralleling Breaker
3 ph 1 ph

- Load Add / Shed Sequence and


Closed L1- L2 L1- L2 L1
L2 - L3 L1- L2 L2
L3 - L1

Open Self Test Panel Lam ps Phase Select

timing.
Run Off Auto Push For
Emergency Stop

2
- Ready To Load status.
- Individual generator ratings. PCCP
- Number of generators (2-4). (for paralleling)

COMPONENTS REQUIRED: 1 Generator Common Bus Current Transformers to care of others (5A secondary *, class 1, 5VA nominal).
Generator Common Bus Potential Transformers to care of others (if required).
2 Generator Synchronising Switch-gear (controlled by PCCP).
3 Mains Sensing (contact signal required by MC150-4 to start generators, ie : PCL005).
4 Changeover Switchgear (ie: ATS).
* Note : 1A secondary Current Transformers may be used to reduce the burden requirements for long cable runs.