DW DEEP WELL DRILLING (LABOR ONLY) DW Mobilization of one drilling unit 1 ls DW Site Preparation and equipment setting 1 ls DW Drilling of pithole 200 m DW Geophysical Borehole Logging (Electric resistivity) 1 ls DW Water Conductivity Test 200 m DW Reaming of pilothole 200 m DW Installation of blank casing & screens 200 m DW Furnishing and installation of casing centralizer every 20m interval 10 pcs DW Furnishing and installation of gravel packing 150 m DW Development by backwashing 12 hrs DW Treatment of Well sodium hexametaphosphate 1 ls DW Development by high pressure water jetting 12 hrs DW Development by air-lifting 12 hrs DW Development by surging & bailing out of sediments 12 hrs DW Step-drawdown pumping test 8 hrs 4step @ 2hr/step DW Continuous constant discharge rate pumping test 72 hrs DW Furnishing and installation of local clay seal 1 ls DW Cement Grouting 50 m DW Furnishing and install well head cap, gravel fill pipe and water level sounding tube 1 ls DW Well Disinfection 1 ls DW Demobilization and cleanup of well site 1 ls