You are on page 1of 6

GROUP 5

- Abdul Hadi Iz’aan Bin Ibrahim


- Adriana Farniza Bt Pozi@Fauzi
- Muhammad Nazmi Aiman Bin Zulkaply
- Noor Fateen Nabiella Maulad Azemi
- Nur Kameelya Binti Kamaluddin

(C3)

In construction, each structure or building have specific type of structure system. It can
consist either only one type or combination.

i) Classify these three structures system.


ii) Choose one structure system and give three (3) of its typical deficiencies.

(C4)

Encik Mazlan has been involved in the construction industry for five years. He wanted to be a
Forensic Engineer after his final construction project has been handed to. To be a Forensic
Engineer, he must know the qualification needed for this profession. As his assistant, you
need to list down and explain the qualification so that Encik Mazlan can become one.
GROUP 6

KELVIN A/L PETER

MUHAMMAD NURAIMAN BIN MOHD HASSAN

ABDUL RASHID BIN AHMAD NASRI

NURUL IZLIN BINTI MAZLIN

NURUL SOFIYYAH BINTI MOHD YUSOFF

CHAPTER 1.

1. Rashid Developer Sdn. Bhd. hires Berjaya Maju Contractor for the construction of 20 unit
bungalow. During construction, Kelvin, a project manager responsible to manage the project
immediately stop the project due to some structural component that not achieved the standard
of building work in compliance with the Building Law.

Justify the process of development approval.

2. Ir. Izlin received a project tender to develop housing unit at Jalan Melati, Pagoh. Based on
your knowledge about building construction process, analyse the flow of process to develop
new project.
GROUP 7

NURHIDAYANA BT SHA’BAN AN150077

TUAN NUR FITRIYAH BT TUAN MANSOR AN150071

NOR MUHAMMAD BIN MAT SAAD AN150196

MUHAMMAD HAZIM BIN HALIB AN150210

MUHAMMAD SYUKRI BIN SHARIF AN150322

1)

Figure above shows a house was built near the big trees. As an engineer, analyse the issues
that will happen to the building before and after construction works. Demonstrate the suitable
solutions.

ANSWER:

Before After
Excavation activities may cause the soil loose Trees roots can grow into a building that
that can make the trees to collapse. interrupt the foundation and cause damage.
Solution: Solution:
The trees around the construction area should Barriers or deflectors can be installed to
be clearly cut. protect against damage to the foundation.
Then, the cutting trees must be transfer to
another site to prevent any settlement in the
future.
Tree collapse on top of the building.
Solution:
Set the applicable radius as safety factor.

2)

The diagram above shows a high rise building collapsed in a minute. As an engineer
investigate the causes of collapsed in a very short time and point out the standard guideline
for building construction.

Answer:

Causes of collapse:

1. Environmental effect (Natural disaster)


-Inappropriate design which not consider earthquake safety factor
-Neglect of maintenance
2. Structural failure
-Low quality material used
-Design fail
-Excessive loading versus design load
3. Soil movement
-Vibration effects by vehicles
-Effects of liquefaction underground
Guidelines:

GROUP 8
1. ‘IZZAT BIN ABDUL AZIZ (AN150060)
2. MUHAMMAD NAIM BIN MISDAN (AN150127)
3. ERNIKA BINTI TUKIMIN (AN150311)
4. NOOR AZLINA BINTI AKBAR (AN150167)
5. NORBALQIS MAYANGSARI BINTI MOHAMAD YUSRI (AN150403)

QUESTION

1. Project Life Cycle (PLC) is the series of phases that the project passes through from
its start to its completion. A typical PLC of developmental project comprise planning
phase, construction phase and post-construction phase.
a) List all person involve in preliminary meeting.
b) Consultant and contractor are involve in project development, anaylse the
difference between their roles.
2. Ilustrate and explain the project life cycle with the aid of diagram. (10m)

GROUP 9
Chapter 3

Question 1

A new building were built on a site in Cheras. The building were recently finished and ready
with all necessary equipment and furniture. The project were successfully handed over to the
client. After a couple of months, the building starts to have problems and begins to show sign
of defects. The walls and floors starts to sow some cracks, fissures and other fracture.

a. Sketch two (2) other common problem that can be found from the situation above. (2
marks)
b. Based on the picture above, list the causes for deterioration of concrete structure. (5
marks)
c. Based on your answer Q (b), point out how environmental can affect the building to
deterioration. (3 marks)
d. Based on the situation above, some of the building structure have been deteriorate due
to corrosion. Analyse how it corrosion can be happen. (6 marks)
e. Based on your answer Q (d), point out the possible decision can be made after finding
structure inadequate? (4 marks)

You might also like