Cooling Load Profile

for TRIMEX New Offices @ BPT-2


Boulevard Plaza Tower 1 & 2
Cooling Load Design
Compare to Load of Units Selected
Minimum Design Selection
Zone Type VAV FT2 TMBH CFM Btu cfm TMBH SMBH CFM Btu cfm ESP Petra Units Flow
# /ft2 /ft2 /ft2 /ft3 Pa Model TR Ltr/sec
Conference FCU-1 Non 473.44 29.3 947 61.9 2.0 36.3 27.5 1400 76.7 3.0 50 PDC-14 3.5 0.2275
Acc/Bala/Cr FCU-2 2-450-200 451.92 20.8 904 46.0 2.0 24.8 19 1000 54.9 2.2 75 PDC-10 2.5 0.18
Pr/SW/Reno FCU-3 2-340-370 269 20.9 538 77.7 2.0 24.8 19 1000 92.2 3.7 75 PDC-10 2.5 0.18
IT/Server FCU-4 Non 150.64 17.9 301 118.8 2.0 21.6 16 800 143.4 5.3 50 PDC-08 2 0.13
Admin/Sp/Tr FCU-5 2-350-300 774.72 31.8 1549 41.0 2.0 38 29.4 1600 49.0 2.1 50 PDC-16 4 0.26
Asst/Ex off-1 FCU-6 1-370 301.28 21.6 603 71.7 2.0 24.8 19 1000 82.3 3.3 50 PDC-10 2.5 0.18
Meet/Ex off-2 FCU-6' Non 318.496 26.4 637 82.9 2.0 32.9 24.6 1200 103.3 3.8 50 PDC-12 3 0.21
Reception FCU-7 Non 634.84 38.2 1270 60.2 2.0 38 29.4 1600 59.9 2.5 50 PDC-16 4 0.18
Chairman FCU-8 Non 344.32 35.3 689 102.5 2.0 38 29.4 1600 110.4 4.6 50 PDC-16 4 0.18
Ex.Mr/Dir FCU-9 2-850-1050 581.04 39.9 1162 68.7 2.0 38 29.4 1600 65.4 2.8 75 PDC-16 4 0.18
Lou/Meet. FCU-10 Non 559.52 26.3 1119 47.0 2.0 32.9 24.6 1200 58.8 2.1 75 PDC-12 3 0.21
Ex. Maglis FCU-11 Non 504.375 38.8 1009 76.9 2.0 38 29.4 1600 75.3 3.2 50 PDC-16 4 0.18
1072
Total 5363.59 347.2 2 388.1 2.2975
7

TR 28.9 TR 39.0 T.Flow

Selected Units are always exceed peak calculation. For example, a 3 TR fan coil unit will be
selected to deliver a capacity of 2.7 TR as the lower standard size (2.5 TR) cannot be selected
FCU-1
FCU-3 1000 1400
FCU-6 cfm 2.5 TR cfm
1000 cfm 3.5 TR
FCU-05
2.5 TR
FCU-06’ 1600 cfm FCU-2
1200 cfm 4 TR FCU-4
1000 cfm
3 TR 800 cfm
2.5 TR
2 TR

FCU-07
1600 cfm Units
4 TR
Distribution
1200 cfm-3 TR

FCU-08
FCU-11
1600 cfm
4 TR
1600 cfm
4 TR
FCU-11 39
1600 cfm
4 TR TR
3.5
2.5 2.5 TR
TR
TR
3 TR 2.5
4 TR 2 TR
TR
13.5
2 TR 22 TR; N
TR; +
W 2 TR 15 TR; S

3-TR
4 TR 4 TR
4 TR
Total Cooling Load Required: 26.69 TR
as Per Dubai Municipality Calculator
for the hall space as One Zone
TOTAL LOAD BTU/HR CFM
without Treated FA
Total Grand Load 320,312 Supply Air 13680
Total
259,928 Return Air 12712
Sensible Heat
Total
60,384 Out Door Air 968
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
26.69 49.61 2.12 1.64

Calculate the Cooling Load for each office/zone


individually is: 28.9, while when we calculate the hall
space found: 26.69 TR (That’s more accurate)
TR vs. Cooling Load Calculations at
more Scenario & Compare to Available
45

40

35

30

25

20

15

10

0
Total Selected Load Total Design Load/RM Total Design Load TDL-with Treated FA Max. TR for Given Flow

Given
• Total Calculated Cooling load for each Office individually
indicates that the peak load is 28.9 TR (2.735 Ltr/sec). While
Calculated Load for the hall area is: 26.69 TR (2.526 Ltr/sec)
TR Equipment has been selected In order to deliver the
proper sensible and latent load of all spaces. Due to
standardization of cooling equipment such as fan coils, it is
not possible to exactly match the cooling capacity of space
with the nominal capacity of the equipment. For example, a 3
TR fan coil unit will be selected to deliver a capacity of 2.7 TR
as the lower standard size (2.5 TR) cannot be selected.
Therefore, the total nominal capacity of the equipment used
is 39 TR (3.69 Ltr/sec).

Since available Flow is: 1.462 Ltr/sec and Selected Unit


Flow is: 3.69 Ltr/sec, while our Peak Flow is: 2.526,
both are more than given flow of 1.462 Ltr/sec
So Cooling at Peak Load is:

Not Okay When compare Maximum


Total Cooling Load Required: 19.05 TR
as Per Dubai Municipality Calculator
Considering that Fresh Air Supply is: 15’C
TOTAL LOAD BTU/HR CFM
with Treated FA
Total Grand Load 228,608 Supply Air 11301
Total
214,711 Return Air 11301
Sensible Heat
Total
13,897 Out Door Air
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
19.05 35.41 1.75 0.8012

Since specification is showing that FA-Fresh Air Supply


Temperature is: 15’C
Run DM-Calculator will lower Total Cooling Load to:
19.05 TR (1.803 Ltr/sec)
• If Building provided FA-Fresh Air at 15’C as per specification
the total Calculated Cooling Load will decrease to 19.05 TR
(1.803 Ltr/sec).
• To ensure FA efficiency will continually monitor the supplied
fresh air condition, and response accordingly:
• If RH% increased (More Latent Load) we’ll close the Actuator
of fresh air and extract.
• If temperature of FA increases will close both also to reduce
the load.
• When offices are vacant after working hours, we’ll close the
unnecessary fresh air and exhaust to reduce total heat load.

Since Maximum Cooling Load Flow is: 1.803 Ltr/sec (If we


controlled the FA-Condition), and since available Flow is: 1.462
Ltr/sec
We can’t get the Comfort Cooling unless we manage part load
condition
So Cooling at Peak Load is:

Not Okay Yet….


Total Cooling Load Required: 11.47 TR
as Per Dubai Municipality Calculator
Considering that Fresh Air Supply above: 15’C
West Zone
BTU/HR CFM
TOTAL LOAD with Treated FA
Total Grand Load 137,611 Supply Air 7029
Total
133,558 Return Air 7029
Sensible Heat
Total
4,053 Out Door Air
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
11.47 73.08 3.73 0.482

West Zone
BTU/HR CFM
TOTAL LOAD without Treated FA
Total Grand Load 172,918 Supply Air 7946
Total
150,967 Return Air 7573
Sensible Heat
Total
21,951 Out Door Air 373
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
14.41 91.83 4.22 0.606
Total Cooling Load Required: 6.08 TR
as Per Dubai Municipality Calculator
Considering that Fresh Air Supply is: 15’C
North Zone
BTU/HR CFM
TOTAL LOAD with Treated FA
Total Grand Load 72,998 Supply Air 3549
Total
67,440 Return Air 3549
Sensible Heat
Total
5,559 Out Door Air
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
6.08 28.27 1.37 0.256

North Zone
BTU/HR CFM
TOTAL LOAD without Treated FA
Total Grand Load 121,419 Supply Air 4806
Total
91,314 Return Air 4295
Sensible Heat
Total
30,104 Out Door Air 511
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
10.12 47.02 1.86 0.426
Total Cooling Load Required: 4.56 TR
as Per Dubai Municipality Calculator
Considering that Fresh Air Supply is: 15’C
South Zone
BTU/HR CFM
TOTAL LOAD with Treated FA
Total Grand Load 54,723 Supply Air 2655
Total
50,438 Return Air 2655
Sensible Heat
Total
4,285 Out Door Air
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
4.56 27.49 1.33 0.192

South Zone
BTU/HR CFM
TOTAL LOAD without Treated FA
Total Grand Load 92,047 Supply Air 3623
Total
68,842 Return Air 3229
Sensible Heat
Total
23,205 Out Door Air 394
Latent Heat
TONS BTU/HR.FT2 CFM/FT2 Flow L/sec
7.67 46.24 1.82 0.323
TRIMEX Orientation
3.5
2.5 2.5 TR
TR
TR
3 TR 2.5
4 TR 2 TR
2 TR TR
+
2 TR

3-TR
When
4 TR 4 TR Distribute
4 TR the Cooling
Load for
Zones
Office can be divided in to 3 Zones

11.47 6.08 TR; N


TR;
W 4.56 TR; S
TR vs. Cooling Load Calculations at
more Scenario & Compare to Available
45

40

35

30

25

20

15

10

0
Total Total Design Total Design TDL-with Max. TR for West Zone West Zone North Zone North Zone South Zone South Zone
Selected Load/RM Load Treated FA Given Flow with T.FA without T.FA with T.FA without T.FA with T.FA without T.FA
Load

Given
• West Zone needs 11.47 TR (1.36 Ltr/sec) at its peak around
4:00 P.M. (Assuming units are working at full capacity).
• While North Zone needs 6.08 TR (0.575 Ltr/sec) at its peak
(Knowing that north zone had the least heat load).
• While South Zone needs 4.56 TR (0.432 Ltr/sec) at its peak
around 12:00 P.M. (Knowing that north zone had the least
heat load).
• It is true that the total required Flow at Peaks (2.09 Ltr/sec) is
still exceeding the maximum given flow of (1.462 Ltr/sec)

To ensure closing the gab between


Available & Maximum Required Flow
we must test the part load scenario
Part Load Scenarios:

Okay
Peak of Heat Load
• Design & selection
of A/C system
depends on Peak
the Peak.
• Peak is at Hour
16:00 (4:00 P.M.)

Time 4 8 12 16 20 24
What do we mean by Diversity ?
Since the sun rays are not
direct on all the building
orientation at the same
time: The Peak can’t
happen at all zones at
the same time

While West side receiving


highest sun heat, North
& South Sides will
receive limited heat as
shown in the Curve
(Sample).
W

Please Note How


Peak Load Can’t
Occur at the Same
Time in all Zones

Conclusion: That S

Peak Load at any E


moment can’t the
sum of Peaks of
all zones.
• Total Heat Load at Peak can be: 11.5 TR (West) + 3 TR (North)
+ 2.5 TR (South)= 17 TR (1.609 Ltr/sec).
• This scenario close the gap between peak and maximum
available chilled water flow of: 14.5 TR (1.462 Ltr/sec).
• Keeping the FCUs at low set point from early morning to
achieve low set point of (20-22’C) before peak time of
4:00P.M., this will ensure that we required part flow to
maintain part load.

To ensure precious flow control that can meet the


required flow to maintain the instant flow at peak
we are going to fix
Dynaimc Flow Control Valves …. As follows:
Dynamic Flow Balancing Valves
• Dynamic Flow Valve is a Intelligent Valve-IPCV
combined pressure Independent Pressure
Balancing Control Valves
independent flow limiter and
control valve. The new and
innovative range of dynamic
balancing valves operates
independently of changes in
system pressure in water-
based cooling or heating
systems.
Dynamic can operate either as
an automatic flow limiter and
control valve or, alternatively
without the actuator, simply as
an automatic flow limiter.

This will reduce flow to half


More Control:

More Okay
• To higher Delta-T of flowing chilled water at TriMex Offices,
we design our piping system to connect both Supply & Return
in Common headers to divert the limited chilled water to
where it needs more.
• Selected FCUs are design for DC-Delta-T of 16’, by cycle the
water more than 10 times facing air, also by creating more coil
resisterant.
• Utilizing the benefits of eDPCV (Electronic Pressure
Differential Control Valve) will slow the water velocity to allow
crossed air to absorbe maximum cooling with least amount of
water.

This measure will benefit both


Tenant & Land Lord
eDPCV
Electronic Pressure Differential Control Valve
• eDPCV is simply a smart
Pressure Differential
Controller that will
create best pressure
conditions for
Modulating Control
Valves to work
according to actual
demand

This will allow Control Valves to reduce flow


to half
More Heat Rejection Methods:

More Reduction of HL
Fact:
CONDUCTION How heat is transferred

86% RADIATION

7%

100 % of Sun
Heat 7%
Load
CONVECTION
Existing Glass Showing Reflecting Film at
50% of the Glass
Using BTU/ft2 Meter
Electronic Pressure Differential Control Valve

More Heat Penetrate Through Clear Glass:


4 Times Compare to Reflecting Film
Convert Results to Percentage %

Setting Clear Glass as 100%, the Penetrate


through Reflecting Film is 26% Only
Since 6 TR of
Calculated Cooling
Load are to Cool the
Extra Heat Load from
Glasses & specially
the Clear Ones.
Better to
Reflect the
Direct Sun:
Utilize Films

Which Side
has the
Film??????
We Advice to Use
More Reflecting Films

Possible to use
Reflecting Film
that are Clear with
Maximum Light
Penetration While
Reflecting Max.
Heat
Best Film

Reject Heat & Visible Light Through


More Cooling Waste Refusing:

More Flow Management


Possible to Reduce Cooling Wastage at
Vacant Office by Occupancy Sensor

And Connect to Pre-Set Temperature that is


higher than Desire “Set-Temp.”
Offices
with more
occupants
facing
Difficult North
Side Back Offices (Less Load)
expected to need less
flow, away from
direct Sun.

Most Units Distribution


Important, Allow for better Flow
Most
Challenging Management by
Occupancy Sensors

Most
Challenging
Side
39
TR
More Accurate Calculation Methods:

LESS Cooling Load Req.


Using

For
more
Load
Analysis
& divide
for
more
zones
Without any load for Fresh Air, since Building
provide Fully Treated Fresh Air & Exhaust
Total Cooling
Load: 16.8 TR

Min
1.8 cfm/ft2
Summary:

And Final Conculsion


• Total Calculated Cooling load-by HAP- for each 5-Zones
indicates that the peak load is 16.8 TR (1.59 Ltr/sec).

Since available Flow is: 1.462 Ltr/sec and Selected Unit


Flow is: 3.69 Ltr/sec, while our Peak Flow is: 1.59, both
are more than given flow of 1.462 Ltr/sec

The Challenges will be:


• How to absorb maximum cooling out of limited Water.
• How manage effectively the limited cooling load capacity.
• How to reduce the unpleasant heat load without compromise
of awesome view.
• How to reduce waste cooling in vacant zones.
• How to monitor the fresh air condition to reduce heat load.
After Commissioning – ‫بعد التشغيل‬
Central HMI-Controller @ TriMex
Offices Layout Map-Touch Desire Zone
Functions that Can be Controlled & Monitored
Setting can
be Adjust as
per
personalized
comfort
Smart Thermostat Connected to Controller
Controller for Each FCU Connected to
Central Controller-HMI
12 Controllers are Connected to 12 A/C
Units
VAV Boxes for small offices. Allow
Independent Control
VAV Thermostat-Temporary

To be Replace with Original within 4-Weeks.


Flow Energy Meter
Showing Chilled Water
Optimization

Consumed Now-CH.W.Flow: 0.8 m3/h


=0.22 Ltr/Sec < 1.67 Ltr/sec Available
Delta-T Controller
Thank you! Looking forward to serve-U better
Eng. Juma Yousef Juma
CEO & Business Development Manager,
Getco Green Earth Technology Co. & Al-
Sadarah Engg.
Follow us for the latest news and information on
Solutions of HVAC Challenges.
jumayjuma@gmail.com
https://www.facebook.com/greenearthtechnologycompany/

https://www.facebook.com/groups/780970768708352/

www.alsadarah.net

https://www.linkedin.com/in/juma-yousef-j-saleh-
%D8%AC%D9%85%D8%B9%D8%A9-%D9%8A%D9%88%D8%B3%D9%81-
%D8%AC%D9%85%D8%B9%D8%A9-%D8%B5%D8%A7%D9%84%D8%AD-
9941b049/

You might also like