NOTES & SPECIFICATIONS: 1/4

50 SPANS OF 17500 EACH


TOTAL LENGTH C/C 927.500M 1. ALL THE DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METRES.
DRAWING RELEASED FOR CONSTRUCTION OF PIER 2. THE DRAWING IS NOT TO BE SCALED. WRITTEN DIMENSIONS SHALL ONLY BE
AND PIER FOUNDATION CONSIDERED.
3. THE QUALITY AND WORKMANSHIP OF CONCRETE SHALL CONFORM TO IS
456-2000.
17500 17500 17500 17500 17500 17500 17500 12200 4. QUALITY AND GRADING OF AGGREGATES SHALL CONFORM TO IS 383-1970.
5. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE RELEVENT

Km 32.771

Km 32.789

Km 32.806
Km 31.948

Km 31.966

Km 31.983
Km 31.931
B.I.S. OR EQUIVALENT STANDARDS WHERE SUCH STANDARDS ARE NOT
PRESCRIBED WITH B.I.S.
6. THE BACK FILLING SHALL BE DONE SIMULTANEOUSLY WITH THE RAISING
9150 20 TH EXPANSION
JOINT WITH PVC WATER STOP
AQUEDUCT TROUGH THE WALLS WITH THE SOIL OF Ø VALUE NOT LESS THAN 28°.
2-VENTS OF2.50X3.30 M EACH
TBL +336.362 TBL +335.986 7. 20 MM THICK EXPANSION JOINT WITH 300 MM WIDE PVC WATER STOP SHALL
SIDE SLOPE 1.5:1 SIDE SLOPE 1.5:1
CANAL FLOW CANAL FLOW BE PROVIDED BETWEEN THE RCC TROUGH SLAB AND TRANSITIONS, OVER
CBL +332.689 +332.687 +332.687 +332.676 +332.670 +332.405 +332.399 +332.393 +332.388 CBL +332.386
+528.286 PIERS IN RCC TROUGH SLAB AT THE JUNCTION OF SLABS AND ALSO
+331.337

VERTICALLY IN THE SIDE WALLS AND GAPS SHALL BE FILLED WITH


2500 2500 PREFORMED ASPHALTIC FILLER.
8.FOOT BRIDGE IS PROVIDED OVER RIGHT END BEAM OF TROUGH AQUEDUCT.
9. THE SBC OF FOUNDATION STRATA SHALL BE VERIFIED AGAINST THE DESIGN
STRESS BEFORE EXECUTION OF THE WORK BY CONDUCTING SUITABLE LOAD
AVG GL
ON HOLD
ON HOLD
BEARING TESTS AT EACH PIER AND ABUTMENT.
10. THE FOLLOWING ARE THE SPECIFICATIONS PROPOSED FOR THE VARIOUS
COMPONENTS OF THE STRUCTURE.

Sl.No DETAILS OF COMPONENTS AS PER IRC:6-2000 MAX.SIZE OF C.A


AS PER IS: 383
TBL +335.688
1 WEARING COAT OVER DECK SLAB CC M35 20 MM

7000
7000

TBL +335.989
2 SEALING COAT OVER TROUGH CC M35 20 MM
STREAM FLOW
BOTTOM SLAB.
3 TROUGH BOTTOM SLAB, SIDE WALLS RCC M30 20 MM
SIDE SLOPE 1.5:1 & ROAD BRIDGE SLAB

4950
4950

100 THICK LINING


FOR BED & SIDES
300 4 END BEAM RCC M30 20 MM
UPTO 10M
5 BEARING PEDESTALS RCC M35 12 MM

300 2500 300 2500 300

CANAL BED WIDTH


CANAL BED WIDTH

2500

2-VENTS OF2.50X3.30 M EACH


6 PIER BED BLOCK RCC M30 20 MM
300

CANAL FLOW CBL +332.689 900 900 900 900 900 900 CBL +332.388

6000
6000

L
7 PIER AND IT'S FOUNDATION RCC M25 20 MM
2500

8 CANAL TRANSITIONS CC M 15 40 MM
1200 1200 1200 1200 1200 1200
9 LEVELLING COURSE FOR PIER & CC M15 40 MM
300

100 THICK LINING


FOR BED & SIDES B B B B B B
CANAL TRANSITIONS

4950
4950

UPTO 10M
SIDE SLOPE 1.5:1

17500 17500 17500 17500 17500 17500


HYDRAULIC PARTICULARS @ FROM KM 31.925 TO KM 32.865 OF RIGHT MAIN CANAL:
TBL +335.688

4000
4000

TBL +335.989
Sl.No DESCRIPTION QUANTITY / UNITS
1 DISCHARGE (REQ) 15.855 CUMECS
ON HOLD 2 DISCHARGE (DES) 17.412 CUMECS
ON HOLD HALF PLAN AT BOTTOM AND HALF PLAN AT TOP 3 FULL SUPPLY DEPTH 2.550 m
4 BED WIDTH 6.00 M
5 FREE BOARD 0.750 m
6 VELOCITY 0.695 M/SEC
AVG GL 7 BED FALL 1 IN 6450
8 SIDE SLOPES 1.5:1
9 COEFF. OF RUGOCITY 0.025
10 CANAL BED LEVEL + 332.689 M / + 332.388 M
150 1500 150
20 TH EXPANSION 11 FULL SUPPLY LEVEL + 335.239 M / + 334.938 M
JOINT WITH PVC WATER STOP
FOOT BRIDGE 12 TOP OF BANK LEVEL + 335.989 M / + 335.688 M
13 TOP WIDTH OF BANKS (L/R) 7.000 m / 4.000 M

HYDRAULIC PARTICULARS OF VAGU:


Sl.No DESCRIPTION QUANTITY / UNITS
TROUGH SIDE WALL IN RCC M30
1 CATCHMENT AREA 26.960 SQ. KM
3340

2 MAXIMUM FLOOD DISCHARGE 197.586 CUMECS


550 300 2500 300 2500 300 550 3 DEEPEST BED LEVEL + 325.106 M
40 TH WEARING COAT
IN CC M35

CBL CBL SPECIAL NOTES


CBL CBL

250MM THICK RCC SLAB 250MM THICK RCC SLAB 100MM THICK FILLET 1. THIS DRAWING IS PREPARED BASED ON THE SITE SURVEY DETAILS
IN M30 GRADE IN M30 GRADE
FURNISHED BY CE (PROJECTS) , MAHABUBNAGAR THROUGH LR.NO.
600

PIER CAP IN RCC M25


PIER CAP IN RCC M25
CE(P)/MBNR/DEE1/AE7/P.99/600 DT:07-06-2018.
600

1050
2. THE PROJECT AUTHORITIES SHALL VERIFY THE PIER FOUNDATION LEVELS
PIER PEDESTAL
IN RCC M30 AND SUITABILITY OF THIS DRAWING WRT SITE CONDITIONS.
1800 450 2500 450 1800 3. SUITABLE PROVISIONS SHALL BE MADE BY PROJECT AUTHORITIES AS PER
SITE CONDITIONS FOR CONTINUATION OF INSPECTION PATH ACROSS THE
SURPLUS COURSE.

900 THK SOLID 900 THK SOLID


PIER IN RCC M25 PIER IN RCC M25

900
GOVERNMENT OF TELANGANA
IRRIGATION AND CAD DEPARTMENT
CENTRAL DESIGNS ORGANISATION, HYDERABAD
JAWAHAR LIFT IRRIGATION PROJECT
PACKAGE 99
AQUEDUCT AT KM. 31.925 ON RIGHT MAIN CANAL
GENERAL PLAN AND SECTIONAL ELEVATION

FOOTING FOOTING
IN RCC M25 IN RCC M25

B 100MM THICK LEVELLING COURSE


L 100MM THICK LEVELLING COURSE IN CC M15
REFER SEPERATE DRAWING FOR FOOTING SIZES IN CC M15

TYPICAL SECTION OF PIER 'PQ' TYPICAL CROSS SECTION OF PIER